HomeMy WebLinkAbout20160444 Ver 1_More Info Requested_20160514
Strickland, Bev
From:Scarbraugh, Anthony
Sent:Saturday, May 14, 2016 6:43 PM
To:Will Larsen (wlarsen@thewootencompany.com)
Subject:PCN and Buffer Authorization Application for New Regional Pump Station and
Collection System Rehabilitation (DWR Project no. 16-0444)
Mr. Larson,
Per the Buffer Interpretation/Clarification #2011-001 (Link Below), the installing of a new non-electric utility line within a
pre-established easement that does not currently contain a line within Zone 1 is allowable with mitigation. This Office
will be placing the project on hold until documentation from an appropriate mitigation bank or the NCDMS indicating
their willingness to accept your request to purchase buffer credit.
https://ncdenr.s3.amazonaws.com/s3fs-
public/Water%20Quality/Surface%20Water%20Protection/401/Buffer%20Clarification%20Memos/Utility-When-
Mitigation-Or-Notification-Required-20110203.pdf
Thanks,
Anthony Scarbraugh
Anthony Scarbraugh
Environmental Senior Specialist
Division of Water Resources – Water Quality Regional Operations
Department of Environmental Quality
252 948 3924 office
anthony.scarbraugh@ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
1