Loading...
HomeMy WebLinkAbout20130188 Ver 1_Year 1 Monitoring Report_2015_20160328Annual Monitoring Report Monitoring Year 1 of 7 FINAL Cochran Stream and Wetland Restoration Site NCDMS Contract No.: 004947 NCDMS Project No.: 95720 Macon County, NC Data Collected: December 2015 Date Submitted: January 2016 Submitted to: North Carolina Division of Mitigation Services NCDEQ-DMS, 1652 Mail Service Center Raleigh NC 27699-1652 This Page Intentionally Left Blank Prepared for: 302 Jefferson Street, Suite 110 Raleigh, North Carolina 27605 Prepared by: EQUINOX balance through proper planning 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 This Page Intentionally Left Blank Contents 1.0 Project Summary ------------------------------------------.| Ll. Goals and Objectives .................................................................................................................... l 12 Success Criteria ............................................................................................................................. | 1.3. Project Setting and Background ---------------------------------. 3 1.4. Project Performance ...................................................................................................................... 3 2.0 Methods ............................................................................................................................................. 4 3.0 References ......................................................................................................................................... 5 Appendix AGeneral Tables and Figures ----------------------------------7 Appendix BVisual Assessment Data ......................................................................................................... |5 Appendix C Vegetation Plot Data ............................................................................................................... 27 Appendix D8beam Geornorphology Data ................................................................................................. 37 AppendixlB Hydrologic Data ..................................................................................................................... h5 This Page Intentionally Left Blank 1.0 PROJECT SUMMARY 1.1. Goals and Objectives The overall goals address the stressors identified in the TLW and include the following: Improve water quality within the restored channel reaches and downstream watercourses by reducing sediment and nutrient inputs and increasing dissolved oxygen levels Improve local aquatic and terrestrial ecological function through increased stream shading, habitat complexity, and availability of organic/ woody material Improve aquatic and benthic habitat and associated streambed form Improve site hydrology, wetland functions, and attenuation of flood flows Provide riparian area and wetland restoration with a native plant community Protect the site from future land impacts The specific project objectives that are intended to target the above goals include the following: Implement Priority I and II restoration of 1,882 feet of stream and rehabilitation/re-establishment of 4.35 acres of wetlands Implement appropriate changes in dimension, pattern and/or profile to establish geomorphically stable conditions within the project reaches Modify degraded stream channels to enable proper sediment transport capacity and improved streambed form Integrate in -stream structures and native bank vegetation Re -grade the floodplain to remove drainage ditches, spoil berms, and overburden soil Plant native woody and herbaceous riparian vegetation within a minimum width of 30 feet from the edge of the restored channels and throughout the restored wetland area Eradicate invasive, exotic or undesirable plant species Install livestock exclusion fencing Establish a permanent conservation easement 1.2. Success Criteria 1.2.1. Morphological Parameters and Channel Stability Restored and enhanced streams are in compliance with the standards set forth in the USACE 2003 Stream Mitigation Guidelines and the "Ecosystem Enhancement Program Monitoring Requirements and Performance Standards for Stream and Wetland Mitigation" dated November 7, 2011. Restored and enhanced streams should demonstrate morphologic stability to be considered successful. Stability does not equate to an absence of change, but rather to sustainable rates of change or stable patterns of variation. Restored streams often demonstrate some level of initial adjustment in the several months that follow construction and some change/variation subsequent to that is also to be expected. However, the observed change should not be unidirectional such that it represents a robust trend. If some trend is evident, it should be very modest or indicate migration to a stable form. Dimension- Cross-section measurements should indicate little change from the as -built cross- sections. If changes do occur, they will be evaluated to determine whether the adjustments are associated with increased stability or whether they indicate movement towards an unstable condition. Cochran Stream and Wetland Restoration Project 1 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Pattern and Profile - Visual inspection of the pattern and profile should indicate stability with little deviation from as -built conditions for the restored stream. Pool depths may vary from year to year, but the majority should maintain depths sufficient to be observed as distinct features. The pools should maintain their depth with flatter water surface slopes, while the riffles should remain shallower and steeper. Pattern and profile measurements will not be collected unless conditions seem to indicate that a detectable and detrimental change appears to have occurred. Substrate - Calculated D5o and D84 values should indicate coarser size class distribution of bed materials in riffles and finer size class distribution in pools. The majority of riffle pebble counts should indicate maintenance or coarsening of substrate distributions. Generally, it is anticipated that the bed material will coarsen over time. Sediment Transport - Depositional features should be consistent with a stable stream that is effectively managing its sediment load. Point bar and inner berm features, if present, should develop without excessive encroachment of the channel. Isolated development of robust (i.e. comprised of coarse material and/or vegetated actively diverting flow) mid -channel or lateral bars will be acceptable. Likewise, development of a higher number of mid -channel or lateral bars that are minor in terms of their permanency such that profile measurements do not indicate systemic aggradation will be acceptable, but trends in the development of robust mid -channel or alternating bar features will be considered a destabilizing condition and may require intervention or have success implications. 1.2.2. Surface Water Hydrology Monitoring of stream surface water stages should indicate recurrence of bankfull flow on average every 1 to 2 years. At a minimum, throughout the monitoring period, the surface water stage should achieve bankfull or greater elevations at least twice. The bankfull events must occur during separate monitoring years. 1.2.3. Groundwater Hydrology The USACE defines minimum hydrology for jurisdictional wetlands to be saturation within 12 inches of the surface for at least 5% of the growing season if soils and vegetation meet jurisdictional criteria. Given the hydric soils are present throughout the restoration area but that wetland vegetation will be newly established, it is reasonable to set the minimum hydrology threshold slightly above the jurisdictional minimum threshold. As such the minimum performance standard is set to provide saturated soils within 12 inches of the surface for at least eight percent (8%) of the growing season under average climatic conditions. In the event of non -typical years of climatic conditions, groundwater monitoring data should demonstrate similar hydro -periods when compared to reference wetland groundwater data. The reference wetland site will be the NCDMS Cat Creek Stream and Wetland Restoration Site — NCDMS Project # 71 — located east of Franklin in Macon County, NC. The growing season for the site was based on the Natural Resource Conservation Service (MRCS) WETS dataset for Macon County (http://agacis.rcc- acis.org/37113/wets). The Macon County dataset is based on a site with elevations roughly the same as the project site. According to NRCS, the growing season for Macon County is defined to be the period with a 50% probability that the daily minimum temperature is higher than 28°F. At the project site, this period extends from April 16' to October 19' for a total of 187 days. Based on this, wetland hydrology success will be achieved if the water table is within 12 inches of the soil surface for 15 consecutive days or more during the growing season. Cochran Stream and Wetland Restoration Project 2 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 1.2.4. Vegetation Riparian vegetation monitoring shall be conducted for a minimum of seven years to ensure that success criteria are met per USACE guidelines. Accordingly, success criteria will consist of a minimum survival of 260 planted stems per acre by the end of the Year 5 monitoring period and a minimum of 210 planted stems per acre at the end of Year 7. If monitoring indicates either that the specified survival rate is not being met or the development of detrimental conditions (i.e., invasive species, diseased vegetation), appropriate corrective actions will be developed and implemented. Additionally, planted vegetation must average 8 feet in height in each plot at year 7 (as defined in the USACE 2003). If this performance standard is met by year 5 and stem density is trending toward success (i.e., no less than 260 five year-old stems/acre) monitoring of vegetation on the site may be terminated provided written approval is given by the USACE in consultation with the North Carolina Interagency Review Team (NCIRT). 1.3. Project Setting and Background The Cochran Branch Mitigation Project (The Site) is located approximately 6 miles northwest of Franklin, North Carolina at latitude 35°12'52" N and longitude 83029120" W. The Site encompasses approximately 10 acres of agricultural land and consists of two streams, Cochran Branch and Parrish Branch, along with 4.35 acres of wetlands on the Cochran Branch floodplain. The Site lies within the Little Tennessee River Watershed NC Division of Water Quality (DWQ) sub -basin 04-04-01 and local HUC 06010202040020. The project is located within the NCDMS Iotla Creek targeted local watershed (TLW) and within the Franklin to Fontana local watershed plant (LWP). Cochran Branch drains to Burningtown Creek approximately 0.5 miles downstream of the project. Burningtown Creek is classified as B;Tr by NCDEQ. 1.4. Project Performance Monitoring Year 1 (MY I) data was collected during December 2015. Monitoring activities included visual assessment of all reaches and the surrounding easement, collection of images at eight permanent photo stations, inventory of eight permanent vegetation monitoring plots, surveying of nine cross- sections, and conducting five pebble counts. Summary information/data related to the occurrence of items such as beaver or encroachment and statistics related to performance of various project and monitoring elements can be found in the tables and figures in the report appendices. Narrative background and supporting information formerly found in these reports can be found in the Baseline Monitoring Report (formerly Mitigation Plan) and in the Mitigation Plan (formerly Restoration Plan) documents available on the NCDMS website (http://portal.NCDEQ.org/web/eep). All raw data supporting the tables and figures in the appendices is available from DMS upon request. 1.4.1. Vegetation Visual assessment of vegetation outside of the monitoring plots (Appendix B — Table 6) indicates that the herbaceous vegetation is becoming well established throughout the project. Several remaining populations of Chinese privet (Ligustrum sinense) were treated during June 2015. Follow-up treatments for Chinese privet will be performed during the winter of 2015-2016. Planted stems were difficult to assess across the site during leaf -off condition. Viability of planted stems will be monitored in subsequent site visits. Monitoring of the permanent vegetation plots (n = 8; VP) was completed during December 2015. Summary tables and photographs associated with MY1 monitoring are located in Appendix C. MY1 monitoring data indicates that all but VP -6 are on track to meet the MY3 interim success criteria of 320 Cochran Stream and Wetland Restoration Project 3 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 planted stems per acre. Vegetation Plot 6 had a density of 121 planted stems per acre, well below the Year 5 and Year 3 target densities of 260 and 320 planted stems per acre, respectively. Planted stem densities among plots ranged from 121 to 769 planted stems per acre with an annual mean of 582 planted stems per acre across all plots. A total of 10 species were documented within the plots. When volunteer stems are included, the mean annual total stems per acre rose to 597 and ranged between 121 and 769 stems per acre. The lack of success in VP -6 can likely be attributed to the location of this plot on top of a small knoll, where it is generally dryer, followed by a dry summer. Additionally, vegetation within, and surrounding, the plot is dominated by fescue. This area will be replanted during spring 2016. 1.4.2. Stream Geomorphology Visual assessment of the stream channel was performed to document signs of instability, such as eroding banks, structural instability, or excessive sedimentation. No indication of instability was observed during visual assessment and all structures are functioning as designed (Table 5 and Figure 2). Geomorphic data for MY1 was collected during December 2015. Summary tables and cross-section plots related to stream morphology are located in Appendix D. Noticeable change in the cross-section data between MYO and MY1 were limited to pool cross-sections 1 and 4, where deposition and scour, respectively, led to slight changes in the maximum pool depth (Appendix B, Table 11 a). These changes are relatively minor and do not exceed expectations of adjustments within the channel, particularly for the first year of monitoring. As expected pebble counts indicate that riffles contain coarser substrate than pools. The riffle D50 fell into the very coarse sand to medium gravel size class for Cochran lb and very fine gravel to fine gravel for Parrish Branch. Substrate will be monitored in future years for shifts in particle size composition. The bank pin arrays indicate that no erosion is taking place in the pools. All bankpins were buried under soft accretions of sediment. Documented shifts in stream morphology do not exceed expectations between MYO and MY1 as the constructed stream adjusts to conditions at the site. The project is meeting success criteria regarding stable cross-section dimensions as well as substrate size composition, and sediment transport. 1.4.3. Groundwater and Stream Hydrology During MY 1, all eight of the groundwater monitoring wells met the 8% hydroperiod success criteria (Table 13). Due to the fact that the baseline monitoring setup and MY1 data collection occurred during the same year, hydrologic data was collected for only 132 days of the 187 day growing season. Calculations of the maximum hydroperiod were based on the full growing season; however, as a result of the shortened data collection period, the maximum number of consecutive days within 12 inches of the ground surface is limited to 132 days. All monitoring wells still met the 8% hydroperiod success criteria. Hydroperiods among the monitoring wells ranged from 13.6% to 100%. During a December 2015 site visit, one bankfull event was recorded on Cochran Branch (mainstem), at 0.86 feet above bankfull (Table 12). This is the first bankfull event since project completion. 2.0 METHODS For MY1, visual assessment was performed during the geomorphic and vegetation data collection event. For future monitoring years, visual assessment of the project will be performed at the beginning and end of each monitoring year. Permanent photo station photos were collected during the geomorphic data collection event; however for future monitoring years, permanent photo station photos will be taken Cochran Stream and Wetland Restoration Project 4 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 during the initial visual assessment; during leaf -off conditions. Additional photos of vegetation or stream problem areas were taken as needed. Geomorphic measurements were taken during low flow conditions using a Nikon® NPR 332 Total Station. Three-dimensional coordinates associated with cross-section data were collected in the field and geo-referenced (NAD83 State Plane feet FIPS 3200). Morphological data were collected at 9 cross- sections. Survey data was imported into CAD, ArcGIS®, and Microsoft Excel® for data processing and analysis. Channel substrate was characterized using a Wolman Pebble Count as outlined in Harrelson et al. (1994) and processed using Microsoft Excel. Vegetation success is being monitored at 8 permanent monitoring plots. Vegetation monitoring follows the CVS-EEP Level 2 Protocol for Recording Vegetation, version 4.2 (Lee et al. 2008) and includes analysis of species composition and density of planted species. Data is processed using the CVS data entry tool. In the field, the four corners of each plot were permanently marked with rebar and photos of each plot are taken from the origin each monitoring year. Precipitation data was collected using an Onset HOBO Data Logging Rain Gauge. Groundwater for hydrologic success of restored wetlands was monitored using eight HOBO U20 Water Level Loggers. An additional logger was installed on site, above ground, for use as a barometric reference. Data loggers collected depth to groundwater daily and all data were processed using HOBOware and analyzed using Microsoft Excel. Bankfull events were documented with two crest gauges, one each being located on Cochran Branch and Parrish Branch. During quarterly visits to the site, the height of the corkline was recorded and cross-referenced with known bankfull elevations at each crest gauge. 3.0 REFERENCES Environmental Banc & Exchange, LLC. 2014. Cochran Branch, Final Mitigation Plan, Macon County, North Carolina. NCEEP Project No. 95720 Harrelson, Cheryl, C. Rawlins and J. Potyondy. 1994. Stream Channel Reference Sites: An Illustrated Guide to Field Technique. Gen. Tech. Rep. RM -245. Rocky Mountain Forest and Range Experiment Station. USDA Forest Service. Fort Collins, Colorado Lee, M.T., R.K. Peet, S.D. Roberts, and T.R. Wentworth. 2008. CVS-EEP Protocol for Recording Vegetation. Version 4.2. http://cvs.bio.unc.edu/methods.htm; accessed November 2008. Cochran Stream and Wetland Restoration Project 5 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 This Page Intentionally Left Blank Cochran Stream and Wetland Restoration Project 6 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Appendix A General Tables and Figures Reference S.ftes Cold Spring:gs i 14AYWOO Creek. J 4-,7-8VVAIN - 28,ft, JACKSON MAC64 CLAY Fairest OC ran Site k, G. South fork Mills River TRAN§' LVANIA nrvri r' ,h,,, a p HIZUTC 1: Vicinity Map res CochranV FQU I NO " Project No. 95720 Notes: CmserwaaQ" iwnt f"11 Ke, Masan County, North Carolina Mapong & Survey. PA Miltzs Cochran Stream and Wetland Restoration Project 8 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 . I fsanklin AMEL.L —it 2? F-tK.74 WWIH tt$.I"dwp Yglr. Uwfi­m US. Td WMTnfSmo*ey MIRwA4. Np,­iy. RoW Alw AmOm cum kttimcoxc,25 &AIIrtFIwvMrvaWy 2 aniLs r" rithi oritoA4mFoad Driwl nffle dacn iwa ltftmo OlsyrHA R"d.AikI 3.5jul, IIUI.Ir�ht-kWA.1u—ad aced Lk mwa w the .4e UA h. 0.71 stok­. .. 11re I'It lnsd4wt [­jml si = rrovjmlsl r­I­fiL-n s i1r. of Lhe wthorIzed pffronue] of mete and fedrut azF in a ffidr Lijw[vM in the ovn5ip =a Q-(-- aflh6r defime4 roles Mti Any mtrrded at& %iot-m aj rlirie}tryIr, -1 -Nil iki- Sri. -d"- . th IAV. p HIZUTC 1: Vicinity Map res CochranV FQU I NO " Project No. 95720 Notes: CmserwaaQ" iwnt f"11 Ke, Masan County, North Carolina Mapong & Survey. PA Miltzs Cochran Stream and Wetland Restoration Project 8 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 OCD CD C N � � n d O O s O C� p d n b c b nt Orperc It CD CD CD OQ C" C CD 0 CL p O r; CD n CD v CD cot CDCD CD O o -C Q CD f c • •i ,''� O -OCD CC CD O OID �_ r / pf ♦♦` CD CD CD m n t� y y �o '1:3W CD 0 CD I C J /" ` � dam%=• � ,`' � ao ♦b � as o rs o /` _ �j♦i CD lu- CD CD LO cn a tc to - f CD 0 CD 00 CD CN o d z CD C a N � O O (p n C: c (D d 0 O T 'd o 0 9z. Cd cd" o �q 0 uz 'Restoration footage accounts for crossings and exclusions. 'BR=Bioretention Cell; SF = Sand Filter; SW = Stormwater Wetland; WDP =Wet Detention Pond; DDP = Dry Detention Pond; FS= Filter Strip; S= Grassed Swale; LS = Level Spreader; NI =Natural Infiltration Area; FB = Forested Buffer Cochran Stream and Wetland Restoration Project 11 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 1. Project Components and Mitigation Credits Cochran Stream and Wetland Restoration Project Mitigation Credits Stream Non-riparian Riparian Wetland Wetland Nitrogen Buffer Nutrient Offset Phosphorous Nutrient Offset Type R RE R RE R RE Totals 1,820 4.24 0.06 Project Components Project Component -or- Reach ID Existing Approach Stationing/Location Footage/Acreage (PI, PII etc.) Restoration - or- Restoration Equivalent Restoration Mitigation Footage or Ratio Acreage Cochran Branch 100+60 - 115+05 1332 PI R 1,418 1:1 Parrish Branch 200+15 - 204+11 232 PH R 402 1:1 Wetland Area 1 _ Re-Est. R 3.33 1:1 Wetland Area 1 0.88 Re-Hab. R 0.82 1:1 Wetland Area 2 0.11 Enh. RE 0.11 2:1 Wetland Area 3 Re-Est. R 0.09 1:1 Component Summation Stream' Riparian Wetland Non-riparian Wetland Buffer Upland Restoration Level (linear feet) (acres) (acres) (square feet) (acres) Riverine Non-Riverine Restoration 1,820 4.24 Enhancement - 0.11 Enhancement I - Enhancement II - Creation Preservation Preservation BLIP Elements Element' Location Purpose/Function Notes FB Entire Site Protect Stream 'Restoration footage accounts for crossings and exclusions. 'BR=Bioretention Cell; SF = Sand Filter; SW = Stormwater Wetland; WDP =Wet Detention Pond; DDP = Dry Detention Pond; FS= Filter Strip; S= Grassed Swale; LS = Level Spreader; NI =Natural Infiltration Area; FB = Forested Buffer Cochran Stream and Wetland Restoration Project 11 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 2. Project Activity and Reporting History Cochran Stream and Wetland Restoration Project Activity or Report Data Collection Complete Completion or Delivery Mitigation Plan Aug - 2014 Sept - 2014 Final Design - Construction Plans Oct - 2014 Oct - 2014 Construction N/A May - 2015 Permanent Seed Mix Applied May - 2015 May - 2015 Live Stake and Bare Root Plantings May - 2015 May - 2015 Baseline Monitoring Document (Year 0 Monitoring - Baseline) Jun - 2015 Aug - 2015 Invasive -Exotic Vegetation Treatment - Jun - 2015 Year 1 Monitoring Dec - 2015 Jan - 2016 Year 2 Monitoring Year 3 Monitoring Year 4 Monitoring Year 5 Monitoring Year 6 Monitoring Year 7 Monitoring Cochran Stream and Wetland Restoration Project 12 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 3. Project Contacts Cochran Stream and Wetland Restoration Project Resource Environmental Solutions, LLC 302 Jefferson Street; Suite 110 Prime Contractor Raleigh, North Carolina 27605 Daniel Ingram (919) 209-1056 Wolf Creek Engineering 12 1/2 Wall Street Suite C Designer Asheville, North Carolina 28801 S. Grant Ginn (828) 449-1930 Northstate Environmental 2889 Lowery Street Construction Contractor Winston Salem, North Carolina 27101 Darrell Westmoreland (336) 725-2010 Northstate Environmental 2889 Lowery Street Seeding Contractor Winston Salem North Carolina 27101 Darrell Westmoreland (336) 725-2010 Resource Environmental Solutions, LLC 302 Jefferson Street; Suite 110 Planting Contractor Raleigh, North Carolina 27605 David Godley (919) 209-1053 Kee Mapping and Surveying PO Box 2566 As-built Surveys Asheville, North Carolina 28802 Phillip B. Key (828) 575-9021 Northstate Environmental 2889 Lowery Street Seeding Mix Source Winston Salem, North Carolina 27101 Darrell Westmoreland (336) 725-2010 Arborgen 5594 Higway 38 South Blenheim, SC 29516 Bare Root Seedlings(843)528-9669 North Carolina Foresty Claridge Nursery 762 Claridge Nursery Road Goldsboro, North Carolina 27530 (919) 731-7988 Foggy Mountain Nursery 2251 Ed Little Road Live Stakes Creston, North Carolina 28643 (336)384-5323 Equinox Environmental Monitoring Performers 37 Haywood St. (MYO-MYI)- 2015 - 2016 Asheville, North Carolina 28802 Hunter Terrell (828) 253-6856 Cochran Stream and Wetland Restoration Project 13 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 4. Project Baseline Information and Attributes Project Information Project Name Cochran Branch County Macon County Project Area (acres) 10.06 Project Coordinates (latitude and longitude) 35°12'52..03" N, 83°29'20.10" W Project Watershed Summary Information Physiographic Province Blue Ridge River Basin Little Tennessee USGS Hydrologic Unit 8-digit 06010203 USGS Hydrologic Unit 14-Digit 6010202040020 DWQ Sub-basin 40-04-01 Project Drainage Area (acres) 811 Project Drainage Area Percentage of Impervious Area <5% CGIA Land Use Classification 2.01.03 Hay and Pasture Land Reach Summary Information Parameters Cochran Branch Parrish Branch Length of reach (linear feet) 1332 232 Valley classification (Rosgen) II H Drainage area 1.25 0.11 NCDWQ stream identification score 48 40 NCDWQ Water Quality Classification B, Tr B, Tr Morphological Description (stream type) (Rosgen) G4 G4 Evolutionary trend (Rosgen) G-+ F -. C -. E G- F -. B Underlying mapped soils NkA NkA, ScC Drainage class Veny Poorly Very Poorly Drained, Drained Mod Well Drained Soil Hydric status Hydric Hydric, Non-Hydric Slope 0.7% 4.2% FEMA classification N/A N/A Native vegetation community Agricultural Agricultural Percent composition of exotic invasive vegetation 6% 0% Wetland Summary Information Parameters A B C D E Area (Acres) 4.24 0.11 Wetland Type (non-riparian, riparian xiverine or riparian non-riverine) Riparian Riparian Non-Riverine Non-Riverine Mapped Soil Series NkA NkA Drainage class Verry Poorly Verry Poorly Drained Drained Soil Hydric Status Hydric Hydric Source of Hydrology Groundwater Groundwater Previous Hydrologic Impairment Dredging/Ditching Dredging/Ditching Native vegetation community Montane Alluvial Montane Alluvial Forest Forest Percent composition of exotic invasive vegetation 0% 0% Regulatory Considerations Regulation Applicable? Resolved? Supporting Documentation Waters of the United States- Section 404 Yes Yes PCN 27 (SAW- 2013-00280 Waters of the United States- Section 401 Yes Yes 401 Certification DWR#-13-0188 Endangered Species Act No Yes ERTR Historic Preservation Act No Yes ERTR Coastal Zone Management Act (CZMA)/ Coastal Area Management Act (CAMA) No N/A FEMA Floodplain Compliance N/A N/A Essential Fisheries Habitat N/A N./A Cochran Stream and Wetland Restoration Project 14 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Appendix B Visual Assessment Data This Page Intentionally Left Blank Table 5. Visual Stream Morphology Stability Assessment Cochran Stream and Wetland Restoration Project - Cochran Branch Assessed Len th 1,418 feet Major Channel Category Channel Sub Category Metric Number Stable, Performing as Intended Total Number in As -built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability 1. Aeeradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars). 0 0 100% 2 Deeradation - Evidence of downcutting. 0 0 100% (Riffle and Run Units) 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate. 23 23 100% 3. Meander Pool 1. Death Sufficient (Max Pool Depth: MeanBankfullDepth z 1.6). 23 23 100% Condition 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstream riffle). 23 23 100% 1. Thalweg centering at upstream of meander bend (Run). 23 23 100% 4. Thalweg Position 2. Thalweg centering at downstream of meander bend (Glide). 23 23 100% 2. Bank 1. Scoured/ Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion. 0 0 100% 0 0 100% Banks undercut/overhanging to the extent that mass wasting appears 2. Undercut likely. Does NOT include undercuts that are modest, appear 0 0 100% 0 0 100% sustainable and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse. 0 0 100% 0 0 100% Totals 0 0 100% 0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 23 23 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill 23 23 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 23 23 100% 3. Bank Protection Bank erosion within the structures extent of influence does NOT exceed 15%. 23 23 100% Pool forming structures maintaining— Max Pool Depth: Mean 4. Habitat Bankfull Depth Ratio > 1.6. Rootwads/logs providing some cover at 23 23 100% base -flow. Cochran Stream and Wetland Restoration Project 17 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 5 Cont'd. Visual Stream Morphology Stability Assessment Cochran Stream and Wetland Restoration Project - Parrish Branch Assessed Len th 402 feet Major Channel Category Channel Sub Category Metric Number Stable, Performing as Intended Total Number in As -built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability 1. Aeeradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars). 0 0 100% 2 Deeradation - Evidence of downcutting. 0 0 100% (Riffle and Run Units) 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate. 22 22 100% 3. Meander Pool 1. Death Sufficient (Max Pool Depth: MeanBankfullDepth z 1.6). 22 22 100% Condition 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstream riffle). 22 22 100% 1. Thalweg centering at upstream of meander bend (Run). 22 22 100% 4. Thalweg Position 2. Thalweg centering at downstream of meander bend (Glide). 22 22 100% 2. Bank 1. Scoured/ Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion. 0 0 100% 0 0 100% Banks undercut/overhanging to the extent that mass wasting appears 2. Undercut likely. Does NOT include undercuts that are modest, appear 0 0 100% 0 0 100% sustainable and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse. 0 0 100% 0 0 100% Totals 0 0 100% 0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 19 19 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 19 19 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 19 19 100% 3. Bank Protection Bank erosion within the structures extent of influence does NOT exceed 15%. 19 19 100% Pool forming structures maintaining— Max Pool Depth: Mean 4. Habitat Bankfull Depth Ratio > 1.6. Rootwads/logs providing some cover at 19 19 100% base -flow. Cochran Stream and Wetland Restoration Project 18 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 N/A - Item does not apply. Cochran Stream and Wetland Restoration Project 19 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 6. Vegetation Condition Assessment Cochran Stream and Wetland Restoration Project Planted Acreage : 10.05 % of Number of Combined Vegetation Category Definitions CCPV Depiction Planted polygons Acreage Acrea e 1. Bare Areas Very limited cover of both woody and herbaceous material. N/A 0 0.00 0% Woody stem densities clearly below target levels based on MY3, 2. Low Stem Density Areas N/A 0 0.00 0% 4, or 5 stem count criteria. Totals 0 0.00 1 0% Areas with woody stems of a size class that are obviously small 3. Areas of Poor Growth Rates or Vigor given the monitoring year. N/A 0 0.00 ° 0 /o Cumulative Totals 0 0.00 0% Easement Acreage : 10.05 of Number of Combined Vegetation Category Definitions CCPV Depiction Easement Polygons Acreage Acreage 4. Invasive Areas of Concern Areas or points (if too small to render as polygons at map scale). Cross Hatch 5 0.40 3% (Red - Dense/Yellow - Present) 5. Easement Encroachment Areas Areas or points (if too small to render as polygons at map scale). N/A 0 0.00 0% N/A - Item does not apply. Cochran Stream and Wetland Restoration Project 19 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran Branch Reach 1 a — Permanent Photo Station 1 Station 101+33 - Downstream Cochran Branch Reach 1 a — Permanent Photo Station 1 Station 101+33 —Upstream Cochran Stream and Wetland Restoration Project 20 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran Branch — Permanent Photo Station 2 East 95° Cochran Branch — Permanent Photo Station 2 South 186° Cochran Stream and Wetland Restoration Project 21 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran Branch — Permanent Photo Station 3 Station 108+87 — Upstream Parrish Branch — Permanent Photo Station 3 Station 108+87 — Upstream Cochran Stream and Wetland Restoration Project 22 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran Branch — Permanent Photo Station 4 South Southeast 160° Cochran Branch — Permanent Photo Station 5 Southeast 150° Cochran Stream and Wetland Restoration Project 23 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 4 Cochran Branch — Permanent Photo Station 6 Station 114+62 —Upstream 186° Parrish Branch — Permanent Photo Station 7 Station 200+25 — Upstream 276° Cochran Stream and Wetland Restoration Project 24 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Parrish Branch — Permanent Photo Station 8 Southeast 135 Cochran Stream and Wetland Restoration Project 25 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 This Page Intentionally Left Blank Cochran Stream and Wetland Restoration Project 26 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Appendix C Vegetation Plot Data Table 7. Vegetation Plot Criteria Attainment Cochran Stream and Wetland Restoration Project Vegetation Plot ID Vegetation Survival Threshold Met? Tract Mean 1 Yes 88% 2 Yes 3 Yes 4 Yes 5 Yes 6 No 7 Yes 8 Yes Cochran Stream and Wetland Restoration Project 28 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 8. CVS Vegetation Plot Metadata Cochran Stream and Wetland Restoration Project Report Prepared By Drew Alderman Date Prepared 12/7/2015 17.20 database name RES_95720_2015_A_Cochran_MYl.mdb database location Z.\ES\NRI&M\EBXMonitoring\Cochran\MY1-2014\Data\Veg computer name FIELD -PC file size 59998208 DESCRIPTION OF WORKSHEETS IN THIS DOCUMENT Metadata Description of database file, the report worksheets, and a summary of project(s) and project data. Proj, planted Each project is listed with its PLANTED stems per acre, for each year. This excludes live stakes. Pro j, total stems Each project is listed with its TOTAL stems per acre, for each year. This includes live stakes, all planted stems, and all natural/volunteer stems. Plots List of plots surveyed with location and summary data (live stems, dead stems, missing, etc.). Vigor Frequency distribution of vigor classes for stems for all plots. Vigor by Spp Frequency distribution of vigor classes listed by species. Damage List of most frequent damage classes with number of occurrences and percent of total stems impacted by each. Damage by Spp Damage values tallied by type for each species. Damage by Plot Damage values tallied by type for each plot. Planted Stems by Plot and Spp A matrix of the count of PLANTED living stems of each species for each plot; dead and missing stems are excluded. ALL Stems by Plot and spp A matrix of the count of total living stems of each species (planted and natural volunteers combined) for each plot; dead and missing stems are excluded. PROJECT SUMMARY Project Code 95720 project Name Cochran Branch Stream and Wetland Description River Basin le ngth(ft) stream-to-edge width (ft) area (sq m) Required Plots (calculated) Sampled Plots 8 Cochran Stream and Wetland Restoration Project 29 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 This Page Intentionally Left Blank Cochran Stream and Wetland Restoration Project 30 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 I C 7� a O O C_'• O O n n O CD CD C CD C C C 0 C CD rs: CCD n n a cr C R � CD q� � 0 rD O cr CD n O A7 o A� O., U C A co CD < 6 m SID O n ' 07DD w � C W w O � n � n g O x n CD n x nSZ o�n CD CD p C -D O 0 x n On CD n '3 c O o� 0 P7, C CD CDC r) co o m r* s Q. o b ..0 CD O b P7" g xf9 (Do � �� eD CD �a fD N fD CI .� .� .� .� .� .� .� .� yy � CD fi .. f� fp n n n n n n n n n n n n n n n n n n n n n yeD f~9 n m O �fD>� oo .-. n . n . n . n . n . n . n ., n .� n n ft o o n n n n n n n n n n n rD .�rD CD y N`O `O w `O w c�ii O fD• O J W N W w N p 00 00 �O N 00 Vii w N w w H+ O 0000 y N 00 00 W W N W W N 'O O O '-• OC W 00 41�N 00 J N 01 r.l �/- CD C f7 00 w O w O A b O 1 ft 00O O 00 � � 00 Oho O y � 000 W 00 Vi 00 w 00 0�0 J N 01 00 C_'• O O n n O CD CD CD 0 CCD C cr C R � CD q� � 0 p o O cr q� CD cr CD w o U < ft < 6 m SID CD W w n g O x n CD n P7" nSZ p -t O 0 x n O' C CD n a N 0 P7, w O O O P7" g �a fD N fD CI CD CD yN' >n o i -t .-. n . n . n . n . n . n . n . n ., n .� n n ft o o n n n n n n n n n n n rD CD O J W N W w N p w N w w y N 00 00 W W N W W N O C f7 00 w w O A ft 000 W O w 00 O1 y A� 00 w J W O 4 G ft R. •A N a1 N O � ` UN � ¢ O Z, .A N vi C w C y y 41 N 01 N .r p � O � b O b � O � Vi � N N 00 41 �• b O b 'fD'S C, p to ON N N Oo O\ O :Q 'r C K A � b J O b O 00 _ O _ ►'3 � N 00 w � D1 � N � O r-� O b � w o o� y _ N N w N b 0000 00 n W N D O 0000 C/i J W N 41 00 J y O\ 00 b J O i"d `ti7 .. oc y d1 N M Cd Cd ct o �q 0 uz Cochran - Vegetation Monitoring Plot 1 December 7, 2015 Cochran - Vegetation Monitoring Plot 2 December 7, 2015 Cochran Stream and Wetland Restoration Project 33 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran - Vegetation Monitoring Plot 3 December 7, 2015 Cochran - Vegetation Monitoring Plot 4 December 7, 2015 Cochran Stream and Wetland Restoration Project 34 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran - Vegetation Monitoring Plot 5 December 7, 2015 Cochran - Vegetation Monitoring Plot 6 December 7, 2015 Cochran Stream and Wetland Restoration Project 35 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran - Vegetation Monitoring Plot 7 December 7, 2015 Cochran - Vegetation Monitoring Plot 8 December 7, 2015 Cochran Stream and Wetland Restoration Project 36 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Appendix D Stream Geomorphology Data This Page Intentionally Left Blank Reach less than 500 feet and restricted to visual assessment; no cross-sections located in this reach - Information unavailable. Non -Applicable. Cochran Stream and Wetland Restoration Project 39 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 10. Baseline Stream Data Summary Cochran Stream and Wetland Restoration Project - Cochran Branch la 379 feet Parameter Regional Curve Pre -Existing Condition Reference Reach Data Design As -Built / Baseline' Dimension&Substrate -Riffle LL UL Eq. Min Mean Med Max SD N Min Mean Med Max SD N Min Mean Max Min Mean Med Max SD N Bankfull Width (ft) - 18.9 9.0 10.01 10.0 11.0 1.4 2 23.4 24.7 24.7 14.7 Floodprone Width (ft) 12.0 18.5 18.5 25.0 9.2 2 43.0 48.0 52.0 - Bankfull Mean Depth (ft) - 1.3 0.9 1.0 1.0 1.1 0.1 2 1.3 1.4 1.5 0.9 BankfullMax Depth (ft) 1.2 1.3 1.3 1.5 0.2 2 1.8 1.8 2.2 1.13 Bankfull Cross Sectional Area (ft) 21.5 9.6 9.8 9.8 10.0 0.3 2 33.4 33.4 34.6 12.7 Width/DepthRatio 8.4 10.3 10.3 12.1 2.6 2 15.8 18.3 - 18.4 - - - 17.0 - - - - - - - Entrenchment Ratio 1.3 1.8 1.8 2.3 0.7 2 1.7 1.9 - 2.1 - - - 5.4 - - - - - - - Bank Height Ratio 0.9 1.5 1.5 2.0 0.8 2 1.0 1.2 - 1.3 - - - - - - - - - - - d50 (mm) - - - - - - - - - - - - 1 - - - Profile Riffle Length (ft) - - - - - - 20.0 29.0 - 40.0 - - - - - 10.9 20.4 18.8 31.7 8.6 7 Riffle Slope (ft/ft) - - - - - - 0.015 0.023 - 0.028 - - 0.009 0.017 0.025 0.007 0.017 0.021 0.025 0.007 7 Pool Length (ft) 6.0 18.0 42.0 - - - 5.3 10.7 8.7 21.6 5.5 7 Pool Max Depth (ft) - - - - - - 2.3 2.3 - 2.3 - - - - - 2.0 2.4 2.4 3.1 0.4 6 Pool Spacing (ft) 51.0 87.0 113.0 - 34.1 45.4 56.8 36.2 48.6 47.6 62.2 9.6 6 Pattern Channel Belt Width (ft) - 43.0 - 18.7 24.9 31.2 17.1 27 28.7 33.4 7.4 4 Radius of Curvature (ft) 44.0 75.0 103.0 - 25.0 31.0 37.0 24.0 37.6 43.9 1 44.8 11.8 3 Rc: Bankfull Width (ft) - - - - - - - - - - - - - - - 1.6 2.6 0.8 3 Meander Wavelength (ft) - - - - - - - 100.0 - - - - - - - 73.9 92.8 t2.O2.3 19.2 5 Meander Width Ratio - - - - - - - 1.7 - - - - - 1.5 - 1.2 1.8 0.5 4 Substrate, Bed and Transport Parameters Ri% / Ru% / P% / G% / S% - - 42%/ 28%/ 22%/ 7%/ 0% SC%/Sa%/G%/C%/B%/Be% -/56%/-/-/-/- 1%/]0%/48%/41%/0%/1% d16/d35/d50/d84/d95/dip /di'p(mm) 3/4/6/11/14/-/- 5.2/22/45/130/190/ -/- Reach Shear Stress (Competency) Ib/ft2 - 1.947 0.47 - Max Part Size (mm) Mobilized at Bankfull - 91 45 - Stream Power (Transport Capacity) W/m2 - - 1.6 Additional Reach Parameters Drainage Area (mi') 1.11 .2.77 Impervious Cover Estimate (%) - - Rosgen Classification G B4 B4 B Bankfull Velocity (fps) 4.5 3.5 Bankfull Discharge (cfs) 123.0 66.0 Valley Length (ft) 380 321 Channel Thalweg Length (ft) 400 337 379 Sinuosity 1.10 1.05 1.18 Water Surface Slope (ft/ft) - 0.035 0.033 Bankfull Slope (ft/ft) 0.035 0.033 Bankfull Floodplain Area (acres) - - - Proportion Over Wide (%) - - Entrenchment Class (ER Range) - - Incision Class (BHR Range) - - BEHI 20.6 Channel Stability or Habitat Metric - - Biological or Other - - Reach less than 500 feet and restricted to visual assessment; no cross-sections located in this reach - Information unavailable. Non -Applicable. Cochran Stream and Wetland Restoration Project 39 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 - Information unavailable. Non -Applicable. Cochran Stream and Wetland Restoration Project 40 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 10 Cont'd. Baseline Stream Data Summary Cochran Stream and Wetland Restoration Project - Cochran Branch lb (1,101 feet Parameter Regional Curve F Pre -Existing Condition Reference Reach Data Design As -Built/ Baseline Dimension&Substrate -Riffle LL UL Eq. Min Mean Med Max SD N Min Mean Med Max SD N Min Mean Max Min Mean Med Max SD N Bankfull Width (ft) 18.9 7.0 7.9 7.5 9.5 1.2 4 12.0 14.4 - 16.5 - - - 14.7 - 14.6 16.6 17.3 17.5 1.77 3 Floodprone Width (ft) 15.0 16.8 16.0 20.0 2.2 4 60.0 72.5 - 72.5 - - - - - 135.0 168.5 173.5 197.0 31.3 3 Bankfull Mean Depth (ft) - - 1.3 1.2 1.3 1.3 1.5 0.2 4 - - - - - - - 0.9 - 0.8 0.8 0.8 1.0 0.11 3 Bankfull Max Depth (ft) 1.5 1.7 1.7 1.8 0.2 4 19 2.3 3.3 1.13 1.0 1.2 1.1 1.5 0.24 3 Bankfull Cross Sectional Area (ft') 21.5 8.3 10.5 10.9 12.1 1.6 4 18.2 25.9 35.9 12.7 11.0 13.7 13.6 16.6 2.78 3 Width/DepthRatio 4.7 6.0 5.6 8.1 1.5 4 7.1 1 8.2 - 10.0 - - - 17.0 - 18.1 20.3 1 19.2 23.4 2.8 3 Entrenchment Ratio 1.7 2.2 2.2 1 2.5 0.3 4 4.3 4.9 - 5.5 - - - 11.5 - 9.3 10.1 10.0 11.0 0.85 3 Bank Height Ratio 1.5 1.9 2.0 2.2 0.3 4741.1 - 1.6 - - - - - 1.0 1.0 1.0 1.0 0 3 d50 (mm) - - - - - - - - - - - - Profile Riffle Length (ft) - - - - - - 62.6 82.0 - 101.4 - - - - - 12.4 29.5 33.6 47.0 11.6 17 Riffle Slope (ft/11) 0.006 0.006 0.007 - 0.006 0.008 0.009 0.001 0.006 0.004 17 Pool Length (ft) - - - - - - 13.4 45.1 - 80.3 - - - - - 16.2 24.1 t006080107 4.6 17 Pool Max Depth (ft) - - - - - - 0.4 0.5 - 0.6 - - - - - 2.3 3.1 0.5 17 Pool Spwing(ft) - - - - - - 67.9 84.9 - 101.9 - - 62.3 74.8 87.3 38.0 60.2 15.6 17 Pattern Channel Belt Width (ft) - - - - - - - - - - - - 24.9 49.9 62.3 17.2 33.9 29.0 64.0 13.9 11 Radius of Curvature (ft) - - - - - - - - - - - - 19.0 25.0 31.0 22.5 29.1 27.4 36.6 5.2 7 Rc: Bankfull Width (ft) - - - 1.4 1.8 1.7 2.2 0.3 7 Meander Wavelength (ft) - 38.1 130.8 136.9 249.7 58.2 12 Meander Width Ratio - - - - - - - - - - - - - 3.2 - 1.0 2.0 1.7 3.9 0.8 11 Substrate, Bed and Transport Parameters Ri%/Ru%/P%/G%/S% - - 50% /3%/39%/8%/0% SC%/Sa%/G%/C%/13 /Be% 30%/-/-/-(- 9%/-/-/-/-/- d16/d35/d50/d84/d95/dip /di5p(mm) 4/8/11/22/29/-/- 7/26/54/68/70/ -/- Reach Shear Stress (Competency) Ib/ftz - - 0.42 - MaxPart Size (mm) Mobilized at Bankfull - - 45 - Stream Power (Transport Capacity) W/mz - - 13 Additional Reach Parameters Drainage Area (min) 1.20 0.72 hnpervious Cover Estimate (%) - - Rosgen Classification G E4 C4 C Bankfull Velocity (fps) - Bankfull Discharge (efs) 66.0 Valley Length (ft) - 989 Channel Thalweg Length (ft) 416.7 1,088 1,101 Sinuosity - - 1.1 1.12 Water Surface Slope (ft/ft) - - 0.0085 0.0076 Bankfull Slope (ft/ft) - - - 0.0068 Bankfull Floodplain Area (acres) - - - Proportion Over Wide (%) - - Entrenchment Class (ER Range) - - Incision Class (BHR Range) - - BEHI 25.7 Channel Stability or Habitat Metric - - Biological or Other - - - Information unavailable. Non -Applicable. Cochran Stream and Wetland Restoration Project 40 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 - Information unavailable. Non -Applicable. Cochran Stream and Wetland Restoration Project 41 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 10 Cont'd. Baseline Stream Data Summary Cochran Stream and Wetland Restoration Prolect - Parrish Branch 402 feet Parameter Regional Curve Pre -Existing Condition Reference Reach Data Design As -Built/ Baseline Dimension & Substrate -Riffle LL UL Eq. Min Mean Med Max SD N Min Mean Med Max SD N Min Mean Max Min Mean Med Max SD N BmkfuE Width (ft) - - 7.4 3.5 4.1 4.1 4.7 0.8 2 23.4 24.7 - 24.7 - - - 5.4 - 4.4 5.2 5.2 5.9 1.06 2 Floodprone Width (ft) 8.0 8.0 8.0 8.0 0.0 2 43.0 48 - 52.0 - - - - - 14.2 19.1 19.1 24.0 6.93 2 Bankfull Mean Depth (ft) 0.6 0.4 0.5 0.5 0.5 0.1 2 1.3 1.35 1.5 0.4 0.4 0.4 0.4 0.4 0.03 2 Bankfull M ax Depth (ft) 0.6 0.7 0.7 0.8 0.1 2 1.8 1.8 2.2 0.57 0.6 0.6 0.6 0.6 0.01 2 Bankfull Cross Sectional Area (ft) 4.0 1.4 1.9 1.9 2.3 0.6 2 33.4 33.4 - 34.6 - - - 2.2 - 1.8 2.0 2.0 2.1 0.23 2 Width/Depth Ratio 8.5 1 9.0 9.0 1 9.5 1 0.7 2 15.8 18.3 - 18.4 - - - 13.4 - 10.9 13.8 13.8 16.6 3.99 2 Entrenchment Ratio 1.6 2.0 2.0 2.3 0.5 2 1.7 1.9 2.1 5.6 3.2 3.6 3.6 4.0 0.57 2 Bank Height Ratio 2.3 6.2 6.2 10.0 5.4 2 1.0 1.2 - 1.3 - - - - - 1.0 1.0 1.0 1.0 0 2 d50 (mm) - - - - - - - - - - - - - - - Profile Riffle Length (ft) - - - - - - 20.0 29.0 - 40.0 - - - - - 6.1 10.0 9.8 15.5 2.3 22 Riffle Slope (ft/ft) - - - - - - 0.015 0.023 - 0.028 - - 0.017 0.026 0.035 0.001 0.025 0.023 0.047 0.013 22 Pool Length (ft) - - - - - - 6.0 18.0 - 42.0 - - - - - 1.7 5.0 4.5 10.2 2.0 22 Pool MaxDepth(ft) - - - - - - 2.3 2.3 - 2.3 - - - - - 1.1 1.5 1.5 1.9 0.2 22 Pool Spacing (ft) - - - - - - 51.0 87.0 - 113.0 - - 12.4 16.5 1 20.7 13.5 17.2 15.5 25.2 3.4 21 Pattern Channel Belt Width (ft) - 43.0 - 6.4 8.5 10.6 6.9 9.9 9.8 12.6 1.4 14 Radius of Curvature (ft) - - - - - - 44.0 75.0 - 103.0 - - 9.0 11.0 13.0 5.8 9.5 8.9 15.3 3.2 8 Re: Bankfull Width (ft) - - - - - - - - - - - - - - - 1.1 1.8 1.7 2.9 0.6 8 Meander Wavelength (ft) - - - - - - - 100.0 - - - - - - - 29.1 32.1 31.4 39.7 2.7 15 M eander Width Ratio - - - - - - - 1.7 - - - - - 2.8 - 1.3 1.9 1.9 2.4 0.3 14 Substrate, Bed and Transport Parameters Ri % / Ru% / P% / G% / S% - - 59%/0%/29%/ 5%17% SC%/Sa%/G%/C%/B%/Be% - 1%/ 10%/48% /41%/0% / 1% 1116/d35/d50/d84/1195/di°/di- (mm) - 5.2/22/45/130/190/ -/- Reach Shear Stress (Competency) lb/ft' 1.947 0.47 MaxPart Size (mm) Mobilized at Bankfull - 91 45 - Stream Power (Transport Capacity) W/mz - - - Additional Reach Parameters Drainage Area (mit) 0.10 2.77 Impervious Cover Estimate (%) - - Rosgm Classification G B4 B4 B Bankfull Velocity (fps) - - 4.5 - Bankfull Discharge (cfs) - - 123.0 9.0 Valley Length (ft) 380.0 375 Channel Thalweg Length (ft) - 400.0 394 402 Sinuosity - 1.1 1.05 1.07 Water Surface Slope (ft/ft) - 0.033 0.025 Bankfull Slope (ft/ft) - 0.029 Bankfull Floodplain Area (acres) - - - Proportion Over Wide (%) - - Entrenchment Class (ER Range) - - Incision Class (BHR Range) - - BEHI 26.6 Channel Stability or Habitat Metric - - Biological or Other - - - Information unavailable. Non -Applicable. Cochran Stream and Wetland Restoration Project 41 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 This Page Intentionally Left Blank Cochran Stream and Wetland Restoration Project 42 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 a no O a � 0. CD CD nM 0 o ca CDJ O � C 0 w b O CD n d d 7y 7y b7 coo oa ttl o y rn o x o o p� m o Gyp `ICY w X 'rZ coo w m iC CCD o o o n a s 21 v Oo -.--1 R a R O a VI U1 A N (� 00 f9 A �. rl R A � R y a � o _ v v v �, J J w [J O O C7 o T N RO Z �-' V � cn N O � J oNo •- oVo p .- O w cn `� rQr.•, N � yy yy A fi+ W A CS' O A .T ii, A QQ cn vi ry � V N R � 7 m n C n .7 V N rn w 4, "^G7 R N A � n7 A W O b � O_ a IIIIII 011111 1 011111 111 1 611111111 1111111111 1 011111111 1111111111 1 011111 1 011111 1 111111 1 011111 11 1 611111111 1111111111 1 011111 11 1 011111111 1111111111 1 611111111 1111111111 1 01111111 1 111111 1 011111111 HIM IIIII I 01111110 HE IIIII I 011111 11 1 611111111 1111111111 1 01111111 111111 11 1 1 011111111 1111111111 1 111111 1 611111111 HIM IIIII I 01111111 11 1 111111 1 011001111 1111111111 1 0111010 ME milli I 011111 1 011111111 1111111111 011111 0 Table 12. Cochran Stream and Wetland Restoration Project Bank Pin Arrays Length of Exposed Pin (mm) Cross Section Downstream Middle Upstream Rate Rate Number mm/ IA/Yr 1 0B OB OB 0 0.00 4 0B OB OB 0 0.00 8 OB OB OB 0 0.00 0B= Buried Bank Pin Cochran Stream and Wetland Restoration Project 45 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Project Name: Cochran XS Number: 1 Station: 104+73 Reach Name: Cochran lb XS Type: Pool Left Descending Bank Right Descending Bank Cochran Stream and Wetland Restoration Project 46 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 2160 2159 2158 y 2157 2156 0 2155 2154 b 2153 2152 2151 2150 0+00 0+05 0+10 0+15 0+20 MYO 0+25 0+30 0+35 0+40 0+45 0+50 0+5w Station (feet) MYI ----- BKF CHANNEL DIMENS IONS SUMMARY MYO MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankful Width (ft) 16.7 16.8 Floodprone Width (ft) 217.0 217.0 Bankfull Mean Depth (ft) 1.6 1.1 Bankfull Max Depth (ft) 3.1 2.6 Bankfull Cross -Sectional Area (ft ) 27.5 19.2 Width/Depth Ratio 10.2 14.7 Entrenchment Ratio 13.0 12.9 Bank Height Ratio 1.0 1.0 Left Descending Bank Right Descending Bank Cochran Stream and Wetland Restoration Project 46 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Project Name: Cochran XS Number: 2 Reach Name: Cochran lb XS Type: Riffle Station: 105+08 Left Descending Bank Cochran Stream and Wetland Restoration Project 47 NCDMS Project No. 95720 Monitoring Year 1 of 7 Right Descending Bank Equinox Annual Monitoring Report 2161 2160 2159 y 2158 2157 0 2156 ------------------------------ ----------- -------- ------------------------------- -------- 2155 b 2154 2153 2152 2151 0+00 0+05 0+10 0+15 0+20 MYO 0+25 0+30 0+35 0+40 0+45 0+50 0, r Station (feet) MYI ----- BKF CHANNEL DIMENSIONS SUMMARY MYO MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankful Width (ft) 17.3 17.1 Floodprone Width (ft) 173.5 173.5 Bankfull Mean Depth (ft) 1.0 0.9 BankfiillMax Depth (ft) 1.5 1.4 Bankfull Cross -Sectional Area (ft ) 16.6 15.2 Width/Depth Ratio 18.1 19.2 Entrenchment Ratio 10.0 10.2 Bank Height Ratio 1.0 1.0 Left Descending Bank Cochran Stream and Wetland Restoration Project 47 NCDMS Project No. 95720 Monitoring Year 1 of 7 Right Descending Bank Equinox Annual Monitoring Report Project Name: Cochran XS Number: 3 Reach Name: Cochran lb XS Type: Riffle Station: 110+60 Left Descending Bank Cochran Stream and Wetland Restoration Project 48 NCDMS Project No. 95720 Monitoring Year 1 of 7 Right Descending Bank Equinox Annual Monitoring Report 2157 2156 2155 y 2154 2153 ------ ----------------- - ---- - ------------- --------------------- --- ----------- 0 2152 2151 b 2150 2149 2148 2147 0+00 0+05 0+10 0+15 0+20 0+25 0+30 0+35 0+40 0+45 0+50 0+55 0+60 Station (feet) MYO MYI ----- BKF CHANNEL DIMENSIONS SUMMARY MYO MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankful Width (ft) 14.6 15.4 Floodprone Width (ft) 135.0 135.0 Bankfull Mean Depth (ft) 0.8 0.7 BankftillMax Depth (ft) 1.0 1.1 Bankfull Cross -Sectional Area (ft ) 11.0 11.3 Width/Depth Ratio 19.2 20.8 Entrenchment Ratio 9.3 8.8 Bank Height Ratio 1.0 1.0 - Left Descending Bank Cochran Stream and Wetland Restoration Project 48 NCDMS Project No. 95720 Monitoring Year 1 of 7 Right Descending Bank Equinox Annual Monitoring Report Project Name: Cochran XS Number: 4 Reach Name: Cochran lb XS Type: Pool Station: 110+90 Left Descending Bank Cochran Stream and Wetland Restoration Project 49 NCDMS Project No. 95720 Monitoring Year 1 of 7 Right Descending Bank Equinox Annual Monitoring Report 2157 2156 2155 y 2154 2153 0 2152 2151 b 2150 2149 2148 2147 0+00 0+05 0+10 0+15 0+20 0+25 0+30 0+35 0+40 0+45 0+50 0+55 0+60 Station (feet) MYO MYI ----- BKF CHANNEL DIMEVSIONS SUMMARY MYO MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankful Width (ft) 16.2 17.4 Floodprone Width (ft) 217.5 217.5 Bankfull Mean Depth (ft) 1.9 1.8 Bankfull Max Depth (ft) 3.5 4.3 Bankfull Cross -Sectional Area (ft ) 31.0 31.3 Width/Depth Ratio 8.5 9.7 Entrenchment Ratio 13.4 12.5 Bank Height Ratio 1.0 1.0 Left Descending Bank Cochran Stream and Wetland Restoration Project 49 NCDMS Project No. 95720 Monitoring Year 1 of 7 Right Descending Bank Equinox Annual Monitoring Report Project Name: Cochran XS Number: 5 Reach Name: Cochran lb XS Type: Pool Station: 113+08 Left Descending Bank Cochran Stream and Wetland Restoration Project 50 NCDMS Project No. 95720 Monitoring Year 1 of 7 Right Descending Bank Equinox Annual Monitoring Report 2155 2154 2153 y 2152 2151 0 2150 -------- 2149 ------- ---- - ------- - --------------------------------------- b 2148 2147 2146 2145 0+00 0+05 0+10 0+15 0+20 MYO 0+25 0+30 0+35 0+40 0+45 0+50 0+55 Station (feet) MYI ----- BKF CHANNEL DIMENSIONS SUMMARY MYO MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankful Width (ft) 17.0 17.3 Floodprone Width (ft) 236.5 236.5 Bankfull Mean Depth (ft) 1.5 1.5 Bankfull Max Depth (ft) 3.3 3.4 Bankfull Cross -Sectional Area (ft ) 25.4 26.4 Width/Depth Ratio 11.4 11.4 Entrenchment Ratio 13.9 13.7 Bank Height Ratio 1.0 1.0 - Left Descending Bank Cochran Stream and Wetland Restoration Project 50 NCDMS Project No. 95720 Monitoring Year 1 of 7 Right Descending Bank Equinox Annual Monitoring Report Project Name: Cochran XS Number: 6 Reach Name: Cochran lb XS Type: Riffle Station: 113+44 Left Descending Bank Cochran Stream and Wetland Restoration Project 51 NCDMS Project No. 95720 Monitoring Year 1 of 7 Right Descending Bank Equinox Annual Monitoring Report 2155 2154 2153 y 2152 2151 0 2150 ______ _------- -------- --- --------------------- ------ --------2149 b 2148 2147 2146 2145 0+00 0+05 0+10 0+15 0+20 MYO 0+25 0+30 0+35 0+40 0+45 0+50 0, r Station (feet) _ MYI ----- BKF CHANNEL DIMENSIONS SUMMARY MYO MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankful Width (ft) 17.8 17.9 Floodprone Width (ft) 197.0 197.0 Bankfull Mean Depth (ft) 0.8 0.8 BankfiillMax Depth (ft) 1.1 1.2 Bankfull Cross -Sectional Area (ft ) 13.6 13.6 Width/Depth Ratio 23.4 23.4 Entrenchment Ratio 11.0 11.() Bank Height Ratio 1.0 1.0 Left Descending Bank Cochran Stream and Wetland Restoration Project 51 NCDMS Project No. 95720 Monitoring Year 1 of 7 Right Descending Bank Equinox Annual Monitoring Report Project Name: Cochran XS Number: 7 Station: 200+88 Reach Name: Parrish XS Tvve: Riffle Left Descending Bank Right Descending Bank Cochran Stream and Wetland Restoration Project 52 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 2163 2162 v 2161 c 0 � 2160 b 2159 2158 0+00 0+05 0+10 MYO 0+15 0+20 0+25 0+30 Station (feet) - MYl ----- BK CHANNEL DEMENS IONS SUMMARY MYO MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankful Width (ft) 4.4 4.5 Floodprone Width (ft) 14.2 14.2 Bankfull Mean Depth (ft) 0.4 0.4 Bankfull Max Depth (ft) 0.6 0.7 Bankfull Cross -Sectional Area (ft) 1.8 2.0 Width/Depth Ratio 10.9 10.4 Entrenchment Ratio 3.2 3.1 Bank Height Ratio 1.0 1.0 - Left Descending Bank Right Descending Bank Cochran Stream and Wetland Restoration Project 52 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Project Name: Cochran XS Number: 8 Station: 201+07 Reach Name: Parrish XS Tvve: Pool Left Descending Bank Right Descending Bank Cochran Stream and Wetland Restoration Project 53 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 2162 2161 v 2160 c 0 --------------- ----------- ------------------- ------------------------------------- 2159 b 2158 2157 0+00 0+05 0+10 MYO 0+15 0+20 0+25 0+30 Station (feet) - MYl ----- BK CHANNEL DEMENS IONS SUMMARY MYO MYl MY2 MY3 MY4 MY5 MY6 MY7 Bankful Width (ft) 6.8 7.2 Floodprone Width (ft) 93.7 93.7 Bankfull Mean Depth (ft) 0.8 0.8 Bankfull Max Depth (ft) 1.8 2.0 Bankfull Cross -Sectional Area (ft) 5.2 5.5 Width/Depth Ratio 9.0 9.6 Entrenchment Ratio 13.7 12.9 Bank Height Ratio 1.0 1.0 Left Descending Bank Right Descending Bank Cochran Stream and Wetland Restoration Project 53 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Project Name: Cochran XS Number: 9 Station: 202+86 Reach Name: Parrish XS Tvve: Riffle Left Descending Bank Right Descending Bank Cochran Stream and Wetland Restoration Project 54 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 2157 2156 v 2155 0 ------------ --------------- ------------ ------------- -------- --- ------------- --------------------------------------- 2154 b 2153 2152 0+00 0+05 0+10 0+15 0+20 0+25 0+30 0+35 Station (feet) MYO - MYl ----- BK CHANNEL DEMENS IONS SUMMARY MYO MYl MY2 MY3 MY4 MY5 MY6 MY7 Bankful Width (ft) 5.9 6.6 Floodprone Width (ft) 24.0 24.0 Bankfull Mean Depth (ft) 0.4 0.3 Bankfull Max Depth (ft) 0.6 0.6 Bankfull Cross -Sectional Area (ft) 2.1 2.0 WidthMepth Ratio 16.6 21.7 Entrenchment Ratio 4.0 3.7 Bank Height Ratio 1.0 1.0 Left Descending Bank Right Descending Bank Cochran Stream and Wetland Restoration Project 54 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran Cross Section 2 - Rifle Monitorin Year - 2015; MY1 Bed Surface Material Particle Size Class (mm) Number % Individual % Cumulative 0-0.062 4 3.7% 4% 0.062 - 0.125 18 16.8% 21% 0.125-0.25 11 10.3% 31% 0.25-0.5 5 4.7% 36% 0.5-1.0 9 8.4% 44% 1-2 14 13.1% 57% 2-4 1 0.9% 58% 4 - 8 11 10.3% 68% 8-16 5 4.7% 73% 16-32 15 14.0% 87% 32-64 10 9.3% 96% 64-128 2 1.9% 98% 128-256 2 1.9% 100% 256-512 0 0.0% 100% 512-1024 0 0.0% 100% 1024-2048 0 0.0% 100% 2048-4096 0 0.0% 100% Bedrock 0 0.0% 100% Total 107 100% 100% Summary Data D50 1.4 D84 26 D95 57 Cochran Stream and Wetland Restoration Project 55 NCDMS Project No. 95720 Monitoring Year 1 of 7 Equinox Annual Monitoring Report 100% Cochran Stream and Wetland Restoration Project Pebble Count Percent Cumulative Cross Section 2 - Riffle 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% pyti py 0o 1ti5 tih Oh ,y0 'L d W yO .S'L pb ,yW yyy' p�, p. 1 3 p p. tMY1 Cumulative % hO titi y'L tis goy tia 1p ytiti 4 'L� pyA ti �(� Pp pa9i ti ato �e 100% Cochran Stream and Wetland Restoration Project Pebble Count Percent Individual Cross Section 2 - Riffle 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 6'L 04 p0(O ,y5 tih h O ti d 4 ye ,�'L pb ,ti'b oti o 5 °' S ti ti ti a' Oti ■ MY1 % by Size Group h� yti .l,A p 1 0�O 'L Cochran Stream and Wetland Restoration Project 56 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran Cross Section 3 - Riffle Monitorin Year - 2015; MY1 Bed Surface Material Particle Size Class (mm) Number % Individual % Cumulative 0-0.062 19 16.7% 17% 0.062 - 0.125 0 0.0% 17% 0.125-0.25 1 0.9% 18% 0.25-0.5 1 0.9% 18% 0.5 - 1.0 1 0.9% 19% 1 - 2 8 7.0% 26% 2-4 0 0.0% 26% 4 - 8 0 0.0% 26% 8-16 15 13.2% 39% 16-32 16 14.0% 54% 32-64 30 26.3% 80% 64-128 20 17.5% 97% 128-256 3 2.6% 100% 256-512 0 0.0% 100% 512-1024 0 0.0% 100% 1024-2048 0 0.0% 100% 2048-4096 0 0.0% 100% Bedrock 0 0.0% 100% Total 114 100% 1 100% Summary Data D50 28 D84 71 D95 110 Cochran Stream and Wetland Restoration Project 57 NCDMS Project No. 95720 Monitoring Year 1 of 7 Equinox Annual Monitoring Report 100% Cochran Stream and Wetland Restoration Project Pebble Count Percent Cumulative Cross Section 3 - Riffle 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% pyti py 0o 1ti5 It, Oy ,y0 yyy' p�, p. p 'L d W yO .S'L pb ,yW hO 1 3 p titi tMY1 Cumulative % y'L tis tia ytiti 4 pyA ti to Pp IZP ti ato �e 100% Cochran Stream and Wetland Restoration Project Pebble Count Percent Individual Cross Section 3 - Riffle 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% �'L 04 p0(O ,y5 tih h O oti o• 5 °' S ti• Oti ti d 4 ti ti a' � �, ti ti ��' ■ MY1 % by Size Group �`' ti° do 1 a° 'L a�° Cochran Stream and Wetland Restoration Project 58 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran Cross Section 6 - Riffle Monitorin Year - 2015; MY1 Bed Surface Material Particle Size Class (mm) Number % Individual % Cumulative 0-0.062 0 0.0% 0% 0.062 - 0.125 11 10.0% 10% 0.125-0.25 11 10.0% 20% 0.25-0.5 4 3.6% 24% 0.5 - 1.0 9 8.2% 32% 1 - 2 7 6.4% 38% 2-4 3 2.7% 41% 4 - 8 5 4.5% 45% 8-16 14 12.7% 58% 16-32 22 20.0% 78% 32-64 13 11.8% 90% 64-128 7 6.4% 96% 128-256 4 3.6% 100% 256-512 0 0.0% 100% 512-1024 0 0.0% 100% 1024-2048 0 0.0% 100% 2048-4096 0 0.0% 100% Bedrock 0 0.0% 100% Total 110 100% 1 100% Summary Data D50 11 D84 42 D95 120 Cochran Stream and Wetland Restoration Project 59 NCDMS Project No. 95720 Monitoring Year 1 of 7 Equinox Annual Monitoring Report 100% Cochran Stream and Wetland Restoration Project Pebble Count Percent Cumulative Cross Section 6 - Riffle 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% pyti py 0o 1ti5 It, Oy ,y0 'L d W yO .S'L pb ,yW yyy' p�, p. 1 3 p p tMY1 Cumulative % hO titi y'L tis tia ytiti 4 pyA ti to Pp IZP ti ato �e 100% Cochran Stream and Wetland Restoration Project Pebble Count Percent Individual Cross Section 6 - Riffle 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% �'L 04 p0(O ,y5 tih h O ti d oti o 5 °' S ti ti ti a' Oti ■ MY1 % by Size Group 1 'L Cochran Stream and Wetland Restoration Project 60 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran Cross Section 7 - Riffle Monitorin Year - 2015; MY1 Bed Surface Material Particle Size Class (mm) Number % Individual % Cumulative 0-0.062 4 3.8% 4% 0.062 - 0.125 21 20.2% 24% 0.125-0.25 5 4.8% 29% 0.25-0.5 6 5.8% 35% 0.5 - 1.0 3 2.9% 38% 1 - 2 8 7.7% 45% 2-4 4 3.8% 49% 4-8 12 11.5% 61% 8-16 18 17.3% 78% 16-32 12 11.5% 89% 32-64 9 8.7% 98% 64-128 2 1.9% 100% 128-256 0 0.0% 100% 256-512 0 0.0% 100% 512-1024 0 0.0% 100% 1024-2048 0 0.0% 100% 2048-4096 0 0.0% 100% Bedrock 0 0.0% 100% Total 104 100% 1 100% Summary Data D50 4.3 D84 24 D95 41 Cochran Stream and Wetland Restoration Project 61 NCDMS Project No. 95720 Monitoring Year 1 of 7 Equinox Annual Monitoring Report 100% Cochran Stream and Wetland Restoration Project Pebble Count Percent Cumulative Cross Section 7 - Riffle 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% pyti py 0o 1ti5 tih Oh ,y0 yyy' p�, p. p. 'L d W yO .S'L pb ,yW 1 3 p tMY1 Cumulative % hO titi y'L tis goy tia 1p ytiti 4 'L� pyA ti �(� Pp pa9i ti ato �e 100% Cochran Stream and Wetland Restoration Project Pebble Count Percent Individual Cross Section 7 - Riffle 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 6'L 04 p0(O ,yh by h O oti o• 5 °' S ti• Oti ti b 4 .yO ,�'L pb ,ti'b ti ti a' ■ MY1 % by Size Group h� yti .tih �`' .l,A y1�% Q0 do pyG 1 Np pb� 'L 0e Cochran Stream and Wetland Restoration Project 62 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Cochran Cross Section 9 - Riffle Monitorin Year - 2015; MY1 Bed Surface Material Particle Size Class (mm) Number % Individual % Cumulative 0-0.062 13 12.1% 12% 0.062 - 0.125 20 18.7% 31% 0.125-0.25 3 2.8% 34% 0.25-0.5 0 0.0% 34% 0.5 - 1.0 2 1.9% 36% 1-2 6 5.6% 41% 2-4 10 9.3% 50% 4 - 8 7 6.5% 57% 8-16 17 15.9% 73% 16-32 25 23.4% 96% 32-64 4 3.7% 100% 64-128 0 0.0% 100% 128-256 0 0.0% 100% 256-512 0 0.0% 100% 512-1024 0 0.0% 100% 1024-2048 0 0.0% 100% 2048-4096 0 0.0% 100% Bedrock 0 0.0% 100% Total 107 100% 1 100% Summary Data D50 3.9 D84 21 D95 30 Cochran Stream and Wetland Restoration Project 63 NCDMS Project No. 95720 Monitoring Year 1 of 7 Equinox Annual Monitoring Report 100% Cochran Stream and Wetland Restoration Project Pebble Count Percent Cumulative Cross Section 9 - Riffle 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% pyti py 0o 1ti5 tih Oh ,y0 yyy' p�, p. p. 'L d W yO .S'L pb ,yW 1 3 p tMY1 Cumulative % hO titi y'L tis tia ytiti 4 pyA ti �(� pa9i ti �e 100% Cochran Stream and Wetland Restoration Project Pebble Count Percent Individual Cross Section 9 - Riffle 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% �'L 04 p0(O ,y5 tih h O oti o 5 °' S ti Oti ti d 4 ye 'L pb 'b ti ti a' ■ MY1 % by Size Group h� yti .l,A p 1 0�O 'L Cochran Stream and Wetland Restoration Project 64 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Appendix E Hydrologic Data This Page Intentionally Left Blank Table 13. Verification ofBankfull Events Cochran Stream and Wetland Restoration Project Date of Data Collection Date of Occurrence Method Feet Above Bankfull Elevation Photo # (if available) Cochran Branch 12/29/2015 Unknown Crest Gauge 0.86 Parrish Branch None Since Construction Completed 'Potential Date is 12/24/2015 Photo Verification of Bankfull Events Photo #1- Cochran Branch Crest Gauge Cochran Stream and Wetland Restoration Project 67 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Figure 3. Daily Precipitation Totals for the Cochran Stream and Wetland Restoration Site 3.5 3 2.5 2 1.5 1 0.5 0 1 -Jan -15 1 -Feb -15 1 -Mar -15 1 -Apr -15 1 -May -15 1 -Jun -15 1 -Ju I-15 1 -Aug -15 1 -Sep -15 1 -Oct -15 1 -Nov -15 1 -Dec -15 ■ Daily Rainfall re 4. Monthly Precipitation Data Compared to 301h and 70th Percentiles for Macon Count 14.0 12.0 10.0 y Gf t V 8.0 C O r 6.0 .Q O L a 4.0 2.0 0.0 Jan -15 Feb -15 Mar -15 Apr -15 May -15 Jun -15 Jul -15 Aug -15 Sep -15 Oct -15 Nov -15 Dec -15 Monthly Rainfall - - - • 30th Percentile — — 70th Percentile Average Cochran Stream and Wetland Restoration Project 68 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Table 14. Wetland Gauge Attainment Data Summary of Groundwater Monitoring Results Cochran Stream & Wetland Restoration Site Success Criteria Achieved/ Max Consecutive Days During Growing Season Percent Gauge ID Year 11 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 2015 (2016) (2017) (2018) (2019) (2020) (2021) Yes/ 18 GW -1 13.6% Yes/ 132 GW -2 100% Yes/ 132 GW -3 100% Yes/ 132 GW -4 100% Yes/ 132 GW -5 100% Yes/ 132 GW -6 100% Yes/ 132 GW -7 100% Yes/ 132 GW -8 100% Hydrology Success Criteria = 8%; Crowing season = 187 days 'Max consecutive days daring growing season limited to 132 days due to shortened growing season. Percent based on full 187 day growing season Cochran Stream and Wetland Restoration Project 69 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 C C Gauge ID: 1 Total Number of Consecutive; Days Water Table within 12 inches of Soil Surface: 18 Percentage of Growing Season Water Table within 12 inches of Soil Surface: 13.6% 5.0 End 25.0 Beginning Grow ing Season of � Grow of ing Season 20.0 4.5 Beginning of End of Grow ing Season Grow ing Season 15.0 4.0 10.0 Ground Surface 5.0 3.5 __.. 0.0 0.0 3.0 Required WWW\3.0 Required -5.0 5.0 Depth \,4 1� / Depth -10.0 2.5 -10.0 2.5 -15.0 2.0 -15.0 2.0 -20.0 -20.0 -25.0 1.5 -25.0 1.5 -30.0 1.0 -30.0 1.0 -35.0 -35.0 40.0 0.5 -40.0 0.5 -45.0 0.0 In N N M V7 N V) V7 -45.0 0.0 {(� In N V7 N O V7 V7 V7 V7 N V7 V7 N V7 N 1n V7 V7 N V7 N N V7 N -50.0 N V7 O N O O N N N Of O N f� O O N N -- O O N N - O O O N N M n O O N N O O N N N O O N N rD O O N M O N h O N O O N � O N a0 O N N O O O N N N 1!Y Of M O O N N n M M r N a0 N fD N N N N N MN N 47 T M r N !-1! N 00 Gauge ID: 2 Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132 Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100% 5.0 25.0 20.0 4.5 Beginning of End of Grow ing Season Grow ing Season 15.0 4.0 10.0 Ground Surface 5.0 3.5 __.. 0.0 WWW\3.0 Required -5.0 1� / Depth -10.0 2.5 -15.0 2.0 -20.0 -25.0 1.5 -30.0 1.0 -35.0 40.0 0.5 -45.0 0.0 In N N M V7 N V) V7 K1 N V7 O N N rr1 N N HI N V7 N N O V7 N N -50.0 V7 O N O O N N O N O O N N O O N N O O N N O O N N � O O O N N N O N O N O N O N O N O N O N O O O N N N O O N N N Of f� t0 N tD O M r � a0 N fD O M r O V a0 N 47 T M r C C Cochran Stream and Wetland Restoration Project 70 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 C C Gauge ID: 3 Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132 Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100% 5.0 25.0 Beginning Grow ing of Season Grow End of ing Season 20.0 4.5 Grow ing Season ;Grow of ing Season �' / 15.0 4.0 r 10.0 Ground Surface 5.0 3.5 ' - - 0.0 3.0 Required Depth -5.0 -10.0 2.5 -15.0 2.0 20.0 -25.0 1.5 -30.0 1.0 -35.0 -40.0 0.5 -45.0 0.0 {() In N V7 V) O V7 V7 V7 V7 V) V7 V7 N V7 N 1n V7 V7 V) N N N V7 N -50.0 LL) V7 O N O O N N N M O N N O O N N f0 N O O N N t0 0 O O N N M n O O N N v O O N N c0 N O O N N t0 O O N M O N h O N O O N O N ao O N N O O O N N N M M M � O O N N n M O O N N N N M NN a N M N � M O N r N V N � N 47 M M r N N M M 7 N (0 h r W M M a- - O - - N N Gauge ID: 4 Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132 Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100% 5.0 25.0 Beginning of End 20.0 4.5 Grow ing Season ;Grow of ing Season �' / 15.0 4.0 r 10.0 Ground Surface 5.0 3.5 ' 0.0 3.0 Required Depth -5.0 -10.0 2.5 -15.0 2.0 -20.0 -25.0 1.5 -30.0 1.0 -35.0 -40.0 0.5 -45.0 0.0 In N N 1(1 V) N V) V7 K1 N V7 O N N � N e7 HI N V7 N N O N N N -50.0 N O N O O N N O N O O N N O O N N O O N N O O N N � O O O N N N O N O N O N O N O N O N O N O O O N N N O O N N N M N t0 N t0 O M r � a0 N M O M r O V ao N 47 M M r C C Gf R C 7 O 0 Q Q 0 Cochran Stream and Wetland Restoration Project 71 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 C C Gauge ID: 5 Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132 Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100% 5.0 25.0 Beginning of Grow End of 20.0 4.5 Grow ing Season Grow ing Season -/ 15.0 4.0 10.0 Ground Surface 5.0 3.5 ` 1►s 1�i�llr 0.0 0.0 3.0 Required Depth Required Depth -5.0 -5.0 -10.0 -10.0 2.5 -15.0 -15.0 2.0 -20.0 20.0 -25.0 25.0 1.5 -30.0 -30.0 1.0 -35.0 -35.0 -40.0 -40.0 0.5 ]1-50.0 -45.0 -45.0 0.0 {() In V7 V7 V7 O V7 V7 V7 V7 V7 V7 V7 V7 V7 N 1n V7 V7 V7 N N N V7 N u7 V7 O N O O N N N M O N N O O N N f0 N O O N N t0 0 O O N N M n O O N N v O O N N c0 N O O N N t0 O O N M O N h O N O O N O N ao O N N O O O N N N M M M � O O N N n M N N NN a N M N � M M N O N G N � N r N N M M 7 N (0 h r W M M a- - O - - N N Gauge ID: 6 Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132 Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100% 5.0 25.0 Beginning of Grow End of ing Season 20.0 4.5 Grow ing Season -/ 15.0 4.0 10.0 Ground Surface 5.0 3.5 ` 1►s 1�i�llr 0.0 3.0 Required Depth -5.0 -10.0 2.5 -15.0 2.0 -20.0 -25.0 1.5 -30.0 1.0 -35.0 -40.0 0.5 -45.0 0.0 In N V7 1r1 V7 N V) V7 Kl N V7 O N N � N u7 HI N V7 N N O N N LL7 50.0 N O N O O N N O N O O N N O O N N O O N N O O N N � O O O N N N O N O N O N O N O N O N O N O O O N N N O O N N N M N t0 N t0 O M r � a0 N M O M r O V ao N 47 M M r C C r R C 7 O a 0 Q Q 0 Cochran Stream and Wetland Restoration Project 72 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 C C Gauge ID: 7 Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132 Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100% 5.0 End of 25.0 Beginning of Grow ing Season 20.0 4.5 Grow ing Season / �' .(/ 15.0 4.0 10.0 Ground Ground Surface 5.0 3.5 1 r __ ww 0.0 3.0 3.0 Required Depth Required Depth -5.0 -5.0 -10.0 2.5 2.5 -15.0 2.0 2.0 -20.0 -20.0 -25.0 1.5 1.5 -30.0 1.0 1.0 -35.0 -35.0 -40.0 0.5 0.5 11 -45.0 0.0+ 1() i i In N + i V7 + i i N O i i i i N {9 i i I 1 2 l9 N 1r1 lhhILL"Ll- N N N N 19 l9 N N N N N N 12 -50.0 N I9 O N O O N N N 0 O N N O O N N 10 N O O N N t0 0 O O N N M n O O N N - v O O N N c0 N O O N N 10 O O N M O N h O N O O N 4 O N ro O N N O O O N N N M 0 M O O N N n M O O O N N N N NN a N M" t0 O � M a0 N fD N M N G N N N 47 T M r N N M M 7 N (0 h iz M W M T r O N N Gauge ID: 8 Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132 Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100% 5.0 End 25.0 Beginning of Grow of ing Season 20.0 4.5 Grow ing Season / �' .(/ 15.0 4.0 10.0 Ground Surface 5.0 3.5 0.0 3.0 Required Depth -5.0 10.0 2.5 -15.0 2.0 -20.0 -25.0 1.5 -30.0 1.0 -35.0 40.0 0.5 45.0 0.050.0 M N N 1(1 N N N N 1f1 N N tr1 Ln N 1r1 N O Ln N N 1(1 N 1r1 N N N N O N O O N N O N O O N N O O N N O O N N O O N N � O O O N N N O N O N O N O N O N O N O N O O O N N N O O N N N Of N t0 N t0 O M r � a0 N fD O M r O V ao N 47 T M r C C d R C 7 O 0 t Q Q 0 Cochran Stream and Wetland Restoration Project 73 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7 Gauge ID: Reference -Cat Creek (MW13) Total Number of Consecuti\,e Days Water Table within 12 inches of Soil Surface: 130 Percentage of Growing Season Water Table within 12 inches of Soil Surface: 70 5.0 25.0 End of Grow ing Season 20.0 4.5 Beginning Grow of ing Season 15.0 4.0 10.0 Ground Surface 5.0 3.5 ���s- • ��l — 0.0 3.0 Required Depth -5.0 -10.0 2 5 15.0 2.0 -20.0 -25.0 1.5 -30.0 1.0 -35.0 -40.0 0.5 -45.0 0.0 Yi YY lr1 Y] 4Y 1f1 N In N Y'l �n If1 N In Y] 1{') 47 1(i N 1f1 In V7 50.0 V7 V) N V7 V) O O O O N N N N O O O N N N O N O O N Q O O N N — O O N N O O N N O O N N O N O N O O N N O O O O O N N N N N 10 M N W N O OM n V W N O O M r- O V w N m M M r ` N r r r N r N N N M M V N N a N O M r O r ro a0 M M O r N N C Cochran Stream and Wetland Restoration Project 74 Equinox NCDMS Project No. 95720 Annual Monitoring Report Monitoring Year 1 of 7