Loading...
HomeMy WebLinkAbout20151288 Ver 1_Approval Letter_20160503Water R esources ENVIRONMENTAL QUALITY May 3, 2016 I T B Holdings, LLC Attn: Mr. Christopher M. Willet 1829 E. Franklin Street, Ste 800-B Chapel Hill, NC 27514 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director DWR # 15-1288 Wake County Subject: Authorization of Neuse River Riparian Buffer Protection Rules Major Variance with Additional Conditions 2912 Wake Forest Road Redevelopment Dear Mr. Willet: You have our approval for the impacts listed below for the purpose described in your application dated December 11, 2015, received by the Division of Water Resources (Division) December 14, 2015, with subsequent information on February 4, 2016. This letter shall serve as your Major Variance approval with conditions as authorized in 15A NCAC 02B .0233 (9)(c)(ii). This letter only addresses the major variance from the buffer rules and does not approve any activity within Waters of the United States or Waters of the State. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed below: 1. The following impacts are hereby approved. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0233(9)(c)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Buffers — Zone 1 23,891 (square feet) 0 (square feet) Buffers — Zone 2 13,686 (square feet) 0 (square feet) 2. No additional impacts other than exempt uses as identified within 15A NCAC 02B .0233 shall occur within the protected riparian buffer unless approved by the Division. State of North Carolina I Environmental Quality I Water Resources 1617 Mail service Center I Raleigh, North Carolina 27699-1617 919 807 6300 ITB Holdings, LLC DWR # 15-1288 Major Variance Approval Page 2 of 5 3. Mitigation Plan Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from Wildlands Holdings to meet 43,383 square feet of this mitigation requirement and Resource Environmental Solutions, Inc. (RES) to meet the remaining 48,819 square feet of this mitigation requirement. Until the bank sponsors receive and clear your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to Wildlands Hydrology and RES to meet the following compensatory mitigation requirement [15A NCAC 02B .0233 (9)(c)001: 4. Stormwater Management Plan You are required to provide one copy of the approved SMP, including plan details on full- sized plan sheets, with proof of City of Raleigh's approval. The approved SMP shall be submitted to the DWR 401 & Buffer Permitting Unit (1617 Mail Service Center, Raleigh, NC 27699-1617) before any impacts authorized in this certification occur. After it is approved and submitted to the Division, the SMP may not be modified without prior written authorization from the City of Raleigh. If the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWR 401 & Buffer Permitting Unit prior to the commencement of the modifications. [15A NCAC 02B .0233 (9)(0001: Compensatory Mitigation Required River and Sub -basin Number Buffers Buck Swamp Parcel and/or Caraway Creek Parcel Bank Sites of the WEI — 43,383 (square feet) Neuse Neuse 01 Nutrient Offset and Buffer 03020201 Umbrella Bank Buffers Buffalo Branch, Cedar Grove, Selma Mill and/or Forrest Creek Banks Sites of the 48,819 (square feet) Neuse EBX Neuse Riparian Buffer Umbrella 03020201 Mitigation Bank or EBX-EM Forrest 4. Stormwater Management Plan You are required to provide one copy of the approved SMP, including plan details on full- sized plan sheets, with proof of City of Raleigh's approval. The approved SMP shall be submitted to the DWR 401 & Buffer Permitting Unit (1617 Mail Service Center, Raleigh, NC 27699-1617) before any impacts authorized in this certification occur. After it is approved and submitted to the Division, the SMP may not be modified without prior written authorization from the City of Raleigh. If the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWR 401 & Buffer Permitting Unit prior to the commencement of the modifications. [15A NCAC 02B .0233 (9)(0001: ITB Holdings, LLC DWR # 15-1288 Major Variance Approval Page 3 of 5 5. Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02B .0200]: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. [15A NCAC 2B .0233] 7. Protective Fencin The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B .0233. 8. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference and are an enforceable part of this Approval. if you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner ITB Holdings, LLC DWR # 15-1288 Major Variance Approval Page 4 of 5 must be given a copy of this Approval and is responsible for complying with all conditions. [15A NCAC 2B .02331 9. The applicant and/or authorized agent shall provide a completed Certificate of Completion Form to the DWR 401 & Buffer Permitting Branch within ten days of project completion (available at: http://deg.nc.gov/about/divisions/water-resources/water- resources-permits/wastewater-branch/401-wetlands-buffer-permits/401-application- forms-help-documents. 10. This approval grants permission to the director, an authorized representative of the Director, or DEQ staff, upon the presentation of proper credentials, to enter the property during normal business hours. This approval and its conditions are final and binding unless contested. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Major Variance can be contested as provided in Articles 3 and 4 of General Statute 150E by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 if sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to Department of Environmental Quality: ITB Holdings, LLC DWR # 15-1288 Major Variance Approval Page 5 of 5 Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under the Neuse Riparian Buffer Rules as described in 15A NCAC 2B .0233. Please contact Jennifer Burdette at 919-807-6364 or jennifer.burdette@ncdenr.gov or if you have any questions or concerns. Sincerely, 11 Karen Higgins, Supervisor 401 & Buffer Permitting Branc cc: Bob Zarzecki, Soil & Environmental Consultants, Inc., 8412 Falls of Neuse Road, Ste 104, Raleigh, NC 27615 Richard Sherman, ITB Holdings, LLC, P 0 Box 2152, Chapel Hill, NC 27515 DWR RRO 401 file DWR 401 & Buffer Permitting Branch file Filename: 151288_2912WakeForest RdRedevelopment(Wake)_NRB_MJV.docx