HomeMy WebLinkAbout20080248 Ver 1_CAMA Application_20080205~~
` 08-0248
.~
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Jaynes H. Gregson, Director Vl~lliam G. Ross, Jr., Secretary
MEMORANDUM
TO: Ms. Cyndi Kazoly
Env. Biological Supervisor
Division of Water Quality, Wetlands Unit
FROM: Doug Haggett Respond to Doug Haggett
Major Permits Processing Coordi~tor Morehead City Office
Coastal Management Division
400 Commerce Avenue
Morehead City NC 28557
DATE:
1 February 2008 (~
~ l-~ ~ ~ ~ ~ ~D~
SUBJECT:
CAMA Application Review ~..~
FEB ~ 2008
APPLICANT: Mrs. Lucille P
erry DENR - `NATEk GiUAI~tT'Y
WETLANDS ANp STORMWATEk ERAi~fCH
PROJECT LOCATION: Bertie County off NC Hwy 45 and Bull Pond Rd. on upstream end of
Perry's Beach on the Chowan River near Colerain, North Carolina
PROPOSED PROJECT: Applicant proposes to Mine the existing bluff shoreline, install 643' of
riprap shoreline stabilization, install 3 - riprap goins and divide the site into 8 residential lots.
Please indicate below your position or viewpoint on the proposed project and return this form by 22
February 2008. Please contact R Kelly Spivey at 252-948-3853, if you have any questions regarding the
proposed project. When appropriate, in depth comments with supporting data aze requested.
REPLY This office has no objection to the project as proposed.
This office has no comment on the proposed project.
This office approves of the proposed project only if the recommended changes
are incorporated. See attached.
This office objects to the proposed project for reasons described in the attached
comments.
Signed
Date
'~toRhCamlina
fl~'~rhrrn!!y
943 Washirxtton Square Mall, Washirgton, PJ~ttt Carolina 27889
Phone:252-946-6481 \ FAX: 252-948-0478 \ Irdemet: www.nc:coastalmanagement.netl
An Equal Opportunity \ AtTttmative Action Emplajrer - 50°% Recycled \ 1096 Post Consumer Paper
~-
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Lucille Perry c/o George D. Perry, Jr.
2. LOCATION OF PROJECT SITE: Bertie County off NC Highway 45 and Bull Pond Rd. on upstream end
of Perry's Beach on the Chowan River near Colerain, North Carolina
Photo Index - 2006, 142-7841,E 12,E 13,E 14 2000, 142-1647, T 14, T 15, T 13
1995, 142-1491, K111, K12, K13, J17
State Plane Coordinates - X: 2,663,200 Y: 887,000
Colerain Quadrangle -Lower Right Corner
3. INVESTIGATION TYPE: CAMA and State Dredge and Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 14 January 2008
Was Applicant Present -Yes
5. PROCESSING PROCEDURE: Application Received - 29 January 2008
Office -Washington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - 1998 Bertie County Land Use Plan
Land Classification From LUP -Conservation (water), Limited Transition (land)
(B) AEC(s) Involved: Estu arine Water, Public Trust Area and Estuarine Shoreline
(C) Water Dependent: Yes
(D) Intended Use: private
(E) Wastewater Treatment: Existing -none
Planned - on-site septic system
(F) Type of Structures: Existing -riprap, borrow pit
Planned -riprap shoreline stabilization, riprap groins
(G) Estimated Annual Rate of Erosion: none
(H) Source -applicant
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHF,R
(A) Vegetated Wetlands
(404)
(B) Non-Vegetated Wetlands 900 ftz
River Bottom
(C) Other (Uplands)
covered 139,392 ftz (3.2
acres)
(D) Total Area Disturbed: ~140,292ft2 (3.2 acres)
(E) Primary Nursery Area: No
(F) Water Classification: BNSW Open: No
8. PROJECT SUMMARY: The applicant proposes to mine the existing bluff shoreline, insta11643' of
riprap shoreline stabilization, insta113 -riprap groins and divide the site into 8 residential lots.
Lucille Perry c/o George D. Perry. Jr.
Colerain
Bertie County
Project setting
The project site is located off N.C. Highway 45 and Bull Pond Rd. on the upstream (north)
end of the Perry's Beach Subdivision near Colerain on the Chowan River in Bertie County, North
Carolina. The project site is an undisturbed X3.2 acre tract except for an area less than one acre that
has been disturbed under CAMA Minor Permit #2005-13 which was issued on 19 August 2005.
A natural bluff, X55' above normal water level (NWL) in elevation, vegetated with mixed
hardwoods and pines is a dominating geographic feature along the 790 linear feet of shoreline. A
sandy beach, compliments of Hurricane Isabel, exists between the toe of the bluff and normal water
level. This width of this beach ranges from 45' on the northern (upstream) to 5' on the southern
(downstream) end of the tract. Transitioning landward the 55' high bluff/ridge rapidly decreases in
elevation to a wooded wetland located approximately 250' landward of NWL thus a ridge and Swale
scenario. The elevation of the tract ranges from X55 feet above water level adjacent the Chowan
River to an elevation of ~6 feet above the water level approximately 250 feet landward of the
shoreline. However, ~ 160' of the southern (downstream) end of the tract has been excavated down
to an elevation of approximately 5' above NWL. Additionally this 160' of shoreline has been
stabilized with riprap. This development activity was conducted under CAMA Minor Permit #2005-
13.
The southern (downstream) side of the proposed project site is a developed lot which has an
elevation of ~ 10' above NWL. This lot is bulkheadedwith asingle-family residence. The northern
side (upstream) of the project area is asingle-family residential development, which was constructed
under CAMA Major Permit #48-02 issued to Point Comfort, LLC.
The Chowan River is classified as B NSW by the Environmental Management Commission
at the project site. The Chowan River is Joint Fishing waters and is not open to shell fishing.
Project description
The applicant proposes to mine (approximately 3.2 acres) the existing bluff shoreline to an
elevation of approximately 15' above NWL. The applicant proposes to create 8 residential lots once
the bluff has been mined. An access road to the 8 residential lots will be constructed adjacent the
wooded wetland drain at the base of the west side slope. The applicant proposes to stabilize the
shoreline with 643 linear feet of riprap. The riprap will be positioned 2' seaward of NWL for a
distance of 751inear feet along the shoreline. The remaining riprap will be placed above the NWL in
order to preserve the natural sand beach. Additionally, the applicant proposed to insta113- 25' long
riprap groins. These riprap groins will have a base width of 10' .The applicant proposes no structural
development (i.e. impervious surface) of the 81ots at this time.
R
Anticipated impacts
The project as proposed will result in a total upland disturbance of approximately 3.2 acres
along the Chowan River. As a result of the riprap shoreline stabilization and the three riprap groins
approximately 900 ft2 of River bottom will be filled. Storm water runoff will be sheet flow both
toward the Chowan River and partially directed into an existing wooded wetland Swale. No
impervious surfaces are proposed for uplands at this time.
Kelly Spivey - 30 January 2008
November 29, 2007
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
943 Washington Square Mall
Washington, NC 27889
To Whom It May Concern:
Included in this packet is the CAMA Major Permit application for development
located off NC highway 45 at Perry's Beach in Colerain on the Chowan River in Bertie
County, North Carolina. This application is for the construction of 643 feet of rip rap and
the mining of 3.2 acres of uplands with three groins.
It is my proposal that this land be developed through mining and rip rap construction
for the purpose of residential lots. The constructional methodologies to be used for this
development include leveling the land by mining with a backhoe, and using a tractor and
pan. This equipment will also be used to establish a shoreline with rip rap, as well as
maintain existing drainage and wetlands.
Mining permit has also been applied for through the NC Department of Natural
Resources.
Sincerely,
George (Buck) D. Perry, Jr.
08-0248
DCM MP-i
APPLiCATiOH for .-~
Maior Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
7. Primary Applicant/ Landowner Information
Business Name Project Name (if applicable)
CN
Applicant 1: First Name
c E MI Last Name
R2
Applicant 2: First Name MI Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
z ~s~l PO Box City State
Z12P. r~ ~f
/v / N ~ Country -r
~ I ~ Phone No. p//
~~rZ/ .~.~ ~ ~ ~ 8 ~7 ext. FAX No.
- -
Street Address (if different from above) City State ZIP
Email
2. Agent/Contracfor Information
Business Name
A entl Contractor 1: First Name
~~ MI
~ Last Name
~
~
Agent/ Contractor 2: First Name MI Last Name
Mailing Address
f g.~8 ~ PO Box City
Cod State
~~
ZIP `~
/ ~~ Phone No. 1
S - ~!-
- ext. Phone No. 2
SoZ. ~`/
~/ 6,(,/ext.
FAX No. Contractor #
Street Address (if different from above) I q State ZIP
Email
<Form continues on back>
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple) Street Address State Rd #
~2T~~ ~, w ~S
Su division Name
' City
C State Zip
~
~C N D LE ~~r' ~~ C. 79 z
Phone No. Lot No.(s) (if many, attach additional page with list)
3 - L ext. ,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
WAN ~ I - ~ -v f2
c Is t~h water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
LJNatural ^Manmade ^Unknown ~ n ^ ~ ~ I
e. Is proposed work within city limits or planning jurisdiction?
^Ye
N f. If applicable, list the planning jurisdiction or city limit the proposed
work fall
ithi
s y~
o s w
n.
4. Site Description
a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.)
I
c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
(If many lot sizes, please attach additional page with a list) ~HW or ^NWL 1 ~ r _L !
/O
e. Vegetation on tract
T DVS /m
f. Man-made features and uses now on tract
N r2 o i
g. Identify and describe the existing land uses adjacent to the proposed project site.
S _ i~L /.~j
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
(Attach zoning compliance certificate, if applicable)
~
^Yes ^No
A
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ^Yes ~o
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ^Yes ~ ^NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ^Yes ~ ^NA
National Register listed or eligible property?
<Form continues on next page>
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? es ^No
(ii) Are there coastal wetlands on the site? ^Yes [~'fVo
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ^Yes ~No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities. e ~ ~ ~~ ~ ,._ ~ I , , / o ~ J~
o. Describe existing drinking water supply source.
NaN~
p. Describe existing storm water management or treatment systems.
l~l()~~
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ^Commercial ^Public/Government
~ivatelCommunity
b. Give a brief description of purpose, use, and daily operations of the project when complete.
~ ~~- is ~) F 1= ~- X L`~-T ~ ~! Cr ~ L.v ~=1= ~U C. R. G ~T~~ fiZ~,s ~ i~c:~,~ri "~.,
(,c)`1'`~> ~ 5~~~ ~ ~:~- Zc= SOU (~~Li !N ~ ~~ i Tl-t ~2. r r' ~;~1~
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is~q be stored.
l I~ )~ A-C:;1'- Iku ~~ C.~i. ~ ~fi"IL ~G i ~ ~~- ~~~~~~~ 4?f~ ~J ~.~~~ l~v ~^~~' i`k~ uc,~.
`ETC? ~~ L~ 0 .~! ~~ ~`~
d. List all development activities you propose. r
C.i~~T~ ~E~~~C;~~ .~~ L,~-rs ~y ~~1~ v ~,~ Cam- ~~~~;v ~~
e. Are the proposed activities maintenance of an existing project, new work, or both? 11 '' '' 1' J
N~ W WQ ~ ~~
f. What is the approximate total disturbed land area resulting from the proposed project? ^Sq.Ft or []Acres
c~~ s
g. Will the proposed project encroach on any public easement, public accessway or other area ^Yes (~ ^NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
~ G+r~ ~i4 C~ ~~N D F~
i. Will wastewater or stormwater be discharged into a wetland? fifes ^No ^NA
If yes, will this discharged water be of the same salinity as the receiving water? [G~es ^No ^NA
j. Is there any mitigation proposed? ^Yes o ^NA
If yes, attach a mitigation proposal.
<Form continues on back>
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additionallnformation
In addition Co this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package fo be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project na«ative.
b An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name EG ~ ~ L- f-- Phone No.
Address /6 4~ C R EE12 R ~ k iT-r~~ l-E-t 7~K N i< 2 S-i - 4 N I -3 87~
Name ~"t_U rg F ~~ r r~ Phone No.
Address Q .(' (~ l~X a- -~ ~~Co - -~ 1 tiJ ~ C- z s 2 - 21 7 s 4 l.L
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
~>~mA rnjNa2 P~=-2m~T ~ Z~o~- 13
(,l_S A r2mu Go12~s 0 F Cti~~ 1~c~rzS #-~1~~~'~~' ~-2I-`1`~S
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
~ 7, Certification and Permission to Enter on Land
I understand that any permit issued In response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthxf-u~l to the best of my knowledge.
Date "..~ ~ ~ ~ ~~ r~ Print Name f/ • ~' 1 (: ~~ ~, Lj ~ d~
T
~,, ~ t
Signature ~!.- ;/~. ' ~ ~~, 1.
Please indicate application attachments pertaining to your proposed project.
^DCM MP-2 Excavation and Fill Information ^DCM MP-5 Bridges and Culverts
^DCM MP-3 Upland Development
^DCM MP-4 Structures Information
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access Other
Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding
(NLW or Breakwater shoreline
NWL stabilization
Length 3 - 2S ~
Width ~ o'
Avg. Existing
NA
NA
Depth
Final Project
NA
NA
Depth
7. EXCAVATION 1is section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
c. (i) Does the area to be excavated include coastal wetlands/marsh
(CW ), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)7 if any boxes are checked, provide the
number of square feet affected.
d. High-ground excavation in cubic yards.
^CW ^SAV ^SB
^WL ^None
(ii) Describe the purpose of the excavation in these areas:
2. DISPOSAL OF EXCAVATED MATERIAL his section not applicable
a. location of disposal area. b. Dimensions of disposal area.
c. (i) Do you claim title to disposal area?
^Yes ^No ^NA
(ii) If no, attach a letter granting permission from the owner.
e. (i) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
^CW ^SAV ^SB
^WL ^None
d. (i) Will a disposal area be available for future maintenance?
^Yes ^No ^NA
(ii) If yes, where?
(i) Does the disposal include any area in the water?
^Yes ^No ^NA
(ii) If yes, how much water area is affected?
(ii) Describe the purpose of disposal in these areas:
3. SHORELINE STABILIZATION ^This section not applicable
(If development is a wood groin, use MP-4 -Structures)
a. Type of shoreline stabilization: b. Length;
^Bulkhead~Riprap ^Breakwater/Sill ^Other..__,.___. Width: /D >
c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL:
D z'
e. Type of stabilization material; f. (i} Has there been shoreline erosion during preceding 12
D G ~'S months?,,_, ~
^Yes Mao ^NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
g. Number of square feet of fill to be placed below water level. ., / h. Type of fill material.
Bulkhead backfill Riprap `~ ~r7 ~S X ~ ~ '
Breakwater/Sill Other `7 ~;'~ , ~: ~- J
i. Source of fill material, -' ~-~, w-LL``"'
~7N S 1'~ ~' ~.t~l'~~J,e. ~ ~\~ J ~~Ses
4. OTHER FILL ACTIVITIES ^This section not applicable
(Excluding Shoreline Stabilization)
a, (i) Will fill material be brought to the site? ^Yes ^No NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW),
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
^CW ^SAV ^SB
^WL ^None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g , dragline,
coQntrolled? r backhoe, or hydraulic dredge)?
c. (i) Will navigational aids be required as a result of the project?
^Yes ^No ^NA
(ii) If yes, explain what type and how they will be implemented.
d. (i) Wi11 wetlands be crossed in transporting equipment to project
site? ^Yes ^No ^NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
Date
Project Name
Applicant Name
Applicant Signature
!-,1 G
Form DCM MP-3
UPLAND DEVELOPMENT
(Construction and/or land disturbing activities)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
GENERAL UPLAND DEVELOPMENT
a. Type and number of buildings, facilities, units or structures
proposed.
S
b. Number of lots or parcels.
c. Density (give the number of residential units and the units per
acre).
e. If the proposed project will disturb more than one acre of land, the
Division of Land Resources must receive an erosion and
sedimentation control plan at least 30 days before land-disturbing
activity begins.
(i) II applicable, has a sedimentation and erosion control plan been
submitted to the Division of Land Resources?
^Yes ^No ®'~
(ii) If yes, list the date submitted:
g. Give the percentage of the tract within the coastal shoreline AEC to
be covered by impervious and/or built-upon surfaces, such as
pavement, building, rooftops, or to be used for vehicular driveways
or parking.
N ~~
i. Give the percentage of the entire tract to be covered by impervious
and/or built-upon surfaces, such as pavement, building, rooftops,
or to be used forAVerhicular driveways or parking.
IV
j. Describe proposed method of sewage disposal.
S ~ P? ~G S (~ST~~'h
I. Describe location and type of proposed discharges to waters of the
state (e.g., surface runoff, sanitary wastewater, industrial/
commercial effluent, "wash down" and residential discharges).
d. Size of area to be graded, filled, or disturbed including roads,
ditches, etc.
.~ , L G~.C r e S
f. List the materials (such as marl, paver stone, asphalt, or concrete)
to be used For impervious surfaces.
N R~
h. Projects that require a CAMA Major Development Permit may also
require a Stomtwater Certification.
(i) Has a site development plan been submitted to the Division of
Water Quality For review?
^Yes ^No Q~
(ii) If yes, list the date submitted:
k. Have the facilities described in Item (i) received state or local
approval?
^Yes ~ ^NA
IF yes, attach appropriate documentation.
m. Does the proposed project include an innovative stormwater
design?
^Yes ^No [~]4d'~
If yes, attach appropriate documentation,
m. Describe proposed drinking water supply source (e.g., well,
community, public system, etc.)
U~ C ~L
o. When was the lot(s) platted and recorded?
v C~ ~
2 p:
Date
,-`+ --
Project Name
Applicant Name
L ~V~'~ '~
i
Applicant Signature
n. (i) Will water be impounded? ^Yes ®1Go ^NA
(ii) If yes, how many acres7l 1 ~ ~ I 1 ET P/~ (_ n
fl ~ ,` EC'0 2D Erb
p. If proposed development is a subdivision, will additional utilities be
installed for this upland development?
^Yes ^No
.API-LIGATION FOR A MINING PERMIT
AF'F'IDAVIT OF NOTIFICATION
I , ~ r _ 2r r .S. , an applicant, or an agent, or employee of an applicant, for a new
Mining Permit, a modification o an existing Mining Permit to add land to the permitted area, from the N.C.
Department of Environment and Natural Resources, being first duly sworn, do hereby attest that the following
are all known owners of record, both public and private, of all tracts of land that are adjoining the mining permit
boundary (including, where an adjoining tract is owned or leased by the applicant or is owned by the lessor of
the mine tract, all owners of record of tracts adjoining these tracts, that are within 1,000 feet of the mining permit
boundary) and that notice of the pending application has been caused to be mailed, by certified or registered mail,
to said owners of record at their addresses shown below, such notice being given on a form provided by the
Department:
(Adjoining L downer Name)
e0 d' N_ ~• ~~r r
F
(Addre/ns~s)
/~ ({r ~e k 121 K i ~-~-U ~ ~k, NC ~9~j
(Attach additional list if necessary)
I do also attest that the following individual is the chief administrative officer of the county or municipality
in which any part of the permitted area is located and that notice of the pending application has been caused to
be mailed, by certified or registered mail, to said office at the following address:
(Chief Administrative Officer Name) ~~~ (Address)
[City Manager, County Manager, Mayor, etc.] ~{ , D - f3py,
~P L~~-('o ~ ~F~ i nc~so r, ~1 C ~ ~ q 8 3
The above attestation was made by me while under oath to provide proof satisfactory to the Department that
a reasonable effort has been made to notify all known owners of record, both public and private, of all tracts of
land that are adjoining the mining permit boundary (including, where an adjoining tract is owned or leased by
the applicant or is owned by the lessor of the mine tract, all owners of record of tracts adjoining these tracts, that
are within 1,000 feet of the mining permit boundary) and the chief administrative officer of the county or
municipality in which any part of the permitted area is located in compliance with N.C.G.S. 74-50(bl) and 15A
NCAC SB .0004(d). I understand that it is the responsibility of the applicant to retain the receipts of mailing
showing that the above notices were caused to be mailed and to provide them to the Department upon request.
l~/a 3 /~ 7
Date
If person executing Affidavit is an agent or employee of an applicant, provide the following information:
(Name of applicant)
(title of person executing
Affidavit)
I, .~, In ~4 C~ ~afnlc -,, , a Notary Public of the County of ~, State of North
i
Carolina, do hereby certify that ~ •~ ~ p~~¢haJly appeared
before me this day and under oath ac owledged that the ab ve Affidavit was mad~~~hj,m11~~''~r :,
JY
Witnes my hand and notarial sealll, this~_ day of Jc.ti, bc.~ s~ ~' c?~"r~~'~,.~ Q•~
No 1 ~~J
My Commission expis~: ~ 1~ r
,~: 'i
„~
-_- _
~ _ .-_--
-------
____
i
~.-
_ ---
- --
__.__-
~~ = y '~I
i _
I ~ -
~ ~_
'_ 1y
Qj ~
6000
t v,
-I
snuo ~
- Isoo
~OOS
IliyG
if(+n
3G00~--~- SOU
800
n!~:
2000 -- cuu
;~;~;
I dGi!
Ii1GU __I- 300
1 2GG
,GG
G I G
aU~4 k:et
-- Metc;s
--
~
1 4•
~;,, 1~ ~ ~ I
2 .30x8
tid9n
! 8[en
1I
21.',36
i ~I2,:;ea
Ir, ~ 3.G4"
{ ~e~g To ronv~~*. feet to r~~6~a
n~u!!irly L'y .30;E
?o ronvert mrleu to feet
n¢!i;piy by 3?~u8
~ au~7
I ~ ~%
~'~ !i ~~
. ~ ~i i, - i
00
N
O
1
O
~ ® ®i®~~
_ _ _ r: -
?~ -
~.
~~~
C ~aW,4IV ~~~V~1~
?Fg9y 5~1~ t .
~, djgcL~-J- ~H~P~P N
JlNdn~1 L1 N~.
', awn, LR
o ,
T _ ~,r~~
s
.o ,
~~ ~ a ~
o n~ ~
2 ~ ~ h
nrp~~,
+i Up~t~
~~nbFt~izwtieN,~i~h S~'oHr
r
~.
u~
u
4
x7~1C - cv~" ~RfA
/~~ F,// AREA
08-0248
2'wwt~~ "FPfih
2' 4/A~~- ptP~h
Lip,' ~!'~ i
,~, /3auNaRu Li/~F
G~~9 ~ pfR~y-~
ad~'geCu~-owMr-R
~kiSfr N~ WF~~.RN~ ~--.--_
F~• ~1
y. rt r( R' S
s~_M 1
~' 2S'
SGaI~ ~" . ,Z S'
DR~w,tJ Ijy
G.p. P~RRy JR.
/2~1 b~o7
2Sz- 35L - y / /11
,~ ~ ~~~~
S'
Ro A~
~f
~,
°.
~: I ".
k k
X '~ X
s'
~~`~~
v~~
~ - ~uwL
/o's-. ~s' fasr~ ~owb }a ~ /5y - ~' ~.se ,
. wEt/ A,vo L i ni g ~ ~0.' N
i.
08-0248
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross, Jr.,
Secretary
1 February 2008
Berne Ledger Advance
PO Box 69
Windsor, NC 27983
Attention: Legal Advertising Department
Please include the enclosed Notice of Filing in the Public Notice section of the 6
February 2008 edition of your newspaper. If it will not be possible to include this notice in that
edition, or if you should have any questions about this notice, please call me as soon as possible
at 948-3820.
The State Office of Budget and Management requires an original Affidavit of Publication
prior to payment for newspaper advertising. Please send the affidavit, an original copy of the
published notice, and an original invoice to:
1Vlelissa Sebastian
NCDENR
COASTAL MANAGEMENT DIVISION
400 COMMERCE AVENUE
MOREHEAD NC 28557
Thank you.
Sincerely,
Sherry Tyson, Secretary
Division of Coastal Management
ATTACHMENT
Cc: File
NorthCarolina
JVatura!!~
943 Washington Square Mall, Washington, North Carolina 27889
Phone: 252-946-6481 1 FAX; 252-948-0418 1 Internet www,nccoastalmanagement.neU
An Equal Opportunity 1 Affirmaiive Adion Employer - 50°k Recyded 110°k Post Consumer Paper
NOTICE OF FILING
OF APPLICATION FOR
CAMA MAJOR DEVELOPMENT PERMIT
The Department of Environment and Natural Resources hereby gives public notice as
required by N.C.G.S. 113A-119(b) that an application for a development permit in an Area of
E~QnmentaLGoncern-as~iesignated~unde~the_GoastaLArea ManagementAct_(CAMA~was-
received on 29 January 2008. According to the said application submitted by Lucille Perry,
applicant proposes to mine the existing bluff shoreline, install 643' of riprap shoreline
stabilization, install 3 - riprap groins and divide the site into 8 residential lots.
A copy of the entire application maybe examined or copied at the office of Terry Moore,
District Manager, Washington Regional Office, 943 Washington Square Mall, Washington, NC,
during normal business hours. Public comments received by 27 February 2008 will be
considered. Later comments will be accepted and considered up to the time of permit decision.
Project modifications may occur based on further review and comments. Notice of the permit
decision in this matter will be provided upon written request.
R Kelly Spivey, Field Representative
Coastal Management Representative
NC Division of Coastal Management
943 Washington Square Mall
Washington, North Carolina 27889
(252) 948-3853
Please publish on: ~ Fe6~a~y 20®8
~~ ~o~T,~, 0 8- 0 2 4 8
~`
ate:
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross, Jr., Secretary
1 February 2008
Mrs. Lucille J. Perry
C/O George D. Perry Jr.
2216 NC 45N
-__ _ _-_Coleran, NC 27924_ _____- __-_-- _ __ _ _ _
Dear Mrs. Perry:
The NC Division of Coastal Management hereby acknowledges receipt of your
application for State approval for development of your property located off Hwy 45 and
Bull Pond Rd on upstream end of Perry's Beach on the Chowan River near Colerain, North
Carolina. It was received on 29 January 2008, and appears to be adequate for processing at
this time. The projected deadline for making a decision is 13 April 2008. An additional
75-day review period is provided by law when such time is necessary to complete the
review. If you have not been notified of a final action by the initial deadline stated above,
you should consider the review period extended. Under those circumstances, this letter
will serve as your notice of an extended review. However, an additional letter will be
provided on or about the 75th day.
If this a~eneg~ does not render a hermit decision within 7J days trot-n the ?q
,1~nu~rt! 200ia; ,,+oiA mag! request ~ rr~eetinc~ witl? Yl~e Director of .she Gi4.!ision ci
'..~~~~~'e~! ~`~l~~,r~~~~'rr!~E"F~ ~atN 6'~~~'r` SIX opt=,?~6Yp 9si e- TM~ '~.'. .~ ~ `?'~ i t~o,iy ,~,,~~acr~es
~! ~ ~ a~~:~t~ i~~y ;}~'~~ s?e 't`IE6~ ulft~a~9t- ~~i~~~ `~~~rCCtY A~ Ole'~.'r!~ ~'i-~i ~ ~ u'3e re~~@~~ '1~ y!Gt.tr ~'~;~E€~~; o
request and shall include the property owner, developer, and project
designer/consulf~nt.
NCGS 113A-119~b requires that ldotice of an application be posted at the
location of the proposed development. Enclosed you will find a "Notice of Permit
Filing" postcard which must be posted at the property of your proposed development.
You should post this notice at a conspicuous point along your property where it can be
observed from a public road. Some examples would be: Nailing the notice card to a
telephone pole or tree along the road right-of--way fronting your property, or at a point
along the road right-of--way where a private road would lead one into your property.
Failure to post this notice could result in an incomplete application.
943 Washington Square Mall, Washington, North Carolina 27889
Phone: 252-946-6461 1 FAX: 252-948-0478 1 Internet: www.nccoastalmanagement.net/
An Equal Opportunity 1 Aiftnnative Action Employer- 50% Recyded 110°k Post Consumer Paper
Mrs. Lucille Perry
1 February 2008
Page 2
An onsite inspection will be made, and if additional information is required, you will be
contacted by the appropriate State or Federal agency. Please contact me if you have any
questions and notify me in writing if you wish to receive a copy of my field report and/or
comments from reviewing agencies.
Sincerely,
;~,~ ,
~Q I"
R. Kelly Spivey
Coastal Management Representative
Division of Coastal Management
Washington Regional Office
Enclosure
Cc: Doug Huggett
Terry Moore, District Manager