Loading...
HomeMy WebLinkAbout20061048 Ver 1_Emails_20060712Avon numbers Subject: Avon numbers From: "Ward Marotti" <wmarotti@rjgacarolina.com> Date: Wed, 12 Ju12006 09:47:57 -0400 To: "Cyndi Karoly" <cyndi.karoly@ncmail.net> Cyndi: I've requested information regarding DOT's annual need for approved sand based on the annual average use from 200-2005, as you requested. I've not received the numbers yet. According to the mining project engineers, the approximate volume of material in the excavation portion of the proposed expansion area (shown in Figure 4 in the report) is approximately 250,000 cubic yards. As I've mentioned during previous presentations/meetings, DOT used approximately 234,000 cubic yards of material (18,000 truckloads) from the site to restore approximately 11,150 linear feet of dune north of Buxton in 2004. Obviously this is a single event and does not address the annual ongoing maintenance need along NC 12, but it illustrates what material from the proposed expansion area could accomplish. I'm supposed to get a letter with the requested numbers faxed to me this morning. As soon as I do I'll have it scanned and a-mail it to you. See 'ya at noon. Ward Marotti, Restoration Ecologist Robert J. Goldstein and Associates, Inc. 1221 Corporation Parkway, Suite 100 Raleigh, NC 27610 tel: 919-872-1174 or 800-407-0889 fax: 919-872-9214 URL: www.rigaCarolina.com S ~ c~ d C~ ~~, /~~ ~~ ~ / ~ ~ ~ o ,,,1 ~~„ ~ ,~ ~~,,,.~, S J ~ ~~, ~~ 1 of 1 7/12/2006 9:49 AM