No preview available
HomeMy WebLinkAboutNCC240057_Annual Fee NOD Letter (2025 Fee)_20250218 JOSH STEIN Governor D.REID WILSON secretary 4D WILLIAM E.TOBY VINSON,JR NORTH CAROLINA D6ector Enwronmenml Qualhy 2/18/2025 Duplin County Attn: Bryan Miller PO Box 910 Kenansville, NC 28349 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC240057-2025 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 1/1/2025 and was due on 2/1/2025.The annual fee applies to the following construction site: Golden Leaf Water Supply Well Project 2022 West Park Drive,Warsaw, NC Duplin County Certificate of Coverage No. NCC240057 NC Reference No. NCG01-2024-0057 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Kieu Tran at kieu.tran@deq.nc.gov. Sincerely, William E.Vinson,Jr., PE,CPESC,CPM Director Division of Energy, Mineral,and Land Resources D E Q� Nrrth Curvlina Deprrtment o1 Cn,,,,nmentd quvlily i Drvisirer of Cnrryy knernl nnrl LnrW Rrsurrces Sl2 Nunh Salisbury Slreel loll M1lail Sers,ce Center 0.ek i9h.North Cmuline Tio99 t612