Loading...
HomeMy WebLinkAbout20071986 Ver 2_More Info Letter_20080204Michael F. Easley, Governor ~ William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources ~ Coleen H. Sullins, Director Division of Water Quality February 4, 2008 DWQ Project # 07-1986, Ver. 2 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED La Scala Associates, LLC 123 S. White Street Wake Forest, NC 27587 Subject Property: Richland Ridge Road Extension Ut to Richland Creek [030402, 27-21-(0.5), C, NSW] REQUEST FOR MORE INFORMATION Dear Sir or Madam: On January 28, 2008, the Division of Water Quality (DWQ) received your application dated November 20, 2007, to fill or otherwise impact 146 linear feet of perennial stream and 8,465 square feet of Zone 1 Neuse River basin protected riparian buffers and 4,484 square feet of Zone 2 Neuse River basin protected riparian buffers to construct the proposed residential subdivision. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please re-submit your site plans on full plan sheets at a scale of no smaller than 1 "=50'. 2. Please provide a BMP Supplement Sheet for each proposed best management practice that will be used on the site (including both worksheets, Design Summary and Required Items Checklist), as well as all of the required items. The BMP Supplement Forms are available on the DWQ web site at: http://h2o.enr.state.nc.us/su/bm~ forms.htm. 3. Per the requirements of GC 3705, this project must comply with Stormwater Management Plan (SMP) Requirements for Applicants Other Than the North Carolina Department of Transportation, available at: http://h2o. enr. state.nc. us/ncwetlands/documents/SMPReauirementsforAnnlicantsotherthanNCDO T.pdf. Please include an SMP that removes a minimum of 85 percent TSS anal 30 percent TN from the stormwater generated by this project. For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are available at the following web site: http://h2o.enr.state.nc.us/su/bmp forms.htm. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwetlands N~ rthCarolina ~atura!!y An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper La Scala Associates, LLC Page 2 of 2 February 4, 2007 4. Per the requirements of the Neuse Riparian Buffer Rule, all stormwater drainage from this site must be discharged through a correctly designed level spreader. Level spreader design requirements are set forth in Chapter 8 of the North Carolina Stormwater BMP Manual, available at: http://h2o.enr.state.nc.us/su/bm~ forms.htm 5. Please provide one Level Spreader Supplement Form for each proposed level spreader, available at: http://h2o.enr.state.nc.us/su/bmp forms.htm. Please include the Required Items checklist and all items listed therein. 6. Please locate all of the protected riparian buffers as overlays on the site plan, clearly showing Zone 1 and Zone 2. 7. This Office believes that the road crossing labeled on the plans as RC-1 can be bridged to avoid the impacts to the stream. Please revise the plans to avoid the impacts. 8. In Section V of the PCN you state that there are no future plans for the site. However, on plan sheet C-3A, you show a future box culvert. Please revise your plans to show all proposed future impacts. Please submit this information within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMill at 919-733- 1786 if you have any questions regarding or would like to set up a meeting to discuss is matter. cc: Lauren Witherspoon, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Michael Allen, Mulkey Engineers and Consultants, 6750 Tryon Road, Cary, NC 27518 071986Ver2RichlandRidgeRoadExt(Wake)On_Hold