Loading...
HomeMy WebLinkAbout20150615 Ver 1_Wet Pond Calcs_20160427 Strickland, Bev From:Devane, Boyd Sent:Wednesday, April 27, 2016 10:57 AM To:Strickland, Bev Subject:FW: Rockingham Grocery stormwater plans #15-0615 Attachments:Rockingham Wet Pond Calcs 160426.pdf Please file this in #15-0615 thanks. NC Division of Water Resources 919-807-6420 From: Andrew Allison \[mailto:aallison@bohlereng.com\] Sent: Wednesday, April 27, 2016 9:56 AM To: Devane, Boyd <boyd.devane@ncdenr.gov> Cc: Turlington, Chad <chad.turlington@ncdenr.gov>; Andrew Moriarty <amoriarty@bohlereng.com>; Wyatt Bone <wbone@bohlereng.com>; NCR151000@nf.bohlereng.com Subject: RE: Rockingham Grocery stormwater plans #15-0615 Boyd, I have attached the updated calculations that now include all three pages. We have changed the orifice diameter to 1.25”. Our calculations show that with a 1.5” orifice the drawdown time would become 1.6 days. We have opted to reduce the orifice to 1.25” in order to stay within the 2 to 5 day drawdown time period. Our detail was modified accordingly. You should receive a link to our full set of plans. We will mail hard copies that are signed and sealed. How many copies will you require? Chad, Three (3) original copies of the O&M agreement will be mailed directly to you if that is okay. Thanks! Andrew Allison, E.I. Bohler Engineering NC, PLLC 4011 Westchase Boulevard, Suite 290, Raleigh, NC 27607 (919) 578-9000 From: Devane, Boyd \[mailto:boyd.devane@ncdenr.gov\] Sent: Monday, April 25, 2016 4:34 PM To: Andrew Allison <aallison@bohlereng.com> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: FW: Rockingham Grocery stormwater plans #15-0615 Thanks for your call offering help. This has been a confusing situation. 1 th Brian sent me a wet pond spread sheet on December 18 that had three pages. Because of a discrepancy in the orifice size with the plan sheets, I asked him to check into it and resubmit the information with corrections. I also included a stth copy of the updated calculations on April 1 so he could see what I received. (See attached) I wrote him back on the 4 th of April and said: “The Wet Pond calculations page in the March 24 Letter of Transmittal had two pages entitled “Wet Detention Basin Design”. Did you omit the second page in your submittal on Friday?” He wrote back on 4/19 and said that “The second page included the stage-storage volume of the pond and is attached to the email that you sent me.” As I tried to explain, the earlier submittal contained 3 pages and the later (attached above) had two. After some study, I realized that the updated page that he failed to resubmit had the project area and runoff volume calculations. Maybe that page was correct but I wanted him to send me all three pages (preferably with page numbers and dates) so I would know what the official submittal was. st He also said in his April 1 email that “We will update the plan sheet accordingly and get you updated copies.” I have never received the updated page(s) that had the correction of 1.5” orifice. st Also, as Chad’s March 1 email (below) indicated, we need three copies of the signed and notarized O&M agreement. I have not seen that. Perhaps I’m missing something and the proper information was sent. Please have Brian call and explain if I have missed something. If not, send the final wet pond calculations and corrections to any of the plan sheets that are needed because of the orifice discrepancy. Thanks. From: Turlington, Chad \[mailto:chad.turlington@ncdenr.gov\] Sent: Tuesday, March 01, 2016 2:44 PM To: Brian O'Kane <bokane@bohlereng.com> Subject: MGP Rockingham Retail Brian, The following items are what Boyd said that were needed to process the stormwater component of the 401 Application for the MGP Rockingham Retail 401 application. 1.Four paper copies of the plans and specs (on 24” x 36” sheets). 2.One disc containing copies of the plans and specs. 3.The original and 3 copies of a signed (and notarized) O&M agreement. 4.Four copies of all stormwater calculations for the sizing of the stormwater treatment device. NC Division of Water Resources 919-807-6420 From: Brian O'Kane \[mailto:bokane@bohlereng.com\] Sent: Friday, April 01, 2016 7:36 AM To: Devane, Boyd <boyd.devane@ncdenr.gov> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: RE: Rockingham Grocery stormwater plans #15-0615 Boyd – Here’s a copy of the latest spreadsheet in PDF version. We had to reduce the size of the draw-down orifice to 1” to meet the requirements for draw-down time. We will update the plan sheet accordingly and get you updated 2 copies. Let me know if you see anything else that you need changed or if you want us to make this change and resend the sheets. Thanks! Brian From: Devane, Boyd \[mailto:boyd.devane@ncdenr.gov\] Sent: Thursday, March 31, 2016 2:30 PM To: Brian O'Kane <bokane@bohlereng.com> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: RE: Rockingham Grocery stormwater plans #15-0615 Just wanted to let you know that I never received anything you were going to send last Thursday. Did you send it? NC Division of Water Resources 919-807-6420 From: Brian O'Kane \[mailto:bokane@bohlereng.com\] Sent: Monday, March 28, 2016 7:49 AM To: Devane, Boyd <boyd.devane@ncdenr.gov> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: RE: Rockingham Grocery stormwater plans #15-0615 Thanks Boyd. I will send them over to you today. From: Devane, Boyd \[mailto:boyd.devane@ncdenr.gov\] Sent: Thursday, March 24, 2016 5:18 PM To: Brian O'Kane <bokane@bohlereng.com> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: Rockingham Grocery stormwater plans #15-0615 Today, I received four copies of the drawings for the stormwater plan for the Rockingham Grocery project. The plans did not include an updated “Wet Detention Basin Design” calculations sheet. We received a copy of the calculations that was dated Dec 18, 2015 but it does not seem to have been updated to reflect the drawings. In just a quick look, I did th notice the orifice drawings showed a 1.5” draw-down orifice and the December 18 Wet Detention Basin Design sheets showed a 1.0” draw-down orifice. Please send me copy of the engineering calculations for the wet detention basin that you intend to apply to the drawings that I received today. You can email them to me at boyd.devane@ncdenr.gov. Thanks NC Division of Water Resources NC Division of Water Resources 919-807-6420 From: Brian O'Kane \[mailto:bokane@bohlereng.com\] Sent: Friday, April 01, 2016 7:36 AM To: Devane, Boyd <boyd.devane@ncdenr.gov> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: RE: Rockingham Grocery stormwater plans #15-0615 3 Boyd – Here’s a copy of the latest spreadsheet in PDF version. We had to reduce the size of the draw-down orifice to 1” to meet the requirements for draw-down time. We will update the plan sheet accordingly and get you updated copies. Let me know if you see anything else that you need changed or if you want us to make this change and resend the sheets. Thanks! Brian From: Devane, Boyd \[mailto:boyd.devane@ncdenr.gov\] Sent: Thursday, March 31, 2016 2:30 PM To: Brian O'Kane <bokane@bohlereng.com> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: RE: Rockingham Grocery stormwater plans #15-0615 Just wanted to let you know that I never received anything you were going to send last Thursday. Did you send it? NC Division of Water Resources 919-807-6420 From: Brian O'Kane \[mailto:bokane@bohlereng.com\] Sent: Monday, March 28, 2016 7:49 AM To: Devane, Boyd <boyd.devane@ncdenr.gov> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: RE: Rockingham Grocery stormwater plans #15-0615 Thanks Boyd. I will send them over to you today. From: Devane, Boyd \[mailto:boyd.devane@ncdenr.gov\] Sent: Thursday, March 24, 2016 5:18 PM To: Brian O'Kane <bokane@bohlereng.com> Cc: Turlington, Chad <chad.turlington@ncdenr.gov> Subject: Rockingham Grocery stormwater plans #15-0615 Today, I received four copies of the drawings for the stormwater plan for the Rockingham Grocery project. The plans did not include an updated “Wet Detention Basin Design” calculations sheet. We received a copy of the calculations that was dated Dec 18, 2015 but it does not seem to have been updated to reflect the drawings. In just a quick look, I did th notice the orifice drawings showed a 1.5” draw-down orifice and the December 18 Wet Detention Basin Design sheets showed a 1.0” draw-down orifice. Please send me copy of the engineering calculations for the wet detention basin that you intend to apply to the drawings that I received today. You can email them to me at boyd.devane@ncdenr.gov. Thanks NC Division of Water Resources 919-807-6420 4 BOHLER Project Information Wet Detention Basin Design Project: Rockingham Grocery Location: 705 U.S. 74 Business Project Number: NCR151000 Date: Apr -26-2016 Designed: KW Checked: WLB Site Information Sub Area Location: Wet Detention Basin 1 Drainage Area (DA) = 109,791 Sf Impervious Area (IA) = 89,308 Sf Percent Impervious (1) = 81.3 % Elevations Top of Bank Elevation = 264.00 ft Emergency Elevation = 263.00 ft Temporary Pool Elevation = 260.29 Permanent Pool Elevation = 259.00 ft Bottom of Pond Elevation = 253.00 ft Sediment Cleanout, Bottom Elevation = 253.00 ft Basin Areas/Volumes Area of Permanent Pool = 4,297 sf Area of Bottom of Shelf = 3,156 sf Area of Bottom of Pond = 106 sf Area of Temporary Pool = 6,336 sf Volume, main pool = 7,257 cf Volume, forebay (sum of forebays) = 1,614 cf Volume, permanent pool = 8,871 cf Forebay % of permanent pool volume = 18.2 % Average Depth Depth of Pond = 5.5 ft Average Depth = 3.28 ft Use Average Depth of = 3.00 ft Aperm pooh (includes main pond & forebays) (Elev = 259.00 ) A bot shelf (includes main pond & forebays) (Elev = 258.50 ) Abot_pond (excluding sediment storage & forebays) A temp_p-d (includes main pond and forebays) (Elev = 260.29 ) V malnl,00l (from Hydraflow) V forebay (from Hydraflow) V penn_,00l (Vforebay+Vmainyool) OK Depth (dist. btwn. bot. of shelf & btm. of pond, excludes sediment) Round down to nearest 0.5 Required Surface Area - Wetland SA/DA = 3.36 (85% TSS Removal via Pond) Min Req'd Surface Area = 3,689 sf (at Permanent Pool) Required Storage Volume - Using Simple Method Design Storm = 1.0 inch (Project Does Not Drain to SA Waters) Determine Rv Value = 0.05 + 0.009 (1) = 0.78 in/in Storage Volume Required = 7,156 cf (above Permanent Pool) Side Slopes of Pond = 3 :1 Is Permenant Pool Surface Area Sufficient (yes/no)? Yes ( 4297 > 3689 ) sf BCH LER V N C I N E I'. R f N C Wet Detention Basin Design 1.0 inch Volume Elevation Required Temporary Pool Volume = 7,156 cu ft Temporary Pool Lower Elevation Bound = 260.00 Temporary Pool Upper Elevation Bound = 261.00 Temporary Pool Lower Volume Bound = 5,186 cu ft Temporary Pool Upper Volume Bound = 12,052 cu ft Temporary Pool Elevation = 260.29 Orifice Sizing - Wet Detention 02 Days = 0.0415 cfs 05 Days = 0.0124 cfs Orifice Size = 1.25 in Driving Head (Hc) = 0.41 ft O orifice = 0.026 cfs Drawdown Time = 2.4 days less than 5 days (yes/no) ? Yes 0 greater than 2 days (yes/no) ? Yes 259.50 Anti -Flotation Device 2,470 2,470 Outside Length = 4.00 ft Outside Width = 4.00 ft Inside Length = 3.00 ft Inside Width = 3.00 ft 6745 Bottom Thickness = 0.50 ft Top of Riser = 261.00 ft Invert of Riser = 257.97 ft Area = 16.0 sf Volume = 56 cf Weight = 3,524 lbs Factor of Safety = 1.10 WT Req'd of Anti -Flotation Device = 3,877 lbs Volume of Concrete Req'd = 44.3 cf Depth Provided = 1.00 ft Volume Provided = 45.2 cf WT of Anti -Flotation Device Provided = 3,960 lbs Contour Contour Area Incremental Accumulated Volume Volume, S Stage, Z sq ft cu ft cu ft ft 259.00 4302 0 0 0.0 259.50 5577 2,470 2,470 0.5 260.00 6045 2,906 5,375 1.0 260.29 6335 1,795 7,170 1.3 261.00 6745 4,643 11,814 2.0 262.00 7565 7,155 18,969 3.0 263.00 8425 7,995 26,964 4.0 264.00 9325 8,875 35,839 5.0 (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) 0 (Outside Dim. = 4 -ft x 4 -ft, Inside Dim. = 3 -ft x 3 -ft) (Water Displaced - Top of Riser to Bottom of Riser) (Weight Water Displaced) (Unit WT of Concrete = 150 pcf) Submerged Concrete Unit Weight 87.6 pcf (4 -ft x 4 -ft Box filled 1.00 -ft deep with concrete) OK )rebav volume Contour Contour Area Accumulat Increment ed al Volume Volume, S Stage, Z sq ft cu ft cu ft ft 255.00 99 0 0 0.0 256.00 222 161 161 1.0 257.00 379 301 461 2.0 258.00 569 474 935 3.0 259.00 789 679 1,614 4.0 Contour Contour Area Accumulat Increment ed al Volume Volume, S Stage, Z sq ft cu ft cu ft ft 253.00 106 0 0 0.0 254.00 301 204 204 1.0 255.00 590 446 649 2.0 256.00 962 776 1,425 3.0 257.00 1,600 1,281 2,706 4.0 258.00 2,176 1,888 4,594 5.0 258.50 2,481 1,164 5,758 5.5 259.00 3,513 1,499 7,257 6.0