Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC250411_Modification Review_20250228 Action History(UTC-05:00)
Submit by Anonymous User 2/27/2025 12:56:49 PM (ADD TO FILE Submittal)
Approve by bethany.georgoulias 2/28/2025 7:56:51 AM (Construction COC ADD TO FILE Review-NCC250411)
• The task was assigned to bethany.georgoulias.The due date is: March 4,2025 5:00 PM
2/27/2025 12:56:51 PM
Ago Permit for DEQMODIFICATION
Construction0i00
0000
Certificate of NCC250411
Coverage(COC)No.* Enter the Certificate of Coverage Number(Use capital letters)
Initial Permit Fee Status Initial Payment Received
PAID 2/10/2025
(N/A prior to Oct 2020) (N/A prior to Oct 2020)
2020 Annual Fee Status 2021 Annual Fee Status 2022 Annual Fee Status
May be blank if N/A May be blank if N/A May be blank if N/A
2023 Annual Fee Status 2024 Annual Fee Status 2025 Annual Fee Status
May be blank if N/A May be blank if N/A May be blank if N/A
Information associated with this permit:
Project Name DEP New Hill BESS 230kV Substation and BESS Project interconnection
Address 5413 Shearon Harris Road, New Hill, NC
County Wake
Latitude 35.6595
Longitude -78.9478
Permittee Listed Duke Energy Progress, LLC;Andrew Hill
Legally Responsible Andrew Hill
Individual At the time of Modification Request(not looked up again at review)
NC Reference No. NCG01-2025-0411
E&SC Plan ID WAKE-2025-00217
Original NOI Tracking 242266
No.*
Date COC Issued* Effective Date at Submittal
02/10/2025
Prior Rescission Date This field will populate only if COC has already been rescinded.
Modification Information:
Reason for Closed-Out Lots/Outparcels in E&SC Plan
Modification* Additional Lots/Outparcels Approved-E&SC Revised
Other Revision(s)to E&SC Plan
Legally Responsible Individual and/or Site Contact Has Changed
Multiple Reasons(List Below)
Other(Describe Below)
Reason for Modification Supporting Doc Name
(OTHER ESC REVIS)
Reviewer Reference Only(Not Visible on Starting Form)
Additional Description/Explanation
More information(e.g.,if lots are being added,please include specific lot numbers.)
NCDOT required additional clearing for line of sight at the construction entrance that ties into Shearon Harris
Blvd.Original acreage permitted 9.5-acres increased to 9.68-acres(0.18-acre increase)to accomodate clearing
line of sight.
You must upload supporting documentation below. Do not upload E&SC Plans unless specific
plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only
upload applicable sheets).
Supporting Documentation
Upload Supporting Documentation(Revised E&SC Approval,Close-Out Doc,etc.)
Application Report-Thursday, February 27,2025 1140 AM.pdf 94.21 KB
Letter Of Approval-2_27_2025 11_40 AM.pdf 196.93KB
Revised Pages from New—Hill—Site—Development—Drawings-
5.38M6
I FP_20250226_Sea led.pdf
Must be PDF format
Is this project funded with ARPA(American Rescue Plan Act)grant funds?
This pertains to funding distributed by the N.C.Division of Water Infrastructure(DWI)only.
No
Yes
Is this project funded with N.C.Session Law 2023-134 Section 12.2 Earmark funds?
No
Yes
North Carolina General Statute 143-215.613(1)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document
filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000).
* I hereby request modification to coverage under the NPDES Stormwater Permit for the
subject project site. I am familiar with the information contained in this request and to
the best of my knowledge and belief such information is true,complete and accurate.
Specify if you are:* The Legally Responsible Individual
Authorized Responsible Person"
*This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a
president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item
(6)of that permit.
Signature
G106K41W A/�
Type Name* Andrew Hill
Title* Director, Real Estate Transactions
Organization* Duke Energy Progress, LLC
Date* 02/27/2025
Email Address* andrew.hill@duke-energy.com
Email for confirmation
Telephone Number* 980.373.7134
Contact number if we need to reach you
Note:Original permittee and site contact are copied on modification correspondence.
Additional Email cjfox@burnsmcd.com
(Optional) Additional email for confirmation
Original Permittee andrew.hill@duke-energy.com
Email
Original Site Contact juniel.miller@duke-energy.com
Email
Review Date 02/28/2025
Rescinded Since
Submitted?
Current Effective Date Current Expiration Date Permit Version
2/10/2025 3/31/2029 1.00