HomeMy WebLinkAbout20072031 Ver 1_General Correspondence_20070727~p~C W A rF9 p Michael F. Easley, Governor
~~ ~i William G. Ross Jr., Secretary
~ tom.- North Cazolina Department of Environment and Natural Resources
~ ~
O -C Coleen H. Sullins, Director
Division of Water Quality
July 27, 2007
Mr. Tyler Morris
Boylan Development Company
410 N. Boylan Avenue
Raleigh, NC 27603
Dear Mr. Morris:
RE: Division of Water Quality position regarding City of Raleigh preferred alignment of Six Forks Extension
Wake County
As you know, the City, US Army Corps of Engineers, Division of Water Quality and your staff have been
working for some time on the environmental issues surrounding the City of Raleigh's preferred location for the
extension of Six Forks Road across Crabtree Creek between Atlantic Avenue and Capital Blvd. The location
that the City prefers would tie into Hodges Street near the old State Farmer's Market in order to align with the
stop light at Hedges Street and Capital Blvd. In order to address the wetland, stream and buffer permitting
issues on the site, the Corps of Engineers conducted a wetland delineation for the state property on the south
side of Crabtree Creek.
Division staff have carefully reviewed the proposed alignment of Six Forks Road as shown on a map
entitled "Exhibit W: Limits of Wetland Disturbance -Six Forks Road Road Extension" dated July 27, 2007 as
prepared by J Davis Architects. Based on our analysis of the location of wetlands north and south of Crabtree
Creek as well as the location of the Floodway Limit and stream buffers, the Division believes that the City of
Raleigh's preferred location is the best practical alternative for the location of the extension of Six Forks Road
across Crabtree Creek with respect to any 401 Certification or Neuse River buffer permitting. We also
understand that the City may pursue permitting of this alignment in the near future although funding for
construction is currently not completely available. If additional information is raised during the public comment
portion of the permitting process, then DWQ may need to revisit our conclusion as to the preferred alignment.
However at this point in time, the Division supports the City's proposed alignment of Six Forks Road as shown
on the above mentioned map.
If you have any questions, please call me at 919-733-9646.
Sin rel rs,
o n Dorney
Cc: Eric Lamb, Transportation Department, City of Raleigh
Jamie Shern, Corps of Engineers Raleigh Field Office
File copy
Central files
Ben Yorker, Boylan Development Company, 410 N. Boylan Avenue, Raleigh, NC ,27603
Harlan Britt, Kimley-Horn and Associates
N ne Carolina
~atura!!y
Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-5083
Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-9612
An Equal OppoRunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper