HomeMy WebLinkAbout20140334 Ver 1_More Info Received_20160510Ground Stabilization Requirements per NCG01 Site Area Description Stabilization Time Stabilization Time Frame Frame Exceptions Permimeter dikes, 7 days None swales, ditches and INSTALL GRAVEL CATTLIE FEEDING PAD. slopes _ SEE DETAIL 2, SHEET 5.12 REFRESH AND LEAVE CONSTRUCTION High Quality Water 7 days None (HQW) Zones FINISH GRADE AND SEED PA TURE Slopes Steeper than 7 days If slopes are 10' or less 3:1 -' BRE CH AN DRAIN POND PF length and are not steeper than 2:1, 14 days are allowed Slopes flatter than 14 days 7 days for slopes > 3:1 than 50' in length All other areas with 14 days None (except for slopes < 4:1 perimeters and HQW) Extensions of time may be approved by the permitting authority based on weather or other site-specific conditions that make compliance impracticable. REFRESH AND LEAVE CONSTRUCTION TO STRFIA[vl CONSTRUCTI o - - I STAGING/STOCKPI LE AREA 371 p SPREAD EXCAVATED POND MATERIAL AS DIRECTED 4.S - - _ WITHIN TEMPORARY CONSTRUCITON EASEMENT AREA. I IIc I I I /y� BREACH AND DRAIN POND PRIOR 40 STREAM CONSTRU ION. J I I II I I I I I I I I I I I I I 4.11 I2 °07/37 Q I I I AREA 4 Zo�9 I 4.9 °O%e/i0�4.10 0�1 r' D° O `L i9 +00 - �_1a5 Ig X \o FINISH GRADE AND SEED PASTURE - - AREAUPON DEMOBILIZATION. /\j I I ING/ST i KP\LE AREA aoi/3o1+ I I / I INSTALL GRAVEL CATTLE FEEDING L / PAD ALONG EXISTING FENCE. OL _ SEE DETAIL2/SSHHEET 5.12 `ID REIDS�I REFRESH AND LEAVE CONSTRUCTION ENTRANCE U_ PON DEMOBILIZATION\ J T \ I I \ &S29 PREVENT OVERLAND SEDIMENT FROM REACHING EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. f:FNIFR41 Mf1TFC 4.7 \� I 0' 300' 600' 900' I(HORIZONTAL) FRIENDSHIP CHURCH RD NQY I I I I I - I I I C o u TCEIL00 EXI ING GRAVEL DRIVEWYAY TO BE USED FOR CONSTRUCTION ACCESS. KEEP DRIVEWAY OPEN AND PASSABLE AT ALL TIMES FOR LAND OWNER. PROVI ANP AND S READ GRAVEL AND SMOOTH OUT DRIVEWAY UPON DEMOBILIZATION. I I I � �D0 I o 00J. JR` N c CONSTRUCTION TRAFFIC SHALIL STAYo° EXISTING ROCK PILE TO BE I / CLOSE TO EXISTING WO DLINE. USED FOR STREAM CONSTRUCTION. 4.6 > o o 4.2 STAGING/ TOCKPILE AREA, BORROW AREA, o AND CONSTRUCTION ROAD SHALL BE PREPARED 4 moo I o° 305100 0°■ AND SEEDED UPON DEMOBILIZATION. I `T'� CTAGING/STO�KPILE AREA - CY AREA 3 ISI CEILOD 4.5 POTENTIAL BORROW AREA OF( oa s I s1 i 4.3 I I 0 Y I AREA 2 I 4.4 1. ALL SEDIMENT AND EROSION CONTROL PRACTICES SHALL COMPLY WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 2. CONTRACTOR SHALL DISTURB ONLYAS MUCH CHANNEL BANK AS CAN BE STABILIZED WITH TEMPORARY SEEDING, MULCH, AND EROSION CONTROL MATTING BYTHE END OF EACH WORKDAY. 3. CONTRACTOR WILL INSTALL PUMP -AROUND SYSTEMS TO DIVERT FLOW WHILE WORKING IN LIVE, FLOWING CHANNELS. CONTRACTOR SHALL NOT REMOVE PUMP -AROUND SYSTEMS AND ADVANCE TO THE NEXT WORK AREA UNTIL THE CURRENT WORK.AREA IS COMPLETED AND STABILIZED. IF FLOWS NOT SUFFICIENTATTHE TIME OF CONSTRUCTION TO CAUSE SEDIMENTATION TO DOWNSTREAM WATERS, PUMP -AROUND OPERATIONS WILL NOT BE REQUIRED. IN THESE CASES, ROCK SILT CHECK DAMS WILL BE INSTALLED NEAR THE DOWNSTREAM EXTENT OF THE WORK AREA FOR THE CURRENT PHASE. CONTRACTOR SHALL TAKE MEASURES NECESSARY TO ENSURE THAT STORM FLOWS DO NOT DAMAGE WORK AREAS OR CREATE SEDIMENTATION OF AQUATIC HABITAT. 4. LOCATIONS FOR STAGING, STOCKPILE AREAS, AND STREAM CROSSINGS HAVE BEEN PROVIDED. ADDITIONAL OR ALTERNATIVE STAGING AND/OR STOCKPILE AREAS AND STREAM CROSSINGS MAY UTILIZED BY THE CONTRACTOR PROVIDED THAT ALL PRACTICES COMPLY WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND ARE APPROVED BY DESIGNER PRIOR TO IMPLEMENTATION. 5. VEGETATION LOCATED ON SITE TO BE USED AS TRANSPLANT MATERIAL (JUNCOS, ALDERS, SMALL TREES, AND SOD MATS) SHALL NOT BE DISTURBED UNTIL CONTRACTOR IS PREPARED TO INSTALL TRANSPLANTS. 6. CONTRACTOR SHALL NOT EXCEED THE LIMITS OF DISTURBANCE SHOWN ON THE PLANS. 7. VARIOUS TYPES OF CONSTRUCTED RIFFLES AND CASCADES ARE SPECIFIED ON THE PLANS. CONTRACTOR WILL BUILD THE SPECIFIC TYPES OF CONSTRUCTED RIFFLES AT LOCATIONS SHOWN ON THE PLANS. CHANGES IN TYPE MUST BE APPROVED BY THE DESIGNER. 8. TOPSOIL WILL BE HARVESTED TO THE EXTENT THAT IT IS ENCOUNTERED IN DEPTHS SUFFICIENT TO WARRANT THE EFFORT. CONTRACTOR WILL BE PAID ONCE TO HARVEST AND ONCE TO APPLY TOPSOIL. 9. FERTILIZER AND SOIL AMENDMENT IS DISCUSSED IN THE PERMANENT SEEDING SPECIFICATION. LIME AND FERTILIZER WILL BE APPLIED TO ASSIST WITH GRASS ESTABLISHMENT IN SOME OR ALL DISTURBED AREAS. THE LIMITS OF APPLICATION WILL BE DETERMINED BY THE DESIGNER IN THE FIELD. 10. LEAF LITTER WILL BE HARVESTED FORM ADJACENT WOODED AREAS AND APPLIED TO THE PROJECT SITE. THE CONTRACTOR WILL BE PAID BASED ON AREA OF COVERAGE. THE CONTRACTOR WILL BE EXPECTED TO HARVEST LEAF LITTER UNTIL SUPPLY HAS BEEN EXHAUSTED FROM REASONABLY ACCESSIBLE AREAS ADJACENT TO THE SITE. o� o 1.10 GF1 °oJl�3j AREA 1 I CE_ 4 30J I I I LU __1 I I I CONSTRUCTION SEQUENCE 1. THE CONTRACTOR SHALL COORDINATE WITH ENGINEER TO SETUP MEETING WITH REGIONAL (WINSTON-SALEM) NCDEQ OFFICE FOR PRE -CONSTRUCTION SEC MEETING. 2. CONTACT NORTH CAROLINA "ONE CALL" CENTER (1.800.632.4949) BEFORE ANY EXCAVATION. 3. MOBILIZE EQUIPMENT AND MATERIALS TO THE SITE. 4. IDENTIFY AND ESTABLISH CONSTRUCTION ENTRANCES STAGING AND STOCKPILE AREAS TEMPORARY ACCESS ROADS EROSION AND SEDIMENT CONTROL PRACTICES AND STREAM CROSSINGS AS INDICATED ON THE PLANS FOR WORK AREAS. 5. SET UP TEMPORARY FACILITIES, LOCATE EQUIPMENT WITHIN STAGING AREAS, AND STOCKPILE MATERIALS NEEDED FOR THE INITIAL STAGES OF CONSTRUCTION WITHIN STOCKPILE AREA(S). 6. INSTALL AND MAINTAIN ONSITE RAIN GAUGE AND LOG BOOKS FOR NPDES AND SEC PERMIT REQUIREMENTS. 7. CONSTRUCTION SEQUENCING SHALL BE DETERMINED BY THE CONTRACTOR AND THE CONTRACTOR SHALL PROVIDE A SCHEDULE TO THE ENGINEER PRIOR TO COMMENCEMENT. PONDS SHOULD BE BREACHED AND DRAINED PRIOR TO STREAM CONSTRUCTION THROUGH SILT BAGS. S. PERFORM ANY NECESSARY CLEARING AND GRUBBING IN PHASES AS WORK PROGRESSES. BANK VEGETATION AND VEGETATION IMMEDIATELY ADJACENT TO LIVE CHANNELS SHALL BE LEFT UNDISTURBED AS LONG AS POSSIBLE. 9. A PUMP -AROUND SYSTEM IS REQUIRED WHEN WORKING IN THE LIVE STREAM. INSTALL IMPERVIOUS DIKES AT UPSTREAM AND DOWNSTREAM ENDS OF PUMP -AROUND LOCATIONS. THE PUMP -AROUND OPERATION SHALL BE PERFORMED BETWEEN THESE DIKE LOCATIONS. 10. PERFORM EXCAVATION AND GRADING OF CHANNEL AND FLOODPLAIN. 11. STOCKPILE SOIL AS NECESSARY. ENSURE THAT EROSION AND SEDIMENT CONTROL PRACTICES ARE PROPERLY INSTALLED AND FUNCTIONING IN STOCKPILE AREAS AS SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN (SEC PLAN). 12. CONSTRUCT IN -STREAM STRUCTURES AND INSTALL RIFFLE AND CASCADE FEATURES ACCORDING TO PLANS, DETAILS, AND SPECIFICATIONS AS CONSTRUCTION PROGRESSES. 13. SEED AND/OR SOD, MAT, AND MULCH BANKS AND FLOODPLAIN AREAS ACCORDING TO PLANS AND DETAILS. 14. ONCE DISTURBED AREAS AND EXPOSED SLOPES ARE STABILIZED, REMOVE PUMP -AROUND SYSTEM, IF USED, AND PROGRESS TO THE NEXT PHASE. 15. BACKFILL ABANDONED CHANNEL SECTIONS WITH STOCKPILED SOIL. ALL NON-NATIVE, INVASIVE SPECIES SHALL BE TREATED AND/OR REMOVED FROM THE OLD CHANNEL PRIOR TO BACKFILLING, 16. SEED AND MULCH OR SOD ANY BACKFILL SECTIONS BEFORE PROCEEDING TO NEXT PHASE. 17. ONCE ALL PHASES OF CHANNEL, FLOODPLAIN, AND WETLAND CONSTRUCTION ARE COMPLETE, PREPARE THE FLOODPLAIN FOR PLANTING PER THE SPECIFICATIONS. 18. REMOVE TEMPORARY STREAM CROSSINGS, STOCKPILE AREAS, AND EROSION AND SEDIMENT CONTROL PRACTICES. 19. APPLY PERMANENT SEED, MULCH AND VEGETATION IN THE FLOODPLAIN. 20. ENSURE THAT THE SITE IS FREE OF TRASH, DEBRIS, AND ANY LEFTOVER CONSTRUCTION MATERIALS PRIOR TO DEMOBILIZATION. 21. DEMOBILIZE GRADING EQUIPMENT FROM THE SITE. 22. SEED, MULCH AND STABILIZE STAGING AREAS AND STOCKPILE AREAS. 23. DEMOBILIZE ALL EQUIPMENT, OFFICES, BUILDINGS, AND OTHER FACILITIES ASSEMBLED ON THE SITE. 20�OF�,SS/p�fy .4 SEAL k-- 0 2,9 3 -•0293 s EN ENTRANCE UPON DEMOBILIZATION. FINI5H GRADEAFID SEEDASP TURF AREA UPON D/EYOBILIZATION. INSTALL GRAVEL CATTLIE FEEDING PAD. _ SEE DETAIL 2, SHEET 5.12 REFRESH AND LEAVE CONSTRUCTION SPREAD EXCAVATED POND MATERIAL IN LOW AREA. - ENTRANCE UPON DEMOS LIZATION. FINISH GRADE AND SEED PA TURE - AREA UPON DEMOBILIZATION. _J -' BRE CH AN DRAIN POND PF TO STRFIA[vl CONSTRUCTI o - - I STAGING/STOCKPI LE AREA 371 p SPREAD EXCAVATED POND MATERIAL AS DIRECTED 4.S - - _ WITHIN TEMPORARY CONSTRUCITON EASEMENT AREA. I IIc I I I /y� BREACH AND DRAIN POND PRIOR 40 STREAM CONSTRU ION. J I I II I I I I I I I I I I I I I 4.11 I2 °07/37 Q I I I AREA 4 Zo�9 I 4.9 °O%e/i0�4.10 0�1 r' D° O `L i9 +00 - �_1a5 Ig X \o FINISH GRADE AND SEED PASTURE - - AREAUPON DEMOBILIZATION. /\j I I ING/ST i KP\LE AREA aoi/3o1+ I I / I INSTALL GRAVEL CATTLE FEEDING L / PAD ALONG EXISTING FENCE. OL _ SEE DETAIL2/SSHHEET 5.12 `ID REIDS�I REFRESH AND LEAVE CONSTRUCTION ENTRANCE U_ PON DEMOBILIZATION\ J T \ I I \ &S29 PREVENT OVERLAND SEDIMENT FROM REACHING EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. f:FNIFR41 Mf1TFC 4.7 \� I 0' 300' 600' 900' I(HORIZONTAL) FRIENDSHIP CHURCH RD NQY I I I I I - I I I C o u TCEIL00 EXI ING GRAVEL DRIVEWYAY TO BE USED FOR CONSTRUCTION ACCESS. KEEP DRIVEWAY OPEN AND PASSABLE AT ALL TIMES FOR LAND OWNER. PROVI ANP AND S READ GRAVEL AND SMOOTH OUT DRIVEWAY UPON DEMOBILIZATION. I I I � �D0 I o 00J. JR` N c CONSTRUCTION TRAFFIC SHALIL STAYo° EXISTING ROCK PILE TO BE I / CLOSE TO EXISTING WO DLINE. USED FOR STREAM CONSTRUCTION. 4.6 > o o 4.2 STAGING/ TOCKPILE AREA, BORROW AREA, o AND CONSTRUCTION ROAD SHALL BE PREPARED 4 moo I o° 305100 0°■ AND SEEDED UPON DEMOBILIZATION. I `T'� CTAGING/STO�KPILE AREA - CY AREA 3 ISI CEILOD 4.5 POTENTIAL BORROW AREA OF( oa s I s1 i 4.3 I I 0 Y I AREA 2 I 4.4 1. ALL SEDIMENT AND EROSION CONTROL PRACTICES SHALL COMPLY WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 2. CONTRACTOR SHALL DISTURB ONLYAS MUCH CHANNEL BANK AS CAN BE STABILIZED WITH TEMPORARY SEEDING, MULCH, AND EROSION CONTROL MATTING BYTHE END OF EACH WORKDAY. 3. CONTRACTOR WILL INSTALL PUMP -AROUND SYSTEMS TO DIVERT FLOW WHILE WORKING IN LIVE, FLOWING CHANNELS. CONTRACTOR SHALL NOT REMOVE PUMP -AROUND SYSTEMS AND ADVANCE TO THE NEXT WORK AREA UNTIL THE CURRENT WORK.AREA IS COMPLETED AND STABILIZED. IF FLOWS NOT SUFFICIENTATTHE TIME OF CONSTRUCTION TO CAUSE SEDIMENTATION TO DOWNSTREAM WATERS, PUMP -AROUND OPERATIONS WILL NOT BE REQUIRED. IN THESE CASES, ROCK SILT CHECK DAMS WILL BE INSTALLED NEAR THE DOWNSTREAM EXTENT OF THE WORK AREA FOR THE CURRENT PHASE. CONTRACTOR SHALL TAKE MEASURES NECESSARY TO ENSURE THAT STORM FLOWS DO NOT DAMAGE WORK AREAS OR CREATE SEDIMENTATION OF AQUATIC HABITAT. 4. LOCATIONS FOR STAGING, STOCKPILE AREAS, AND STREAM CROSSINGS HAVE BEEN PROVIDED. ADDITIONAL OR ALTERNATIVE STAGING AND/OR STOCKPILE AREAS AND STREAM CROSSINGS MAY UTILIZED BY THE CONTRACTOR PROVIDED THAT ALL PRACTICES COMPLY WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND ARE APPROVED BY DESIGNER PRIOR TO IMPLEMENTATION. 5. VEGETATION LOCATED ON SITE TO BE USED AS TRANSPLANT MATERIAL (JUNCOS, ALDERS, SMALL TREES, AND SOD MATS) SHALL NOT BE DISTURBED UNTIL CONTRACTOR IS PREPARED TO INSTALL TRANSPLANTS. 6. CONTRACTOR SHALL NOT EXCEED THE LIMITS OF DISTURBANCE SHOWN ON THE PLANS. 7. VARIOUS TYPES OF CONSTRUCTED RIFFLES AND CASCADES ARE SPECIFIED ON THE PLANS. CONTRACTOR WILL BUILD THE SPECIFIC TYPES OF CONSTRUCTED RIFFLES AT LOCATIONS SHOWN ON THE PLANS. CHANGES IN TYPE MUST BE APPROVED BY THE DESIGNER. 8. TOPSOIL WILL BE HARVESTED TO THE EXTENT THAT IT IS ENCOUNTERED IN DEPTHS SUFFICIENT TO WARRANT THE EFFORT. CONTRACTOR WILL BE PAID ONCE TO HARVEST AND ONCE TO APPLY TOPSOIL. 9. FERTILIZER AND SOIL AMENDMENT IS DISCUSSED IN THE PERMANENT SEEDING SPECIFICATION. LIME AND FERTILIZER WILL BE APPLIED TO ASSIST WITH GRASS ESTABLISHMENT IN SOME OR ALL DISTURBED AREAS. THE LIMITS OF APPLICATION WILL BE DETERMINED BY THE DESIGNER IN THE FIELD. 10. LEAF LITTER WILL BE HARVESTED FORM ADJACENT WOODED AREAS AND APPLIED TO THE PROJECT SITE. THE CONTRACTOR WILL BE PAID BASED ON AREA OF COVERAGE. THE CONTRACTOR WILL BE EXPECTED TO HARVEST LEAF LITTER UNTIL SUPPLY HAS BEEN EXHAUSTED FROM REASONABLY ACCESSIBLE AREAS ADJACENT TO THE SITE. o� o 1.10 GF1 °oJl�3j AREA 1 I CE_ 4 30J I I I LU __1 I I I CONSTRUCTION SEQUENCE 1. THE CONTRACTOR SHALL COORDINATE WITH ENGINEER TO SETUP MEETING WITH REGIONAL (WINSTON-SALEM) NCDEQ OFFICE FOR PRE -CONSTRUCTION SEC MEETING. 2. CONTACT NORTH CAROLINA "ONE CALL" CENTER (1.800.632.4949) BEFORE ANY EXCAVATION. 3. MOBILIZE EQUIPMENT AND MATERIALS TO THE SITE. 4. IDENTIFY AND ESTABLISH CONSTRUCTION ENTRANCES STAGING AND STOCKPILE AREAS TEMPORARY ACCESS ROADS EROSION AND SEDIMENT CONTROL PRACTICES AND STREAM CROSSINGS AS INDICATED ON THE PLANS FOR WORK AREAS. 5. SET UP TEMPORARY FACILITIES, LOCATE EQUIPMENT WITHIN STAGING AREAS, AND STOCKPILE MATERIALS NEEDED FOR THE INITIAL STAGES OF CONSTRUCTION WITHIN STOCKPILE AREA(S). 6. INSTALL AND MAINTAIN ONSITE RAIN GAUGE AND LOG BOOKS FOR NPDES AND SEC PERMIT REQUIREMENTS. 7. CONSTRUCTION SEQUENCING SHALL BE DETERMINED BY THE CONTRACTOR AND THE CONTRACTOR SHALL PROVIDE A SCHEDULE TO THE ENGINEER PRIOR TO COMMENCEMENT. PONDS SHOULD BE BREACHED AND DRAINED PRIOR TO STREAM CONSTRUCTION THROUGH SILT BAGS. S. PERFORM ANY NECESSARY CLEARING AND GRUBBING IN PHASES AS WORK PROGRESSES. BANK VEGETATION AND VEGETATION IMMEDIATELY ADJACENT TO LIVE CHANNELS SHALL BE LEFT UNDISTURBED AS LONG AS POSSIBLE. 9. A PUMP -AROUND SYSTEM IS REQUIRED WHEN WORKING IN THE LIVE STREAM. INSTALL IMPERVIOUS DIKES AT UPSTREAM AND DOWNSTREAM ENDS OF PUMP -AROUND LOCATIONS. THE PUMP -AROUND OPERATION SHALL BE PERFORMED BETWEEN THESE DIKE LOCATIONS. 10. PERFORM EXCAVATION AND GRADING OF CHANNEL AND FLOODPLAIN. 11. STOCKPILE SOIL AS NECESSARY. ENSURE THAT EROSION AND SEDIMENT CONTROL PRACTICES ARE PROPERLY INSTALLED AND FUNCTIONING IN STOCKPILE AREAS AS SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN (SEC PLAN). 12. CONSTRUCT IN -STREAM STRUCTURES AND INSTALL RIFFLE AND CASCADE FEATURES ACCORDING TO PLANS, DETAILS, AND SPECIFICATIONS AS CONSTRUCTION PROGRESSES. 13. SEED AND/OR SOD, MAT, AND MULCH BANKS AND FLOODPLAIN AREAS ACCORDING TO PLANS AND DETAILS. 14. ONCE DISTURBED AREAS AND EXPOSED SLOPES ARE STABILIZED, REMOVE PUMP -AROUND SYSTEM, IF USED, AND PROGRESS TO THE NEXT PHASE. 15. BACKFILL ABANDONED CHANNEL SECTIONS WITH STOCKPILED SOIL. ALL NON-NATIVE, INVASIVE SPECIES SHALL BE TREATED AND/OR REMOVED FROM THE OLD CHANNEL PRIOR TO BACKFILLING, 16. SEED AND MULCH OR SOD ANY BACKFILL SECTIONS BEFORE PROCEEDING TO NEXT PHASE. 17. ONCE ALL PHASES OF CHANNEL, FLOODPLAIN, AND WETLAND CONSTRUCTION ARE COMPLETE, PREPARE THE FLOODPLAIN FOR PLANTING PER THE SPECIFICATIONS. 18. REMOVE TEMPORARY STREAM CROSSINGS, STOCKPILE AREAS, AND EROSION AND SEDIMENT CONTROL PRACTICES. 19. APPLY PERMANENT SEED, MULCH AND VEGETATION IN THE FLOODPLAIN. 20. ENSURE THAT THE SITE IS FREE OF TRASH, DEBRIS, AND ANY LEFTOVER CONSTRUCTION MATERIALS PRIOR TO DEMOBILIZATION. 21. DEMOBILIZE GRADING EQUIPMENT FROM THE SITE. 22. SEED, MULCH AND STABILIZE STAGING AREAS AND STOCKPILE AREAS. 23. DEMOBILIZE ALL EQUIPMENT, OFFICES, BUILDINGS, AND OTHER FACILITIES ASSEMBLED ON THE SITE. 20�OF�,SS/p�fy .4 SEAL k-- 0 2,9 3 -•0293 s EN o i m i c nLC: 70-ri0n ��\°v I REF:DB:3222PG:644 STREAMS6 IMPACT ID #S24 SEE VERNAL POOL DETAIL SHEET5.6-1 -/-/ WETLAND BB ` °f• I-.' TEMPORARY STREAM I / CROSSING (TYP) CONSTRUCTION TRAFFIC SHALL STAY TABLE 1-1 CT CLOSE TO E))JSTING WOODLINE. BRYAN DAVID HOPKINS o° r PIN:8900-51-5378 & ESTATE FILE: 13-E-2589 \XISTING REF:DB:1826 PG:75 ROCK PILE TO BE /- o USED FOR STREAM CONSTRUCTION. (REMAINING PORTION OF) °°lh° NO GRADING IN THIS AREA. REMOVE • `ov ROCKS WITHOUT CHANGING TOPOGRAPHY. �e1 _ WETLAND CC e I cEl�o J� DARIN W. CARR & I = �l0s+00 — r i� IMPACT ID #W17c��`-Ov I WIFE, TAMELA P. CARR- PIN:8900-52-0126 i D13:7310 PG:3064 0--®® _, Q 0�o° STREAM S7 IMPACT ID #S25 1SEE VERNAL POOL o `{ NANCY BRAY PIN:8900-50-2413 0 DETAIL 3, SHEET 5.6 DB:4552 PG:2029 STREAM S8 e - • • P13:168 PG:103 (LOT 2) �' IMPACT ID #S26 1-2 i �QOI/371�0°l/3J1�QOl/3J1��OOl/3J1�0°l/3J1�QOl/3J1J SEE VERNAL POOL °o'� m • // / I I DETAIL 3, SHEET 5.6 � 00 / 110 0' 50' 100' 150' O q i - °° � I I HAUL ROUTE (TYP) ® � I e e • �I VIRGINIA8 9- 9 7407 ER PIN: e` • ESTATE FILE: 95-E-1675 /• ®i REF:D8:3222 PG:646 a. � v I F Gil\O / I il�Ov I 71, • WETLAND FF IMPACT ID #W19 I I I I I I I I I CES CE CE -- --------- -- F PREVENT OVERLAND SEDIMENT FROM REACHING EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. Z Z«r00i nim++" 11 +`•Zmm w ~ -N n v ~Zour2E W~ LL 1 1N CARO// 20�OF�,SS/p�fy 4 SEAL �• _ ' 0293 ' o I _ fa� �zcE`O�p�STAGING/ST/OCKPILE AREA, BORROW AREA, AND CONSTRUCTION ROAD SHALL BE PREPARED AND SEEDED UPON DEMOBILIZATION. i - r HAUL ROUTE (TYP) °'110- - w _ CIO - o I 0 f' I WETLAND DD o ��') - g,IMPACTID#W18 _ -- --- — — — -- - - TEMPORARY STREAM h0 CROSSING (TYP) . , _ - . -��✓ o o ° �la� o rho -• _ ��� - — - - _ i '°o0/30 1 cE �� CE �. _.o,cl�,00 I / \x1 = CE S s/_ WETLAND EE J -3 i c01011 / o I \i3 e r"1`O o' so' loo lso, 1 .c ® �- _ (HOPRONTAL) c oo WETLAND IMPACT ID #W19 S� 5 r1-4' Op BRYAN DAVID HOPKINS --®aoiW' -- - cF • �� - PIN:8900 51 5378 0o0/30 o BOO °plea ESTATE FILE: 13-E-2589 ao� REF.D8.1826PG.75 _"--------- _-- vola (REMAINING PORTION OF) o � I'� g • 6NII.o �� �p0 o - y' �� °07�sJ ° • _� — ---_ _ -- eo UJgoo e r DARIN W. CARR & foo o v A -�� -- • _� g i r PIN:8900-52-0126 I D6:7310 PG:3064 WIFE, TAMELA P. CARR c I I ---------CEAoo 0 6 0 \ I 0 ® J PREVENT OVERLAND SEDIMENT FROM REACHING EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. ZG�r�i vaioo dZ r�nm 6 K W V N M° bzmmZ -n egg c Q ZZs .aZourLLE :4 SEAL �• _ ' 0293 ' I I I o � 11 HERBERT WALLACE HOPKINS & SPOUSE, MARJORIE HOPKINS • �' o I PIN:8900-53-3395 - - - - - DB:3654 PG:306 Io— I ' 1-7 e I I 1.5 I � I I I •, • I JOE W. HOPKINS & WIFE, .1 I LISA RICH HOPKINS PIN:8900-42-8870 ® Y DB:3502 PG:1633 ® • • W �W )J i WETLAND I • U IMPACT ID ID #W16 • • , r— °oio ��• �� �. • 001-11 ^fin o0 / 00 • � • • 1 1 •, ooA---------- 6 500.00 ---- - 500+00 o -- --- A I • • �,J o'i11 • e •; • • - °°,h� / -- •1 ID • 1 5 old ` � I i° � • + a ZU'�ry noo • Rjrcwumni6 ' • e aZour,iE „r CA I m 20�OFgSS/Oyyy'��� :4 SEAL • _ 0293 m • 0' 50' 100' 150 (HORIZONTAL) o N • O n 0 • �� • UT3 \ I • �� •• SILT FENCE':/(TYP) WETLAND JJ 0 00 s e e I iLL I � o • '----� - •• � •; ��� � I - � / ��� � -- � pO�I-4 � • • .' - - e,-.•. � POTENTIAL BORROW A +/A � rc • /i e c • o -- ' 001-6 • • \cert° � • ST A S - - - — eB- - - --� •' I L �� �• IMPACT ID#S23 • / CON" SEE VERNAL POOL cpjtoD • •el�� • J - - �n i DETAIL 3, SHEET 5.6 - cE— -- -,,, �� -_ • • cel ° �_• I �' � � - �� - - , - - •�� rbo / COLOD ow, cp ® o / WETLAND EE CEILOD I o i I DARIN W. CARR & WIFE, TAMELA P. CARR • I PIN:8900-52-0126 o DB:7310 PG:3064 TCE/LOD—TC(TCE/IbO�TCE/l0, I / I o REACHING EXISTING/PROPOSED STREAM. ADD ADEQUATE (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. O 10, ;-4 O U U �>, ''o 0 O U� �.J U � 1 � 1 \ I I I I I 1 I 1 I m p 1 I %^ � M H Z W l� t�+f 0 W1JmM0 i � Zc inn v o° Zvizr.i E DAVID ELMO CHRISMON PIN:8900-55-2557 0 ESTATE FILE: 05-E-941 REF:DB:188 PG:532 $ •1 ®1� (REMAINING PORTION OF) i �11UIIIIII�gy CARS I •� � °° 20 oFE§sioyy�% J I 50, 100, 150 = . 4 q SEA JEFFERSON TODDHOPKINS& _ 4029 WIFE, WIFE, MARYANN HOPKINS owl��,Au P 8:3557 PG 8 826 I � ``� HERBERT WALLACE HOPKINS & SPOUSE, MARJORIE HOPKINS �� • PIN:8900-53-3395 • • \ DB:3654 PG:306 • N/EILANDT • - �— SAF • ��e� •' • SPF �SP • //� • —�I _1� o /--1 --� � 0ao7/3o 0 001133 3 00V33 001. D aolA� 33 007/33 - _ • _ 4,a07 � -. 1007/30 -_- H 0011 2-3 �` • 007/3.) U _ � • � � � - • o �1 �• - � � ��'�� I ® 0 WETLAND T'07iaD -��- � $--4 D IMPACT ID #W15 oo - -- - �II ( { { 1 • 1/33 II --- 1 X • I • X \• Y� • y ++ u 4-� i • cr '/, ; / CANDY CREEK�3s o - -_ ;A' - o NOD ° \ • ill • u cH�OD CE/t00 �� - - _® r • r _ �I - U OF/(oD 1.00 cE/100' cI ® • • • / / � o CEO• I CEILOD CEI FA00 • 1 _ __ _ • \. D --_ CE/loD ` • 1 w� 1}i CE/(00 CEIIOD • • 4JEA0 H �- 2-1, • 1 •�/�' °°/// --- - a c� 007/ 00 , Ce/too c I s o u J PREVENT OVERLAND SEDIMENT FROM REACHING E W EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. A / e 1H3 OE/l/3� OER/3}�-00'+/3}'�-OON3J 901{33 e/. UT2A 61 %d/ BREACH AND DRAIN POND PRIOR i TO STREAM CONSTRUCTION. ETLAND KK WETLAND U � IMPACT ID #W11 #W20 PACT ID 371 F -4 CEAOD- CEAOD -TEMPORARYSTREA / CROSSING (TYP)P) e � UT MoD POND 2 IMPACT ID #02 e • �TCE/LDD�rrcn HAUL ROUTE (TYP) REFRESH AND LEAVE CONSTRUCTION ENTRANCE — — _ UPON DEMOBILIZATION. E _OD'TCE/LOD-TCE/LODF/Inn�r�� ._ SPREAD EXCAVATED POND MATERIAL IN LOW AREA. INSTALL GRAVEL CATTLE FEEDING PAD. SEE DETAIL 2, SHEET 5.12 FINISH GRADE AND SEED PASTURE AREA UPON DEMOBILIZATION. WETLANDX '3l, 37-37-37-37-37-37-37 2i 3J-37-33 UT2B I ds � ,00 6Iv J I � WETLAND W I ° ------ \ 9 CHLO CE/LOD -ri CE/LOD IMPACT IDD #W13 cE/fou-=� cE/Loo cE�oD \e1L05 WETLAND Y &ID#W12 ° WETLAND - 11 JEFFERSON TODD HOPKINS& WIFE, MARY ANN HOPKINS PIN:8900-53-8916 DB:3557 PG:282 Fa o�� 2-5 N I - � a - e - -- .� - � I \ 0p7/3J CP 007/3) HERBERT WALLACE HOPKINS & SPOUSE, MARJORIE HOPKINS PIN:8900-53-3395 DB:3654 PG:306 /oO oo Moi o0 e c A`14 eO� O C.EI\O TCEILCD- 2� pFE.SS/pyf-s•; _TCE1Lo0� = :qT SEAL TCEILOD 0293 •. • ` IN O o U 00 x 0' 50, 100, 150, O (HORIZONTAL) U U N O U� u s o PREVENT OVERLAND SEDIMENT FROM REACHING E W EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. A ' 21212 V I O \ 1 I _ 1"V 1 1 o � ' X DAVID ELMO CHRISMON PIN:8900-55-2557 8 ESTATE FILE: 05-E-941 REF:DB:188 PG:532 0_; i 1' ____ �OBy sy00s��b (REMAINING PORTION OF) ° ® 69 OJ �Od ° \ WETLAND Q IMPACT ID #W8 & #W9 \ f UT1 C 01-11 J \\ F s J 3-2 e / I k J 00, ce 3-1 J CE \ ( 1 I O K., jd5 o° WETLAND o'► CE - S. �/ CE -X5 CE -XS I 1 �L V� O° °° • 00 ' • I i Al 0 i I � �.1 \II TEMPORARY STREAM CROSSING (TYP) -WETLAND P ANDY CREEK \ e cF��OS CROS e© o 0 CE/LOD fe/LOD ® CE/LOD CE/LDD BRUCE H. CHRISMON & WIFE MARGIE LONG CHRISMON PIN:8900-44-7926 DB:6156 PG:1053 PB:102 PG. -52 I I I a' so' 100 150, (HORIZON—) I I I Z e CE/LOD I I SILT FENCE (TVP) e I � e 1 1 � I I WETLAND S r 1 '\rI O ` cel�pO STREAM S4 i I I I PREVENT OVERLAND SEDIMENT FROM REACHING EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. M z�Y��oo w6 d�v�mm bzmm aZYvoo= g11g .4 z . LL E � LL STAGING/STOCKPILE ARF" SPREAD EXCAVATED POND MATERIAL AS DIRECTED WITHIN TEMPORARY CONSTRUCITON EASEMENT AREA. BREACH AND DRAIN POND PRIOR TO STREAM CONSTRUCTION. 0 p'/3j aQ a� s • s P� � jtl. N • OOH j3j ® 001z 160,()0 \`fl r I \ N • QO °°a 1 `• • _ I `Oo � ° s s ° •� __ SILT FENCE (TYP) zr �'✓ x�0 s ° _._•_--_ / gel o0 OND 1 91) o IMPACT ID#O1 WETLAND R MPACTID#W10 • �` / cEi�oo . • �'' � , ceM1pO r�cels o0 ,/ rL� � • , � 7 , ' r cel oo DAVID ELMO CHRISMON PIN:8900-55-2557 ESTATE FILE: 05-E-941 • REF:DB:188 PG:532 (REMAINING PORTION OF) UT1 C `f/ r + 1 • N � � O / - Y��O • 0 L`f�VO01\� •�' • \ O ° • -.250+00 a y FINISH GRAD AREA UPON DEMOBILIZATION. REFRESH AND LEAVE CONSTRUCTION ENTRANCE UPON DEMOBILIZATION. 100' 150' HORIZONTAL) PREVENT OVERLAND SEDIMENT FROM REACHING EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. Z«r00i nim++" d K W V m N O +`•Zmm w aZYvoo= ��nrw ~ZouriE W~ LL N CAR���,� _� 2� pFE,SS/pyf-y :4- SEAL 9�' — ? 0293 ` IN soQ�W looff / • 11 � f i ;,��� I _ / � r i (�\ I p jI I o �• I I • p0 I /N I I 09 JEFFERSON T. HOPKINS & m' • f • o' 50' 100, 150' WIFE MARYANN HOPKINS 00 Ixoarzorvrnq PIN:6900-46-6427 / • ' DB:4057 PG:1613 • • (REMAINING PORTION OF) Ip° WETLAND K 1�- __-- //. ,/ • WETLAND) �• a° •, /— — ' O— ——�• — — — — — — — — oo. •� ;0 0 5 i i Ii i a i i i i - .. • - / WETLAND MM pd�s • - -� _ �s a �. IMPACT ID #W21 o bpi ti • v WETLAND L \ IWETLAND I I Via° o° I ,00 i i� •• , - o� � � I � 5 ,iii • � Eoo /., I I I FW s sk • �� �- I i Q r -ray • / � -- I �i 0 nc-�A s� 9v ' oll < —GE/L9D — — :°4 SEAL 0293 ' �i�9•q 1�ly�,j v U U U W I I I I I I I I Q .- I I I �� „o I Iv � I PREVENT OVERLAND SEDIMENT FROM REACHING E w m a — —TJ I EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES a d (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. a U , CE -,X\1 S CE -XS rF � CE -XS !pp Cul F - �O o - rF °o 0 JEFFERSON T. HOPKINS & WIFE MARY ANN HOPKINS ` PIN:8900 48-2030 F` DB 4507 PG 1769 (REMAINING PORTION OF TRACT I) \ ppb I I O I I ie 711�� cE_X, WETLAND E- A \ IMPACT ID #W2 WETLAND F I oIMPACT ID #W3 \ 003/3] 007/35 O"STREAMS2 OOl/37 OOl/37 , _ IMPACT ID #,S21 \ 4-2 % - --- -- - - WETLANDG °pL IMPACT & #W4 °° `-------- _ # Ol/3 O01/33 00)/3 1/3 QOl/3J 003/30 - O - / C ._ OplH7 003 3 -_--_ n _CE/LO- — v-1—YVVL \� DETAIL 3, SHEET 5.6--_, I �/lOD CE/LCH). CE/L00 FINISH GRADE AND SEED PASTURE AREA UPON DEMOBILIZATION. STAGING/STOCKPILE AREA INSTALL GRAVEL CATTLE FEEDING PAD ALONG EXISTING FENCE. SEE DETAIL 2, SHEET 5.12 I I \ I `SILT FENCE (TYP) I I I I REFRESH AND LEAVE CONSTRUCTION ENTRANCE UPON DEMOBILI ATION. I 0. 50' 100' 150' (HORIZONTAL) I \� I I I I I PREVENT OVERLAND SEDIMENT FROM REACHING EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. Z_«>r�inmLL d K W V m N ZO bzmm aZYvoo c .aZou22E 20�OF�,SS/p�fy 4 SEAL t-• _ IN Q � m I 00 I Z Z«��m'1 v�mm6 aw�zmm I(Cz egg IN 1Zc 2t w ~ Z" 2 E CAR11 50, 100, 150, _ ,n SEAL �• \� (sow-s,Au ? 0293 WETLAND A s- fE, 0p�31 b L \ WETLAND B �3bs zo�0p, WETLAND C IMPACT ID t�Wl "E (TYP) oo�J 001-10 <o _ \1,01-1 r'I c&xs 4-3 E-xs S eff XS 1 CE�y o CF 1 CE CE -XS <00 C I 1 c - S V i � JEFFERSON T. HOPKINS & WIFE MARY ANN HOPKINS PIN:8900-48-2030 DB:4507 PG:1769 (REMAINING PORTION OF TRACT 1) WETLAND E_� IMPACT ID #W2 OOl/3J , 001/11 001/11 N SUEAN IMPACT ID #: STREAM S1� X IMPACT ID #S20 r CE/LOD _ CE/40D SEE VERNAL POOL' - DETAIL 3, SHEET 5.6 -E/L00 PREVENT OVERLAND SEDIMENT FROM REACHING EXISTING/PROPOSED STREAM. ADD ADEQUATE MEASURES (E.G. STRAW WATTLES/ SILT FENCE) AS NEEDED. U a.+ U