Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG020766 DMR SW (2)
ANNUAL SUMMARY DMR - STORMWATER SEND TO CENTRAL OFFICE * STORMWATER DISCHARGE OUTFALLS (SDO) GENERAL PERMIT NO. NCG020000 *Report ALL STORMWATER Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH 1 of each year. CERTIFICATE OF COVERAGE NO. N FACILITY NAME: �f1�1dL,2 A -t -* 7 a b PERSON COLLECTING SAMPLES CERTIFIED LABORATORY Lab # Lab # Part A • Ctnrmwatar Mnnitnrina RvnnirPmenk SAMPLE CLETION YEAR: d I S - COUNTY G/✓ PHONE NO. 1 C2 �1© ADD TO LISTERVE? YES ❑ NO EMAIL: TOTAL RAINFALL: EVENT DURATION: INCHES MINUTES Date Sample Collected Outfall No. (mo/dd/yr OR NO FLOW) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 Total Flow '(MG) Total Suspended a Turbidity Solids (NTLI) (mg/1) Settleable Solids (ml/1) 1003'4 See Footnote 3's 0.1 E 02 Z1116 QWR fw r LES J 'If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here and the Date Range. 2 Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range 3 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. 4 TSS benchmark values are 100 mg/1 except in ORW, HWQ, trout, and PNA waters where they are 50 mg/1. 5 The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO. Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. Permit Date: 1/1/2010-12/31/2014 Last Revised 01-19-10 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 eal of new motor oil/month on average Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 In Tier 2 Monthly Monitoring? (y/n) # f oMonths m Tier 22 Sampling New Motor Oil Total Flow Usage (MG) (gal/month) TPH using Total Suspended pH, method 1664A Solids, (Standard SGT -HEM (mg/1) Units) (mg/1) - - 153 1003 6-93 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEENDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES [:]NO ❑ HAVE YOU CONTACTED THE REGION? YES [:]NO ❑ WHO AT THE REGION HAVE YOU SPOKEN WITH? MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE" & LIMIT VIOLATIONS) BY MARCH I OF EACH YEAR TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOUMUST SIGN THIS CER TIFICA TION FOR ANYINFORMA TION REPOR TED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and lete. I am aware that there a significa penalties for submitting false information, including the possibility of fines and imprisonment for knowing iolations " _ /__� (Si a re of Permittee) (Date) Permit Date: 1/1/2010-12/31/2014 Last Revised 01-19-10 Page 2 of 2