Loading...
HomeMy WebLinkAbout20140334 Ver 1_More Info Received_20160510 (24)JEFFERSON TODD HOPKINS& WIFE, MARY ANN HOPKINS PIN :8900-53-8916 D6:3557 PG:282 asm Z,+'N nmLL w6 d�v�mm +`•Zmm aZYvoo= Q� o r g .a Z0/ u 22 E 0' 20' 40' 60' (HORIZONTAL) 0' 5' 10' 15' (VERTICAL( 2+50 2+00 1+50 1+00 0+50 0+00 s o PREVENT OVERLAND SEDIMENT FROM REACHING E W EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. A' R V N 1. THE POND SHALL BE DEWATERED IN SUCH A MANNER TO PREVENT DOWNSTREAM 0 SEDIMENTATION. 2. THE POND SHALL BE DEWATERED PRIOR TO BREACHING USING PUMPS OR SIPHONS. 4.5 O ALTERNATIVE DEWATERING METHODS SHALL BE PRE -APPROVED BY THE ENGINEER. 3. BREACHING SHALL COMMENCE ONCE THE POND IS DEWATERED. 4. THE CONTRACTOR SHALL EXCAVATE THE DAM EMBANKMENT TO THE GRADES SHOWN ��++ ?-I f 1 u IN THE PLANS. STABLE SIDE SLOPES (2:1 MIN) SHALL BE MAINTAINED AT ALL TIME O EXISTING WATERLINE THROUGHOUTTHE BREACHING PROCESS. 4 5. EXCAVATED DAM EMBANKMENT MATERIAL SHALL BE STOCKPILED FOR FILLING IN OLD C�5 � CHANNELS ELSEWHERE IN THE PROJECT. POND BED SILT SHALL BE EXCAVATED AND / , O 0 SPREAD ON ADJACENT FIELDS AS DIRECTED BY THE ENGINEER AND LANDOWNER. rl 6. SUITABLE MATERIAL FROM THE DAM EMBANKMENT OR ELSEWHERE IN THE PROJECT 55 SHALL BE IMPORTED AND INSTALLED ALONG THE PROPOSED STREAM CORRIDOR TO THE PROPOSE BANKFULL ELEVATION. PR POSED GRADE 7. THE PROPOSED CHANNEL SHALL BE EXCAVATED AND BUILT WITHIN THE IMPORTED x SUITABLE MATERIAL. o � O U U 7 o 0 w U u 2+50 2+00 1+50 1+00 0+50 0+00 s o PREVENT OVERLAND SEDIMENT FROM REACHING E W EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. A' R V N 0 \ E ISTING GROUN 7 EXISTING WATERLINE 7 � � D / , REMOVE 2' TOP LAYEROFSILT-_/- 75 NDAMENDSOILWITH FILL D IRTo 55 PR POSED GRADE o 2+50 2+00 1+50 1+00 0+50 0+00 s o PREVENT OVERLAND SEDIMENT FROM REACHING E W EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. A' R V N