HomeMy WebLinkAbout20050732 Ver 09_Triage Check List_20080130Triage Check List
Date: 01/30/2008 Project Name: Briar Chapel Development
DWQ #: OS-0732 ver 9
County: Chatham
To: Lauren Witherspoon, Raleigh Regional Office
60-day Processing Time: 01/28/2008 - 3/28/2008
From: Ian McMillan Telephone: (919) 715-4631
The file attached is being forwarded to you for your evaluation.
Please call if you need assistance.
^ Stream length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps
^ Minimization/avoidance issues
^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy
^ Is the application consistent with pre-application meetings?
O Cumulative impact concern
^ Sent to you Per Cyndi Karoly
Comments: