Loading...
HomeMy WebLinkAbout20050732 Ver 09_Triage Check List_20080130Triage Check List Date: 01/30/2008 Project Name: Briar Chapel Development DWQ #: OS-0732 ver 9 County: Chatham To: Lauren Witherspoon, Raleigh Regional Office 60-day Processing Time: 01/28/2008 - 3/28/2008 From: Ian McMillan Telephone: (919) 715-4631 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ^ Stream length impacted ^ Stream determination ^ Wetland determination and distance to blue-line surface waters on USFW topo maps ^ Minimization/avoidance issues ^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ^ Pond fill ^ Mitigation Ratios ^ Ditching ^ Are the stream and or wetland mitigation sites available and viable? ^ Check drawings for accuracy ^ Is the application consistent with pre-application meetings? O Cumulative impact concern ^ Sent to you Per Cyndi Karoly Comments: