Loading...
HomeMy WebLinkAbout20160350 Ver 1_More Info Received_20160420 Strickland, Bev From:Michael Ivy <MIvy@kleinfelder.com> Sent:Wednesday, April 20, 2016 1:50 PM To:Smith, Cherri L Cc:Joshua Crumpler Subject:RE: Nash 97 Solar Hey Cherri, Thanks for returning my voicemail. Just to follow up on our conversation and to answer your questions from below, the correct impact length is 84LF (The inset A was a typo) and there will be no maintenance corridor to the underground utility line. Feel free to contact me with any questions or comments. Thanks. Mike D. Ivy, PE Staff Professional II Local Wellness Champion 3500 Gateway Centre Blvd, Suite 200 Morrisville, NC 27560 o| + (1) 919.755.5011 d| + (1) 919.653.7028 f| + (1) 919.755.1414 The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. The linked The linked The linked The linked The linked image image image image image cannot be cannot be cannot be cannot be cannot be displayed. displayed. displayed. displayed. displayed. The file The file The file The file The file may have may have may have may have may have been been been been been moved, moved, moved, moved, moved, renamerenamedrenamedrenamedrenamed WWWWW From: Joshua Crumpler Sent: Wednesday, April 20, 2016 10:46 AM To: Michael Ivy <MIvy@kleinfelder.com> Subject: Fwd: Nash 97 Solar FYI. Can you reach out to Cherri? 1 ---------- Forwarded message ---------- Smith, Cherri L From: "" <cherri.smith@ncdenr.gov> Date: Wed, Apr 20, 2016 at 7:05 AM -0700 Subject: Nash 97 Solar To: "Joshua Crumpler" <JCrumpler@kleinfelder.com> Hi Josh, I just had a question about the crossing for the Nash 97 Solar site. The impact table in the application states that the impact length is 84 feet, but Inset A on E-1 has the impact length at 95 linear feet. I just need to know the correct length. Also, what’s the width of the maintenance corridor for the underground utility? I’m just trying to determine if that buffer impact is exempt and doesn’t require written authorization. I typically don’t put exempt activities in the buffer authorization. Thanks for your help with these questions. Cherri Cherri Smith NCDEQ Division of Water Resources Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 ph. 919-791-4251 The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties 2