HomeMy WebLinkAboutNCG020580 DMR SWANNUAL SUMMARY DMR - STORMWATER
STORMWA TER DISCHARGE OUTFALLS (SDO)
GENERAL PERMIT NO. NCG020000
TRepott AlL Sr0RiY11,�!�TEI��Ivi�nitonng Data~drithis fotiri,,'(includtng No Plow and No,D,rscharg'eani1 Pe�mrt Lainii,Yaol'atiotis•)gby NfARCH o each year',- A? w '_ _°"'
CERTIFICATE OF COVERAGE NO. NCG020580 SAMPLE COLLECTION YEAR: 2015
FACILITY NAME: Richmond Quarry COUNTY: Richmond
PERSON COLLECTING SAMPLES: N/A PHONE NO. (704) 525-7740
CERTIFIED LABORATORY: PACE ANALYTICAL Lab #12 ADD TO LISTERVE? YES ❑ NO ❑ EMAIL:
Part A Qf-i Tatar Mnnitnrma Rmmnrmmnntc
Date Sample
Outfall Collected
No. (mo/dd/yr OR
NO FLOW)'
In Tier 2
Monthly # of Months in Total Flow
Monitoring? Tier 2 (MG)
(/n) Sampling
Total Suspended Total Event
Solids Turbidity4 Settleable Rainfall Duration
(mg/1) (NTU) Solids (ml/1) (m. )
- -
- - -
1003'4 See Footnote 3,40.1 3
No SW Outfalls Exist on Site
Richmond Quarry is an undeveloped greensite
'If "NO FLOW" or "NO DISCHARGE," enter "NO FLOW" or "NO DISCHARGE" foi each outfall here and the Date Range
ZPei NCG02 Tier 2 Monthly Sampling shall be done until 3 consecutive samples are below the benchmaik of within the benchmark range
3 I a value is in excess of the benchinaik, of outside the benchmark range (for pH), you must implement the Teir I or Tier 2 responses in the General Permit
4TSS benclumaik values are 100 mg/I except in ORW, HWQ, trout, and PNA wateis where they are 50 mg/1
5The discharge shall not cause an instantaneous measuiement of the turbidity of the receiving water to exceed 10 NTU for fieshwatei streams, lakes, and reservois designated
as tiout waters, 25 NTU foi all lakes and teservois, and all salt water, 50 NTU foi all other streams and surface wateis Turbidity may be monrtoied at the SDO
Alternatively, the permittee may choose to monitor turbidity in the receiving water, dnectly upstream and downstream of the SDO
Permit Date 1/1/2010-12/31/2014 Last Revised 01-21-11
Page 1 of 2
Part A: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month on average
Outfall
No.
Date Sample In Tier 2
Collected Monthly # of Months in New Motor
(mo/dd/yr OR Monitoring? Tier 2 Oil Usage
NO FLOW)' (y/n) Sampling (gal/month)
-
Total Flow TPH using method
(MG) 1664A SGT -HEM
(mg/1)
- 15 3
Total Suspended
Solids
(mg/1)
100 3
pH Total Event
(Standard Rainfall Duration
Units) (in)
6-9 3
N/A
0
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES
AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑
HAVE YOU CONTACTED THE REGION?
WHO AT THE REGION HAVE YOU SPOKEN WITH?
YES ❑ NO ❑
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE" & LIMIT
VIOLATIONS) BY MARCH 1 OF EACH YEAR TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6300
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMA TION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information sumbitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisionment for knowing
violations."
2/15/16
(Signature of Permittee) t (Date)
Permit Date I/1/2010-12/31/2014 Last Revised 0 1 -21 -11
Page 2 of 2