Loading...
HomeMy WebLinkAbout20151229 Ver 1_Other Documents_20160506'A d_PT1 PIEDMONT TRIAD AIRPORT AUTHORITY May 5, 2016 United States Army Corps of Engineers Regulatory Division Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 North Carolina Department of Environmental Quality Division of Water Resources 450 W. Hanes Mill Rd., Suite 300 Winston Salem, NC 27105 Attention: Mr. David E. Bailey Ms. Susan L. Homewood Regulatory Project Manager Environmental Senior Specialist Raleigh Field Office Winston-Salem Regional Office Subject: Actium ID SAW -2015-00920, DWR File 15-1229 HAECO ]Facility Improvements at Piedmont Triad International Airport Pursuant Special Condition 4 of the subject Section 404 Individual Permit and the Workplan Verification (enclosed) e-mailed from Michael Baker International on April 25, 2016, the Piedmont Triad Airport Authority (PTAA, permittee) has verified that the final construction plans comply with the permit drawings. Pursuant to Special Condition 5 of the subject Permit, PTAA understand that the Corps have confirmed compliance with the pre -construction meeting requirement based on the Construction Schedule dated March 21, 2016 (enclosed) and information provided in the e-mail referenced above. Pursuant to Special Condition 9 of the subject Permit, PTAA notified the Corps of proposed beginning of the authorized work in the e-mail with enclosed construction schedule referenced above. Pursuant to Special Condition 12 of the subject Permit, PTAA require contractors and agents to comply with the terms and conditions of this permit. PTAA have provided contractors associated with the construction or maintenance of this project with a copy of this Permit which is also available at the project job site. Pursuant Special Condition 19 of the subject Permit and the acknowledgements of receipt e- mailed from Dave Bailey on April 21 and April 27, 2016, PTAA understand that: • The Corps has received the three (3) Compensatory Mitigation Responsibility Transfer Forms signed by the Mitigation Sponsors (Restoration Systems, LLC and the NC Division of Mitigation Services) • Construction within jurisdictional areas authorized by the permit can begin • PTAA is no longer responsible for providing the mitigation identified in these forms 1404A Ted Johnson Parkway 0 Greensboro, North Carolina 27409 • Phone: 336.665.5600 + Fax: 336.665.1425 ,T® PIEDMONT TRIAD AIRPORT AUTHORITY Mr. David E. Bailey, Ms. Susan L. Homewood May S, 2016 Page 2 of 2 • PTAA will retain copies of these executed forms • PTAA responsibilities specified on these forms have thus been satisfied Pursuant to Special Condition 20 of the subject Permit, PTAA understand and concur that 214 stream mitigation units (SMUs) of the previously available 702 SMUs from the Causey Farm mitigation site have been applied to the project authorized under Action ID SAW -2015-00920, and that no additional SMUs are available at Causey Farm. Pursuant to Special Condition 21 of the subject Permit, PTAA understand and concur that 1.62 wetland mitigation units (WMUs) of the previously available 3.07 WMUs from Causey Farm have been applied to the project authorized under Action ID SAW -2015-00920, that these 1.62 SMUs are no longer available to apply to any future project, and that 2.08 WMUs are currently available at Causey Farm for use on future PTIA projects, pending Corps review. Pursuant to confirmation from Sue Homewood e-mailed on April 20, 2016, PTAA understand that the Division WSRO has proof that PTAA payments to the Cripple Creek and Bass Mountain Mitigation Banks have cleared, that Condition 2 of the subject Section 401 Water Quality Certification (WQC004054) has thus been satisfied, and that impacts specified in this Authorization Certificate may occur. Please contact me (rossera@gsoair.org, 336.665.5620) and / or Richard Darling (rdarling@mbakerintl.com, 919.481.5740) with any questions or comments regarding PTAA compliance with the subject permit conditions. It is our understanding that PTAA have fully complied with Special Conditions 4, 5, 9, 12, 19, 20, and 21 of the subject Individual Permit and Condition 2 of the subject Water Quality Certification. Sincerely, PIEDMONT TRIAD AIRPORT AUTHORITY 4 bv"� J. Alex Rosser, P.E. Deputy Executive Director RD/AR:kh Enclosures: Construction Schedule Workplan Verification cc: Richard Darling; Michael Baker International https•//proiects mbakercorp.com/PTOM04/HAECO PreConCmoLpdf U O1 -4 'O O z N V- P -j ,0 O M a� rl C0(0 (A T n T = T (D N T T (6 y TT " LA T n T n T n T VI T n T T r6 N T T r0 'O (0 'O -p 10 (0 'O -O r0 'O r0 'O r0 r6 r6 M r0 r0 -p M 0 0 00 c 0 .--i 0 c .--i 0 0 o 'O 0 0 0 0 .--� c LL O O � of 0000 of O O 00 N Ln N Ln to m ko o 7 kD kD w iO -q I N ;o NO %.o N Ln .q N -4 M O M -4 1 NIMId- I Ln I LO I N I CO I OC I - I -I.N-i I,M-(IV I - I - IN Q a Q¢¢¢¢ a a a CL a a a a o 0 o a o o Q Cl 0 Cl Cl 0 o 0 0 0 0 0 0 0 00 c 0 0 0 c 0 0 0 o 0 0 0 0 0 c LL of of Ln of o' of of of of Ln Ln Ln to m ko o kD kD w iO iD ko ;o %o %.o ko r4 .q _q -4 M O M M L 1 C' L 1 Lr) L 1 .N -i t\O n .--i rNi a a a a a a a a a a Q Q Q t0 C) a o 0 o a o o a a o 0 0 0 0 0 0 0 o 0 0 0 0 o 0 0 0 o Cl 0 0 0 0 0 66 66 66 GN Lo o' m ko of to of � a;%o o; m %D °i °' 00 %o 00 ko 00 ko 00 %o `.-o `ro � rq ko rq -4 rq %o r -q rq %o %D r -q r -q rq r-4 \ \ 00 \ O N N \ I� LL l N N ri M _q - Ol O .--I d' N n \ 01.--i N Nr .--i O N 00 •-I .^-i \-i N N M M 1 1 L 1 L 1 m L] t\O 0\0 .\-I ri ri ri �Id Id N C C O O u V C 0) a C O "d C 7 O V Ln xU m a) N a,,, O O C E a) v Y _ H 3 L m" cn ^ 0) CV a O 0) (a z � m a c 3 .. P; w M — 2 .-. 22- — UG) ( o c o ° m m in a cn M cn W¢ o CL)E v a) � U o ami L (7 m O o 0 0 0 2 O o m n a E a x o vim, +� `O c¢ o¢ Q¢ +' ol a) a a D W s a=(0--- c N nn c E O C7 > ca 'U a S c a Z -L +� c ru'aCU a 'a rv'a ro 0a W = O ii U S S ii a a s 0 Ln -4 1 NIMId- I Ln I LO I N I CO I OC I - I -I.N-i I,M-(IV I - I - IN skwl< WDICKSON community infrastructure consultants April 251", 2016 Mr. J. Alex Rosser Piedmont Triad Airport Authority 1000-A Ted Johnson Parkway Greensboro, North Carolina 27409 RE: HAECO Facility Improvements Project (SAW -2015-00920) Dear Mr. Rosser This letter shall serve as written verification that the final construction drawings for the HAECO Facility Improvement project conform to the permit plans which are attached to the 404 impact permit issued by the United States Army Corps of Engineers on April 11, 2016 for final signature. In the event that there are revisions to the plans, we will notify Mr. David E. Bailey of the Corps of Engineers Raleigh Regulatory Field Office prior to any active construction in waters or wetlands. If you have any questions or need any other information regarding this matter, please don't hesitate to contact me. Sincerely, W.K. Dickson & Co., Inc. Jason P. Kennedy, P.E.