From:Michael Ivy <MIvy@kleinfelder.com>
Sent:Wednesday, April 20, 2016 1:50 PM
To:Smith, Cherri L
Cc:Joshua Crumpler
Subject:RE: Nash 97 Solar
Hey Cherri,
Thanks for returning my voicemail. Just to follow up on our conversation and to answer your questions from below, the
correct impact length is 84LF (The inset A was a typo) and there will be no maintenance corridor to the underground
utility line.
Feel free to contact me with any questions or comments.
Thanks.
Mike D. Ivy, PE
Staff Professional II
Local Wellness Champion
3500 Gateway Centre Blvd, Suite 200
Morrisville, NC 27560
o| + (1) 919.755.5011
d| + (1) 919.653.7028
f| + (1) 919.755.1414
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to
the correct file and location.
The linked image cannot be displayed. The file may have been moved,
renamed, or deleted. Verify that the link points to the correct file and location.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
The linked The linked The linked The linked The linked
image image image image image
cannot be cannot be cannot be cannot be cannot be
displayed. displayed. displayed. displayed. displayed.
The file The file The file The file The file
may have may have may have may have may have
been been been been been
moved, moved, moved, moved, moved,
renamerenamedrenamedrenamedrenamed
WWWWW
From: Joshua Crumpler
Sent: Wednesday, April 20, 2016 10:46 AM
To: Michael Ivy <MIvy@kleinfelder.com>
Subject: Fwd: Nash 97 Solar
FYI. Can you reach out to Cherri?
1
---------- Forwarded message ----------
Smith, Cherri L
From: "" <cherri.smith@ncdenr.gov>
Date: Wed, Apr 20, 2016 at 7:05 AM -0700
Subject: Nash 97 Solar
To: "Joshua Crumpler" <JCrumpler@kleinfelder.com>
Hi Josh,
I just had a question about the crossing for the Nash 97 Solar site. The impact table in the application states that the
impact length is 84 feet, but Inset A on E-1 has the impact length at 95 linear feet. I just need to know the correct
length.
Also, what’s the width of the maintenance corridor for the underground utility? I’m just trying to determine if that
buffer impact is exempt and doesn’t require written authorization. I typically don’t put exempt activities in the buffer
authorization.
Thanks for your help with these questions.
Cherri
Cherri Smith
NCDEQ Division of Water Resources
Raleigh Regional Office
1628 Mail Service Center
Raleigh, NC 27699-1628
ph. 919-791-4251
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties
2