HomeMy WebLinkAbout20151279 Ver 1_More Info Received_20160503�olsla�yp 4• ANGLER ENVIRONMENTAL April 29, 2016 Ms. Jennifer Burdette @ �/ 2 NCDEQ — DWR l5 D 512 North Salisbury Street MAY 0 3 2016 I Raleigh, NC 27604 Re: Comment Response; Hathaway Switching Station (DWR # 15-1279) Dear Ms. Burdette, We are in receipt of your comments dated April 14, 2016. The following are our responses. 1. Title 15A NCAC 02H .0506 requires that a proposed activity has no practical alternative by demonstrating that, considering the potential for a reduction in size, configuration or density of the proposed activity and all alternative designs, the basic project purpose cannot be practically accomplished in a manner which would avoid or result in less adverse impacts to wetlands. Because the preferred alternative involves the greatest amount of wetland impact, the Division cannot review this alternative until the U.S. Army Corps of Engineers (USAGE) determines that this alternative is the least environmentally damaging practical alternative (LEDPA). Please provide correspondence from the USACE indicating which alternative is selected as the LEDPA. Response: The alternatives analysis is still under review with the USACE and all correspondence will be provided by Angler Environmental as it is received. 2. Stream impact S3 — 5.48 linear feet is labeled as a temporary impact. This should be classified as a permanent impact since the stream will be relocated away from this small section of channel and it will no longer receive upstream flow. Response: Stream impact S4 - 5.48 linear feet has been re -labeled as permanent on the impact maps and PCN. 3. Stream impact S 1 — 462.2 linear feet is labeled as temporary. Since the channel will be filled, this should be classified as a permanent impact. Relocation of the stream will be considered as self -mitigating. Response: Stream impact S1— 462.2 linear feet has been re -labeled as permanent on the impact maps and PCN. 4. Grading and revegetation (fill) in Zone 2 of the buffer is an exempt activity that does not need to be quantified. The stormwater discharge into the buffer from the stormwater BMP is an allowable activity that requires the impact to be quantified for approval. Please remove B2 entirely and revise B3 to limit the impact to the stormwater discharge only. 613 Poole Drive, Garner NC 27529 1 P: 919-324-6342 www.AnglerEnvironmental.com Virginia Electric Power Company DWR # 15-1279 Comment Response Letter April 29, 2016 Page 2 of 2 Response: Impact B2 was removed and impact B3 was revised to limit the impact to the stormwater discharge only. These changes are reflected on both the impacts maps and PCN. 5. Explain how erosion in Zone 1 from the SW discharge will be prevented. These types of discharges are usually. connected to the stream channel unless the discharge is anticipated to be non-erosive. Response: The proposed stormwater management pond has been designed to detain the 1-, 10- and 25 -year flows to be less than the pre -developed conditions. Rip rap outlet protection at the end of the primary outfall (SWM culvert) and riprap protection on the emergency spillway have also been proposed to prevent stormwater discharge into Zone 1. 6. Add dashed outline of the existing road within the buffer to make the existing use clearly discernable on the buffer impact map. Response: A dashed outline of the existing road within the buffer has been added to the impact map. 7. This Office has the following comments regarding the stream restoration design. Please feel free to contact Mac Haupt at 919-807-6476 or mac.haupt a,ncdenr. ov if you have any questions regarding the stream restoration design recommendations. a. Green ash should be substituted for loblolly pine in the planning plan. b. Proposed log sills should be installed with footers and/or matting to prevent piping and eventual undermining. Response: Green ash has been substituted for loblolly pine in the planting plan and footer logs were added to the log grade control structures to prevent piping and eventual undermining. Based on the revisions displayed within the plan and/or the responses provided within this comment - response letter, we feel that we have adequately addressed or responded to your comments presented April 14, 2016. If there are any questions or further comments, please feel free to contact me to discuss. Sinnccerely, Anna Reusche, PWS Project Manager CC: Amanda Mayhew, Virginia Power and Electric Company Jean Gibby, USACE 613 Poole Drive, Garner NC 27529 I P: 919-324-6342 www.AnglerEnvironmental.com ATTACHMENT PCN FORM Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form —Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps:X❑ Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: IP or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑X Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑X Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑ No 2. Project Information 2a. Name of project: Hathaway Switching Station 2b. County: Nash 2c. Nearest municipality / town: Battleboro 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no. - o:3. 3. Owner Information 3a. Name(s) on Recorded Deed: Virginia Electric and Power Company 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 701 East Cary Street 3e. City, state, zip: Richmond, VA 23219 3f. Telephone no.: 804-771-6145 3g. Fax no.: 3h. Email address: amanda.m.mayhew@dom.com Page 1 of 10 PCN Form —Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Anna Reusche, PWS 5b. Business name (if applicable): Angler Environmental 5c. Street address: 613 Poole Drive 5d. City, state, zip: Garner, NC 27529 5e. Telephone no.: 919-615-0301 5f. Fax no.: 5g. Email address: areusche@anglerenvironmental.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 018274, 020042, 022200, 037306, 040250, 040252 1 b. Site coordinates (in decimal degrees): Latitude: 36.0449 Longitude: -77.7524 1 c. Property size: 37.010000 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Beech Branch 2b. Water Quality Classification of nearest receiving water: C; NSW 2c. River basin: Tar Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is located approximately 0.3 miles south of the area known as Battleboro. A railroad easement serves as the eastern boundary of the site with single family residences along Crepe Myrtle Street and Ethridge Street being the northern and western boundary and a tributary to Beech Branch serving as the southern boundary. Land use in the vicinity of the project is primarily residential in nature. 3b. List the total estimated acreage of all existing wetlands on the property: 3.68 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 2,347 3d. Explain the purpose of the proposed project: Provide a new electrical switching station that will connect to existing circuits in order to provide additional reliability to the grid and comply with NERC 3e. Construction Describe the overall project in detail, including the type of equipment to be used: of 115 kV and 2130 kV switching station, BMP, and access road. Equipment includes, but not limited to, escavators, and dump trucks. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases)in the past? 0 Yes ❑ No ❑ Unknown Comments: JD pending 4b. If the Corps made the jurisdictional determination, what type of determination was made? X❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Anna Reusche, PWS Agency/Consultant Company: Angler Environmental Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. JD Requested 2015-08-07, NCDEQ DWR stream determination letter recieved 2015-09-08 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes Q No 6b. If yes, explain. Page 3 of 10 PCN Form —Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): 0 Wetlands Q Streams —tributaries X❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary T W1 Choose one Choose one Yes/No W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 Choose one Choose one Yes/No - W5 Choose one Choose one Yes/No - W6 Choose one Choose one Yes/No - 2g. Total Wetland Impacts:' 1.0445 2h. Comments: See attached table 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Fill UT to Beech Branch PER Corps 4 462.2 S2 P Road UT to Beech Branch PER Corps 4 46.03 S3 T Road UT to Beech Branch PER Corps 4 17.29 S4 P Road UT to Beech Branch PER Corps 4 5.48 S5 - Choose one - S6 - Choose one - 3h. Total stream and tributary impacts 531 3i. Comments: Permanent impacts to stream will result from the culvert installation associated with the proposed access road as well as filling the channel for the relocation. Relocated stream to be installed west of existing stream channel approximately 100ft. Proposed channel will tie into existing channel through double 24 inch culverts. Proposed channel will include several curves around proposed substation, then follows the fall of the valley until it ties in again at the woodline in southwestern quadrant. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑X Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number— Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 P UTto Beech Branch Yes 1651 1466 B2 - REMOVED Yes/No B3 P UT to Beech Branch Yes/No 0 192 B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 1651 1658 6i. Comments: The proposed stream relocation design includes establishing Zone 1 and Zone 2 buffers. Both buffer areas will be seeded with native species typical of coastal NC. Zone 1 to be planted with woody species. Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The applicant through this process has identified all environmental constraints including wetlands and streams and has taking steps to avoid and minimize including proposing to relocate and restore the stream channel that would be impacted by the proposed lot fill 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. less impervious material, loose stone to allow GW infiltration reduce runoff, indirect avoidance not direct. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑X Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑X DWQ ❑X Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑X Payment to in -lieu fee program ❑Q Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: 39.8 linear feet 4c. If using stream mitigation, stream temperature: warm 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: 1.035 acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: Unavoidable impacts to wetlands and streams will be compensated through the purchase of mitigation credits 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires E] Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). The proposed relocated and restored riparian buffers will mitigate impacts resulting from the proposed access road and switching station. The proposed riparian buffers would likely result in a functional uplift through an increase in native species as well as vegetative density compared to existing conditions. Please see the stream mitigation conceptual plan for more details. 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑X Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. No. The proposed project will not result in any man-made ditches or conveyances. ❑ Yes X❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 66.4% 2b. Does this project require a Stormwater Management Plan? 0 Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The substation pad area will sheet flow to a stormwater pond to the south, which will outlet to the stream via a culvert. The area immediately west of the substation will be uncontrolled and will sheet flow (it will not concentrate) to the stream. A stormwater management plan has not been submitted as of the date of this report. 2e. Who will be responsible for the review of the Stormwater Management Plan? City of Rocky Mount 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? ❑ Phase II ❑X NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been El Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑X No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑X Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Program, USFWS NC County List 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Fisheries and Essential Fish Habitat database 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? N.C. State Historic Preservation office database 8. Flood Zone Designation (Corps Requirement) _7 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? NC Floodmaps Map No. 3720386300J, Panel 3863 Applicant/Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 ATTACHMENT 2 IMPACT MAPS AND IMPACT TABLE ATTACHMENT 3 STREAM RELOCATION DESIGN PLANS I INCH = 200 FEET ® 0 200 400 600 FEET 1W LEGEND L a J APPROXIMATE PROJECT LIMITS F-1 ZONE I BUFFER (EXISTING) T ­ of Wetland foresbdlYl(N) - STREAM LIMITS ZONE 2 BUFFER (EXISTING) B] Zone 1 PALUSTRINE EMERGENT (PEM) WETLAND LIMITS [.' . ZONE I STREAM RELOCATION BUFFER (PROPOSED) ki ` „$ ® PALUSTRINE FORESTED (PFO) WETLAND LIMITS ZONE 2 STREAM RELOCATION BUFFER (PROPOSED) FILL ® - PALUSTRINE SCRUB SHRUB (PSS) WETLAND LIMITS ZONE I BUFFER IMPACT (PROPOSED) 0.0001 ® STREAM IMPACT ZONE 2 BUFFER IMPACT (PROPOSED) FILL pFo WETLAND IMPACT = = STREAM RELOCATION (PROPOSED) = 0.0002 +/- AC (5.48 +/- LF) W3Ip)BMP PFO Y 00336 4,,W2. , PERMANENT WETLAND IMPACT (PEM -FILL): = O.000 I +/- AC np, PERMANENTWETLAND IMPACT (PFO -FILL): = 0.0035 +/- AC PERMANENT STREAM IMPACT (FILL): = 0.0477 +/- AC (462.20 +/- LF) 3. BUFFER D1sTUR5AN,.I ZONE 1: 0 SF ZONE 2: 192 SF W12. PERMANENT WETLAND IMPACT (PFO -CHANNEL): = 0.0 1 43 +/- AC W I G. TEMPORARY WETLAND IMPACT (PFO -BMP): = 0.0123 +/- AC W3. PERMANENT WETLAND IMPACT (PFO -BMP): = 0.0336 +/- AC W14. TEMPORARY WETLAND IMPACT (PFO -BMP): = 0.04 1 +/- AC W10. PERMANENT WETLAND IMPACT(P55-FILL): = 0.00 1 9 +/- AC XI I . PERMANENT WETLAND IMPACT (PEM-FILI): = 0.0 1 28 +/- AC a W4. PERMANENT WETLAND IMPACT (PFO -BMP): = 0.2376 +/- AC 1 W5. PERMANENT WETLAND IMPACT (PEM -BMP): = 0. 1005 +/- AC • 4N: 5. TEMPORARY WET,AND IMPACT (PEM PMP): ). ')338 +/- AC W6. PERMANENT WETLAND IMPACT (PFO -FILL): y Wetland lmptl Nwnber Type Pllmpxt T ­ of Wetland foresbdlYl(N) Areadlmpart (59Pae Feeq BI Zone 1 mvtnent IPI wierrpomry In B] Zone 1 1,a66.LO 03 Zone 1 laoeP) ,1 Zone2 191.00 WIIP) FILL PEM N 0.0001 W1Ip) FILL pFo Y 00035 = 0.0002 +/- AC (5.48 +/- LF) W3Ip)BMP PFO Y 00336 W41p) BMP PFO y 023M WS IPI BMP PEM N 0.1005 W6Ip) FRL PFO y 0®23 W)IN FILL PEM N 0.1111 wBIPI FILL PFO Y 0.2858 Ws 1pl ROAD PEM N 00038 W10(p) fill Ps5 N 0.0019 W111P) Fill PEM N 0. 0118 W121p) [M1annel vf0 Y 0.0143 W13IT) ROA. PEM N 0.0025 W14IT) BMD pF0 Y D., W15IT1 BMp pEM N 00338 w., imp PFO Y 0.0123 iod 1016 Average ftm RAlPgt) abase sveam Area Pf Baeam btvan xunier iYne of IRRI_ strewn Nary alr2emdNrnt weanwkiN wry impact wrrrr..nt 0)ararpemry M two Oeetl Phew 1-0 feet) SIIPI FILL IT to Beecfi BranN Perenn al ON-Sft O6i.2 0.011) 511 PI ROAD Dt to Bee[h BranrM1 Perenn al 4N -SN 0603 0.0026 S3 (T) RDD I1T to BeerM1 111.- nn Cry -SN 17.19 0.0012 64(p) ROAD Ll 1. Bee[M1 B,a Perennal 1X-5'1 5,a 0.0002 Tobi 53f MM17 01. BUFFER DISTURBANCE: ZONE I: I ,G5 I SF IZONE 2: 1 .4GG 5F W9. PERMANENT WETLAND IMPACT(PEM-ROAD, = 0.0038 +/- AC W 1 3. TEMPORARY WETLAND IMPACT (PEM-ROAL`. - QOOZS +/- AC F_ �4 '�-- 53. TEMPORARY STREAM IMPACT (ROAD): Area of gfUrrbaw guxergsWrMaNumber guxerlare (59Pae Feeq BI Zone 1 1,651 m B] Zone 1 1,a66.LO 03 Zone 1 0.00 ,1 Zone2 191.00 01. BUFFER DISTURBANCE: ZONE I: I ,G5 I SF IZONE 2: 1 .4GG 5F W9. PERMANENT WETLAND IMPACT(PEM-ROAD, = 0.0038 +/- AC W 1 3. TEMPORARY WETLAND IMPACT (PEM-ROAL`. - QOOZS +/- AC F_ �4 ��TLA!, D IMPACT (PFO -FILL): = 0.2858 +/- AC 0 z I • 0000 0 • / 00 0 0000, NOTE5: I . 5A5E MAPPING OBTAINED FROM ANGLER ENVIRONMENTAL. 2. LIMITS OF STREAMS AND WETLANDS WERE SURVEYED BY DOMINION UNLE55 NOTED ON THE MAP. 3. WETLANDS ARE DELINEATED IN ACCORDANCE WITH THE ROUTINE DETERMINATION FOR AREAS LARGER THAN FIVE (5) ACRE5 AS OUTLINED IN THE 19,57 U.S. ARMY CORPS OF ENGINEERS WETLAND DELINEATION MANUAL. OTHER WATERS OF THE U.S. ARE DELINEATED BASED ON THE PRESENCE OF AN ORDINARY HIGH WATER MARK, A5 DEFINED BY THE U.5. ARMY CORP5 OF ENGINEERS DEFINITION OF WATER OF THE U.S. z z Z - } Q W � � O5� 4rV'o Opo o' Wo wo W L:J S z Z Y O Q Q z Q O z J Q O z = U Q F LL z �E- O_� Q c(� Qom_Lu/ _ D_ Q LLJ U Q �> O O Q) LL CLI O O � v PROJECT MANAGER: AIR DRAWN: TD JOB NUMBER: 4746.57 .REVISIONS: NONE '�-- 53. TEMPORARY STREAM IMPACT (ROAD): = 0.001 2 +/- AC () 7.29 +/- LF) 52. PERMANENT 5TREAM IMPACT (ROAD): = 0.0026 +/- AC (46.03 +/- LF) /�� a PERMANENT STREAM IMPACT (ROAD)::: = 0.0002 +/- AC (5.48 +/- LF) ��TLA!, D IMPACT (PFO -FILL): = 0.2858 +/- AC 0 z I • 0000 0 • / 00 0 0000, NOTE5: I . 5A5E MAPPING OBTAINED FROM ANGLER ENVIRONMENTAL. 2. LIMITS OF STREAMS AND WETLANDS WERE SURVEYED BY DOMINION UNLE55 NOTED ON THE MAP. 3. WETLANDS ARE DELINEATED IN ACCORDANCE WITH THE ROUTINE DETERMINATION FOR AREAS LARGER THAN FIVE (5) ACRE5 AS OUTLINED IN THE 19,57 U.S. ARMY CORPS OF ENGINEERS WETLAND DELINEATION MANUAL. OTHER WATERS OF THE U.S. ARE DELINEATED BASED ON THE PRESENCE OF AN ORDINARY HIGH WATER MARK, A5 DEFINED BY THE U.5. ARMY CORP5 OF ENGINEERS DEFINITION OF WATER OF THE U.S. z z Z - } Q W � � O5� 4rV'o Opo o' Wo wo W L:J S z Z Y O Q Q z Q O z J Q O z = U Q F LL z �E- O_� Q c(� Qom_Lu/ _ D_ Q LLJ U Q �> O O Q) LL CLI O O � v PROJECT MANAGER: AIR DRAWN: TD JOB NUMBER: 4746.57 .REVISIONS: NONE I INCH = 50 FEET ® 0 50 100 150 FEET LEGEND L_ J APPROXIMATE PROJECT LIMITS = STREAM LIMITS ® PALUSTRINE EMERGENT (PEM) WETLAND LIMITS ® PALUSTRINE FORESTED (PFO) WETLAND LIMITS PALUSTRINE SCRUB SHRUB (PSS) WETLAND LIMITS ® WETLAND IMPACT CHANNEL ZONE I STREAM RELOCATION BUFFER (PROPOSED) ZONE 2 STREAM RELOCATION BUFFER (PROPOSED) - - STREAM RELOCATION (PROPOSED) LINOI I. BASE MAPPING OBTAINED FROM ANGLER ENVIRONMENTAL. 2. LIMITS OF STREAMS AND WETLANDS WERE SURVEYED BY DOMINION UNLESS NOTED ON THE MAP. 3. WETLANDS ARE DELINEATED IN ACCORDANCE WITH THE ROUTINE DETERMINATIO N FOR AREAS LARGER THAN FIVE (5) ACRES AS OUTLINED IN THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLAND DELINEATION MANUAL. OTHER WATERS OF THE U.S. ARE DELI NEATED BASED ON THE PRESENCE OF AN ORDINARY HIGH WATER MARK, AS DEFINED BY THE U.S. ARMY CORPS OF ENGINEERS DEFINITION OF WATER OF THE U.S. Document Path: Y:\GIS\GIS Work\Actllc Job5\474657 Nash\maps\474G57 Impacts_I I.17_Cha,i-112—J W12. PERMANENT WETLAND IMPACT(PFO-CHANNEL): = 0.0 143 +/- AC Dare .,�f ..ung.-•ms®o.-a� • .` s f� fi ¢ Q z z z z U W~� Z> > Q �4W p z i < Z.~ o z _� off; v$ Ze L Q r� W M Lu f! O 3�', QM o6 �o 0 — �7 3r c� fi z aM Zo uj � �� °a Fu C O � v 3 — O a � c 2 � O V ¢ V z Z Q O z Q O cri J Q W U Z U z w = O o ~ v (s)L z <li O Q U oL cn _ W V— > =Q < < o U — � w O OO U AR TD 47a�.�7 I INCH = 50 FEET ® O 50 100 150 FEET LEGEND 117. J APPROXIMATE PROJECT LIMITS = STREAM LIMITS ® PALUSTRINE EMERGENT (PEM) WETLAND LIMITS ® PALUSTRINE FORESTED (PFO) WETLAND LIMITS ® PALUSTRINE SCRUB SHRUB (PSS) WETLAND LIMITS ® WETLAND PERMANENT IMPACT BMP WETLAND TEMPORARY IMPACT BMP ZONE I STREAM RELOCATION BUFFER (PROPOSED) ZONE 2 STREAM RELOCATION BUFFER (PROPOSED) - - STREAM RELOCATION (PROPOSED) NOTES: 1. BASE MAPPING OBTAINED FROM ANGLER ENVIRONMENTAL. 2. LIMITS OF STREAMS AND WETLANDS WERE SURVEYED BY DOMINION UNLESS NOTED ON THE MAP. 3. WETLANDS ARE DELINEATED IN ACCORDANCE WITH THE ROUTINE DETERMINATION FOR AREAS LARGER THAN FIVE (5) ACRES AS OUTLINED IN THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLAND DELINEATION MANUAL. OTHER WATERS OF THE U.S. ARE DELINEATED BASED ON THE PRESENCE OF AN ORDINARY HIGH WATER MARK, AS DEFINED BY THE U.S. ARMY CORPS OF ENGINEERS DEFINITION OF WATER OF THE U.S. w .mav ar.� Document Path: Y:\G15\GI5 W-kVItive Jobs\474657 Na5h\mep5\474G57 Impacts_ I I x 1 7_BMF.mad Date Saved: 4/29/201 G W 14. TEMPORARY WETLAND IMPACT (PFO -BMP): = 0.04 1 +/- AC ` 10 W3. PERMANENT WETLAND IMPACT (PFO -BMP): = 0.033G +/- AC F77RMANENT WETLAND IMPACT (PFO -BMP): _ ♦ = 0.2376 +/- AC W) 5. TEMPORARY WETLAND IMPACT (PEM -BMP): = 0.0335 +/- AC • w ` h � W5. PERMANENT WETLAND IMPACT (PEM -BMP): . = O. 1 005 +l- ACI' 4- _ fl Q z z i z _v d W z Z rZ, a7 ar Fr f o Lu uza N z p i } z = � Z Q O z � Q J O Q U zIn = z_ LLLJ O z o ~ Q L z O = z, W Q > = Q < O a/- YLL-w �- LL- LL-1 0 0 CL U PROJECT MANAGER: A DRAWN: TD JOB �JUMBER: 4746.57 NONE I INCH = 50 FEET ® O 50 I00 150 FEET LEGEND L.J APPROXIMATE PROJECT LIMITS - STREAM LIMITS ® PALUSTRINE EMERGENT (PEM) WETLAND LIMIT5 ® PALUSTRINE FORESTED (PFO) WETLAND LIMITS ® PALUSTRINE SCRUB 51111,1JB (PSS) WETLAND LIMITS ® STREAM PERMANENT IMPACT ROAD ® WETLAND PERMANENT IMPACT ROAD WETLAND TEMPORARY IMPACT ROAD ® STREAM TEMPORARY IMPACT ROAD ZONE I STREAM RELOCATION BUFFER (PROPOSED) ZONE 2 STREAM RELOCATION BUFFER (PROPOSED) - - STREAM RELOCATION (PROPOSED) fJnr--f ParhYV;1I )\C -,IS JobM474C57 Nash\—,\ 74657 Impacts I Ix 17 R—A2_—J NOTES: I\ 1. BA5E MAPPING OBTAINED FROM ANGLER ENVIRONMENTAL. 2. LIMITS OF STREAMS AND WETLANDS WERE SURVEYED BY \ DOMINION UNLESS NOTED ON THE MAP. WWz 3. WETLANDS ARE DELINEATED IN ACCORDANCE WITH THE ROUTINE DETERMINATION FOR AREAS LARGER THAN FIVE (5) \ ACRE5 AS OUTLINED IN THE 1987 U.S. ARMY CORPS OF z ENGINEERS WETLAND DELINEATION MANUAL. OTHER WATERS / 1 OF THE U.S. ARE DELINEATED BASED ON THE PRESENCE OF /i AN ORDINARY HIGH WATER MARK, A5 DEFINED BY THE U.S. ARMY CORPS OF ENGINEERS DEFINITION OF WATER OF THE �. U.S. fJnr--f ParhYV;1I )\C -,IS JobM474C57 Nash\—,\ 74657 Impacts I Ix 17 R—A2_—J WWz z p �Y - _;Y1 jr W pY _ tea. 'f. rra Y z Q O z Q O U QDz (f i L.� w O LL V J `l z O O LLJ Q Q n U = Q OO U LL - 0 O OO w U AK -c 11�5 NI iMF FfR 474=.57 B3. BUFFER DISTURBANCE: ZONE 1: 0 SF ZONE 2: 192 5F EXISTING ROAD I r ®INCH = 50 FEET O 50 100 150 FEET LEGEND L_J APPROXIMATE PROJECT LIMITS STREAM LI M ITS PALUSTRINE EMERGENT (PEM) WETLAND LIMITS ® PALUSTRINE FORESTED (PFO) WETLAND LIMITS PALUSTRINE SCRUB SHRUB (PSS) WETLAND LIMITS ZONE I BUFFER (EXISTING) ZONE 2 BUFFER (EXISTING) ZONE I STREAM RELOCATION BUFFER (PROPOSED) ZONE 2 STREAM RELOCATION BUFFER (PROPOSED) - ZONE I BUFFER IMPACT (PROPO5ED) ZONE 2 BUFFER IMPAC (PROFO5E1)) )ocument Path: Y:\GIS\G15_Work�Actve_Job5\474657_Na5h\map5\474G57_Impacts_ I I x 17_Buffer.mxd - Date Saved: 4/29/201 G BI. BUFFER DISTURBANCE: ZONE 1: 1 ,G51 5F ZONE 2: 1 AGG 5F NOTES: I . BASE MAPPING OBTAINED FROM ANGLER ENVIRONMENTAL. 2. LIMITS OF STREAMS AND WETLANDS WERE SURVEYED BY DOMINION UNLESS NOTED ON THE MAP. 3. WETLANDS ARE DELINEATED IN ACCORDANCE WITH THE ROUTINE DETERMINATION FOR AREAS LARGER THAN FIVE (5) ACRES AS OUTLINED IN THE 1987 U.S. ARMY CORPS OF ENGINEERS WETLAND DELINEATION MANUAL. OTHER WATERS OF THE U.S. ARE DELINEATED BASED ON THE PRESENCE OF AN ORDINARY HIGH WATER MARK, AS DEFINED BY THE U.S. ARMY CORPS OF ENGINEERS DEFINITION OF WATER OF THE U.S. � N J � M 1 N N a a z z z WZ>� ZaM �M �P a— o— o� Z am aMN M OF^ Z. W � O v 3 Lw a z o z p u z Q O z Q W J 0 cf� z U z n NN a-- Z U z ~ uw W LL- L- O >1 >1O _ -u- �D z ct� o LL -m z �~ 0 � o �Q Q U ry _ W Q Q U OO Q E_— U n LL- w O 0 � U PROJECT MANAGER: A DRAWN: TD JOB NUMBER: 4746.57 REVISIONS: NONE PROTECT SITE LOCATION MAP -P OF FORDECT GRAPHICSCALE 1 o 1000 RR t Battleboro � ,Battle PC D.A— OF EATURAL ®S (DER) CITY OF ROCOMOMIT ZONING A QN (DOE I x-�� p0 Reti3�FO3 0 1 2 3 4 5 7 8 9 10 11 12 HATHAWAY SWITCHING STATION PROPOSED STREAM MITIGATION PLAN CITY OF ROCKY MOUNT, NORTH CAROLINA Awa JDb DA746 57 -Yam qsw do 8U­CADDFAe R.I.. v I. 8h.lA4540571 COVERSHMET. dAg, 4-0 PM—I,g, 11 STREAM MITIGATION PIAN GOALS/OBJECTIVES. THE PROPOSED PROJECT « TEMPORARILY IMPACT 485LINEAR FEE OFPERENNKSTRN,MCEANNESE THE CONSTRUCTION OF THE NE' S"HING STATION AND ILL PERMANENTLY IMPACT 4 1 LINEAR FEET OF STREAM CHAN" a UNDER THE STAION AND TO MITIGATE FOR THE ROAD CROSSING IMPACT, THE APPLICANT FIR OR OSES TO RELoCATE THE CHANNEL FROM UNDER THE STATION AND E ROAD CROSSING DESIGN IMPACT, APPLICANT PROPOSES `oEFTxNBv;R;s�ESSTARNTH�TM�TOCw �NONOME REFERENCE FEMA MAP. 37203863007 OWNERICLIENT/APPLICANT: DOMINION NORTH CAROLINA POWER CONTACT: AMANDA MAYHEW 701 EAST CARY STREET, 12TH FLOOR RICHMOND, VIRGINIA 23219 PHONE NUMBER: 804-771-6145 EMAIL: AMANDA.M.MAYHEW@DOM.COM PROPERTY INFO: PARCEL IDS: 020042, 037306, 040250, 018274, 022200, & 040252 ON -PART) CUMULATIVE ACREAGE: 3 7. 01 AC ZONING: I-2 & A-1 SHEET INDEX: L I ' UTAS E2 EXISTING CONDITIONS E3 STREAM GEOMETRY E4 STREAM PLAN & PROFILE E5 STREAM DETAILS E6 STREAM CROSS-SECTIONS E7 STREAM DESIGN NARRATIVE E8 PLANTING PLAN & NOTES E9 MONITORING & MITIGATION PLAN PROJECT STATUS RELATED REQUIRED PERMITS -P OF FORDECT RRQD N0TREQB N PC D.A— OF EATURAL ®S (DER) CITY OF ROCOMOMIT ZONING A QN (DOE sopeWnlen' COVER SHEET E°oFE'ONLY EATEA—-ITCHINGSTA„ON Elo E9 A wa J.—AH246 57- Ham q ­dSlanovLCABDFAe F.—I-1. Sheerst424057 2 HASTING CONDILONS BAY, 4rz 016 3:59. 12 PM. buatovg, 1 1 11 111 11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11!11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11 11 111 0 1 2 3 4 5 7 8 9 10 11 12 LEGEND PO'WER POLE SANITARY NHoi­H EXISTING CONDITIONS -©POST — "• —'J ? / / N OW OR FORBN1Y THEPROPOSER PROJECT WOULD IMPACT AN UNNAMED TRBUTARY'ro BEECH BRANCH. THE TRIBUTARY RON ROD SET OF APPROXIMATELY 02 SQUARE M CAROLDLA STRESIA IRON ROD FOUND OD GA WAS USED TO EVALUATE THE EFUNC'HON OANDHCONDITION OF THIS COASTALIRON PLPE FOUND TRES"UE ToNDS SLOWLY TO STORM EVENTS.THE STREAM HAS THREE DISDNCT REACHES fl/ / REACH LEDTBHIaSoRW.CH CROSSES THE BASTING HIGH T A�Y AN ES ryESSION U YEGETATON AND LACKS WELL DERNED CHANNEL BED FORMS THE RRGHT OF AVAY IS PERDODICALLY FEFG, FLOODPLADH PROBABLY DITCHED AS PART OF THE INSTALL ANoN OF THE EASUNGCE PAGTED BYTHEW_AND OPiPP01 LBUTS o ENT�M, Pw�SSTIN�CRUE SH IPRRI WERAND LRS RU BEDFORMS ARE POO SYS TH ONLY A PEW SH LOW RFRE SEGRaN2 AND LONG RAT �M LI S --� +sl,-� ;_--s--- 1��� %� �� �/ POOLS THELE B NRISH�SHHFORESTEDANDTEROSIOND NDL LACKS MAT M022 ODN MUCH OF �, , , • °�E R,��°ew�K,2� o�ER o � ° ���ow R �Eo w�°NEN°�SSER WooDs� �N N LYSIS E THIS NOTES 1) �"NGTOPOG --- - �TIG��O r ,, aNL PARCEL IF 04 owY 52 O 24, 20 15 AND ONSPTEMER3,ON 2015 IBROTE BY -_- ,W SEPTEMBER -_—L�� �,�A�TEDO�AIDGDRT2, —= ���� ,— RIG — -�— y, �� / , —EW WELL 2o NEDBEDELTARooGRO—OUT FIT THHANNa AN DONE "" SCOUR POOL AT A LOG DROP THE SAM RESULTED w A FUNCRONAL EVALUATION OF HIGH�FOR s; gCRES wRRa AREAS LARGER THAN FNE 71�' "ED i CHOERPUSSOF BNGLNEERS DEFWNION OF WATERO )MS ANGLBRwERESDRVEYED BY DOrvEmoN. i I — -/xei i - RAN SI07NES � �� .� REACH l 20 ZONE2 _ 30 ZONE 1 � r� REACH 2 — REACH S _� G4 B ES{ RN+cx 2. exo-ro of wvnsrve vecerAnoN REACH 2. exam of STREAM wasloN ZONE 1 i'�� TARYTZS 20' ZONE 2 1 I 12 r (� J I REACH 3 REFERENCE REACH FOR REFERENCE ONLY, PROJECT STATUS r� NOT FOR CONSTRUCTION DATE DESCRIPTION ---- I --- ----- -4/16 REAL DESIGN I-- �� I /' x•� .�.ANc� - — '\ REALDRA oG EXISTING CONDITIONS FOR ROCKY MOUNT so�LY 1N°9 !BSIBW — 0 0 Degigned OS 4/16E�ae E lo \ GRAPHIC SCALE 1-50 FFe1MN ReF2 LA�I 1— (1D,a 1TIea °° O11� e dl�o� P F.— A wa J.—AH246 57- Ham q ­dSlanovLCABDFAe F.—I-1. Sheerst424057 2 HASTING CONDILONS BAY, 4rz 016 3:59. 12 PM. buatovg, 1 1 A 11— j...AH 74s 17 - H—, F -Ah, AU..1CAeevsee- seeer14 74617 3 STa&U,.a cP-RTRY AAE, 42 1116 3:IS 14 eM buat— 1 1 11 111 11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11!11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11 11 111 0 1 2 3 4 5 7 8 9 10 11 12 11ZRHNW TOPOGRAPHIC SUa WAS AKOMNEPDHN, cEOSEST"_Ec ON rvovemaER W, C WE ANDS WERE e¢menTE ON AUGUST ACCORD EE"TETTER° ° ; (5)wRESASS�SeowTHSR9H UA FIVE MAN I G' "HE REA ICE OF a" oHewAHeA_'.CARpNS OF H,6H�AYH�R s of o EMEeHeTHEUHAE DEPIDATED HEUH O ; % E°R ;�SoF -AEo °MDESTRTMSe Ae NDS HVANGLE uveae suaveee O e� / CONTROL P/c 37 CAP 3Ei RAID �H o fRC / E e3aeosAa 0 / X93.15 N2 1 "TTEL 105.51 0 ' 11 T /// d A//C dC S P 8Ei P 137 OR 77 gGN E,L 2 141 1 2,36B.542,82 8.45' 1. O v �.. o 0 0 N \ &CAP SE SE N' 83776262 o / /FOe —_ —._ _ —__—_ —_ —__ —- —- —-- _ _ —_ —_ —_ E: 2.368.1 ai.e e 1 ro —_ _ _ _ _ —_ —_ _ —_ _ —_ , EL 2.60 DO&SET w `N AROAP 38,022 7 2.386 8 6 5 3 88 E / EL 119.84 STREAM THALWEG LINE / CURVE TABLE N ­ER RADIUS LENGTH IRAPHORD DIRE -ON IT IS PROJECT STATUS DATE DEIIRIPHON 12/4/15 30SIDEAGN Hep 204/16 REAL DESIGN r�LeGLM �pe�InMn' �N STREAM GEOMETRY loH Hw FIBRO 6 oNE3HATHAWAY AWITCHING STATION CYTY OF ROCKY MOUNT, NORTH CAROLINA d A = E303 E9 GRAPHIC SCALE 1 30 — FTM N — Riws�FFs F— 1� e d�:o, F A (Pie,) 11,,eomD. N. 9 A 11— j...AH 74s 17 - H—, F -Ah, AU..1CAeevsee- seeer14 74617 3 STa&U,.a cP-RTRY AAE, 42 1116 3:IS 14 eM buat— 1 1 A--j.—AG746E, e,3„q —S<,n CADDA—Re—I-1.Sh-4,4as,-4-STREAMPLANIPROAEEawE4aaas1a4ee3aRED—E,11 11 111 11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11!11 0 1 2 3 4 5 11 11 11 11 111 11 11 11 11 111 11 7 8 9 11 11 11 11 111 11 11 11 11 111 10 11 12 — —SIGN LEGEND I 1'I� START —moi i/ 1 i -- — _ eaoeosec suaaTnno" ReeeR To ON, "—IS To' INDO—TON / i ` RELOCATION , "w"xoEASEwe 0 FORx RON RE SET MONUMENT FOUNDES " 3av 1 1 —° *� pTARYTO BE CH BRANC TRS CONTROLe4� v 'ssIo" OCR E.RHIDITT 0 D ST ME FEESS — , �- , ELLANDEASTING STREAM eFea FORESTED o� :� r LBUTS o w E"T SEND ,PES) wEEE D L -SRS I STREAM PROPOSED TOP OF / DP ER , _ oL TRUCTURE EAan"cTOPOGRAPHIC SUBY WAR COMPLEED BYBOrANCONS"x 24 D,EADns�O"nEPnR3 ` /' \ — /'ExcEOSYNTE3O""OVEMBER16, s u— E50 OC E0 BER RDHEREewCOCANWTANDSE EAUGUST AC"WERE£— DBTEwm"nnoOR nRnainRCER MEAN � reSouwSHWncRens EDEya,os , /0 ENG. ELLAND / OF AN ORDELARY HIGH AVATER MARK, ASSri weeRs oeFlmnorvown°E of xe us. 105 -LCJ - 3) Awes OF wenn"DS AND STREAMS 105 MESIO"DES.ECTED BY . ""cies uveae suavexes BY 00 �.-.a..ce 100 11— Ul 95 ,� 95 90 55 H,ecmrr r se's_. — - - - 90 b5 PROJECT STATUS DATE DEscR�eno" - 12/4/15 30EODESIGN REQ W1+00 -4/16 REAL DESIGN -8/16 ADDRESSED DEeicm: corvm4Errrs 0+00 0+50 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6-50 7+00 7+25 ,,c, -ANGLER �pe�InMn' A" aEa STREAM PLAN & PROFILE Do IEW —PO O"Ex STE VAR d o = E4o E9 eOAAEI TS AE 1 35 vER„A SCALE 1._ 3, mods a1M tia.�, 4, Rewsleas Lill.11 1111 F-1 a� n 0e,) �1e�e41�,ed 11.No A--j.—AG746E, e,3„q —S<,n CADDA—Re—I-1.Sh-4,4as,-4-STREAMPLANIPROAEEawE4aaas1a4ee3aRED—E,11 A I—jo AH74657- £,O q PAIS n,no CABDFA , Re -I-1. SIIA474857-5-STaEM EETAES BAY,-8a0I84 00 58 RED b o E,1 1 11 111 11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11!11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11 11 111 0 1 2 3 4 5 7 8 9 10 11 12 STREAM MITIGATION SEQUENCE OF CONSTRUCTION cIKODUCnory TH SEQOE"OE EEOW FLOW " THE CHANNEL ° O"ST OW°"OFT°° "SAW°" CHANNEL S°� GENERALLY F° OwT°° OUTTHE ALIGNMENT OF THE CHANNEL SHALL BE STIIED IN THE EE TODEMFMINEIF=ONoSRlRNEAND REVIE ED WTTE THE EHGEMER PRIOR TO TTER joe TTo°o of° TMEDESIGNTOC R'RENTs RI SHOULD TO GROUND DISTURBANCE, PERH,H7ER CONTROLS WILL BE -FAILED ON THE DOWNHILL TEADDSESTTRDISTURBED AREA SPECLALAROUND� � AEJACENWTLNSANBANTM MILGATION STOCKH.LNEG�CLLEOAGRSMSD�GARBULEBTFoREEUSSMD SHERUBS DOCATE.D H. TE�°wT°�TsoFTE° M "E AGAFE," PoOF'FEFTRH TOP SOS. FROM AREA TO BE GRADED, AND STOCKPE.E FOR REUSE ACROSS THE WENA"E FLOODPLAHN A'oN OF THE CHANNEL My MY ACC FULAH N o FMERHW DEVICE ONTO A STSELLEYED AREA ENSURlNG NO EROSION OCCURS AROUND THE OUTRALL OF THE aTERHW DEVICE "TALLAISOUN. o F LOG STRUCTURES USIG LOGS SALVAGED FROM SITE INkRING, STALL THE LOG STRUCTURES PER THE AN NG THAT HE TOP S HVBN WELL THE DLVERT OF THE STRBAJA CHANNEL PoSRK BN T OF THE ED . THE CHANNEL I ONTR INGe o NN aVIE D MI AS REQU ED BYSALVAGED TwcPPTwasTo THE wens"E FTooEPLAw AND ELCULNME TMFE M T G O" THE31SSIDE SLOPES OF THE BUFFER, OVEMAP 1 E T USED SECUREN TO COVER THE STREAM BANKS AND WENAND FLOODPLAD4, G THE MATHNG PER T E PROVIDED DETAILS THE DIMENSIONS OF THE MSW"O STR MPLETE GRADING OF CHANNEL FROM SUR UAL M E ""E "ST L TOP SOE wE A"°SEE° "S A"E OIR MAlA "OTO STARE. E THE CULVERTS, BNSURING T T THE CULVERT OUTLEDS ARE PROPERLY COUNTERSUN K INSTALL Top So. SEEDING AND _T`NW °E° TECULVESTO"EAS INDICATED w THE "S. wSOM"O THAT THE SURFACE O THE STONE hITCHES THE PRORLE ELEVATION THEIIID RESED FEESBLOCK. TLE INS mNEL MA -NW IN THE APPROVED MA -NW SEASON, STALL THE WENAND FLOODPI. AND ..RFSN BUFFER PLANNNGS INCLUDED THE SUANNEG MAN LOG GRADE CONTROL STRUCTURE DETAIL M INVERT OF LOG EVEN WEECHANNEwOEET CHANNEL /—�j COIR FIBER MATTING DETAIL"'" INSTALLATIONSTAKE I UPSTREPREDR AM To OFDOWNSTREAM °"S STAKE." EEOAcOP L 13 TOP OF B K — —G STAPLES MAG ® ® ® z SPASLOG cows STAccEREE MP ® ® _'NW STAFF KEYw BOTTOM a w °EFTS S M cE "" °" °ST°ENA°ES 4 O c cE OOEMAP oS — FOOTER SALVAGED HARDWOOD LOGS— 8 �z DESES 1z 14 OS VIEWHEADER LOG WELLAN°FT OO°PEM" HEALOS- 12 Mw CHANNEL - - -FOOTER LOG ° ioG'� WENAND FLOG IIAN TYPICAL CROSS-SECTION GEOMETRY M DO GRADE EX GRADE TLE TO I GRADE NE TO �EGRADE 4 11 F — z' LIVE STAKE TYPICAL DETAIL ADAPTED FROM USDA S oOO4I OP r °'" wLATERALJ'\,� I LE STAFFS SHALL Ee GATDBo BUD FE ETT T°es°xowTaEASEA T MEMRI"TEE -- TO EwBETS SEOFSs S.EE°°A"cE REMOBEE AT WATERT K 8 ALLE ••-••••••• •••••••••• BUFF END SECTIO" VIEW \ \v CHANNEL DETAIL MTs ) 2 SALVAGED TOPSOIL VAN EOFFE°. w DISTURBED ESTHARUGH S JUTE MATT9"G O" 3.1 SIDE -ORES WETLaLow sTAKe SEEEmcu"EERMATTwc A"o FLOOEPLAWjUTE M O Q AP, 1 DEAD R M "SSERE °LOW STAKE _ OARM E"S O" OOEPLw EA"KFML N STAKE -II II_ PROJECT STATUS DATE DESCRIPTION SACOEINc°Ee 12/4/15 30EODESIGN DESIGN Eee coME"Ts __ _' III 11 111 111111 '11 11 L 1 1 1 1 1 1 111 Tl°S �ASEE I I I I I I I I I I III -_ - - - _ -_ - _ - - ___ __ _ _ _ _ _ - - - - =111= =111=1II- III -III -III I -III -III -1 -III=III=III III=III= II III III III III III III II III I III -III II III=III= I III=11 = _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ — — — — — — — ---------— — — — DEAD BLOW STAKE TYPICAL DETAIL ESO"ALLTTO NcT EEAEEL _AiANGLER �pn�InMn' RE FORREVIEW OSES O"LT STREAM DETAILS CTLY OF ROCKY MOUNT N oRTH CAROLINA E5oF E9 8vM � � A E = Re�91 am A (LTe.) 1sn,eom 1F�ea �� 411M e Q��o� ".4" - A I—jo AH74657- £,O q PAIS n,no CABDFA , Re -I-1. SIIA474857-5-STaEM EETAES BAY,-8a0I84 00 58 RED b o E,1 1 Awa j.m Aw24G 57- Ham q ­dst ,ACADDAI.. a I..l I. Sh.lA424ss2-s-CRoss-SECTIONS awg 4rz 016 4:01:21 PM Au'- 1 1 11 111 11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11!11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11 11 111 0 1 2 3 4 5 7 8 9 10 11 12 STREAM THALWEG CROSS-SECTIONS #1, STATION 1+50,0 STREAM THALWEG CROSS-SECTIONS #4, STATION 4+50.0 110 410 110 110 o 100 g,_ _ /j100 100 J 100 P canoe Ex. GRADE J — — — — — — — e:. canoe J PROPOSED 90 90 90 90. PROPOSED GRADE 80 80 80 80 -20 -10 0 10 20 -20 -10 0 10 20 STREAM THALWEG CROSS-SECTIONS #2, STATION 2+50.0 STREAM THALWEG CROSS-SECTIONS #5, STATION 5+50.0 110 110 110 --1— - - —1-110 100 �m 100 100 1100 —GRADE — Ex. GRADE Ex. — — — 0PaoGRADE 90 90 90 go PROPOSED GRADE '— - �80 80 80 - 80 -20 -10 0 10 20 -20 -10 0 10 20 STREAM THALWEG CROSS-SECTIONS #3, STATION 3+50.0 STREAM THALWEG CROSS-SECTIONS #6, STATION 6+50.0 110 110 110 — 410 100 0,100100 — 100 -- --- EX GRADE EA -- oe� — — --- PROPOSED 90 GRADE 90 90 90 PROPOSED GRADE 80SU SU 80 -20 -10 0 10 20 -20 -10 0 10 20 PROJECT STATUS DATE DESCRIPHON 12/4/15 30EODESIGN DEQ 2-16 REAL DESIGN ,ANGLER �pe�InMn' PHN STREAM CROSS-SECTIONS DORF IHW PURPORHR ONES d ' AI S111 E9 -10 e1M N V Rei a� A (11e,) «,eom 1P�ea h�d��o�ENS a D,P Awa j.m Aw24G 57- Ham q ­dst ,ACADDAI.. a I..l I. Sh.lA424ss2-s-CRoss-SECTIONS awg 4rz 016 4:01:21 PM Au'- 1 1 Aaaj.—AH74657 E,0„w„ s d� S: n CADDA­ Re—n-1. SHaaA4,405,-,-STREAM[ DESIGN NARRATIVE BAY, 4,28,20104 0148 PM, tAff­ 1 1 11 111 11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11!11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11 11 111 0 1 2 3 4 5 7 8 9 10 11 12 R, -..�. .... 133.9 AC -0.2 S•M Ln� Q w CONTRIBUTING DRAINAGE'F;REA _ _ f '.'• : ,•THE - •1 ,I _ _ / �r ,sem 7' 1 .•� i3 _;.+' attlebom : ' Battl J , • iii r • �.f ! ,... • - \ f � � • • PROJECT vv Il SITE r DRAINAGE AREA MAP GRAPRGSGALL 1 E00 PROPOSED STREAM RESTORATION DESIGN THE "Toll"I OR THIS COASTAL TARGET DESIGN CRTTERA. THE FOLLOWINGARE rcEY DESICI COMPOIEILS. A coASTu eLAw 111—I EYDIIIC GEOMHTRY RIIIOISE1e IREGIOII CURII BASED Ox THE sT s DR AGE AREA Io 2 SQUARE rvu'e THE STREAM WOULD HAVE A HnIrcRnL WIDTH OP A"RoAFGGESY s PT., A HAIrcRnL REFER'CE REACH REACHT 'LLBEEG) AS A SCORED AS HIGH FUNcnON.G BASED ON"SAM T SCOUR TO. --N A POOL DEPTH TEATIS24wCHES DEETO C FEET WLDE AT TOP OF BANK, AND 4 6 —HES DEEP THE REFERENCE REACH GENERALLY LACKS WELL DERNE POOLS PER To owcxESATRTA THHAN Txe ResETToPTnERNS ¢¢ HAS A 4 POOL HarroM ON WIDTH, WITH A DEPTH OPCH AND o s FEET. WITH 21 SIDE SLOPES THETOP wIDTE WOULD HE o FEET. eao¢.e- Txe eaoeoseD cxAFm¢wnL HA' PLO SLOee oF-000'"(osW) wwcx Is coMPA'ELETnTHAcoASTu SAID HED SYSTEM. THE SLOPE IS GOVERNED HY LIE IIVERL of c1nvERTU AL LHE LOP AID BOLTON oFLEE REAcx. HESIDxS THE RFFLE AT THE OUTFALL OF THE CULVERT THE DESIGN OF THIS SAID HED CHANNEL DOES NOT 'CL DE CONSTRUCTED RTIES AND PooLS. THESE FEATURES WUL DEVELOP OVER nME AS THE CHANNEL ExPERENCES STORM EVE LIS THAT SORT HED MATERALS AND SCOUR POOLS PARTCULAKY AT THE LOG STRUCTURES (SEE DISCUSSION HELOw1. EYE .................................................................................. ........................... APE CN COMPADHLE WITH A SAND HED SYSTEM. LL STO . PER ECO D E DI SCHARGE IS COMPARABLE To THE REGIoNl CURVE PREDICTION OF DISCHARGE, ENLS WOULD ACCESS THE WEnAND FLOODPLAw WHERE VELOCFY WOULD HE CONTROLLED THROUGH DENSE VEGETALIONPLANFORM THE PLANFORM FOR THIS STREAJA INCLUDES SEVERAL CURVES AROUND THE PROPOSED SUBS—ON, TH. THE CHANNEL FOLLOWS THE FALL OF THE VICE MA L SCALE MEANDER PATTERNS WERE NOT INCLUDED D4 THE DESIGN SUCE RECONNECTONVE—E, THE CHANNEL WUL DEVELOP A SMALL SCALE MEANDER AND OR THE STREAM TO DEVELPo"TOP AI APPHOPRALE EELL HEBANKS ADIUST. THE WIDTH OPTHE ROODPL eaovmxs suPPICIHIm AREA P LDLE WOOD HELPS PLINTY. POOL DEPTH THE DESIGN INCLUDES LOGS SALVAGED ON SELE AND STALLED APPROANLATELY EVERY IODLIIR FEET THUSH 11 THE INVERT OFv� DOWNSTREAM LHALwsncALESAxEADcvr. "OsoTHE PROVICHANNDE GRADE coILROoGS L Sxo1¢D LEERE HEAmSLURHAICE WENAND FLOODPLIN ON EACH IDE OF THE RESTORED CHANNES, THE DESIGN INCLUDES A WENAND FLOODRAI WLTH A MIDOLLES WIDTH OF 5 FEET THE WMANIS ONLY 0 1 FEET ABOVE THE INVERT OF THE STREAM CHANNEL SO E SEED RUB ID AN AN ES AMOUNTHOFRo.MAT INTHE CHMIEL WULHIG R YREDDGE HEVELOGI EHAHWELLASS PRODUCELARGERE EAS WIL RESEEDED HIA IDESPEGIESHE YPI OFCOASTALNORTHGAROLDLA THE ZONE 1 AND E I BUFFERWHLLBEIE 2 BUFFER TED ELH WOODY wP ANDFoODPT�Mw°oNEo eo E o°oNNTeEw TEFoR of Naw OF ZONE RNTzo� WIDE THE EY"'I'll Hydrauic Geonietly RelationsFips a c 1 , ,•� ,,.,. iY 15 FOR REFERENCE ONLY, PROJECT STATUS FOR CONSTRUCTION DALE DESGRIPROI 12,4,1E 30RDESIGN-USACOEINCDEQ 2,24.10 REAL DESIGN -8/16 ADDRESSED GTTY COMMENTS .4.eANGU R VIRIIMEITIL �pe�InMn' REAL DRAWING STREAM DESIGN NARRATIVE FOR REVIEW PURPOSES ONLY CTLY OF ROCKY MOUNT N oRTH CAROLINA E70, E9 NTS e1M Na. crow xotmn ror ft.m.11 o„��„ HP_o H c.T, _ •� m _- ,m r® -- i.. _ — t aim a6 wzo wzs �"' cross s.oeon ror 2 r..r stormPOOL wwao �a+a.D om wmI a a. ��� .-1. x •w I Rao oa cm- S..11—ft, 10 r..r storm �Pmlar✓Ocrlplbn _ InEM xmre�iaroNw• 'I TNOT � — — _ o d = Rewsl005 am rye.) IP�e0I w� s Aaaj.—AH74657 E,0„w„ s d� S: n CADDA­ Re—n-1. SHaaA4,405,-,-STREAM[ DESIGN NARRATIVE BAY, 4,28,20104 0148 PM, tAff­ 1 1 AWdmaJnhmaswv¢ssv H,3, gSia�n,bnn+C,BDFA , Fa-bn—Sh-A47¢ss,-6-PINTINGPLANhNOTESBAY, ¢,26/201s¢0235RED -g,11 11 111 11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11!11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11 11 111 0 1 2 3 4 5 7 8 9 10 11 12 �l — /�� LEGEND PO'TER POLE ORE SAN TARY MANxoLDSEwe POST J x1 I Lo.Y —AN-I,5OiVE 1\ �m \ p IN RTE' POTE I Irl\' \ / ✓IR / "\ \ I l I _ ES OVERHEAD rvEssloN — — eaoeosE SUBSTATION, / l PR OR MILLED REFER T — I"N Os off / CND 2 DRkWNc R FEMA GOODPF� — — i - f�ELOCATION eR START l mF'oRMATION / / ,f ' BUFF — — - TeK (PFO) RELOCATION ,� -—.0 ifs w ELLAND NT + wp��w�Ty�oR� sH TIB S e.. �... BEECH BRANCH ; ��. Top OF BANK NPROPOSED AR TO / s U'+z PROPOSED STREAM BUFF AMED TR . Loc GRADE co CONTROL ST.-RE O _ wN BUFFER e / r BUFFER y� WENAND oDeLUN t FKANTING n r ewESNNG r TOPOGRAPHIC SURVEY WAS �. I� ON lint COMPLIED oaolTIorvAi � - L o PNS' ID ' r C � � o / aoomeoBNYSceoSLItiNBTeo ory Nl0'lB eR 1G, / C�� / Ell e 2)W ANDS WERE DEFEMhTED ON AUGUST TED ON zorve � IO zoos avArvGeew�rvML D4 ACcoaDANcewITx THe ROUTwe x (5) ACRES wsrxeNeea THAN Fiv e � � I\ � to j { zoN IA A -•. � .�� � '- y oON of ENcmEEFs weAM / TION MANuu. oTxER WATERS of THE Enlxixeoen servce , s RwwaYcwnNrvwns BY ARMN CORPS OF NGNED DEEMS ENCINeeFS DEFINmoN OF OF WATERY / ANGLERDs WEREAND DOMNHON. P weN,ANsURveYE BY I Zone YA- Wetlantl FlbotlpWin Ptanting: Zone i8-Innee' Riparian Buffet -KN ­ PLANTING NOTES: P onspor enoa v r acro r root (waa nax ootw mnt9T, each nanq —1 wenn T.1 EB11 1. PLANTS AND SEEDS SHAH BE OBTAINED FROM A CO—EFCIAL SUPPLIER. THE CONTRACTOR SHAH MAKE ARRANGEMENTS WITH RELIABLE SOURCES TO ENSURE THAT AN ADEQUATE SUPPLY OF THE REQUIRE PLANT AND SEED MATEFW.S is sgenane Neme common ueme acawc. Size 5wek v° 'i, poemity nme comri�on (nal"caror size s"mak r. "aua'imy gVA4ABLE. — --NH V_ 2 IEEIIToTVHEADT A PLANT OR SEED fPECI DED Is NOT COMMERCW.LY AVAILABLE THE CONTRACTOR MAY REQUEST A SUBS—ON w WR—G. ALL REQUESTS FOR sUBSTTMtONs SHALL BE MADE AT LEAST I MONTH PRIOR TO wSTALLAHON f n«nam eN yq¢ ,run Swaez a Ae a,a amenw 'h S HE, s : ¢i 'p W cueareeod sv, =,y 3 ALL PLANT MATERNts SCENE FROM COMMERCW. PUT PLIERS SHALL CONFORM TO THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR NURSERY STOCK PUBLISHED BY THE AMERICAN ASSOCIAHONs OF NURSERYMEN. v rc'vnyNe-- caionwx C `- a " S -- xneNv. q,h nGw b,a' ee;xwd -s°h ,� 4 THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALLPLANT MATE" IN THE APRRoawATE SEASON FOR EACH TYPE of STOCK. THE PLANTING SEASON FOR CONTAINER TREES SHRUBS TUEEIINGS CONTAINER SEEDLINGS AND LIVE SLAKE S THROUGH MARCH I5. LIVE STAKES AND BAREROOT THE AND SHRUBS MUST BE INSTALLED w THE DORMANT SEASON. ADJUSTMENTS TO THE PLANTING SEASONS —' t00% 5]8 '',vanu us +,remgryna Seann Cdtwvmotl LOU 812' eaemd to'r, ',, qp SHAH BE FROM NOVEMBER I THROUGH DECEMBER IS AND FEBRUARY 1'. MAY BE MADE BY THE OWNER BASED ON SEASON. AND SLID CONDILONES ZonetA-Wetland Floodplain Saetl Mix (t) ----- --- -SOMANSPLANTPLAN MY ALINFESTAOFFCK OR EFESIM EWFTUNHAAFTHYPLANT STOCK THE PLANT DISEASE, INSECT PEST EGGS, AND ALL res 0.13 US AN F CCED AplAicaoon Kate [IGS/ac] 25 Zone 18(2-Riperian ButtefSeetl Mix{1) T TIME FOR THE ROOTS TO HAVE DEVELOPED SUAREFFICIENTLY TO HUNACCEPTABLEOLD ANDTHE So.S TOGETHER WHEN REMOVE FROM THE CONTAINER. Total Seed 3516' ll] OEF CTE�CIE Application Rxte. LM'jPc) NOT BE ALLOWED IF THE SITE IS FLOODED, UNLESS DETERMW E OTHERWISE BY THE OWNER. io,ai seed ND 'I'D,APHTDo K THE CONTRACTOR SHALL NOTIFY THE OWNER A MINFvUM OF . HOURS P.OR TO THE _AS LOCATION OF PLANTING ZONES, WIL BE SUBJECT TO THE APPROVAL OF THE OWNER. THE CONTRACTOR WUL BE RESPONSIBLE FOR THE REPLANTMG OR RESEEDING ANY PLANT MATERIAL LED WELHOUT PPR VAL OF THE OWNER v us 54 _ -- 10. EACH CONTAINER PLANT SHAH E FERTII¢E WITH 20-10-5 CONTROLLED RELEASE TABLE'' FORMULATIONS VARY CONSIDERABLY BY MANUFACTURER, AND OTHER FORMULATIONS ARE ACCEPTABLE, PROVIDE THE TABLETS ARE NOT S.— tau , 159n - na mp:s --- --- ME THE TABLES SHAH BE BU PINTS Ro. SYSTEM THE PLANT STOCK SHAH BE FERT4¢ED AT THEFOILOWING FATES .Gree na 'cape >er Nbd,;Yxens - taY- -� rex ? r° WATER-SOIU RIE NEAR THE -- C-1ANI a smmN fo-urn i4 t_ STOCK TABLETS - >W Va Wdtlrye Elymw wzwmous PLUGS AND QUARTS ONE 5 GRAM TABLE ."DN a - cnre.np:,-- a% - pY° BAREFOOT TUBEFUGS AND SEEUNGS ONE 10 GRAM TABLET PROJECT STATUS _ _ _ ___ __ "'mH 'ma ,m a% .. _ GRAM TABLETS a Ne m aa� n% »1 CONTAINER TWO fsrn R�eh DATE DESCRIPTION .__ mem. lyrata »s coNTAweR Ywo 21 GRAM TABLers emK aw .,x.x, ,a» flex a: rdi _- __- til etno,rer cw.ro,,,,n knxe.a.+,a, zay.- 12/¢ns 3oN DeslcN-usgcoearvc Dep - nou; moYov xw 2rz¢ns LINAL DesICN 9xamp 6unAnwr ,u,vc.rgsstlohis 2:0 Pw -. — i oW 11. DURING PLANTING THE CONTRACTOR SHALL WATER EACH PLANT WITH THE FOLLOWING NEN— QUANTITIES OF WATER UNLESS OWNER DETERNENES THERE IS SUFFICIENT SO¢ MOISIUE ON SITE. ¢TIg/16 ADDESSE DEICITY COMMENTS IE ksnetl 'FNU eN imq sn ww-arc u t aN` TEE 1 GALLON OF WATER o� - SHRUBS 1 GULON of WATER wWremne -- sc mea nceePrx - -- °pP - PLUGS WNT OF WATER .�. ANGLER 12 HI BUFFER S EED AS ED BE ASA iemner;,w,anax - +.,=a.°a,aM+i +.,.r .�. mm ENm oR ERmuIERls mo Be ADDS Am mxemmne oP seEINC. „r �pnnl�nNn' w i" "' "'" SEE seEINC DATes seEINC RATes '""'" _ -- _ _ _ JAN -MAY a AUG see e w RYE so LB/Ac „pa .r '.- —S - GERMAN MILE MAYAUG20LBAc DRAWING PLANTING PLAN & NOTES iarA. , A 2" LAYER SHALL BE PLACE IN THE WENAND FLOODPIIN PwOR pUp°NSE ' rvIY HATHAWAY SWITCH'T ST o ro6EEINGASW LAS IN DIS EEBUFLEFAFI6F RE A = ESeF°E9 GRAPHIC SCALE 1 - -306/N Nx. w Rew31gp3 LAI, F- me,1 {pie{>b,cdJ s.4€s u AWdmaJnhmaswv¢ssv H,3, gSia�n,bnn+C,BDFA , Fa-bn—Sh-A47¢ss,-6-PINTINGPLANhNOTESBAY, ¢,26/201s¢0235RED -g,11 AaaNa,—DA74GA7 HaN, q ­dh� SLl.NSCADDFA re F.I.-NIC. SBaaM,4746E7 9 MOMTONGMFHGAWON PLAN dAM 4T2-016 4 03 31 M,11111 1 11 111 11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11!11 11 11 11 11 111 11 11 11 11 111 11 11 11 11 11 111 11 11 11 11 111 0 1 2 3 4 5 7 8 9 10 11 12 LEGEND ID'TER POLE Q--� MOVE f--.�,' MANHOLF5EW6 X51 1 1 Y ROD IRON DO' PR —' FN D MUMBXT FOUNDi — — — — _ INFOwNATION / - P.ELOCA.ION STAT ESolERHOLEFSATINES RELOC&TI N �" I — > NussloN - STREALLUITCHLINE T BASTING ER E PE—NENT 91� HIUSOORESTED _ TFC 0 SECTION 2 enL¢`iIsANENNEEEVERe NT (PEND iTS Y TO BEECH BRANCH G N 0 " % PLOJ FALSIFIEDSCRUB SHRUB D TRI / ,.� AMe �. I /� I) WETLAND LES PROPOSED STREAM BUFFER T I FOG GRAREE CONTROL FIT FU OUTER N BUFFER ERY L'OIP. EPARNNBUFFBR Li/I'JLIx yyyyy�y� MANG FLOODPLAIN ND I ON r�� �p NOTBS. �00 -(� r! F/ IC EXISTNG TOPOGRAPHIC SURVEY WAS I I I ( ON JULY \ry' y l� II °2Po1EANDAooI oNAL°ARD`¢"D. r I \ 040252 ON =DI BER3 20 5. D E I V VEGEf ON -20LbIBBB BY 0B08YNTBC ON NOVEMBER 16, \ I \ I \ o E SAMPLE PLOT ` - / Z WETLANDS WERE B¢NPATEB.N AUGUSTS G E_ - { - )_ Y 1 y ^ 2015 ANB 9UPPLERLEMEIF F ON NOVEMB R l IGT � VEGETATION/ i i - - - - ACCOMDV oN POR`AR AF I'N ENTA DBTB THAN FlVB \ CRSS AS OUTLINER. THE 1987 U.S. AABLE OF ENGINEERS WANDUDISHARRED /I EUY lillicI OF GINEERS DENITION OF WATER OF THE U S DEERN'�'ER BY ARMY COS O THE S�RPFs � f s � 3) LDBTS OF WMANDS AND STRFAMS BY ANGLER WERE SURVEYED BY M.IODDBS­NED . MITIGATION PLANI THE CROSS SECTION SHALL SHOW WELL D 'I a oPED VEGETATION AND LATERAL STABDITY THE CROSS T ON SHALL REMP. RM—BLY CONSISTENT WITH THE AS BUIT CROSS SECTION BUT MAY WE oW AGGRA (12 COMPONENTS OF A NAL MT­ PLAN, AS REQUIRED BY 2008 REAL MINGA'HON RULE) G ATAND NARROWING As THE CHANN¢ NNTURES. TIO BH19 SHALL NOT EXCEED 1 2 AT ANY RIFFLE CROSS SECTION. _ REs I.— OF COASTAL PIAN SANDBED STREAMS P E. SHALLOW OBJECTIVES. THE PROPOSED STREAM BE'HGATION WILL COMPENSATE FOR 5NE.CoN MATS).O HAVEA W1 IAC OF 'PARLANTMAND FLOODHE PROPOSEDPLAIMELENANoN AND RLPAA"RwN BUFL BE FER FlA E PROPOSED MILGA11ON PROJECT w¢R�'ROV AHANN¢ STAB¢Ir'TRoANDTED LF oPwN THE �RlRr PROECT SHALL R-N STABLE EAND ALL OTHER o RFORMANCEESTANDARDS SHALL BE MEE THROUGH 4 BANKFUI.I EVENTS OCCURRNG N SEPARATE YEARS (742 HO WHICH WILL CONNECTION COMPARED TO THE CONDITION OF THE EHSNG STRAIGHTENED, DEGRADED STREAM, AND PROVIDE MORE FORESTED RIPARN BUFFER THAN THE EHSTING YEARSOF MONFO RIXG CONDITION ENTS COMPHANCE WELL THE PERFORMANCE STANDARDS WOULD BE DETERNFNED THROUGH ANNUAL MONFORDXG AND REPORLNG E IMPACTED BY THE CONSTRUCTION OF A sWITCH.G sTAllON. T EVEGEHTAlON s 1, 2, 3, 5 AND 7 POST CONSTRUCTION. VISUAL MONITORNG ONLY SHALL BE CONDUCTED . YEARS 4 AND ROJECT Is AN ON-SITE R¢OCATION OF AN EHSTING sTRE4M CHANN¢ TO BME TO a CL RESULTS ' CHAD FIT N ON A EAS PILL ETo THE IS A CT SEND THUS oST E T 6 NFL FELL SH DXCL HE OIL WATERSHED THE AlIGNMENT OF THE RELOCATED STRBIA IS DKERhENED BY THE UPSTREAM AND DOWNSTREAM TERhElff WHICH CONNECT TO THE EASHNG STREAM A AS BULLT SURVEYS AS BULLT SURVEYS SHALL BE SUBhETTED TO USACE WINED4 60 DAYS OF PROJECT CONSTRUCTION. SURVEYS LLYERA D STRUCTURES, PLAN VIESS OUCHAs sTRE4M GAGES,DPE"RNNNEIT"SIKES, AND VEGETATION MOTS,,'ANDN ­S�DE OF T RES So UPAN SIR"EQUIREDTO RMOVED A ¢OCAOTE THEF Too STRBAMEl TCHANNEIWA FROM THE PROPOSED SUBSTADON, .TO AN AREAINTO ITSHAII ON OF ALLAISODOCUMENT THEIOCATION OF AIIMOMTNING EQNMENT SUCH CROSS SECTIONS ION. A CONSERVATION HASENTENT OR SDX.AR INSTRUMENT WILL BE PLACED OVER TH E LEVELS F T E BELL ON TREALS UFFERS B RHARLAN BUFFER VEGETATION MONFORHIG VEGETATION MONFORIXG SHALL BE CONDUCTED EI JULY 1 AND LEAF DROP OF EACH MOMTORHW YEAR. PLmTS SHEET E2, DXCLU DXG IN TH PLAor sOE JURISDICHONAIIS PARLAN B DETERNEJATION FOR THE SITE AREA IoLLo . Fl MUST BE I THE GROUND N THE Fl¢D. A NEIJIMUM OF 4 PIGTs WILL BETHE LOCATED, TWO ON FPCH SIDE OF THE sTRFPM. WITL BE HIN FPCH SK HE THE FOIIOWNG DATA (RHO aSAMTOG.PHES OF ) EVALUATION THE NESJSED G STHEDOCUMENTSED TH aCONDITION OF oHE EhISRTINREL AN a G STREAM.E FNCDONAL CONDITION OF THE sTRFAM. A sTRFAM ASSESSMENT METHOD ED L PR IF RMS (3 1L SONO) CREDITST PROJECT T WILL PROVIDE FNCHONAI UPLIFT OVER THEF LONG WHICH IS RFNNON. CAPACITY OFTHAN THE LENGTH OF S'ITIE ENPACTED CHANN¢g"T'G a. UN Em THIS AND STRAIGHTENED CHAPIN ERNNG ALONG THE BANKS NGSNG VERTICALLY, WHICH IS DISCONNECTED FROM THESHALL BE COUNTED AS A SINGLE STEPS REPLANTED STEMS MUST BE OVER 2 YEARS OLD THE . STEN¢"(RPPCH Z) IS A DITOHED RESTED AND CONNSINS INVASIVE HERBACEOUS SPECCES BEFORE THEY IN BE COUNTED VOLUNTEER STEPS DATA MUST BE PRESENTED SEPARATELY FROM PLANTED STEM DATA INVA RVE SPECIES IDEPEN RED DUING MONITORNG SHALL BE CONDUCTED As OUTI LED BELOW. A PROFIHE WOULD ONLY BE REQUIRE IF sIGNIRCANT CHANGES DEFDX.LON, HYDROLOGY, HYDRAULICS, CHANNEL SFYDXG, AND STRUCTURE DETAILS AND NOTES, EROSION AND AL AND SEDEHENTA"ONAT DESIGN S(REFERT'O SEQUENoo° CONS-CHON ON"HELFF El,. FOR REFERENCE ONLY AND PI-NW PLAN AND a. PROJECT STATUS NT,MMUMENTEDCROSSSENONSWILBENSTALLEDNTHERED,ANDMASUREDACHMGNITGNGYEARTOBE NOT FOR CONSTRUCTION DATE DEsCRIPLON ERIE CROPS SEED"' TW BUD THE M_T`NXN CE S HALL "CLUD E P' oDIC INS E_ TYPI� I TWATERUPER YEAR, FOR DAMAGE TO THE SITE FROM STORMS, FLOODS, DROUGHTS AND OTHER C M AR TO THE AS HE DESIGN FEATURES OF THIS Eo,EFT°REFDEoEEEoESREFaDEFR°IEMP� °a w °oFT"AN¢A ERGGNIFl NTSTGM NTS BASED ONT ASSE=L CH FIT. G HARTo K T E PLATUR TDo CHANNES, AND THE ALLTICHATED INCREASE ILL -4/16 REAL DESIGN TYPICALFREQDENGY AND DURA„GN OF FLOOD EVENTS DEQ HABITAT F.TURES SUCH AS FFLES, POOLS, ROOT —, LEAF P CKS, AND WOODY DEBRES THE NORTH CARoLCXA ST — ASSESSMENT METHOD WILL BE USED 8............................................................. .....................................................................................DGG>n,_HONDH,GN6.......................................................................................... ••••••••••••••••••••••••••••••••••••••••••••••••""''''""'"'""''''"'''"'"'''''''''"''"'"'''""'''''''""''''""''''''.•••••••V iMOttl VOCf11ENTA710NAMJ NSUAl'NPEC710N'ENE IIMA'CEAM1MEf SHAll'EE'MSPECTEE'RNV 4"WVQP UTU EtlCWV`?PS COND.ON AT LEAST TWICE PER ===RDS APPLY TO THIS nON PROIECT. HALL BE IDENnFlED MOTANDSTR_ .i. ANGLER A ORNIANCE STANDARD S PHOTOS SHALL ALSO BE TAKEN AT EACH CROSS SEC ON MM M OF 2B0 sT¢ FlAGRE OF E .a. �pe�InMn' YEAR LD PLANTED ST A BAR D AMI �l . YEAR 7 10 MANAGEMENT `VILT"PROVIDE b PLANTED VEGETATION ILL EACH PLOT MUST AVERAGE 7 FEE ILL HEIGHT AT YEAR 5 AND 10 FEE IN YEAR 7 THELONG EQRED PEI OD DOMMON OR uaNUAL SET rvION"A"E"seECHOFF OFF'THEMENG-ON SEND TO moRE THAT THE"PROJECT IS PLEBILMING PROPERTY ANMEREHASBE.oRRED NO SINGLE SPECLES, R TED OR VOLUNTEER, SHALL COMPROSE MORE THAN BOX, OF THE TOTAL COMPO==Y OR 7 DT AT UN EPRG,E°TENETS REAL DRAWING MONITORING & MITIGATION PLAN M PERT YEAR , AND No OTHER PROBLEMS HAVE T=R 3, ANDARDS ABOVE ARE ACHIEVED THROUGH G OF THE SEND MAY 11 ADAP-EMANAGEMENTPLAN DOMMON SHALL BE RESPONSIBLE FOR IMPLEMENTATION OF THE ADAPTIVE MANAGEMENT PLAN BASED ON SPECTIONS OF THE o—CE ST APPROVAL OF THE USACE BUTGANoN CBS E H WITTEN SFNBTH PERLACHEE SHALL TAKE CORREC11VE ACTIONS AS MIGHT BE NECESSARY TO DXSURE THE LONG TERM SUCCESS OF THE SITE FOR EW HATHAWAY SWESCH'T G STATION B PR�TTTOINSURETHATCoNSTRU"C ONIS o PD o" PURPOSES ONLYF RE K UN , NORTH VAR ENCEEADJUSFEBENTS.GEOM'ETRYASTHECONSTRUCTED°HAANNELBECOMEINeEEITEE N,RNANTHE PERFOR CE STANDARDS EE°Ee REMENTSOFTHEMIT-ON"°ofT`WILBEDXCD"DED. THE ANNUAL OPERATION ANDNIANAGEMENTBUDGETFOR = E MOoJECTINAND MCIPwESTHATTHECHAONao°oaE H"THESoENENT THES ITGH.GSTA GN E9oF E9 DROLOGY OF THE WATERSHED SUCCESS SHALL BE EVALUATED BASED ON BOTH PHYSICAL MEASUREMENTS AND VISUAL / PHOTOGRAPHIC BS LOAReti3IRFA SCALE 1 30 A e/M N a AGRAPHIC (Fe,( m l—, No AaaNa,—DA74GA7 HaN, q ­dh� SLl.NSCADDFA re F.I.-NIC. SBaaM,4746E7 9 MOMTONGMFHGAWON PLAN dAM 4T2-016 4 03 31 M,11111 1