Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC250639_MODIFICATION Supporting Doc (OTHER ESC REVIS)_20250310
JOSH STEIN
Governor
D. REID WILSON
Secretary
WILLIAM E. TOBY VINSON, JR.
Director
North Carolina Department of Environmental Quality | Division of Energy, Mineral, and Land Resources
Mooresville Regional Office | 610 East Center Avenue, Suite 301 | Mooresville, North Carolina 28115
704-235-2100
February 28, 2025
LETTER OF APPROVAL
Iredell Statesville Schools
Attention: Scott Hager
350 Old Murdock Road
Troutman, North Carolina 28166
RE: Project Name: Weathers Creek High School
Project ID: IREDE-2024-004
Acres Approved: 104.6
County: Iredell
City: Troutman
Location: Overcash Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: CESI
Date Received by LQS: February 24, 2025
Plan Type: Revised
Dear Scott Hager:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted
at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive
the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
Letter of Approval
Scott Hager
February 28, 2025
Page 2 of 2
North Carolina Department of Environmental Quality | Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality | Division of Energy, Mineral, and Land Resources
Mooresville Regional Office | 610 East Center Avenue, Suite 301 | Mooresville, North Carolina 28115
704-235-2100
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules, including the applicant’s eventual receipt of other
environmental permits, authorizations or certifications that may be required for the project. In
addition, local city or county ordinances or rules may also apply to this land-disturbing activity.
This approval does not supersede any other permit, authorization, certification, or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notified this office
of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Abel Ferry
Assistant Regional Engineer
Land Quality Section
AJF
Enclosures: Certificate of Approval
NCG01 Fact Sheet
LORR Post-Construction Stormwater