HomeMy WebLinkAbout20070047 Ver 2_Email_20070917yR~ : R-245 Work bridge revision
Sabject: Re: R-225 Work bridge revision G"'~
From: Masot,l Herndon ~~-ml~erndon(~;dot.state.nc.lis>
llate: Mon, 17 Sep 2447 4~;:12:14 -4400
To: Steve Sollod <Steve.Sollod(x~~c;mail.net=,
_.
CC: Stephen bane ~~Stephen.Lane(a?~ncnaail.net>, David Wainwright <David.Wainwi-ight(a~ncmail.net>,
"David L. Tinipy" ~David.L.Tii~lpy{ri< a«-{~)2.~isace.a~rn~y.niil>, Ken Aver~itte <l:en.avcritte~~znenlai3_net>,
".Joe F. Blair" <jblair~~dot.state.i~c.us>, "Brett M. Fei~hier" <bmfeu ner(a;~dot.state.nc.t~s>, Chris
Rivet~bark ~crivcnbark~%dot.state°.nc.us>
Steve:
Per discussions with the Resident Engineer's office and tl~e contractor late
Friday afternooon, the temporary bulkhead will placed water ward and
is~i;-eciiat.ely adjacent tQ•5 - 1 ft} to the existing btillchead. As proposed
tl~er_e should be minimal if any esicroachment water ward. The ccntract.or
said on t::he west end he may have to bring it: land ward of the existing t:o
ma}te sure it does no conflict with ccnst.ruction of the bent.
"'hank". and if you l=ave any additional quest.iens, please do not hesitate to
coxitar~t: r:.,e.
M
Stej~re So?..lad. wrote ;
N;a.>orl ,
Y,~u provided a goad write up and drawings for your request and it
appears that this charge N=ill likely be authorized by a wetter of
_
Re£ine~~tent. The only thine ;::hat is not clear to me is the placement of
the sheet pile '"bulkhead" or: the island side, as described in your
lett,e?°, "...to lae placed... along !.he shoreline between t;he existing
bulkhead and the work bridge'". Will the sheet pile be installed
watereaaY-d, along side (immediately next toj the exist i.r~g bulkhead, such
that, there is no extension ~saaterward of the bulkhead`? That is how it
looks in the plans...
S t, eve
Mason Herndon wrot=e:
St=eve & st,ephen,
As discussed at the field meet.:ing en Sept. ~ for R-2245, attached
is a request for a revision to CAMA Permit 20-07. The request is
for reconfigu7-ation of the work bridges and approval of temporary
access roads to the work bridges. Attached you will are two
files; a signed 7_etter- and plan sheets. I separated. them since
they are on two different paper sizes to assist you in printing.
L)r~ve and Ken, per cur discussion on site, these plan sheets
sl~ou.7.d satisf.~r your rec.~ui.rements and a rnod:i.fication to the 404
and 40i is not required. Please reply by e-mail to this fact.
As dsct:rssed i.n t:he field, this i;~ a very Mime sensitive matter
d~xe. to the mcratori~.zm restr.ctions. The contractor needs to have
access roads constr-l:€cted prier t,c Oct.ober 1, so has s-_ot to delay
~__e bridge contractor and this project.
1 was net planning on sending any hard copies since everything
~~<>,~ k;e r,rci~~:. dec e , ectr r,z c.a:l iy'. T.:. ou need a cc
_ ~ Y .~az a 'F Y,
b: ~ase send ^e an e ~r_zi 1 .
`~hank_ you for meeting us cn site and fo-r your timely assistance
1 of 2 9/17/2007 8:43 AM
t i~~: R-245 Work bridge revision
1-T.':. t~::l ::> "'?t ~.PY', ..~. vJ ].. ,, 1. C. ~'a-~. C:".t Y.:.U SOC:i:"l tdlt}"1 t~'l.E' d~~.t C= t1.. ;~`' a.T~..d
~;~~"C'E: (t :i;F=', 1t=Xt.~iE:ld Y~~~v1.E'.'n%. Lf ~Gtl nE'.ed aTl~ u.ddltlGnal
lI1fGT~Illd.t.1G": GI" Y~taY'e ._1T1~~ ~~u.GSt.1.0I7 I.n ~.'le i'(IC.dI":. t'llle~ X%I.E_'.aSE; CMG nUt
hesitate too cGl~t,~s:,t: rye.
Macon
Steve SG11od.
'I'ransport.a:ion Project Coordinator
NC Division Gf Coastal Management
1638 Mail Ser;rice Cent:e~~
Faleigh, NC" 27699-'638
{9191 733-2293 X23 phone
i919) '733 -~~{95 Pmt,
Mason Ilerndon t~mherndon(c%dot.state.nc.us>
Environmental Supervisor I
Division Office, Highway Division 3, Operations, Division of Highways
2 of 2 9/17/2007 8:43 AM