Loading...
HomeMy WebLinkAbout20140090 Ver 3_Erosion report_20160330North Carolina Department of Transportation Roadside Environmental Unit Erosion & Sedimentation / Stormwater Report Proiect Information Inspection Date: 03/30/2016 Project #: 34839.3.GVS4 Division #: 9 Project Type: Contract Evaluator TIP #: County: Engineer: Phil Suggs U-2579B Forsyth Winston Salem Res. (Cragmore) Project Length: 4.00 Disturbed Acres: River Basin: Yadkin HQW Zone: NO Trout Zone: NO Location Winston Salem Northern Beltway Eastern section US 158 to Bus 421 and I 40 Description: Proiect Evaluation Report Type: ✓❑ Routine ❑PCN Length Section 0.1 Permitted area 3.9 Remainder of Project OF NORiH �qR � `" �`ti 9 * * o = 0 9�r��NrOF iRANSQ��P ❑ICA ❑ICA Ex 1st ❑ICA Ex 2nd ❑CICA - SWO ❑ ECPAR Installation Maintenance Effectiveness Plan Overall Project of BMPs of BMPs of BMPs Implementation Evaluation 8 7 8 7 7 7 E:� E�3 Grading Scale: 0- 6= Immediate Corrective Action Required, 7= Fair, 8= Good, 9= Very Good, 10 = Excellent Remarks and Recommendations: Reviewed project today with Lindsay Panek, Scott Wyrick and Amy Euliss. -Discussed needing abbreviated reclamation plan for staging, stockpile site on Hastings hill Rd. Construction entrance needed to limit tracking onto the road. Site 19 at approx sta 670 -stabilize the eroding stockpile and haul road slopes and ensure all runoff directed to the skimmer basin -left side of L at culvert inlet corner at inlet wall eroding. Stabilize at end of wing wall. Stabilize the erodible areas around the culvert immediately with ground cover if no other work is to be done -per onsite discussions with Amy, recommend utilize the large natural rock in the stream to armor the bank where iYs starting to cut. Also, utilize the rip rap at the diversion inlet to fill in the scour hole below the head cut area. Continue to monitor head cut in the channel. Permit Site 14 area: -At basin 16.8C, extend skimmer outlet in the short term to the creek. Install silt checks in the channel below the temp haul road. Pipe system needs to be completed and the ditch line to the creek built and stabilized before turning live flow thru the pipe. Basin 15.10 B, site drainage bypassing the basin. Runoff needs to go thru the skimmer basin. -Site 10, project right, all slopes need to be brought to finish grade and permanent seeded, mulched. At culvert outlet, slopes need to be brought to finish grade and permanent seeded, mulched. At wing walls on outlet, finish grade to dress up the slopes and seed, mat to stabilize them. Silt fence should be removed, slope graded to tie into wing walls and then silt fence reinstalled and area stabilized with permanent groundcover. Remove accumulated silt from the channel. Project left, culvert inlet area, slopes need to be walked and seeded, mulched to permanently stabilize them. Site 6, right of L, reinstall basin 7.3 , moving it out from toe of slope. Slope across Site 6 needs to be reworked, brought to finish grade and permanent seeded to stabilize it. Site 4, left, stabilize eroding slopes. All areas around pipe inlet need to be stabilized. 7 7 3/30/2016 7:45 AM Page 1 of 2 Right of L, areas along the of slope needs to be stabilized with groundcover. Repair slope erosion. Area needs to be finished out and stabilized. Site 5, left, stabilize toe of slope areas and repair slope erosion. Reseed slopes after repairs. Site 2, clean out behind silt checks and stabilize erodible slopes; temp seed if area is to be worked soon Site 1: clean out stream channel to remove accumulated silt. Several slope sections and areas from previous reports noted on this review. There area areas that need to be final graded and permanently stabilized that exceed the time limits for establishing ground cover. Utilize temporary seeding if areas are to be redisturbed within 30-60 days. 1 / � �d �9'�!+ j; ` ,� ` � --� �% �r'� ��`'= u ' ' � � � � ��„` � � r �W� '�r I.I� y� � i � • �' \� � A r - fi `� j� jf �� 'i� �' "r. r " �+e5. ." ° �..S h k ; { ��..' / / - ,r� _>� t /[ ya � � '* i „; , � >i �, � » ' -� _ � �@�r g� �n: �� � - �� A �`kt � YE A " �� 3'". � ���4 0� �.1 � ,.T"h�'�� .$ '���.� .�r � . i �. i;; i i� �� , $ r t r ,, :T6 . � -r� .�'�^ 3 � �3'. � � 1 �`�! � � f � 9i�1� .rtl�" ar ' � � . � � I � � k �' �f � ,t ' �'�, /� � �..c .i � �"3 :i k' N µ\� A 4 � t , Yc ��; rir'�'`�„�c",��as y .;� "�` �,dr�, �,'� ''`'✓ � s .�'" e� ` 1� �.�t�': b��� � ' 1 ,� ' FI ;� �1 .e f� ,r ',:Xt � !': � + i�� s�(��r s �' i ;�I a M�y�. y� „-°'�` i� � : 3±�,�1V �iy�,,, � .Y" a i F � + q �..F .�,�f�'�`#r 't �' ,• �Y5 � ^ti� : �r�,� i' r ��, f� 11A � �, . rt �� ti F � � � p'��? � 'i s l� � � r�'�_ �a �,� �� � rR° i�51 �4� 4 �z 46ia�{ ft �'n�! `� � �' ,�y . � �y � ��c;. 4 st k� � $.�x� � �l �� �.i h: 1� u A �,��:�n� P � � �'��� � x� �,��, , E%�:, �., `::F � '___: - - € �'`.�. . �.- � ' \ � '.�, l ;� � �, i � w • � .� ..� e �` wr � .X . ... .- .. . �,~�Va.av. � �,� �� r��� � ��� �,ri �`� a , a� ,, �! � �. _.,'�'� n � J _,a � , : o ��f5���� h ,g��,�, � �„_,_ ,� .� .., � � • ■ � .�. _ - ,- � _ ..- .` »� � � �:." - .. � ' 5 E y§g�yy� �4 i' p . . �wl!��3Felrm-� " 'i l. ��'��� �.� �_. , _ '� . -, _ �xv � 'w � ". 4 ''��, ��� � � <� �'� ti:a � y i � 2 2 . � 1 . "/44 P� � �. � . �. A'-ny �I.� ; �'� ��� �,�` � • 1..�:� � "4. EM' �' 't' ti Y � �y � ` , t �`Y "A� � � ', ~� hn � e 1:�, T r�„i� � 5' _ � ` � � .e ap� ,� t?.,:� .� .��y.�..�'� �_s , n .,, .. �, y,.. ,,�,,. .._ .sk'_Ao�,y„+, � ���h _��_ ���� .....M ..' . , . .- . . .. ' �M��'E��.,. � . � , i � � h 4 . . � ' �' � � ���.: � ..�sY`k- . . . �� ����b ���� � � � 4 �. �"' .,y� , � D�k. � 'N' '�� �y^- -.y���tVy4{ . .paV�g--� ' Y tj :l �"� k.. � .. � „y - �y,,,�' � p � .. 1a a kf � r '„��' � x'b` � t yi � -u ��` � � ,;� '��� ��, ,. `�"� a t .. `� p� :,� �� . �X ; � W : . � � � y�,�� � .:� a ` ..<.��� ��.V�¢s +.r'��Ol' ..2'� , ...�r�.�.'�Y �:�•'�S�u.r �'�`� ,., � � , 3/30/2016 7:45 AM Page 2 of 2