HomeMy WebLinkAbout20061048 Ver 1_Power Point Slide Show (2)_20060713Project Background and History
I l September 211111 — Mine Permit Modification Application
Submitted to DLR
Proposed addition of 11.62 acres to existing permit 28-
Excavated using o hydraulic dredge
average depth of 15 feet. maximum of 20 feet. ,
Project Background and History
26 September 2001 - Multi -agency site visit
• NC Division of Coastal Management
• NC Division of Land Resources
• NC Wildlife Resources Commission
26 December 2001 - US Army Corps of Engineers Site Visit
William Walker
• Action ID 200210235
The proposed action does not have a regulated impact of
jurisdictional waters or wetlands"
14 June 2004 - DWQ Wetlands Section Meeting (Raleigh)
John Dorner
-Project could be permitted through 2H.1300 if isolated
-if not isolated, request exemption from water quality standards from
EMC (28.0226) and follow 21-1.1300
Project Background and History
10 August 2004 - USACE Washington Regulatory Field Office
NN Minn, Wescott
• wetland jurisdictional
• activity non -jurisdictional
• NO DOA PERMIT REQUIRED — concurrence with 2001 finding
I 1 August 2004 - NC Division of Coastal Management
Dennis Hawthorn
• wetland not tidally influenced
-WETLAND NOT CAMA JURISDICTIONAL
1 August 2004 — 1.5 Acres of On-site ?Mitigation Identified
.historic dredgd, ill mule ial deposited into tidal wetland
y� a
ae
r a
On-site mitigation -1 .S acres
2
Dare County Department of Public Health - Molly Fullw000d
Identified sites small (under one acre each) and scattered —3 acres total
North Carolina National Estuarine Reserve - Buxton Woods
Michelle Droszcz (Northern Sites Manager)
3 r'.
Project Background and History
September _2001 - January 2002 Agency Comments to Application
Division of Water Resources, Water Allocation Section - Blake Rouse and Nat Wilson
-'should not have an unduly adverse effect on ground water supplies"
US Fish and Wildlife Service - Garland Pardue
• Coastal Barrier Resources System Unit LO3 Impacts
only applies to unincorporated Dare county, Nags Head, and Kitty Hawk
• Wetland Impacts --
requires Corps permit
no avoidance, minimization. or mitigation provided
activity "a,Corps jurisdictional, onsite and fee -in -lieu of mitigation proposed
• Saltwater Intrusion Potential
flora and fauna of adjacent lakes do not indicate saltwater intrusion
• Water Table Draw Down and Resulting Impacts To Live Oak Forest
DWR response (above), adjacent lakes do not impact groundwater levels, live
oaks are scattered and don't comprise maritime forest
Project Background and History
September 2001 — January 2002 Agency Comments to Application
State Historic Preservation Office - Rene Gledhill -early for David Brook
•'...it is unlikely that any archaeological sites ...will be affected.
-no archaeological survey recommended
Division of Land Resources, Land Quality Section -- Bal crew
•general mine characteristics, maps, natural resource protection, reclamation
plan
to be addressed in a revised application, pending this meeting's outcome
NC Wildlife Resources Commission-wiuiemwesroat
-"we are opposed to the destruction of wetlands without adequate mitigation"
adequate mitigation will be provided, pursuant to this meeting's outcome
• protected species
no habitat present for federal species (sea beach amaranth and dune blue curls)
stale species not observed
Project Background and History
September 2001 - January 2002 Agency Comments to Application
NC DWQ Wetlands Section -John Denney
•'this activity will violate wetland standards by altering natural hydrology'
this change can only be done in the context of a 401 certification or an
Isolated Wetland Permit"
1H
Background and History.
Summary
I 1 September 2001 - Mine Expansion Permit Submitted to DLR
26 September 2001- Multi -agency field meeting
27 September 2001 - Division of Water Resources Response
9 October 2001 - USFWS Response
I I October 2001 - SHPO Response
16 October 2001 - DLR and WRC Responses
20 December 2001 - DWQ Wetlands Section Response
3 January 2002 - DWQ Wetlands Section Response
19 January 2002 -DWQ Wetlands Section Response
14,(une 2004 -John Dorney Meeting (Raleigh)
10 August 2004 -- USACE Washington Regulatory Field Office
I I August 2004 - Division of Coastal Management Site Visit
1 1-1; October 2004 - Mitigation Site Search
7 April 2005 --Cyndi Karoli Meeting (Raleigh)