Loading...
HomeMy WebLinkAboutNCS000093 DMR SW (5)March 17, 2016 Division of Water Quality Surface Water Protection Section ATTENTION: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Subject SDO Monitoring Report Sample #4 Year 2 Period 2 BRP US Inc. Spruce Pine, Mitchell County Permit No. NCS000093 To Whom It May Concern - BRP US Inc. 1211 Greenwood Road Spruce Pine, North Carolina USA 28777 T 828 766 1100 F 828 765 2391 www brp corn Enclosed are the original and one copy of the completed Stormwater Discharge Outfall (SDO) Monitoring Report for the BRP US Inc. facility located in Spruce Pine. These results were received February 29, 2016 for samples collected February 21, 2016 and are for Sample Number 4, Year 2 - Period 2 of the Monitoring Schedule No parameters tested exceeded Table 3 Benchmark Values of the Permit I trust this satisfies the reporting requirements pursuant to Permit Number NCS000093 Part III Section E 1 & 2. Should you have any questions regarding this information, please contact me at (828) 766-1185. Respectfully, b441 Bernice Wilson EHS Coordinator cc: Stephen Floyd Ski -Doo Lynx Sea -Doo Evmrude Johnson Rotax Bombardier AN STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit NumbejQS2 W13 FACILITY NAME 5RY�5 )( I PERSON COLLECTING SAMPLE(S) UU)11 9 Ih)1W10 CERTIFIED LABORATORY(S) ;QI t ?qMG, :f / Ot Lab # YO _ Lab # Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: 711L (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) Outfall 4 No. Date Sample Collected = Total Rainfall TSS Aluminum pH Total mo/dd/ r inches m m - 001 OZ ZIlmp, V, 3 , (x, 30 (� 5 (if appl.) ' O&G/TPH Suspended 'Oil Usage, COUNTY M I rG H 6- t (, PHONE NO. (rbM );7 :706 — I I SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. 0'%F-CEIVED MAR 2 8 2016 CENTRAL FILES ©WR SECTION Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes /no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall Date Total Flow Total Oil &Grease Non -polar Total pH New Motor No. Sample, Collected (if Rainfall (if appl.) ' O&G/TPH Suspended 'Oil Usage, applicable) y (Method 1664 Solids SGT -HEM); if a ' L ,mo/dd/ r - MG- inches m m unit al/mo • N/A FORM SWU-247, LAST REVISED 2/2/2012 PAGE 1 OF 2 STORM EVENT CHARACTERISTICS: Date Total Event Precipitation (inches): 0 E 5 Event Duration (hours): 3.0 (only if applicable - see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable - see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 • "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) r (Date)