Loading...
HomeMy WebLinkAbout20160137 Ver 1_Approval Letter_20160503Water Resources ENV!RONMEN7AL OUALITY i� � i .��ci:�z��K�� 1)UN��I,f) K. �'��N UI;I: V��AR'T� S. JAY 'LIMMERMAN May 3, 2016 lredell County NCDWR Project No. 20160! 37 v.1 Bridge 69 on NC 1 15 TIP Project No. B-4766 APFROVAL of 401 WATER QUALITY CERTIFICAT[ON with ADDITIONAL CONDITIONS Mr. Philip S. Harris, III, P.E., CPM Natural Environment S:,ction Head Project Development and Environmental Analysis North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina, 27699-1598 Dear Mr. Harris: You have our approval, in accordance with the conuitious Iisted belc,w, for t;ie following impacts for the purpose of replacing Bridgz 69 on NC 115 in [redell County: � Stream Impacts in the Yadkin-P�eDee River Basin � Permanent I+�ll Temporary FSII Permanent Fill Temporary Fill Stream Impacts Bank Total Stream in Intermittent in Irftermittent in �'erennial in Perennial Requirir,g Site Stabilization �rnpact Stream Stream Stream Stream 1VHtigation (linear ft) (linear ft) (linear ft) (linear ft) (linear ft) � (linear ft) (linear ft) 1 120 72 72 0 2 10 98 20 118 98 0 0 0 0 TOTAL 130 0 0 98 92 190 98 Total Strea� Impact for Project: l90 linear feet. The project shall be constrt!cted in accordance with your application da±ed received March 23, 2016. After reviewing your a�piication, we have decided that these impacts are covered by General Water Quality Certification Numbers 3885, 3891, and 3893, This certification corresponds to the Nationwide Permits 13, 23, and 33 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local pernlits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approvai will expire with tne accompanying 404 permit. This appr�val is valid solzIY� ior the purpose a:�� ciesign des�ribed �n yout- anpli�at�ar lunt�ss moaif�vd relowj. ShoisiG yoa, p�•c��et.t State of North Carolina �,Environmeotal Quality I �✓ate� Resocrces 1Si7 �dail Senice �ente�, Raieiaii, Nurh Carolina 27o9S-161; Fhor.a yi5-BG?-5300 This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. If the properiy is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions•. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacis to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. Condition(s) of Certification: Projeet 5pecific Conditions 1. As pertains to impact Site 2: Pipe should not be buried, but laid on grade. Conditions and existing steep topography at Site 2 would cause destabilization with a very small Right of Way to allow repair. Advanced site review supports exemption from pipe burial at Site 2. Citation: General Condition (1) of thz 401 permit. [15A NCAC 02H.0506(b)�2)] 2. As a condition of this 401 Water Quality Certification, the bridge demolition and construction must be accomplished in strict compliance with the most recent'version of NCDOT's Best Management Practices for Construction and Maintenance Activities. [I SA NCAC 02H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)] 3. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre- treated through site -appropriate means (grassed swales, pre -formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of Stormwater Best Management Practices. [ISA NCAC �J2H .0507(d)(2) and 15A NCAC 02H .0506(b)(5)] 4. All stormwater runoff shall be directed as sheetflow through stream buffers at non-erosive velocities, unless otherwise approved by this certification. [I SA NCAC 2B.0233(6)] General Conditions Unless otherwise approved in this certification, placement of culverts and other structures in open waters and streams shall be placed be;ow the elevation of the streambed by one foot ioi all culverts with a diametei greater tha� 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to a11ow low flow passage of water and ac�uaiic Iifz. Design and place�neni ai culverts and other struc�ures including temporary eros;o�i control m�asures si-,all not be conducted in a manner that may result in dis-�quilibrium of wetlands or streambeds or banks, adjace:�t to or upstream and downstream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by NCDWR If this condition is unable to be met due to bedrock or other limiting features encountered during construction, pleas� contact NCD�VR for guidance on how to proceed and to det�r.nine whether or not a permit modification will be required. [15A NCAC 02H.0506(b)(2)] 2. If concrete is used durir.g construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. [ 15A NCAC 02B.0200] 3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [ 15A NCAC 02H.0506(b)(2)] 4. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)] 5. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [ 15A NCAC 02H.0506(b)(2)] 6. The Permittee shall ensure that the fmal design drawings adhere to the permit and to the permit drawings submitted for apnraval. [15A NCAC 02H .C507��) anu 15A N�A� O�H .OSCf (b)(2) and (a)(2)� 7. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, roak berms, cnfferdams and other diversion structures shall be used to prevent excavation in flawing v�ater. [15A NCAC 02H.U506(b)(3) and (c)(3)] 8. Heavy equipmer.t shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)] 9. All mechanized equipment operated near surface waters must be regularly ins�iecied and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] ? 0. No rock, sand or other materials shal! be dredged from the stream ch�nnel except wher� authoriz�d by this certificatior.. [15A NCAC 02H.0506(b)(3)] 11. Discharging hydroseed mixtures and washing out hydroseeders and other equipmer.t ir. or adjacent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 12. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with �303(d) of the Clean Water Act) and any otl-ier appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 13. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification. [15A NCAC 02H.0506(b)(2)] 14. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on- site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 15. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.050 i and .0�02] 16. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, o� ordinances inai r�iay oe imposed by other gove�i7-neiit agencies (i.e. local, state, and fede�al} 1-iavu�g jur;sdictior�, inciudiiig but not limited to applicable buffer : ules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 17. The Permittee shall report any violations of this certification tc the Division of V6'ater Resources within 24 hours of discovery. [15A NCAC 02B.0506(b)(2)] 18. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed. [15A NCAC 02H.0502( fl] 19. Native riparian vegetation [ex. Salix nigra, Juncus (spp), Carex (spp), et al.] must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. [ISA NCAC 02B.0231(b)(6)] 20. 'There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit withcut appropriate modification. Sl-iculd waste or bo�row sites, or access roads to waste o: bor:ow sites, be located ir. wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities.[15A NCAC 02H.0506(b)(3) and (c)(3)] 21. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Pract;ces in order to protect surface waters standards [15A NC'AC �2Ei.0�Ob(b1�3 j and (c)f3]�: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in acccrdance with the most recent version of the North Carolina Sed.iment ancl Erosion C_nnt�•ol Planning and Design .Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Cvntrol �fanual. The devi�cs shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. 'The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedsmentation Pollution Cor.trol Act. 22. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. [15A NCAC 02H.0506(b)(3) and (c)(3)] If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the oftice of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal o�ce hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919) 431-3000, Facsimile: (919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Sam M.Hayes, General Counsel Uepartmeirt uf Environmenial Quality 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Donna E�ood at (704)682-2839 or donna.hood@ncdenr.gov. Sincerel , / � � S. Jay Zimmerman, Director Division of Water Resources Electronic copy only distribution: Steve Kichefski, US Army Corps of Engineers, Asheville Field Office Trish Beam, Division 12 Environmental Officer Colin Mellor, NC Department of Transportation Carla Dagnino, NC Department of Transportation Marella Buncick, US Fish and Wildlife Service Marla Chambers. N� VVildl:fe Resources Cocnmi�sion File Copy � �- � ; -_ � Water Resources ENVIRONMENT.4L �UALITY NCDWR Project No.: Applica�t: Project Name: Date of Issuance of 401 Water Quality Certification: County: I'.-A"I ��11� �'I�OIZ1` l)(>I�' \f.li K. V,1N I>I;l� VAART ti. JAY 'I,IMMF,RMAN Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, ±he applicant is required to return this certificate to the 401 Transportation Permitting Unit, Na �h Carafina �iv�sicn cf �'�'ater Resources, 1617 Ma:! Service Cert�r, Ral:,igh, NC, 27599-161?. This fo;�r� may be returned to NCDVb'R by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send cer±ifi�ates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance anr_i intent of the 401 Water Quality Certification and Buff�r Ri�les, the approved plans and specifications, and other supporting materials. S;�c:a�ure: ��t:;: Agertt's Certification [, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 �Vater Quality Certification and Buffe: Rules, the approved plans and s}�eci ications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construciion such that the construction was observed to be built within sabstantial complia��ce and ir�tent of the 401 Water Quality Certitication and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Rejistration No. State oF North Czrolina !Enviror,mental Quality i, bVat�r Rasoarces 1017 Mail Service Center, Raleigh. North Carolina 27699-161; �I�one: 919-80i-5300