HomeMy WebLinkAbout20071739 Ver 2_Initial Interest_20080204~ )c.p o ~- I x'13 q v 2
INITIAL INTEREST IN PARTICIPATION IN THE EXPRESS REVIEW PROGRAM
WITHIN THE 401 OVERSITE/EXPRESS PERMITTING UNIT
October 1, 2006
Version 4
Applicant Name: Bob Fraser. Manager, Centennial Development, LLC (& Associate Vice Chancellor,
Centennial Campus Development Office)
Applicant Address: PO Box 7408, NCSU Campus, Raleigh, NC 27695-7408
Applicant's phone number: ___ (919) 513-7997 Fax number: _(919) 513-7997
Applicant's email address: RWFRASER@GW.FIS.NCSU.EDU
Consultant Name (if applicable): Mack Little, Little & Little Landscaye Architects, PLLC
Consultant address (if applicable): _PO Box 1448, Raleigh, NC 27602
Consultant's phone number: (919) 821-5645 Fax number: (919) 831-2329
Consultant's email address: mack.l@lal-la.com
Type of action requested under the Express Review Program (check all that apply):
^ 401 Water Quality Certification ^ Stream Origin Determination
^ Isolated Wetland Permit # of Determinations Requested
X^ Riparian Buffer Approval (Revision to approved plan) ^ Intermittent/Perennial Determination
^ Riparian Buffer Minor Variance # of Determinations Requested
^ Coastal General "Major" Variance ^ Isolated Wetland Determination
linear feet or acres
^ Stormwater Management Plan (this fee is not additive when approval is combined with 401 Cert.)
# of Drainage Areas/Project Site
Name of Project: _NCSU Centennial Campus Golf Course Complex County: Wake
Total project acreage: 226 (acres) Total built out impervious area: 13.25 (acres)
Nearest Named stream + River Basin (from USGS topo map): Walnut Creek (27-34-(4)), Neuse River (NEU02)
Basin
Please provide a brief description of this project (attach site plan if available):
Revision to previously approved buffer imaacts related to trail and irrigation water line crossings associated with golf
course construction. Crossing #2 will be deleted from the plan, Crossing #5 is widened by 2' (from 12'-14') to
accommodate the irrigation line originally associated with Crossing #2.
Please attach a map of site location using USGS 1:24,000 map and county soil survey.
1
e• '~
Location of project site -please include reference to the county, nearest name town and highway number:
Site is in Wake County in the southeastern portion of NCSU's Centennial Campus in Raleigh From I 40
take Lake Wheeler Rd. exit heading towards downtown Turn onto Centennial Parkway from Lake Wheeler
Road (towards State Farmers Market). Take first left onto Achievement Drive Turn left on Main Campus
Drive. Project area is south of the end of the drive
Proposed impacts:
8,133
Acres of 404/401 wetlands
Acres of isolated wetlands
Linear feet of streams
Linear feet of isolated streams
Squaze feet of protected stream buffers
Has consultant or applicant attended any DWO-sponsored training sessions in the past two vears~ If so please list
which ones. DWO/COE Consultants Workshop September 2007
Has any DWQ staff visited the site? X , if yes, please provide DWQ staff name, _Amy Chapman & Rob Ridings
and date of visit: 4/26/2006
Which other environmental permits from other agencies will be needed for this project? Please list the permits and
issuing agencies below:
Erosion Control Approval (NC Div of Land Ouality~
Stormwater Management Approval (NC State)
Does this project require approval under the State Environmental Policy Act or National Environmental Policy Act?
EA/FONSI has been obtained
Is this project an After-the-fact application or has this project received a previous Notice of Violation from DWQ?
No
Does this project require approval of a Variance from the NC Environmental Management Commission? No
Are you awaze of any local controversy concerning this project? If so, please describe the controversy and any
measures that have been taken with respect to public involvement.
No
This form must be submitted via email (c/o 401express@ncmail.netl, faxed (919-733-6893) or hand-delivered to the
Parkview Building, 2321 Crabtree Blvd. Suite 250, Raleigh, NC 27604. Applicants who aze selected to participate in
the Express Review Program will be notified via fax within 2 days. Successful applicants will then be instructed
regarding detailed procedures for full application (Note: Submittals of the review packages on Friday after 12:00 pm
will be stamped as received on the next business day).
Please contact Cynthia Van Der Wiele at 919-715-3473 if you have any questions regarding this form.
(Lonnk Pole GoH Course)\WetlanA Crossings\127-73 HkWrkel Plan 02 02 2008.dwg, 11 z 17, 2/12008 1:14:04 PM, tlowder
// ~ /
r7
sa
e ~ i -------- __- -
mc~o ~ ~w
:~
3
u°, m
!
-
~ ~, ..
v ~
8 ~ <n
~ N m0
~
Q ~ \
\ N
m
N \ r(p
~ ~ \ \~
m ~
\
n ~
0
o
o \
Ir u~r_~n ~
I,.._
Z \~~
~f _~
® /
o
t /
~ ~ C Stream /Buffer Crossing
Overall G~ Grou
~
c ,
p
~ o N Lonnie Poole Golf Course
N
A
Y Centennial Campus, N.C. State I..ANO PLANNING
CIVIL ENGINEERING
v
~
Wake County, North Carolina LAND SURVEYING
~,;.;;x ;;„~;~~p,~.u~;n ~~
~.
b
m
.~...
b
r
~z ~
C~- ~
p p ~
N M
Oyy
~ ~ m
'LS
c~
0
M
0
G
..
N
N
n
O
b
N
k
O
Zn
°D
o ~
N O
n
~zn^
V,
rn
n
Z
O
9\
~1
~~~
\~9
USGS Topographic Map
From Raleigh West, NC 7.5 Minute Quadrangle
Scale: 1:24,000
Dated 1993
NCSU Centennial Campus Golf Course Complex
Centennial Development, LLC
Ftwtary highway
NC • e nara.uKaFe........
seeaaaary nignway
nara anlaee........
QUADRANGIEIpG110N
ROAD CLASSIFICATION
Licht-duty road, hard or
mFrwea.arra~......:
uaimyravearaaa...... __'°____~
- ~ Interstate Routa O U.S. Route O State Route m _
1 2 s ]Sanheest DUrhwa
: e.yl.et -
9 W6 Forut
C+t9 _
a S 6Apugh~ RALEIGH WEST, NC
Il.h.wheelr: ~
c ~ s e G.mw 1993 °_
ADJOP11N0 T.5'QUADaANGLE NAMES NP7A SZ6515W-SERIES Va42 ~-
u moarRnS , e
~ MElEN6 IWO ~
Custom Soil Resource Report
Soil Map
Survey
Natural Resources Conservation Service
(Web Soil Survey)
NCSU Centemtial Campus Golf Course Complex
Centennial Development, LLC
A o ~ ~ ,.~ ,.~~
Feat
0 1.11110 2.000 1.000 8.000