HomeMy WebLinkAbout20021232 Ver 1_More Info Letter_20021021Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
October 21, 2002
Dr. Greg Thorpe, PhD., Manager
Planning and Environmental Branch
North Carolina Department of Transportation
1548 Mail Service Center
Raleigh, North Carolina, 27699-1548
Re: Permit Application for proposed widening of NC55 from US 17 in Bridgeton to NC 304 in Bayboro in Craven
and Pamlico Counties
DWQ No. 021232, TIP No. R-2539
Dear Mr. Thorpe:
The Division of Water Quality has reviewed your submittal fora 401 Water Quality Certification for the
aforementioned project. Review of your application revealed it lacking necessary information required for making
an informed permit decision. The permit application was deficient in the following areas:
• The application does not present any of the anticipated impacts from the relocation of utilities that will be
required as a result of the road project. Please provide the location of all utility lines (above and below ground)
as well as any associated structures. In addition, please provide the proposed relocation plans for all of the
impacted utilities and include the anticipated impacts to all wetlands, streams, and buffers.
• The drawings presented in the application do represent the latest available designs. Please provide the most
recent designs for the entire project including any changes in proposed impacts to wetlands, streams, and
buffers.
While DWQ agrees with the proposed onsite wetland mitigation in concept, we require additional information
prior to approval. In reference to the document titled "Restoration Plan for Swamp Hardwood Wetlands at
Existing Bridge Causeways of NC 55", the information provided regarding the proposed species for planting
and the vegetation and hydrologic monitoring plans is insufficient. Please provide a planting plan that lists the
species to be planted. In addition, please remove the phrase, "...Depending on availability, the seedling mix
will mimic...". Replace the statement to indicate that the NCDWQ will have to approve the list of species to be
planted in the sites. Furthermore, the vegetative monitoring will need to continue for 5 years, not the 3
proposed years. Please make changes to that section as well. Finally, the hydrologic success criteria will need
to use an on site reference site. The restored site mimicking the reference site within some approved variance
will achieve hydrologic success. To coordinate discussion on this issue please contact John Hennessy at 919-
733-5694. The reference site should be located immediately to the restoration area. Please change the proposed
plan as described above and resubmit for approval by the NCDWQ.
• There is no specific design criteria presented for the proposed onsite stream mitigation in Section B. Please
provide all appropriate plans, geomorphological data, sediment transport analysis, planting plans, and
monitoring plans.
• .The application proposes the use of the Croatan Mitigation Site as off-site non-riverine wetland mitigation. At
this time, the NCDWQ has not approved that site for use. We will coordinate with DOT to finalize approval of
the site. Please contact John Hennessy at 919-733-5694 to coordinate those efforts.
N. C. Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 (919) 733-1786 ~
Customer Service: 1 800 623-7748
F WATF Michael F. Easley, Governor
~~~ ~QG William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
~ rte-- Alan W. Klimek, P.E. Director
o ~
• The application does not show the proposed bridge bent locations for the three project bridges. Please provide
the proposed locations of the bents and the anticipated impacts.
• In reviewing the tables for stream and buffer impacts, it is not clear if the totals presented include anticipated
construction impacts. Please clarify and provide additional information as necessary.
• The design drawings presented do not provide sufficient information to visually identify proposed project
impacts. Please provide additional information that shows the limits of jurisdictional impacts with shading or
hatching of impact areas.
• The design drawings do not show all the proposed stormwater collection pipes. Please provide additional
information that shows all the proposed stormwater collection system and outfalls. Information should be
provided at the outfall locations so that DWQ can determine that stormwater discharges will be through riprian
buffers as diffuse flow at non-erosive velocities.
• Review of Section C indicates that insufficient information is present to allow issuance of the Buffer
Certification for this project. Please provide the latest design drawings that were reviewed by DWQ on
10/11/02.
Therefore, pursuant to 15A NCAC 2H .0507(a)(5), we will have to place the permit application on hold until we are
supplied the necessary information. Furthermore, until the information is received by the NC Division of Water
Quality, we request (by copy of this letter) that the US Army Corps of Engineers place the permit application on
hold.
Hopefully, we can work together to expedite the processing of your permit application. If you have any questions or
require additional information, please contact John Hennessy at 919-733-5694.
Sincerely,
~~,
Alan W. Klimek, P.E.
Director
cc: DWQ Washington Regional Office
US Army Corps of Engineers Washington Field Office
File Copy
C:\ncdot\TIP R-2539\conespondence\021232h1d.doc
N. C. Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 (919) 733-1786
Customer Service: 1 800 623-7748
SgTIE Il.3 ° ~,- S7CA~. ~3~ + 75 7C® X37 ~- 3® ~$7C ~ IL~C
~ ~ ~, ~
,~
~~
~ ~ ~
.. ..
•• • •
e:1~
g ~~.
a ~'`e 24 ~ ~
~ ~` ~ ~. ~ ' ' •
• ~`' • ~ ~ 26 ~~ i i
I
~. .te
vP is ~
m t .
. it. ~c I
... ~ 1i
II\~
eznT. ~o.~e 1100.1 R/M I
. . .. .. .,
..
..
.. ..
..
__ ,
O
~O
~
_r_T~
/ \ / ___~;___
~- ______ _.
__
-'-~- ~T--- ----
\ ~ ~
---- -
I I
--------
-------
I
,
/
EX15T. .~! 1g0'1 R/11 ~'
I I ~
~ I ~
I I
° I I L~
h
I
r ~ E- -
a
° a E !
~ Dc I
~ /, ~~ ~ ~
~ I
I
I
-~ ~
~
~^
~ . .
• . • m
•
~;• a
~
o
BKD ~ II ~ I ISBKD
LT ~, `~/ -~
~ •
• .. ~ • • • . • .•
• •
I I
. II II ~----~ ix o
~ • C• ~I I I
Ix
25
O
NATURAL
STREAM ;..
•~ ~~`'~
I
d I ° I
II
I I L °
H ~ II (3
TR ~ I
I
~ fl DESIGN
1~` II
~~
1
1 1 0
n ~ ' ~~ .... a
N.C. DEPT. OF TRANSPORTATION
DENOTES FILL IN DIVISION OF HIGHWAYS
f
~ /y///~ SURFACE WATER
Z11LIfd PAMLICO COUNTY•
DENOTES EXCAVAT ION PROJECT 8.1170901 (R-25398)
IN WETLAND
® NC 55 FROM EAST OF SR 1127 TO EAST
~ p IQ SR 1129 •
® P~~~~~~7~ DENOTES FILL IN •
•
•
• DENOTES MECHANIZED
crelc 1.1nnn
i; ~~
.I WETLAND •
•
~
. . . . CLEARING _
.. __~~-__~Il~l
__ .__ .'__.