Loading...
HomeMy WebLinkAbout20071668 Ver 1_Staff Comments_2008020707-1668 Lexington Plantation AML comments February 7, 2008 RETURN. In the December 11, 2007 Request for More Information on this project, the DWQ requested that you submit the following items: • Please provide the location of any proposed Stormwater management practices as required by GC3705. • Please provide plans and profiles for all the Stormwater management devices as required by GC3705, including all required supplement forms and Inspection and Maintenance agreements. • Please indicate all Stormwater inlets and outfalls on the site plan. The above information was not included in your resubmittal dated and received on January 9, 2007. Z. If you choose to reapply, please be aware that per GC 3705, this project must comply with Stormwater Management Plan (SMP) Requirements for Applicants Other Than the North Carolina Department of Transportation, available at: http://h2o.enr.state.nc.us/ncwetlands/documents/SM PRequirementsforApplicants otherthanNCDOT.pdf. Please include an SMP that removes a minimum of 85 percent TSS the Stormwater generated by this project. For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http:/ih2o.enr.state.nc.us/su/hmp fonns.htm.