Loading...
HomeMy WebLinkAbout20140929 Ver 1_C203587 B-3159 Environmental Permit Pre-Construction Meeting_20160406 Wanucha, Dave From:Shaver, Larry B Sent:Wednesday, April 06, 2016 10:00 AM To:Greg Tucker (gtucker@jtrussellandsons.com); Brian Weaver Cc:Swicegood, Dale L; Manuel, Ashley S; Euliss, Amy; Wanucha, Dave; John.T.Thomas.JR@usace.army.mil Subject:C203587 / B-3159 Environmental Permit Pre-Construction Meeting Greg/Brian, Greg/Brian, On Monday, April 4, 2016, the environmental permit pre-construction meeting was held onsite for the NC 8 Over I-85 Business project (C203587) in Davidson County. In attendance were Dale Swicegood (Resident Engineer), Larry Shaver (Asst. Resident Engineer), Shane Manuel (NCDOT Project Inspector), Amy Euliss (NCDOT Environmental Officer), and yourselves (representing JT Russell & Sons). Following is a summary of the items that were discussed:  The only permitted site (Site 1) for the project is located at –Y- Lt Sta. 16+30 (+/-). The permit drawings (dated 2014) indicate replacement of the existing headwall and pipe system. The construction drawing (dated 2015) is noted “Do Not Disturb Headwall”. The construction drawing indicates leaving the last 19’ of existing pipe in place and installing a pipe liner. It was believed (and later confirmed) that the headwall is classified as historic and is therefore shown on the construction drawings to remain. As per these drawings, there shall be no disturbance to the headwall or the channel downstream of the headwall. The trees adjacent to the headwall and channel should also be left undisturbed.  Visual observation of the headwall and existing channel revealed a constant flow of water from the pipe system, during our meeting. This water is designated as a jurisdictional stream beginning at the headwall. Ms. Euliss noted that due to the water being a jurisdictional stream, every location entering the pipe system shall be considered an SDO and shown as such on the NPDES reporting.  The source of the water in the pipe system was not determined during the meeting, but will be determined before ground disturbing work began.  Ms. Euliss confirmed that the C203587 project was granted an exemption from the bat moratorium that had been previously discussed. This concluded the meeting. Any discrepancies to the above notes from the meeting should be provided to the Resident Engineer. If no discrepancies are noted, this will indicated concurrence with the minutes as noted. Thanks, Larry B. Shaver Senior Assistant Resident Engineer Division 9, Lexington Construction Office North Carolina Department of Transportation 336 249 6255 office 704 223 7543 mobile lbshaver@ncdot.gov 452 Central Avenue Lexington, NC 27292 1 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2