Loading...
HomeMy WebLinkAbout20160373 Ver 1_Riparian Buffer Authorization_20160414Montalvo, Sheri A From: Smith, Cherri L Sent: Monday, April 18, 2016 1.10 PM To: Montalvo, Sheri A Subject: RE: Weavers pond greenway Sheri, I'd just make it a new number. Thank you. Cherri From: Montalvo, Sheri A Sent: Monday, April 18, 2016 12:43 PM To: Smith, Cherri L <cherri.smith@ncdenr.gov> Subject: Weavers pond greenway Cherri, I got in a buffer auth for the above. Do you want a new number on it one do you want it to be a 0 of 20052070? Thanks Sher% MowtoLvo 401 & Buffer Permitting Unit - Administrative Assistant Department of Water Resources Division of Environmental Quality 919-807-6303 (office) shen.montalvo6rDncdenr Qov 512 N. Salisbury St., Ste 942-D, Raleigh, NC 27604 1617 Mail Serive Center Raleigh, NC 27699-1617 Environmental Consultants, 8412 Falls of Neuse Road, Suite 104, Raleigh, NC 27615 - Phone: (919) 846-5900 • sandec.com 201 60373 To: NC DWR, 401 & Buffer Permitting Unit Attn: Karen Higgins Archdale Building — 9th Floor 512 North Salisbury Street Raleigh, NC 27604 From: Deborah E. Shirley Soil & Environmental Consultants, PA Re: RIPARIAN BUFFER AUTHORIZATION REQUEST ONLY Weaver Pond Greenway Zebulon, Wake County, NC April 14, 2016 S&EC Project # 8713.W6 7APH14 2016 i On March 31, 2016, a conversation took place with Cherri Smith with the NC Division of Water Resources regarding this project. Cherri requested that this application be submitted as a request for a new Riparian Buffer Authorization, not a new version of an existing project. As such, please find attached a complete application and supplemental information requesting a No Practical Alternatives review for Neuse Riparian Buffer impacts from the NC Division of Water Resources. Please contact me at (919) 846-5900 if you have any questions or require additional information. PROJECT SUMMARY Project Name Weavers Pond Greenway Project Type Greenway Owner / Applicant Weavers Pond Development Co. LLC County Wake Nearest Town Zebulon Waterbody Name Beaverdam Creek Basin & HUC Neuse; 03020203 Index Number 27-86-2-3 Class C, NSW IMPACT SUMMARY Stream Impact (acres): 0 Wetland Impact (acres): 0 Open Water Impact (acres): 0 Total Stream Impact (linear feet): 0 Total Riparian Buffer Impact (square feet): Zone 1: 316 ;Zone 2: 13,438 Attachments: Riparian Buffer Authorization Application Form Weavers Pond Greenway Overall Plan -IMA Agent Authorization Form Impact Exhibit -Buffer Impact Sheet-IM.2 USGS Topographic Map NRCS Soil Survey Map Surface Water Determination letter-NBRRO#14-141 Copy of Recorded Map Zebulon Greenway Master Plan State of North Carolina W. DW. Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1 a. Name of project: Weavers Pond Greenway 1 b. County: Wake 1 c. Nearest municipality: Zebulon 1 d. Subdivision name: Weavers Pond 1e. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer 1f below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: David Berry 2b Deed Book and Page No. Deed Bk: 14947, Deed Pg: 1191 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): See Attached 2d. Responsible Parry (for Corporations): Weavers Pond Development Co., LLC 2e. Street address: 9407 Barton's Creek Road 2f. City, state, zip: Raleigh, NC 27615 2g. Telephone no.: 919-604-1928 2h. Fax no.: N/A 2i. Email address: david(a)futrellaroaertv.com 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: Deborah E. Shirley 4b. Business name (if applicable): Soil & Environmental Consultants, PA 4c. Street address: 8412 Falls of Neuse Road, Suite 104 4d. City, state, zip: Raleigh, NC 27615 4e. Telephone no.: 919-846-5900 4f. Fax no.: 919-846-9467 4g. Email address: dshirlev(a)sandec.com FORM: BA 10-2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1796-77-6326 & 1796-79-6490 1 b. Site coordinates (in decimal degrees): Latitude: 35.8581 Longitude: -78.3301 1 c. Property size: 1173 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Beaverdam Creek 2b. Water Quality Classification of nearest receiving water: C, NSW 27-86-2-3 2c. River basin: Neuse Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The existing conditions on site are a partially developed residential community. Phases 1 & portions of Phase 2 have been completed. The general land use in the vicinity of the project is primarily wooded, some agricultural and residential. 3b. Attach an 8'/z x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Approximately 4,294 linear feet 3e. Explain the purpose of the proposed project: The purpose of the project is to construct a portion of the Zebulon Master Greenway that is located within the Weavers Pond Subdivision. Please see attached "Zebulon Greenway Master Plan". 3f. Describe the overall project in detail, including the type of equipment to be used: The overall project consists of an asphalt & boardwalk greenway within the riparian buffer from the sidewalk at Pippen Road to the future Street A cul-de-sac. Equipment to be used will include typical equipment used for land clearing & construction. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ® Yes ❑ No ❑ Unknown Corps or State been requested or obtained for this property/ Comments: project (including all prior phases) in the past? 4b. If yes, who delineated the jurisdictional areas? Agency/ Consultant Company: Soil & Name (if known): Steven Ball Environmental Consultants, PA Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Property was delineated in 2004 and then again in 2013 by S&EC. USACE site visit verifying jurisdictional areas conducted on September 5, 2013 with James Lastinger (AID# SAW -2013-01731). A NCDWQ Neuse Buffer determination was conducted on June 23, 2004 with Michael Horan (NBRRO #04-0211), an updated NCDWR Neuse Buffer determination was conducted on June 6, 2014 with James Graham (NBRRO #14-141). 5. Project History 5a. Have permits or certifications been requested or obtained for thisElYes ® No" ElUnknown. project (including all prior phases) in the past? 5b. If yes, explain and detail according to "help file" instructions. `In discussion with Cherri Smith, since riparian buffer impacts are not considered cumulative, it was requested to keep this buffer impact request separate and for it to be issued a new DWR No. Yes, previous 404 & 401 has been issued for impacts to streams & wetlands. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. FORM: BA 10-2013 Page 2 of 4 C. Proposed Impacts Inventory 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The greenway is being required by the Town of Zebulon. Existing residential lots limit greenway location. Minimal impacts to Zone 1 needed to raise the grade of greenway to meet the required elevation of the proposed boardwalk that is needed at existing level spreader location. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Proposed greenway grades are designed to minimize required rill within the riparian buffer to the maximum extent practicable. 1. Buffer Impacts 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. 1 a. Project is in which protected basin? ® Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MIUST fill out Section D of this form. Buffer impact number — Permanent (P) or Temporary T Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) B1(#1) ®P ❑ T Greenway Allowable UT to Beaverdam Creek ❑ Yes ® No 316 13,438 B2 ❑ P❑ T ❑ Yes ❑ No B3 ❑ P❑ T ❑ Yes ❑ No B4 ❑ P❑ T ❑ Yes ❑ No Total buffer impacts 316 13,438 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The greenway is being required by the Town of Zebulon. Existing residential lots limit greenway location. Minimal impacts to Zone 1 needed to raise the grade of greenway to meet the required elevation of the proposed boardwalk that is needed at existing level spreader location. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Proposed greenway grades are designed to minimize required rill within the riparian buffer to the maximum extent practicable. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: BA 10-2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ® Other BMP* maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1 a. If due to site constraints, a BMP other than a level spreader is proposed, please provide a ❑ Yes ® No plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP public (federal/state) land? Manual and attach a BMP Supplement Form. 1 b. *Combination of other BMP's & level spreaders have been utilized around the project. ❑ Yes ❑ No This portion where the greenway is being constructed (i.e. Phase 2D) is existing and the environmental document pursuant to the requirements of the National or State (North project engineer is proposing to extend the existing pipes under the greenway. F. 1 Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the use of ❑ Yes ® No public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): April , Deborah E. Shirle2016 Applicant/Agent's Printed Name Applicant/Agent's Signature,Date (Agent's signature is valid only if an authorization letter from the lican s provided.) Send this completed form and accompanying documents to the following: For government transportation projects sent For government transportation projects sent by First Class Mail via the US Postal Service: by delivery service (UPS, FedEx, etc): NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1650 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1650 Raleigh, NC 27604 For all other projects sent by First Class Mail via the US Postal Service Karen Higgins NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 - 1650 FORM: BA 10-2013 For all other projects sent by delivery service (UPS, FedEx, etc.): OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 Page 4 of 4 Environmental Cornsultants, PA Road • Ralcigb, North Carolina 29614 • Pbowe: (919) 846-5900 • Fax: (919) 846-9467 www.SegdEC.com AGENT AUTHORIZATION FORM All Blanks To BeFiFilled In By The /Current Landowner Name: w e -A y? rs Psh i C1p . L L L Address: q116-7 IJGt(hk S tekP Phone: W"M e. a%% / S- ' - Project Name/ Description: I/�i�Ul�(Z Ftp Date:l The Department of the Army U.S. Army Corps of Engineers, Wilmington District P.O. Box 1890 Wilmington, NC 28402 Attn: Field Office: Re: Wetlands Related Consulting and Permitting To Whom It May Concern: S&EC Project # ?,-I k I, the current ro er owner, hereby designate and authorize Soil & Environmental Consultants, PA to act in my behalf as my agent in the processing of permit applications, to furnish upon request suppl ental information in support of applications, etc. from this day forward. The day of This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied hY C ou should call S&EC to arrange a site meeting prior to visiting the site. / 'ba,v-, ��y Y ( In/ Qa.V tr f12✓ e�� �.� LLL j1 Print Property Owners Name Property Owner's Signature r ! L L cc: Ms. Karen Higgins cc: Mr. Steven Ball NCDENR - DWQ WeSCAPe Soil & Environmental Copsultants, PA Archdale Building 512 N. Salisbury Street, 9Lh Floor Raleigh, NC 27604 •A\ ...v,�� '�o�'• , Lam:- 1 i 15 �„ /- , 1 l!,r r`f .—. � - . _�� ,•) '� ., 9D i6 J O ice`' y \y.��'- \ `� ` / �'�� .�; % �_.' 1 i i .'�•.:', '.'� 5 -� �.` 1�jr ``\=,` _ `` 99•sI'%Cei» ,: �/ N 'L l" �: 1` t` -"r~ ,.\\ ,1 fy, {� �/C. (�� rte"♦ '� `-^_/ asps R� f ~\\�` �4l ^` i�-- 1 f �� ��`� �f�l I'�`; i r. i/�JJI° `, .r r ( /�-^_{�/�'c� •yes/`r; % ���+k �_� 4� / Y� 3J�`� r 11� -�\ �`,� ( .., t (� �{� v '.ci Yf�j ,�ip / . •l.eT \_ ._� \ � 11 t. G N I ^ , , Buffered stream segment �. •` ,1., °� �, ��% �� ;_. , where greenway ,S• proposed to be located \ f JI r',..• r � �� �' • /� ,, +✓ � '�' •cam, � �: ,.. � �r�.. � ���✓,�:-�\ �C) i l J'�, i`i`'`%`��,..�'�!%j'/r"•� \ (- ? f � � � ✓ S 7y7� k� '•% ,,f " .l`i /� � j�i `` • 'I — l / /! ~l !:.' l �'�� ` :N\` `; .'�` V �'' 'sof . : ?I j • • �f r� • .7% 1/ /'�.t ^� '�', ' // r/ °tea � "` o i� i 1� � _ � _, ; •; J -'c •i ° (a �,,� '�~ � / •� `-- �� • �•� '�J:�'= '' C J 4))�j n Y `sk-�, f/, ...'may$ �`•`� / / -06 FA 11 �,, i i\ 1. � ,`.� j I ,••. 4,,•. � `\,,;/;_;,,• Project No. FIG�ure I - 1:24K USGS 8713..W3 Topographic Quadrangle Project Mgr.: • SB Weavers Pond Soil & Environmental Consultants, PA Wake County, NC 11010 Raven Ridge Rd.• Raleigh NC 27614 Scale: (919) 846-5900 • (919) 846-9467 I 2,000' Web Page www.SandEC.com " = Zebulon Quad 8/16/13 RM—ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor S&EC Steven Ball 8412 Falls of the Neuse Suite 104 Raleigh, NC 27615 Determination Type: i Buffer Call ® Neuse (15A NCAC 2B .0233) I ❑ Tar -Pamlico (15A NCAC 2B 0259) ❑ ,Jordan (15A NCAC 2B.0267) Project Name: Location/Directions: Subject Stream: Weavers Pond June 18, 2013 Isolated or EIP Call John E. Skvarla, III Secretary ;n1 III 012014 J By Soil & Ekronmental Consultants, PA Subject: Buffer Determination NBRRO#14-141 Wake County i ❑ Ephemeral/intermittent/Perennial Determination ❑ Isolated Wetland Determination f Property is located north of Wake field off of Pippin Road UT to Beaverdam Creek Determination Date: June 6, 2014 Staff: James Graham gtop@ Soil IUSGS Survey I Topo Start@ Not Subject Subject To To buffers D u ers X culvert throu out X A x throu hout throu hout x _ B C X Start flag throu out X X D X --- X E X ----�_..._._ _�— X X F X X G H X I Off-site X X 1 x Off-site X X — Off-site R OOff-siteX NOce Carolina K a{ X� A711j/ North Carolina Division of Water Resources 1628 Mad Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 C 27609 Fax (91) 788-7159 REmployerN5%Recycledll%PostConsumerrPaper Internet www ncwatemualiriaro An Equal Opportun4lAffirtnativeAcdon0 Barrett Drive Weavers Pond Wake County June 18, 2014 Page 2 of 2 Explanation: The feature(s) listed above has or have been located ma at a 24,000 sca ey of h feature than is checked Carolina or the most recent copy of the USGS TopographicP Features that are checked "Not Subject" has been determined not to be a stream or is not present on the property be a stream There may be "Subject" have been located on the property and possess characteristics that qualify other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources (DWR). This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DwitDelegated si60) days f date of this letteLocal Authority may r or from the date the affected Director. An appeal requet a determination by the st must be made letter. A request party (including downstream and/or adjacent r owners) �notified en Higgins, sDWR WeBSCaPefUnit,1650 Mail Service e Director shall be referred to the Director g Center, Raleigh, NC 27699. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (611) days. stated The owner/future owners should concerning future correspondences eesources s regarding the ncluding any osubject prother �petrty (an Federal Agencies) of this decision goposed inquiries be above). This project may require a Section 404/41 Permit Central Office) at the(gip 807-6300cand the US Army Corp of Engineers directed to the Division of Water Resources (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this determination, please feel free to contact James Graham at (9 19) 791-4256. R pe tfully, r Danny Smith, Supervisor Water Quality Section Raleigh Regional Office cc: RRO/SWP File Copy i r ' � � Ic •,•�.� SII " �� .,.,- :erz ►_ 14 _ • • "�► 11 • • aG'�a'sI • J� T ~" r loft of dMA— p I IN No. i 8� • Project Mqr,; weaverS PondS Wake County, NC EC '" ' (V T O 0 0 0 - Lc) 0 0 N 2 m Y aD CeMreate of 0WNWh4p U hereby c& -ft VW ! ma the ower of the properly deeerlbed hmm% rhKh properly rs Tho the V b&WA.. regulation lurredr tan of the row o/ Qu and that ! freeb, adopt tis plan of subdmm . 3�4-.2GaS' Owren Dote T'9ra T)W SU KY ORWES A SV9f7MSKW Or /AMD WTNW THE AREA OF A C"TY W MR40 AL/TY AMT NtS AN ORLMNMCE AN7 ASMAW or L4va C] b T1/ SRMtY 6 LOCATED W SLICK McWN !Y A MWY OR ARAWCPAUTY AMT 6 WRECLUTED AS TO AN ORM%AACE 7Mr REGUUTES PARCEiS OF LANA ❑ a nes SLWWY 6 Or AN DOSRW PARCEL OR PARCELS OF LAMS ❑6 DAS SLPWY 6 W ANOTNPP WIDOW. SUCH AS THE REQOYBTNOIOW Or DOSTMIG PARCELS A OOUWT-QWMM SLNKY. OR OndW EYCGVW TD THE DEWM W OF SL MWM ❑ . THE MWMA7Kw AWABLE TO THE SLAVEY04 6 SLfar AMT THE SLWVEM 6 UMNBLE TO LAKE A CETERWAKWW 70 INC BEST Or MIS OR NER PROPESDGYAL ABKlA' AS M PROW SKA6 OONWNED W (A) TIOW l (D) AME PKCYESSVW LAWSLOVEWIN CAN C.rUFAbte of Apprewl - / hereby csrW that the n*w subalvolon show an roan Ph" does not mach. the motion of nen pubs sfreeb or any charge hr -1.&g Public sheets, that the srbdWm= show u n NI r -p..& in comp/ance rKh CAoptr I57 of the Land Use Ordao— of the Tow of Z.bulmh acrd Nat Mers/ore Ods PW hos been gWfo od by the Land LMs AdrwdAgdw of the Tow of Zebulm subject to its berg recorded la Me OfRce of fhe Re$ of Deeds of 1 ks ty wLha W days of the dote boor. K. Date Land Ues Adm _ 1 ACT 'SCALE ""E CARGLRM e WhA I Lau F O N CInID CERTIFY AMT R.S PLATR M TAS DRISN LrrDOt w DED Vi SOW nOW AN OM Dp W 1MOE Ol10ER W StPERVSKA( THE004A 7KW RELL RVR AS RE CL ON WX T7MT 114" B01/MDkffi ACT STlR1tYID ARE CLEARLY AYEICOED AS D&NN FROM DF1]RI UM F'OIMD W BOOW OF PATE -IAL—. ANT ThE Alla d PREO6IGV AS C1lLVUA M d T TleS PGT AAS AV -ARM W ACCOROUCE WTN GS 47-M AS beth6S Nr ORMNAL SGATURC WWWnWNRYTBOI AID SELL TM ��O1�r OF bN� A,p� �,� hhO DIRVt1LCP fiewmArlum /A. L -3278s 3 S L -3M FRED FOR REGSTR 77ON LAURA At RWDVCK 0. AllOFof= fflllelow eNl� my 77KC . RECORDED IN BOOK OF MAPS PAG£y)i 1 State of North Ovollna Count' of Mbke L . Raier OMioer of the Tow of Zebulan. CWW)o that the map or Plot to Mich this cprbftcatm !s oHrked meets off statutory rowe amts Ion . r Offw Date I WAKE COUNTY. MC 297 LAURA N RIDDICK REGISTER OF DEEDS PRESENTED S RECORDED ON 03/15/2005 AT 13:09:06 BOOK:DNZOO 5 PAGE:00492 f i 212DYI ASS v JI.7TQ ACAS 4J a A XLMA- TAlcr t- 4ABM ACRS A. Tr- , for m6So" � NOTE Nen AbSCYOSUtz WAS 05nMKM BY TIE COURt4 LffT W De DSTANCLS ON W EMP ARE AWL6TEO HORUWAL GROUND D6TMCES L A.ESS h07M OTNcwsar ALL ARFA CfLCLU7E0 Ler COOYDAATE CaWAMIKWL 400' 100' 0' 400' 80D 7100' SCALE IN FEET >' O (u w W *' V) a al C Y j =3 V 0 Tz- = -C C L ^ _o O j V z _ o Q- N ~ U ° 3 w >> o a, o C m In v v QH 0)ro QJ M :Ll T N a1 rp O J O a! O Q v 0 m V) tA m O C: aJ C V1 Y v ° a) E a,Y m E a, LU crl7 a c p w a v E C J A 7 T v1 a1 m C 'A U O O w O 41 vYiQj CL +� a. O >' Q QI N aj O X O > O O Z v E >' O (u w W *' V) a z C Y j =3 V 0 Tz- = -C C L ^ _o O j 3 v o z _ o Q- N ~ U ° 3 w >> o a, o C In v v QH 0)ro QJ M :Ll T N a1 rp O J O a! O ZiN to Cl- w a a m— .E v O s v W 0 O D C O) a W LU I' J " H m N -0 m v JO r�r Nd3d H31SVW AdMN33HD Noin93Z i'll Lca 0 1, CAtoo 14` 1 (p N QT# LI) F— o (6 -a _ • �� rr r ' yam♦ � W LU �j W 4 • .. r g Q cc 110, � W LU U. W CC L i Z m fu E E V) N v x x W z ' OVOa S3�a1/3d - y V t = a.2 �} i I $ CP avoa llaHaun Hovr l 1 " 1 " 1 , 1 1 I . 1 ' 1 I -kddId \ LU ` a Z" d I• I 1 Q (n/e anend ,oS) L� z W I 1 VI I I' 3Ntll 1f1N213dSINM w w- / 1 I I W Z r 1a o� Z' "TM ' %i; r �f i i a W 0600 =a.p 1 /; ,I1 1 I 1 IA z3am _ a>Q�fn p N z3ao - S' I/ II I 1 W Ln U 1\ \ I I 11-- -- / /'b t ` Zm ' / I I 1� -• t I II'I I' vn . I II �p \ Iv S Wu onend .os) • • 3AINa 3`JOR! CIHVA3NIA Ws onend .os) AtlM MOIIIM (IN vv T __ x o M6. N a �o' A w U W z J>�0 m VNIIOMVO HIMON.`NO�n83Z w"OOm J Q• z QO z z (-) -0 :. I- o z ' OVOa S3�a1/3d - y V t = a.2 �} i I $ CP avoa llaHaun Hovr l 1 " 1 " 1 , 1 1 I . 1 ' 1 I -kddId \ LU ` a Z" d I• I 1 Q (n/e anend ,oS) L� z W I 1 VI I I' 3Ntll 1f1N213dSINM w w- / 1 I I W Z r 1a o� Z' "TM ' %i; r �f i i a W 0600 =a.p 1 /; ,I1 1 I 1 IA z3am _ a>Q�fn p N z3ao - S' I/ II I 1 W Ln U 1\ \ I I 11-- -- / /'b t ` Zm ' / I I 1� -• t I II'I I' vn . I II �p \ Iv S Wu onend .os) • • 3AINa 3`JOR! CIHVA3NIA Ws onend .os) AtlM MOIIIM (IN vv T __ x o 0 N a �o' w U W z J>�0 m VNIIOMVO HIMON.`NO�n83Z w"OOm J Q• z QO z z (-) -0 :. I- o O N, UNaQZ Q W N 0NOd SU3nd3M 0) QW p Qor-=Op , 0AVMN3389 j<�; aY- a � z ' OVOa S3�a1/3d - y V t = a.2 �} i I $ CP avoa llaHaun Hovr l 1 " 1 " 1 , 1 1 I . 1 ' 1 I -kddId \ LU ` a Z" d I• I 1 Q (n/e anend ,oS) L� z W I 1 VI I I' 3Ntll 1f1N213dSINM w w- / 1 I I W Z r 1a o� Z' "TM ' %i; r �f i i a W 0600 =a.p 1 /; ,I1 1 I 1 IA z3am _ a>Q�fn p N z3ao - S' I/ II I 1 W Ln U 1\ \ I I 11-- -- / /'b t ` Zm ' / I I 1� -• t I II'I I' vn . I II �p \ Iv S Wu onend .os) • • 3AINa 3`JOR! CIHVA3NIA Ws onend .os) AtlM MOIIIM (IN vv T __ x o 0 N a �o' z w J Q• O N, __-_ - _ _ _ \------- 11 'i 111 ; I 11 11 1 r , LLI Uw Z ^. LO Z,�02d� Hl�ON`NO13Z VN1Oom .. OZZU 0 CE CLw LL, z I O N *k Baa ,ta W W F AVMN33HO ONOd SN3nd3M CL LLI 0-j Of -Q a o 09, � �; o zT /w / / O \ � Q I I � I /I I p / ,oz ,oc 017 114 i W LL, w l w I I \j z Z Z ZO i' O OI O N I� I -- � I' I� i 3NIl HOivh 3NIl HOiVN � 3 � ow -J 10 I I w 3wz I I 0�0 C70 / I 00 I I Z� cif D LL. ,�mj�� � \ z \ \ _Z , Q_ \ \CL 13 \ \ \ \\ N \ CA �w w w \\ Z Z Z Z O O O O N N\ N N o \� 3NIl HOiVIN 3NIl HOiVV4 oW I I w M<o M<O d n- O Z�LLI wo o ZN ZLL. �00 w:2 w N W O M W O CL - CLN M 11 0 O _ LO O Lf Lc£Z 2iS adp� Nlddld J Q U O co Sl - -, IT -11-0 I log / iI � I Z�1-0 3NIl HOiVIN 3NIl HOiVV4 oW I I w M<o M<O d n- O Z�LLI wo o ZN ZLL. �00 w:2 w N W O M W O CL - CLN M 11 0