Loading...
HomeMy WebLinkAbout20080222 Ver 1_More Info Letter_20080206~Q'~ W ArFRQ Michael F. Easley, Governor ~O G William G. Ross Jc, Secretary ~- North Carolina Department of Environment and Natural Resources .:,~ ~ Coleen H. Sullins, Director Division of Water Quality February 6, 2008 DWQ Project # 2008-0222 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Clyde Harris 106 East Drewry Lane Raleigh, NC 27609 Subject Property: Harris Retaining Wall, Raleigh, NC UT to Crabtree Creek [030402, 27-33-(10), C, NSW] REQUEST FOR MORE INFORMATION Dear Mr. Harris: On February 1, 2008, the Division of Water Quality (DWQ) 401 Oversight/Express Permitting Unit received your application dated January 9, 2008 regarding your request for a Minor Variance from the Neuse Buffer Rules (15A NCAC 2B .0233) for the subject property. The Division of Water Quality (DWQ) is required to prepare a "preliminary finding" /"finding of fact" as to whether the variance request meets the requirements of 15A NCAC 02B .0233(9)(a). The DWQ may attach conditions to a variance approval that support the purpose, spirit and intent of the riparian buffer protection program. Conditions usually include stormwater management and buffer mitigation. Additional information will be required before we can proceed with the review of your variance request. Therefore, unless additional information is provided as described below, we will have to move toward denial of your request per 15A NCAC 2B .0233 and will place this project on hold as incomplete until we receive this additional information. Additional Information Requested: Buffer Mitigation Buffer mitigation will be required as a condition if you choose to proceed with the Minor Variance. If you choose to proceed with a variance, then please provide a buffer mitigation.plan pursuant to 15A NCAC 02B .0233 and 0242. If you choose to pay into a mitigation bank for the required mitigation, please provide an acceptance letter from the mitigation bank demonstrating they have the available mitigation credits. Please respond in writing within three weeks of the date of this letter by sending a copy of this information to me and to Lauren Witherspoon of the DWQ Raleigh Regional Office. If we do not hear from you in writing within three weeks, we will assume that you no longer want to pursue your variance 401 Oversight/Express Review Permitting Unit ~/VlltllCll~~1,/ 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http://h2o.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Clyde Harris Page 2 of 2 February 6, 2008 request and we will consider the request as withdrawn. Please call Ms. Amy Chapman of this office at (919) 733-1786 if you have any questions. Since y, Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/ijm/asc cc: Lauren Witherspoon, DWQ Raleigh Regional Office David Hooper, 1015 Edgewood Ave, Burlington, NC 27215 File Copy Central Files Filename: 080222HarrisRetainingWail(Wake)NBR_On_Hold