HomeMy WebLinkAbout20130188 Ver 1_Year 1 Monitoring Report_2015_20160328Annual Monitoring Report
Monitoring Year 1 of 7
FINAL
Cochran Stream and Wetland Restoration Site
NCDMS Contract No.: 004947
NCDMS Project No.: 95720
Macon County, NC
Data Collected: December 2015
Date Submitted: January 2016
Submitted to:
North Carolina Division of Mitigation Services
NCDEQ-DMS, 1652 Mail Service Center Raleigh NC 27699-1652
This Page Intentionally Left Blank
Prepared for:
302 Jefferson Street, Suite 110
Raleigh, North Carolina 27605
Prepared by:
EQUINOX
balance through proper planning
37 Haywood Street, Suite 100
Asheville, North Carolina 28801
This Page Intentionally Left Blank
Contents
1.0 Project Summary ------------------------------------------.|
Ll. Goals and Objectives ....................................................................................................................
l
12 Success Criteria .............................................................................................................................
|
1.3. Project Setting and Background ---------------------------------.
3
1.4. Project Performance ......................................................................................................................
3
2.0 Methods .............................................................................................................................................
4
3.0 References .........................................................................................................................................
5
Appendix AGeneral Tables and Figures ----------------------------------7
Appendix BVisual Assessment Data .........................................................................................................
|5
Appendix C Vegetation Plot Data ...............................................................................................................
27
Appendix D8beam Geornorphology Data .................................................................................................
37
AppendixlB Hydrologic Data .....................................................................................................................
h5
This Page Intentionally Left Blank
1.0 PROJECT SUMMARY
1.1. Goals and Objectives
The overall goals address the stressors identified in the TLW and include the following:
Improve water quality within the restored channel reaches and downstream watercourses by
reducing sediment and nutrient inputs and increasing dissolved oxygen levels
Improve local aquatic and terrestrial ecological function through increased stream shading,
habitat complexity, and availability of organic/ woody material
Improve aquatic and benthic habitat and associated streambed form
Improve site hydrology, wetland functions, and attenuation of flood flows
Provide riparian area and wetland restoration with a native plant community
Protect the site from future land impacts
The specific project objectives that are intended to target the above goals include the following:
Implement Priority I and II restoration of 1,882 feet of stream and rehabilitation/re-establishment
of 4.35 acres of wetlands
Implement appropriate changes in dimension, pattern and/or profile to establish geomorphically
stable conditions within the project reaches
Modify degraded stream channels to enable proper sediment transport capacity and improved
streambed form
Integrate in -stream structures and native bank vegetation
Re -grade the floodplain to remove drainage ditches, spoil berms, and overburden soil
Plant native woody and herbaceous riparian vegetation within a minimum width of 30 feet from
the edge of the restored channels and throughout the restored wetland area
Eradicate invasive, exotic or undesirable plant species
Install livestock exclusion fencing
Establish a permanent conservation easement
1.2. Success Criteria
1.2.1. Morphological Parameters and Channel Stability
Restored and enhanced streams are in compliance with the standards set forth in the USACE 2003 Stream
Mitigation Guidelines and the "Ecosystem Enhancement Program Monitoring Requirements and
Performance Standards for Stream and Wetland Mitigation" dated November 7, 2011. Restored and
enhanced streams should demonstrate morphologic stability to be considered successful. Stability does
not equate to an absence of change, but rather to sustainable rates of change or stable patterns of variation.
Restored streams often demonstrate some level of initial adjustment in the several months that follow
construction and some change/variation subsequent to that is also to be expected. However, the observed
change should not be unidirectional such that it represents a robust trend. If some trend is evident, it
should be very modest or indicate migration to a stable form.
Dimension- Cross-section measurements should indicate little change from the as -built cross-
sections. If changes do occur, they will be evaluated to determine whether the adjustments are
associated with increased stability or whether they indicate movement towards an unstable
condition.
Cochran Stream and Wetland Restoration Project 1 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Pattern and Profile - Visual inspection of the pattern and profile should indicate stability with
little deviation from as -built conditions for the restored stream. Pool depths may vary from year
to year, but the majority should maintain depths sufficient to be observed as distinct features.
The pools should maintain their depth with flatter water surface slopes, while the riffles should
remain shallower and steeper. Pattern and profile measurements will not be collected unless
conditions seem to indicate that a detectable and detrimental change appears to have occurred.
Substrate - Calculated D5o and D84 values should indicate coarser size class distribution of bed
materials in riffles and finer size class distribution in pools. The majority of riffle pebble counts
should indicate maintenance or coarsening of substrate distributions. Generally, it is anticipated
that the bed material will coarsen over time.
Sediment Transport - Depositional features should be consistent with a stable stream that is
effectively managing its sediment load. Point bar and inner berm features, if present, should
develop without excessive encroachment of the channel. Isolated development of robust (i.e.
comprised of coarse material and/or vegetated actively diverting flow) mid -channel or lateral
bars will be acceptable. Likewise, development of a higher number of mid -channel or lateral
bars that are minor in terms of their permanency such that profile measurements do not indicate
systemic aggradation will be acceptable, but trends in the development of robust mid -channel or
alternating bar features will be considered a destabilizing condition and may require intervention
or have success implications.
1.2.2. Surface Water Hydrology
Monitoring of stream surface water stages should indicate recurrence of bankfull flow on average every 1
to 2 years. At a minimum, throughout the monitoring period, the surface water stage should achieve
bankfull or greater elevations at least twice. The bankfull events must occur during separate monitoring
years.
1.2.3. Groundwater Hydrology
The USACE defines minimum hydrology for jurisdictional wetlands to be saturation within 12 inches of
the surface for at least 5% of the growing season if soils and vegetation meet jurisdictional criteria. Given
the hydric soils are present throughout the restoration area but that wetland vegetation will be newly
established, it is reasonable to set the minimum hydrology threshold slightly above the jurisdictional
minimum threshold. As such the minimum performance standard is set to provide saturated soils within
12 inches of the surface for at least eight percent (8%) of the growing season under average climatic
conditions. In the event of non -typical years of climatic conditions, groundwater monitoring data should
demonstrate similar hydro -periods when compared to reference wetland groundwater data. The reference
wetland site will be the NCDMS Cat Creek Stream and Wetland Restoration Site — NCDMS Project # 71
— located east of Franklin in Macon County, NC. The growing season for the site was based on the
Natural Resource Conservation Service (MRCS) WETS dataset for Macon County (http://agacis.rcc-
acis.org/37113/wets). The Macon County dataset is based on a site with elevations roughly the same as
the project site. According to NRCS, the growing season for Macon County is defined to be the period
with a 50% probability that the daily minimum temperature is higher than 28°F. At the project site, this
period extends from April 16' to October 19' for a total of 187 days. Based on this, wetland hydrology
success will be achieved if the water table is within 12 inches of the soil surface for 15 consecutive days
or more during the growing season.
Cochran Stream and Wetland Restoration Project 2 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
1.2.4. Vegetation
Riparian vegetation monitoring shall be conducted for a minimum of seven years to ensure that success
criteria are met per USACE guidelines. Accordingly, success criteria will consist of a minimum survival
of 260 planted stems per acre by the end of the Year 5 monitoring period and a minimum of 210 planted
stems per acre at the end of Year 7. If monitoring indicates either that the specified survival rate is not
being met or the development of detrimental conditions (i.e., invasive species, diseased vegetation),
appropriate corrective actions will be developed and implemented. Additionally, planted vegetation must
average 8 feet in height in each plot at year 7 (as defined in the USACE 2003). If this performance
standard is met by year 5 and stem density is trending toward success (i.e., no less than 260 five year-old
stems/acre) monitoring of vegetation on the site may be terminated provided written approval is given by
the USACE in consultation with the North Carolina Interagency Review Team (NCIRT).
1.3. Project Setting and Background
The Cochran Branch Mitigation Project (The Site) is located approximately 6 miles northwest of
Franklin, North Carolina at latitude 35°12'52" N and longitude 83029120" W. The Site encompasses
approximately 10 acres of agricultural land and consists of two streams, Cochran Branch and Parrish
Branch, along with 4.35 acres of wetlands on the Cochran Branch floodplain. The Site lies within the
Little Tennessee River Watershed NC Division of Water Quality (DWQ) sub -basin 04-04-01 and local
HUC 06010202040020. The project is located within the NCDMS Iotla Creek targeted local watershed
(TLW) and within the Franklin to Fontana local watershed plant (LWP). Cochran Branch drains to
Burningtown Creek approximately 0.5 miles downstream of the project. Burningtown Creek is classified
as B;Tr by NCDEQ.
1.4. Project Performance
Monitoring Year 1 (MY I) data was collected during December 2015. Monitoring activities included
visual assessment of all reaches and the surrounding easement, collection of images at eight permanent
photo stations, inventory of eight permanent vegetation monitoring plots, surveying of nine cross-
sections, and conducting five pebble counts.
Summary information/data related to the occurrence of items such as beaver or encroachment and
statistics related to performance of various project and monitoring elements can be found in the tables and
figures in the report appendices. Narrative background and supporting information formerly found in
these reports can be found in the Baseline Monitoring Report (formerly Mitigation Plan) and in the
Mitigation Plan (formerly Restoration Plan) documents available on the NCDMS website
(http://portal.NCDEQ.org/web/eep). All raw data supporting the tables and figures in the appendices is
available from DMS upon request.
1.4.1. Vegetation
Visual assessment of vegetation outside of the monitoring plots (Appendix B — Table 6) indicates that the
herbaceous vegetation is becoming well established throughout the project. Several remaining
populations of Chinese privet (Ligustrum sinense) were treated during June 2015. Follow-up treatments
for Chinese privet will be performed during the winter of 2015-2016. Planted stems were difficult to
assess across the site during leaf -off condition. Viability of planted stems will be monitored in
subsequent site visits.
Monitoring of the permanent vegetation plots (n = 8; VP) was completed during December 2015.
Summary tables and photographs associated with MY1 monitoring are located in Appendix C. MY1
monitoring data indicates that all but VP -6 are on track to meet the MY3 interim success criteria of 320
Cochran Stream and Wetland Restoration Project 3 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
planted stems per acre. Vegetation Plot 6 had a density of 121 planted stems per acre, well below the
Year 5 and Year 3 target densities of 260 and 320 planted stems per acre, respectively. Planted stem
densities among plots ranged from 121 to 769 planted stems per acre with an annual mean of 582 planted
stems per acre across all plots. A total of 10 species were documented within the plots. When volunteer
stems are included, the mean annual total stems per acre rose to 597 and ranged between 121 and 769
stems per acre. The lack of success in VP -6 can likely be attributed to the location of this plot on top of a
small knoll, where it is generally dryer, followed by a dry summer. Additionally, vegetation within, and
surrounding, the plot is dominated by fescue. This area will be replanted during spring 2016.
1.4.2. Stream Geomorphology
Visual assessment of the stream channel was performed to document signs of instability, such as eroding
banks, structural instability, or excessive sedimentation. No indication of instability was observed during
visual assessment and all structures are functioning as designed (Table 5 and Figure 2).
Geomorphic data for MY1 was collected during December 2015. Summary tables and cross-section plots
related to stream morphology are located in Appendix D. Noticeable change in the cross-section data
between MYO and MY1 were limited to pool cross-sections 1 and 4, where deposition and scour,
respectively, led to slight changes in the maximum pool depth (Appendix B, Table 11 a). These changes
are relatively minor and do not exceed expectations of adjustments within the channel, particularly for the
first year of monitoring. As expected pebble counts indicate that riffles contain coarser substrate than
pools. The riffle D50 fell into the very coarse sand to medium gravel size class for Cochran lb and very
fine gravel to fine gravel for Parrish Branch. Substrate will be monitored in future years for shifts in
particle size composition.
The bank pin arrays indicate that no erosion is taking place in the pools. All bankpins were buried under
soft accretions of sediment. Documented shifts in stream morphology do not exceed expectations
between MYO and MY1 as the constructed stream adjusts to conditions at the site. The project is meeting
success criteria regarding stable cross-section dimensions as well as substrate size composition, and
sediment transport.
1.4.3. Groundwater and Stream Hydrology
During MY 1, all eight of the groundwater monitoring wells met the 8% hydroperiod success criteria
(Table 13). Due to the fact that the baseline monitoring setup and MY1 data collection occurred during
the same year, hydrologic data was collected for only 132 days of the 187 day growing season.
Calculations of the maximum hydroperiod were based on the full growing season; however, as a result of
the shortened data collection period, the maximum number of consecutive days within 12 inches of the
ground surface is limited to 132 days. All monitoring wells still met the 8% hydroperiod success criteria.
Hydroperiods among the monitoring wells ranged from 13.6% to 100%.
During a December 2015 site visit, one bankfull event was recorded on Cochran Branch (mainstem), at
0.86 feet above bankfull (Table 12). This is the first bankfull event since project completion.
2.0 METHODS
For MY1, visual assessment was performed during the geomorphic and vegetation data collection event.
For future monitoring years, visual assessment of the project will be performed at the beginning and end
of each monitoring year. Permanent photo station photos were collected during the geomorphic data
collection event; however for future monitoring years, permanent photo station photos will be taken
Cochran Stream and Wetland Restoration Project 4 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
during the initial visual assessment; during leaf -off conditions. Additional photos of vegetation or stream
problem areas were taken as needed.
Geomorphic measurements were taken during low flow conditions using a Nikon® NPR 332 Total
Station. Three-dimensional coordinates associated with cross-section data were collected in the field and
geo-referenced (NAD83 State Plane feet FIPS 3200). Morphological data were collected at 9 cross-
sections. Survey data was imported into CAD, ArcGIS®, and Microsoft Excel® for data processing and
analysis. Channel substrate was characterized using a Wolman Pebble Count as outlined in Harrelson et
al. (1994) and processed using Microsoft Excel.
Vegetation success is being monitored at 8 permanent monitoring plots. Vegetation monitoring follows
the CVS-EEP Level 2 Protocol for Recording Vegetation, version 4.2 (Lee et al. 2008) and includes
analysis of species composition and density of planted species. Data is processed using the CVS data
entry tool. In the field, the four corners of each plot were permanently marked with rebar and photos of
each plot are taken from the origin each monitoring year.
Precipitation data was collected using an Onset HOBO Data Logging Rain Gauge. Groundwater for
hydrologic success of restored wetlands was monitored using eight HOBO U20 Water Level Loggers. An
additional logger was installed on site, above ground, for use as a barometric reference. Data loggers
collected depth to groundwater daily and all data were processed using HOBOware and analyzed using
Microsoft Excel. Bankfull events were documented with two crest gauges, one each being located on
Cochran Branch and Parrish Branch. During quarterly visits to the site, the height of the corkline was
recorded and cross-referenced with known bankfull elevations at each crest gauge.
3.0 REFERENCES
Environmental Banc & Exchange, LLC. 2014. Cochran Branch, Final Mitigation Plan, Macon County,
North Carolina. NCEEP Project No. 95720
Harrelson, Cheryl, C. Rawlins and J. Potyondy. 1994. Stream Channel Reference Sites: An Illustrated
Guide to Field Technique. Gen. Tech. Rep. RM -245. Rocky Mountain Forest and Range Experiment
Station. USDA Forest Service. Fort Collins, Colorado
Lee, M.T., R.K. Peet, S.D. Roberts, and T.R. Wentworth. 2008. CVS-EEP Protocol for Recording
Vegetation. Version 4.2. http://cvs.bio.unc.edu/methods.htm; accessed November 2008.
Cochran Stream and Wetland Restoration Project 5 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
This Page Intentionally Left Blank
Cochran Stream and Wetland Restoration Project 6 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Appendix A
General Tables and Figures
Reference S.ftes
Cold Spring:gs
i 14AYWOO Creek.
J
4-,7-8VVAIN
- 28,ft,
JACKSON
MAC64
CLAY
Fairest OC ran
Site
k,
G.
South fork
Mills River
TRAN§' LVANIA
nrvri r' ,h,,,
a
p
HIZUTC 1: Vicinity Map res CochranV FQU I NO "
Project No. 95720 Notes: CmserwaaQ" iwnt f"11 Ke,
Masan County, North Carolina Mapong & Survey. PA
Miltzs
Cochran Stream and Wetland Restoration Project 8 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
. I
fsanklin
AMEL.L
—it 2? F-tK.74 WWIH tt$.I"dwp Yglr.
Uwfim US. Td WMTnfSmo*ey MIRwA4. Np,iy.
RoW Alw AmOm cum kttimcoxc,25 &AIIrtFIwvMrvaWy 2
aniLs r" rithi oritoA4mFoad Driwl nffle dacn iwa ltftmo
OlsyrHA R"d.AikI 3.5jul, IIUI.Ir�ht-kWA.1u—ad aced Lk
mwa w the .4e UA h. 0.71 stok. .. 11re I'It
lnsd4wt [jml si = rrovjmlsl rIfiL-n s i1r. of Lhe
wthorIzed pffronue] of mete and fedrut azF in a ffidr
Lijw[vM in the ovn5ip =a
Q-(-- aflh6r defime4 roles Mti
Any mtrrded at& %iot-m aj
rlirie}tryIr,
-1 -Nil iki- Sri. -d"- . th IAV.
p
HIZUTC 1: Vicinity Map res CochranV FQU I NO "
Project No. 95720 Notes: CmserwaaQ" iwnt f"11 Ke,
Masan County, North Carolina Mapong & Survey. PA
Miltzs
Cochran Stream and Wetland Restoration Project 8 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
OCD CD C
N
� � n
d O O
s O C� p
d n b c b nt Orperc
It CD
CD CD
OQ C" C CD
0 CL
p O
r; CD n CD
v CD cot
CDCD
CD
O o -C Q
CD f
c • •i ,''�
O
-OCD
CC
CD
O OID �_ r / pf ♦♦`
CD
CD CD
m n t� y y
�o
'1:3W
CD 0
CD
I
C
J /" ` � dam%=• � ,`' �
ao
♦b
� as o rs o /` _ �j♦i
CD
lu-
CD
CD
LO
cn
a tc to - f
CD 0
CD
00
CD
CN
o
d
z
CD
C a
N �
O
O (p
n
C:
c (D d
0
O
T
'd o 0
9z.
Cd
cd" o
�q
0
uz
'Restoration footage accounts for crossings and exclusions.
'BR=Bioretention Cell; SF = Sand Filter; SW = Stormwater Wetland; WDP =Wet Detention Pond; DDP = Dry Detention Pond; FS= Filter Strip; S=
Grassed Swale; LS = Level Spreader; NI =Natural Infiltration Area; FB = Forested Buffer
Cochran Stream and Wetland Restoration Project 11 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 1. Project Components and Mitigation Credits
Cochran Stream and Wetland Restoration Project
Mitigation Credits
Stream
Non-riparian
Riparian Wetland Wetland
Nitrogen
Buffer Nutrient Offset
Phosphorous
Nutrient Offset
Type
R
RE
R RE R RE
Totals
1,820
4.24 0.06
Project Components
Project Component -or-
Reach ID
Existing Approach
Stationing/Location Footage/Acreage (PI, PII etc.)
Restoration -
or-
Restoration
Equivalent
Restoration
Mitigation
Footage or Ratio
Acreage
Cochran Branch
100+60 - 115+05 1332 PI
R
1,418
1:1
Parrish Branch
200+15 - 204+11 232 PH
R
402
1:1
Wetland Area 1
_ Re-Est.
R
3.33
1:1
Wetland Area 1
0.88 Re-Hab.
R
0.82
1:1
Wetland Area 2
0.11 Enh.
RE
0.11
2:1
Wetland Area 3
Re-Est.
R
0.09
1:1
Component Summation
Stream'
Riparian Wetland Non-riparian Wetland
Buffer
Upland
Restoration Level
(linear feet)
(acres) (acres)
(square feet)
(acres)
Riverine Non-Riverine
Restoration
1,820
4.24
Enhancement
-
0.11
Enhancement I
-
Enhancement II
-
Creation
Preservation
Preservation
BLIP Elements
Element'
Location
Purpose/Function
Notes
FB
Entire Site
Protect Stream
'Restoration footage accounts for crossings and exclusions.
'BR=Bioretention Cell; SF = Sand Filter; SW = Stormwater Wetland; WDP =Wet Detention Pond; DDP = Dry Detention Pond; FS= Filter Strip; S=
Grassed Swale; LS = Level Spreader; NI =Natural Infiltration Area; FB = Forested Buffer
Cochran Stream and Wetland Restoration Project 11 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 2. Project Activity and Reporting History
Cochran Stream and Wetland Restoration Project
Activity or Report
Data
Collection
Complete
Completion
or Delivery
Mitigation Plan
Aug - 2014
Sept - 2014
Final Design - Construction Plans
Oct - 2014
Oct - 2014
Construction
N/A
May - 2015
Permanent Seed Mix Applied
May - 2015
May - 2015
Live Stake and Bare Root Plantings
May - 2015
May - 2015
Baseline Monitoring Document (Year 0 Monitoring - Baseline)
Jun - 2015
Aug - 2015
Invasive -Exotic Vegetation Treatment
-
Jun - 2015
Year 1 Monitoring
Dec - 2015
Jan - 2016
Year 2 Monitoring
Year 3 Monitoring
Year 4 Monitoring
Year 5 Monitoring
Year 6 Monitoring
Year 7 Monitoring
Cochran Stream and Wetland Restoration Project 12 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 3. Project Contacts
Cochran Stream and Wetland Restoration Project
Resource Environmental Solutions, LLC
302 Jefferson Street; Suite 110
Prime Contractor
Raleigh, North Carolina 27605
Daniel Ingram (919) 209-1056
Wolf Creek Engineering
12 1/2 Wall Street Suite C
Designer
Asheville, North Carolina 28801
S. Grant Ginn (828) 449-1930
Northstate Environmental
2889 Lowery Street
Construction Contractor
Winston Salem, North Carolina 27101
Darrell Westmoreland (336) 725-2010
Northstate Environmental
2889 Lowery Street
Seeding Contractor
Winston Salem North Carolina 27101
Darrell Westmoreland (336) 725-2010
Resource Environmental Solutions, LLC
302 Jefferson Street; Suite 110
Planting Contractor
Raleigh, North Carolina 27605
David Godley (919) 209-1053
Kee Mapping and Surveying
PO Box 2566
As-built Surveys
Asheville, North Carolina 28802
Phillip B. Key (828) 575-9021
Northstate Environmental
2889 Lowery Street
Seeding Mix Source
Winston Salem, North Carolina 27101
Darrell Westmoreland (336) 725-2010
Arborgen
5594 Higway 38 South
Blenheim, SC 29516
Bare Root Seedlings(843)528-9669
North Carolina Foresty Claridge Nursery
762 Claridge Nursery Road
Goldsboro, North Carolina 27530
(919) 731-7988
Foggy Mountain Nursery
2251 Ed Little Road
Live Stakes
Creston, North Carolina 28643
(336)384-5323
Equinox Environmental
Monitoring Performers
37 Haywood St.
(MYO-MYI)- 2015 - 2016
Asheville, North Carolina 28802
Hunter Terrell (828) 253-6856
Cochran Stream and Wetland Restoration Project 13 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 4. Project Baseline Information and Attributes
Project Information
Project Name
Cochran Branch
County
Macon County
Project Area (acres)
10.06
Project Coordinates (latitude and longitude)
35°12'52..03" N, 83°29'20.10" W
Project Watershed Summary Information
Physiographic Province
Blue Ridge
River Basin
Little Tennessee
USGS Hydrologic Unit 8-digit 06010203
USGS Hydrologic Unit 14-Digit
6010202040020
DWQ Sub-basin
40-04-01
Project Drainage Area (acres)
811
Project Drainage Area Percentage of Impervious Area
<5%
CGIA Land Use Classification
2.01.03 Hay and Pasture Land
Reach Summary Information
Parameters
Cochran Branch Parrish Branch
Length of reach (linear feet)
1332 232
Valley classification (Rosgen)
II H
Drainage area
1.25 0.11
NCDWQ stream identification score
48 40
NCDWQ Water Quality Classification
B, Tr B, Tr
Morphological Description (stream type) (Rosgen)
G4 G4
Evolutionary trend (Rosgen)
G-+ F -. C -. E G- F -. B
Underlying mapped soils
NkA NkA, ScC
Drainage class
Veny Poorly Very Poorly Drained,
Drained Mod Well Drained
Soil Hydric status
Hydric Hydric, Non-Hydric
Slope
0.7% 4.2%
FEMA classification
N/A N/A
Native vegetation community
Agricultural Agricultural
Percent composition of exotic invasive vegetation
6% 0%
Wetland Summary Information
Parameters
A B C
D E
Area (Acres)
4.24 0.11
Wetland Type (non-riparian, riparian xiverine or riparian non-riverine) Riparian Riparian
Non-Riverine Non-Riverine
Mapped Soil Series
NkA NkA
Drainage class
Verry Poorly Verry Poorly
Drained Drained
Soil Hydric Status
Hydric Hydric
Source of Hydrology
Groundwater Groundwater
Previous Hydrologic Impairment
Dredging/Ditching Dredging/Ditching
Native vegetation community
Montane Alluvial Montane Alluvial
Forest Forest
Percent composition of exotic invasive vegetation
0% 0%
Regulatory Considerations
Regulation
Applicable? Resolved? Supporting
Documentation
Waters of the United States- Section 404
Yes
Yes PCN 27 (SAW-
2013-00280
Waters of the United States- Section 401
Yes
Yes 401 Certification
DWR#-13-0188
Endangered Species Act
No
Yes ERTR
Historic Preservation Act
No
Yes ERTR
Coastal Zone Management Act (CZMA)/
Coastal Area Management Act (CAMA)
No
N/A
FEMA Floodplain Compliance
N/A
N/A
Essential Fisheries Habitat
N/A
N./A
Cochran Stream and Wetland Restoration Project 14 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Appendix B
Visual Assessment Data
This Page Intentionally Left Blank
Table 5. Visual Stream Morphology Stability Assessment
Cochran Stream and Wetland Restoration Project - Cochran Branch
Assessed Len th 1,418 feet
Major Channel
Category
Channel
Sub Category
Metric
Number
Stable,
Performing
as Intended
Total
Number in
As -built
Number of
Unstable
Segments
Amount of
Unstable
Footage
% Stable,
Performing
as Intended
Number
with
Stabilizing
Woody
Vegetation
Footage
with
Stabilizing
Woody
Vegetation
Adjusted %
for
Stabilizing
Woody
Vegetation
1. Bed
1. Vertical Stability
1. Aeeradation - Bar formation/growth sufficient to significantly
deflect flow laterally (not to include point bars).
0
0
100%
2 Deeradation - Evidence of downcutting.
0
0
100%
(Riffle and Run Units)
2. Riffle Condition
1. Texture/Substrate - Riffle maintains coarser substrate.
23
23
100%
3. Meander Pool
1. Death Sufficient (Max Pool Depth: MeanBankfullDepth z 1.6).
23
23
100%
Condition
2. Length appropriate (>30% of centerline distance between tail of
upstream riffle and head of downstream riffle).
23
23
100%
1. Thalweg centering at upstream of meander bend (Run).
23
23
100%
4. Thalweg Position
2. Thalweg centering at downstream of meander bend (Glide).
23
23
100%
2. Bank
1. Scoured/ Eroding
Bank lacking vegetative cover resulting simply from poor growth
and/or scour and erosion.
0
0
100%
0
0
100%
Banks undercut/overhanging to the extent that mass wasting appears
2. Undercut
likely. Does NOT include undercuts that are modest, appear
0
0
100%
0
0
100%
sustainable and are providing habitat.
3. Mass Wasting
Bank slumping, calving, or collapse.
0
0
100%
0
0
100%
Totals
0
0
100%
0
0
100%
3. Engineered
Structures
1. Overall Integrity
Structures physically intact with no dislodged boulders or logs.
23
23
100%
2. Grade Control
Grade control structures exhibiting maintenance of grade across the sill
23
23
100%
2a. Piping
Structures lacking any substantial flow underneath sills or arms.
23
23
100%
3. Bank Protection
Bank erosion within the structures extent of influence does NOT
exceed 15%.
23
23
100%
Pool forming structures maintaining— Max Pool Depth: Mean
4. Habitat
Bankfull Depth Ratio > 1.6. Rootwads/logs providing some cover at
23
23
100%
base -flow.
Cochran Stream and Wetland Restoration Project 17 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 5 Cont'd. Visual Stream Morphology Stability Assessment
Cochran Stream and Wetland Restoration Project - Parrish Branch
Assessed Len th 402 feet
Major Channel
Category
Channel
Sub Category
Metric
Number
Stable,
Performing
as Intended
Total
Number in
As -built
Number of
Unstable
Segments
Amount of
Unstable
Footage
% Stable,
Performing
as Intended
Number
with
Stabilizing
Woody
Vegetation
Footage
with
Stabilizing
Woody
Vegetation
Adjusted %
for
Stabilizing
Woody
Vegetation
1. Bed
1. Vertical Stability
1. Aeeradation - Bar formation/growth sufficient to significantly
deflect flow laterally (not to include point bars).
0
0
100%
2 Deeradation - Evidence of downcutting.
0
0
100%
(Riffle and Run Units)
2. Riffle Condition
1. Texture/Substrate - Riffle maintains coarser substrate.
22
22
100%
3. Meander Pool
1. Death Sufficient (Max Pool Depth: MeanBankfullDepth z 1.6).
22
22
100%
Condition
2. Length appropriate (>30% of centerline distance between tail of
upstream riffle and head of downstream riffle).
22
22
100%
1. Thalweg centering at upstream of meander bend (Run).
22
22
100%
4. Thalweg Position
2. Thalweg centering at downstream of meander bend (Glide).
22
22
100%
2. Bank
1. Scoured/ Eroding
Bank lacking vegetative cover resulting simply from poor growth
and/or scour and erosion.
0
0
100%
0
0
100%
Banks undercut/overhanging to the extent that mass wasting appears
2. Undercut
likely. Does NOT include undercuts that are modest, appear
0
0
100%
0
0
100%
sustainable and are providing habitat.
3. Mass Wasting
Bank slumping, calving, or collapse.
0
0
100%
0
0
100%
Totals
0
0
100%
0
0
100%
3. Engineered
Structures
1. Overall Integrity
Structures physically intact with no dislodged boulders or logs.
19
19
100%
2. Grade Control
Grade control structures exhibiting maintenance of grade across the sill.
19
19
100%
2a. Piping
Structures lacking any substantial flow underneath sills or arms.
19
19
100%
3. Bank Protection
Bank erosion within the structures extent of influence does NOT
exceed 15%.
19
19
100%
Pool forming structures maintaining— Max Pool Depth: Mean
4. Habitat
Bankfull Depth Ratio > 1.6. Rootwads/logs providing some cover at
19
19
100%
base -flow.
Cochran Stream and Wetland Restoration Project 18 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
N/A - Item does not apply.
Cochran Stream and Wetland Restoration Project 19 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 6. Vegetation Condition Assessment
Cochran Stream and Wetland Restoration Project
Planted Acreage : 10.05
% of
Number of
Combined
Vegetation Category
Definitions
CCPV Depiction
Planted
polygons
Acreage
Acrea e
1. Bare Areas
Very limited cover of both woody and herbaceous material.
N/A
0
0.00
0%
Woody stem densities clearly below target levels based on MY3,
2. Low Stem Density Areas
N/A
0
0.00
0%
4, or 5 stem count criteria.
Totals
0
0.00
1 0%
Areas with woody stems of a size class that are obviously small
3. Areas of Poor Growth Rates or Vigor
given the monitoring year.
N/A
0
0.00
°
0 /o
Cumulative Totals
0
0.00
0%
Easement Acreage : 10.05
of
Number of
Combined
Vegetation Category
Definitions
CCPV Depiction
Easement
Polygons
Acreage
Acreage
4. Invasive Areas of Concern
Areas or points (if too small to render as polygons at map scale).
Cross Hatch
5
0.40
3%
(Red
- Dense/Yellow - Present)
5. Easement Encroachment Areas
Areas or points (if too small to render as polygons at map scale).
N/A
0
0.00
0%
N/A - Item does not apply.
Cochran Stream and Wetland Restoration Project 19 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran Branch Reach 1 a — Permanent Photo Station 1
Station 101+33 - Downstream
Cochran Branch Reach 1 a — Permanent Photo Station 1
Station 101+33 —Upstream
Cochran Stream and Wetland Restoration Project 20 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran Branch — Permanent Photo Station 2
East 95°
Cochran Branch — Permanent Photo Station 2
South 186°
Cochran Stream and Wetland Restoration Project 21 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran Branch — Permanent Photo Station 3
Station 108+87 — Upstream
Parrish Branch — Permanent Photo Station 3
Station 108+87 — Upstream
Cochran Stream and Wetland Restoration Project 22 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran Branch — Permanent Photo Station 4
South Southeast 160°
Cochran Branch — Permanent Photo Station 5
Southeast 150°
Cochran Stream and Wetland Restoration Project 23 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
4
Cochran Branch — Permanent Photo Station 6
Station 114+62 —Upstream 186°
Parrish Branch — Permanent Photo Station 7
Station 200+25 — Upstream 276°
Cochran Stream and Wetland Restoration Project 24 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Parrish Branch — Permanent Photo Station 8
Southeast 135
Cochran Stream and Wetland Restoration Project 25 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
This Page Intentionally Left Blank
Cochran Stream and Wetland Restoration Project 26 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Appendix C
Vegetation Plot Data
Table 7. Vegetation Plot Criteria Attainment
Cochran Stream and Wetland Restoration Project
Vegetation
Plot ID
Vegetation
Survival
Threshold
Met?
Tract Mean
1
Yes
88%
2
Yes
3
Yes
4
Yes
5
Yes
6
No
7
Yes
8
Yes
Cochran Stream and Wetland Restoration Project 28 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 8. CVS Vegetation Plot Metadata
Cochran Stream and Wetland Restoration Project
Report Prepared By
Drew Alderman
Date Prepared
12/7/2015 17.20
database name
RES_95720_2015_A_Cochran_MYl.mdb
database location
Z.\ES\NRI&M\EBXMonitoring\Cochran\MY1-2014\Data\Veg
computer name
FIELD -PC
file size
59998208
DESCRIPTION
OF WORKSHEETS IN THIS DOCUMENT
Metadata
Description of database file, the report worksheets, and a summary of project(s)
and project data.
Proj, planted
Each project is listed with its PLANTED stems per acre, for each year. This
excludes live stakes.
Pro j, total stems
Each project is listed with its TOTAL stems per acre, for each year. This includes
live stakes, all planted stems, and all natural/volunteer stems.
Plots
List of plots surveyed with location and summary data (live stems, dead stems,
missing, etc.).
Vigor
Frequency distribution of vigor classes for stems for all plots.
Vigor by Spp
Frequency distribution of vigor classes listed by species.
Damage
List of most frequent damage classes with number of occurrences and percent of
total stems impacted by each.
Damage by Spp
Damage values tallied by type for each species.
Damage by Plot
Damage values tallied by type for each plot.
Planted Stems by Plot and Spp
A matrix of the count of PLANTED living stems of each species for each plot;
dead and missing stems are excluded.
ALL Stems by Plot and spp
A matrix of the count of total living stems of each species (planted and natural
volunteers combined) for each plot; dead and missing stems are excluded.
PROJECT SUMMARY
Project Code 95720
project Name Cochran Branch Stream and Wetland
Description
River Basin
le ngth(ft)
stream-to-edge width (ft)
area (sq m)
Required Plots (calculated)
Sampled Plots 8
Cochran Stream and Wetland Restoration Project 29 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
This Page Intentionally Left Blank
Cochran Stream and Wetland Restoration Project 30 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
I
C
7�
a
O
O
C_'•
O
O
n
n
O
CD
CD
C CD
C
C
C
0
C
CD
rs:
CCD
n
n
a
cr
C
R
�
CD
q�
�
0
rD
O
cr
CD
n
O
A7
o
A�
O.,
U
C
A
co
CD
<
6
m
SID
O
n
'
07DD
w
�
C
W
w
O �
n �
n
g
O
x
n
CD
n
x
nSZ
o�n
CD
CD
p
C -D
O
0
x
n
On
CD
n
'3
c
O
o�
0
P7,
C
CD
CDC
r)
co
o
m r*
s
Q.
o
b
..0
CD
O
b
P7"
g
xf9
(Do
�
��
eD
CD
�a
fD
N
fD
CI
.�
.�
.�
.�
.�
.�
.�
.�
yy
�
CD
fi
..
f�
fp
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
n
yeD
f~9 n
m O
�fD>�
oo
.-.
n
.
n
.
n
.
n
.
n
.
n
.
n
.,
n
.�
n
n
ft
o
o
n
n
n
n
n
n
n
n
n
n
n
rD
.�rD
CD
y
N`O
`O
w
`O
w
c�ii
O
fD•
O
J
W
N
W
w
N
p
00
00
�O
N
00
Vii
w
N
w
w
H+
O
0000
y
N
00
00
W
W
N
W
W
N
'O
O
O
'-•
OC
W
00
41�N
00
J
N
01
r.l �/-
CD
C
f7
00
w
O
w
O
A
b O
1
ft
00O
O
00
�
�
00
Oho
O
y �
000
W
00
Vi
00
w
00
0�0
J
N
01
00
C_'•
O
O
n
n
O
CD
CD
CD
0
CCD
C
cr
C
R
�
CD
q�
�
0
p
o
O
cr
q�
CD
cr
CD
w
o
U
<
ft
<
6
m
SID
CD
W
w
n
g
O
x
n
CD
n
P7"
nSZ
p
-t
O
0
x
n
O'
C
CD
n
a
N
0
P7,
w
O
O
O
P7"
g
�a
fD
N
fD
CI
CD
CD
yN'
>n
o
i -t
.-.
n
.
n
.
n
.
n
.
n
.
n
.
n
.
n
.,
n
.�
n
n
ft
o
o
n
n
n
n
n
n
n
n
n
n
n
rD
CD
O
J
W
N
W
w
N
p
w
N
w
w
y
N
00
00
W
W
N
W
W
N
O
C
f7
00
w
w
O
A
ft
000
W
O
w
00
O1
y
A�
00
w
J
W
O
4
G ft
R.
•A
N
a1
N
O
� `
UN
�
¢ O
Z,
.A
N
vi
C w
C y
y
41
N
01
N
.r
p
�
O �
b
O
b �
O
�
Vi
�
N
N
00
41
�• b
O
b
'fD'S
C,
p
to
ON
N
N
Oo
O\
O
:Q 'r
C
K
A
�
b
J
O
b
O
00
_
O
_
►'3
�
N
00
w
�
D1
�
N
�
O
r-�
O
b �
w
o
o�
y
_
N
N
w
N
b
0000
00
n
W
N
D
O
0000
C/i
J
W
N
41
00
J
y
O\
00
b
J
O
i"d `ti7
.. oc
y
d1
N
M
Cd Cd
ct o
�q
0
uz
Cochran - Vegetation Monitoring Plot 1
December 7, 2015
Cochran - Vegetation Monitoring Plot 2
December 7, 2015
Cochran Stream and Wetland Restoration Project 33 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran - Vegetation Monitoring Plot 3
December 7, 2015
Cochran - Vegetation Monitoring Plot 4
December 7, 2015
Cochran Stream and Wetland Restoration Project 34 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran - Vegetation Monitoring Plot 5
December 7, 2015
Cochran - Vegetation Monitoring Plot 6
December 7, 2015
Cochran Stream and Wetland Restoration Project 35 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran - Vegetation Monitoring Plot 7
December 7, 2015
Cochran - Vegetation Monitoring Plot 8
December 7, 2015
Cochran Stream and Wetland Restoration Project 36 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Appendix D
Stream Geomorphology Data
This Page Intentionally Left Blank
Reach less than 500 feet and restricted to visual assessment; no cross-sections located in this reach
- Information unavailable.
Non -Applicable.
Cochran Stream and Wetland Restoration Project 39 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 10. Baseline Stream Data Summary
Cochran Stream and Wetland Restoration Project - Cochran Branch la 379 feet
Parameter
Regional Curve
Pre -Existing Condition
Reference Reach Data
Design
As -Built / Baseline'
Dimension&Substrate -Riffle
LL UL Eq.
Min Mean Med Max SD
N Min Mean Med Max SD N
Min Mean Max Min Mean
Med Max
SD
N
Bankfull Width (ft)
- 18.9
9.0
10.01 10.0 11.0 1.4
2 23.4 24.7 24.7
14.7
Floodprone Width (ft)
12.0
18.5 18.5 25.0 9.2
2 43.0 48.0 52.0
-
Bankfull Mean Depth (ft)
- 1.3
0.9
1.0 1.0 1.1 0.1
2 1.3 1.4 1.5
0.9
BankfullMax Depth (ft)
1.2
1.3 1.3 1.5 0.2
2 1.8 1.8 2.2
1.13
Bankfull Cross Sectional Area (ft)
21.5
9.6
9.8 9.8 10.0 0.3
2 33.4 33.4 34.6
12.7
Width/DepthRatio
8.4
10.3 10.3 12.1 2.6
2 15.8 18.3 - 18.4 - -
- 17.0 -
-
-
- -
-
-
Entrenchment Ratio
1.3
1.8 1.8 2.3 0.7
2 1.7 1.9 - 2.1 - -
- 5.4 -
-
-
- -
-
-
Bank Height Ratio
0.9
1.5 1.5 2.0 0.8
2 1.0 1.2 - 1.3 - -
- - -
-
-
- -
-
-
d50 (mm)
-
- - - -
- - - - - - -
1
- - -
Profile
Riffle Length (ft)
-
- - - -
- 20.0 29.0 - 40.0 - -
- - -
10.9
20.4
18.8 31.7
8.6
7
Riffle Slope (ft/ft)
-
- - - -
- 0.015 0.023 - 0.028 - -
0.009 0.017 0.025 0.007 0.017 0.021 0.025 0.007
7
Pool Length (ft)
6.0 18.0 42.0
- - -
5.3
10.7
8.7 21.6
5.5
7
Pool Max Depth (ft)
-
- - - -
- 2.3 2.3 - 2.3 - -
- - -
2.0
2.4
2.4 3.1
0.4
6
Pool Spacing (ft)
51.0 87.0 113.0 -
34.1 45.4 56.8
36.2
48.6
47.6 62.2
9.6
6
Pattern
Channel Belt Width (ft)
- 43.0 -
18.7 24.9 31.2
17.1
27
28.7 33.4
7.4
4
Radius of Curvature (ft)
44.0 75.0 103.0 -
25.0 31.0 37.0
24.0
37.6
43.9 1 44.8
11.8
3
Rc: Bankfull Width (ft)
-
- - - -
- - - - - - -
- - -
1.6
2.6
0.8
3
Meander Wavelength (ft)
-
- - - -
- - 100.0 - - - -
- - -
73.9
92.8
t2.O2.3
19.2
5
Meander Width Ratio
-
- - - -
- - 1.7 - - - -
- 1.5 -
1.2
1.8
0.5
4
Substrate, Bed and Transport Parameters
Ri% / Ru% / P% / G% / S%
-
-
42%/ 28%/ 22%/ 7%/ 0%
SC%/Sa%/G%/C%/B%/Be%
-/56%/-/-/-/-
1%/]0%/48%/41%/0%/1%
d16/d35/d50/d84/d95/dip /di'p(mm)
3/4/6/11/14/-/-
5.2/22/45/130/190/ -/-
Reach Shear Stress (Competency) Ib/ft2
-
1.947
0.47
-
Max Part Size (mm) Mobilized at Bankfull
-
91
45
-
Stream Power (Transport Capacity) W/m2
-
-
1.6
Additional Reach Parameters
Drainage Area (mi')
1.11
.2.77
Impervious Cover Estimate (%)
-
-
Rosgen Classification
G
B4
B4
B
Bankfull Velocity (fps)
4.5
3.5
Bankfull Discharge (cfs)
123.0
66.0
Valley Length (ft)
380
321
Channel Thalweg Length (ft)
400
337
379
Sinuosity
1.10
1.05
1.18
Water Surface Slope (ft/ft)
-
0.035
0.033
Bankfull Slope (ft/ft)
0.035
0.033
Bankfull Floodplain Area (acres)
-
-
-
Proportion Over Wide (%)
-
-
Entrenchment Class (ER Range)
-
-
Incision Class (BHR Range)
-
-
BEHI
20.6
Channel Stability or Habitat Metric
-
-
Biological or Other
-
-
Reach less than 500 feet and restricted to visual assessment; no cross-sections located in this reach
- Information unavailable.
Non -Applicable.
Cochran Stream and Wetland Restoration Project 39 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
- Information unavailable.
Non -Applicable.
Cochran Stream and Wetland Restoration Project 40 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 10 Cont'd. Baseline Stream Data Summary
Cochran Stream and Wetland Restoration Project - Cochran Branch lb (1,101 feet
Parameter
Regional Curve
F Pre -Existing Condition
Reference Reach Data
Design
As -Built/ Baseline
Dimension&Substrate -Riffle
LL UL Eq.
Min Mean Med Max SD
N
Min Mean Med Max SD
N Min Mean Max Min Mean Med Max
SD
N
Bankfull Width (ft)
18.9
7.0 7.9 7.5 9.5 1.2
4
12.0
14.4 - 16.5 -
- - 14.7 -
14.6
16.6
17.3 17.5
1.77
3
Floodprone Width (ft)
15.0 16.8 16.0 20.0 2.2
4
60.0
72.5 - 72.5 -
- - - -
135.0 168.5 173.5 197.0 31.3
3
Bankfull Mean Depth (ft)
- - 1.3
1.2 1.3 1.3 1.5 0.2
4
-
- - - -
- - 0.9 -
0.8
0.8
0.8 1.0
0.11
3
Bankfull Max Depth (ft)
1.5 1.7 1.7 1.8 0.2
4
19
2.3 3.3
1.13
1.0
1.2
1.1 1.5
0.24
3
Bankfull Cross Sectional Area (ft')
21.5
8.3 10.5 10.9 12.1 1.6
4
18.2
25.9 35.9
12.7
11.0
13.7
13.6 16.6
2.78
3
Width/DepthRatio
4.7 6.0 5.6 8.1 1.5
4
7.1 1
8.2 - 10.0 -
- - 17.0 -
18.1
20.3 1
19.2 23.4
2.8
3
Entrenchment Ratio
1.7 2.2 2.2 1 2.5 0.3
4
4.3
4.9 - 5.5 -
- - 11.5 -
9.3
10.1
10.0 11.0
0.85
3
Bank Height Ratio
1.5 1.9 2.0 2.2 0.3
4741.1
- 1.6 -
- - - -
1.0
1.0
1.0 1.0
0
3
d50 (mm)
- - - - -
-
- - -
- - -
Profile
Riffle Length (ft)
- - - - -
-
62.6
82.0 - 101.4 -
- - - -
12.4
29.5
33.6 47.0
11.6
17
Riffle Slope (ft/11)
0.006 0.006 0.007 -
0.006 0.008 0.009 0.001 0.006 0.004
17
Pool Length (ft)
- - - - -
-
13.4
45.1 - 80.3 -
- - - -
16.2
24.1
t006080107
4.6
17
Pool Max Depth (ft)
- - - - -
-
0.4
0.5 - 0.6 -
- - - -
2.3
3.1
0.5
17
Pool Spwing(ft)
- - - - -
-
67.9
84.9 - 101.9 -
- 62.3 74.8 87.3
38.0
60.2
15.6
17
Pattern
Channel Belt Width (ft)
- - - - -
-
-
- - - -
- 24.9 49.9 62.3
17.2
33.9
29.0 64.0
13.9
11
Radius of Curvature (ft)
- - - - -
-
-
- - - -
- 19.0 25.0 31.0
22.5
29.1
27.4 36.6
5.2
7
Rc: Bankfull Width (ft)
- - -
1.4
1.8
1.7 2.2
0.3
7
Meander Wavelength (ft)
-
38.1
130.8 136.9 249.7 58.2
12
Meander Width Ratio
- - - - -
-
-
- - - -
- - 3.2 -
1.0
2.0
1.7 3.9
0.8
11
Substrate, Bed and Transport Parameters
Ri%/Ru%/P%/G%/S%
-
-
50% /3%/39%/8%/0%
SC%/Sa%/G%/C%/13 /Be%
30%/-/-/-(-
9%/-/-/-/-/-
d16/d35/d50/d84/d95/dip /di5p(mm)
4/8/11/22/29/-/-
7/26/54/68/70/ -/-
Reach Shear Stress (Competency) Ib/ftz
-
-
0.42
-
MaxPart Size (mm) Mobilized at Bankfull
-
-
45
-
Stream Power (Transport Capacity) W/mz
-
-
13
Additional Reach Parameters
Drainage Area (min)
1.20
0.72
hnpervious Cover Estimate (%)
-
-
Rosgen Classification
G
E4
C4
C
Bankfull Velocity (fps)
-
Bankfull Discharge (efs)
66.0
Valley Length (ft)
-
989
Channel Thalweg Length (ft)
416.7
1,088
1,101
Sinuosity
-
-
1.1
1.12
Water Surface Slope (ft/ft)
-
-
0.0085
0.0076
Bankfull Slope (ft/ft)
-
-
-
0.0068
Bankfull Floodplain Area (acres)
-
-
-
Proportion Over Wide (%)
-
-
Entrenchment Class (ER Range)
-
-
Incision Class (BHR Range)
-
-
BEHI
25.7
Channel Stability or Habitat Metric
-
-
Biological or Other
-
-
- Information unavailable.
Non -Applicable.
Cochran Stream and Wetland Restoration Project 40 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
- Information unavailable.
Non -Applicable.
Cochran Stream and Wetland Restoration Project 41 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 10 Cont'd. Baseline Stream Data Summary
Cochran Stream and Wetland Restoration Prolect - Parrish Branch 402 feet
Parameter
Regional Curve
Pre -Existing Condition
Reference Reach Data
Design
As -Built/ Baseline
Dimension & Substrate -Riffle
LL UL Eq.
Min Mean Med Max
SD
N
Min Mean Med Max SD N
Min Mean Max Min Mean Med Max
SD
N
BmkfuE Width (ft)
- - 7.4
3.5
4.1 4.1 4.7
0.8
2
23.4
24.7 - 24.7 - -
- 5.4 -
4.4
5.2
5.2 5.9
1.06
2
Floodprone Width (ft)
8.0
8.0 8.0 8.0
0.0
2
43.0
48 - 52.0 - -
- - -
14.2
19.1
19.1 24.0
6.93
2
Bankfull Mean Depth (ft)
0.6
0.4
0.5 0.5 0.5
0.1
2
1.3
1.35 1.5
0.4
0.4
0.4
0.4 0.4
0.03
2
Bankfull M ax Depth (ft)
0.6
0.7 0.7 0.8
0.1
2
1.8
1.8 2.2
0.57
0.6
0.6
0.6 0.6
0.01
2
Bankfull Cross Sectional Area (ft)
4.0
1.4
1.9 1.9 2.3
0.6
2
33.4
33.4 - 34.6 - -
- 2.2 -
1.8
2.0
2.0 2.1
0.23
2
Width/Depth Ratio
8.5
1 9.0 9.0 1 9.5 1
0.7
2
15.8
18.3 - 18.4 - -
- 13.4 -
10.9
13.8
13.8 16.6
3.99
2
Entrenchment Ratio
1.6
2.0 2.0 2.3
0.5
2
1.7
1.9 2.1
5.6
3.2
3.6
3.6 4.0
0.57
2
Bank Height Ratio
2.3
6.2 6.2 10.0
5.4
2
1.0
1.2 - 1.3 - -
- - -
1.0
1.0
1.0 1.0
0
2
d50 (mm)
-
- - -
-
-
-
- - - - -
- - -
Profile
Riffle Length (ft)
-
- - -
-
-
20.0
29.0 - 40.0 - -
- - -
6.1
10.0
9.8 15.5
2.3
22
Riffle Slope (ft/ft)
-
- - -
-
-
0.015 0.023 - 0.028 - -
0.017 0.026 0.035
0.001
0.025
0.023 0.047
0.013
22
Pool Length (ft)
-
- - -
-
-
6.0
18.0 - 42.0 - -
- - -
1.7
5.0
4.5 10.2
2.0
22
Pool MaxDepth(ft)
-
- - -
-
-
2.3
2.3 - 2.3 - -
- - -
1.1
1.5
1.5 1.9
0.2
22
Pool Spacing (ft)
-
- - -
-
-
51.0
87.0 - 113.0 - -
12.4 16.5 1 20.7
13.5
17.2
15.5 25.2
3.4
21
Pattern
Channel Belt Width (ft)
-
43.0 -
6.4 8.5 10.6
6.9
9.9
9.8 12.6
1.4
14
Radius of Curvature (ft)
-
- - -
-
-
44.0
75.0 - 103.0 - -
9.0 11.0 13.0
5.8
9.5
8.9 15.3
3.2
8
Re: Bankfull Width (ft)
-
- - -
-
-
-
- - - - -
- - -
1.1
1.8
1.7 2.9
0.6
8
Meander Wavelength (ft)
-
- - -
-
-
-
100.0 - - - -
- - -
29.1
32.1
31.4 39.7
2.7
15
M eander Width Ratio
-
- - -
-
-
-
1.7 - - - -
- 2.8 -
1.3
1.9
1.9 2.4
0.3
14
Substrate, Bed and Transport Parameters
Ri % / Ru% / P% / G% / S%
-
-
59%/0%/29%/ 5%17%
SC%/Sa%/G%/C%/B%/Be%
-
1%/ 10%/48% /41%/0% / 1%
1116/d35/d50/d84/1195/di°/di- (mm)
-
5.2/22/45/130/190/ -/-
Reach Shear Stress (Competency) lb/ft'
1.947
0.47
MaxPart Size (mm) Mobilized at Bankfull
-
91
45
-
Stream Power (Transport Capacity) W/mz
-
-
-
Additional Reach Parameters
Drainage Area (mit)
0.10
2.77
Impervious Cover Estimate (%)
-
-
Rosgm Classification
G
B4
B4
B
Bankfull Velocity (fps)
-
-
4.5
-
Bankfull Discharge (cfs)
-
-
123.0
9.0
Valley Length (ft)
380.0
375
Channel Thalweg Length (ft)
-
400.0
394
402
Sinuosity
-
1.1
1.05
1.07
Water Surface Slope (ft/ft)
-
0.033
0.025
Bankfull Slope (ft/ft)
-
0.029
Bankfull Floodplain Area (acres)
-
-
-
Proportion Over Wide (%)
-
-
Entrenchment Class (ER Range)
-
-
Incision Class (BHR Range)
-
-
BEHI
26.6
Channel Stability or Habitat Metric
-
-
Biological or Other
-
-
- Information unavailable.
Non -Applicable.
Cochran Stream and Wetland Restoration Project 41 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
This Page Intentionally Left Blank
Cochran Stream and Wetland Restoration Project 42 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
a no
O a �
0. CD
CD nM
0 o ca
CDJ
O �
C
0
w
b
O
CD
n
d
d
7y
7y
b7
coo
oa
ttl
o
y
rn
o
x
o
o
p�
m
o
Gyp
`ICY
w
X
'rZ
coo
w
m
iC
CCD
o
o
o
n
a
s
21
v
Oo
-.--1
R
a
R
O
a
VI
U1
A
N
(�
00
f9
A
�. rl
R A
�
R
y a
� o
_
v
v
v
�,
J
J
w
[J
O
O
C7
o
T
N
RO
Z
�-'
V
�
cn
N
O
�
J
oNo
•-
oVo
p
.-
O
w
cn
`�
rQr.•,
N
�
yy
yy
A
fi+
W
A
CS' O
A
.T ii,
A QQ
cn
vi
ry
�
V
N
R
�
7
m n
C n
.7
V
N
rn
w
4,
"^G7
R
N
A �
n7 A
W
O
b
�
O_
a
IIIIII
011111
1
011111
111
1
611111111
1111111111
1
011111111
1111111111
1
011111
1
011111
1
111111
1
011111
11
1
611111111
1111111111
1
011111
11
1
011111111
1111111111
1
611111111
1111111111
1
01111111
1
111111
1
011111111
HIM
IIIII
I
01111110
HE
IIIII
I
011111
11
1
611111111
1111111111
1
01111111
111111
11
1
1
011111111
1111111111
1
111111
1
611111111
HIM
IIIII
I
01111111
11
1
111111
1
011001111
1111111111
1
0111010
ME
milli
I
011111
1
011111111
1111111111
011111
0
Table 12. Cochran Stream and Wetland Restoration Project
Bank Pin Arrays
Length of Exposed Pin (mm)
Cross Section
Downstream
Middle
Upstream
Rate
Rate
Number
mm/
IA/Yr
1
0B
OB
OB
0
0.00
4
0B
OB
OB
0
0.00
8
OB
OB
OB
0
0.00
0B= Buried Bank Pin
Cochran Stream and Wetland Restoration Project 45 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Project Name: Cochran XS Number: 1 Station: 104+73
Reach Name: Cochran lb XS Type: Pool
Left Descending Bank
Right Descending Bank
Cochran Stream and Wetland Restoration Project 46 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
2160
2159
2158
y 2157
2156
0 2155
2154
b 2153
2152
2151
2150
0+00
0+05 0+10 0+15
0+20
MYO
0+25 0+30 0+35 0+40 0+45 0+50 0+5w
Station (feet)
MYI ----- BKF
CHANNEL DIMENS IONS SUMMARY
MYO
MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankful Width (ft)
16.7
16.8
Floodprone Width (ft)
217.0
217.0
Bankfull Mean Depth (ft)
1.6
1.1
Bankfull Max Depth (ft)
3.1
2.6
Bankfull Cross -Sectional Area (ft )
27.5
19.2
Width/Depth Ratio
10.2
14.7
Entrenchment Ratio
13.0
12.9
Bank Height Ratio
1.0
1.0
Left Descending Bank
Right Descending Bank
Cochran Stream and Wetland Restoration Project 46 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Project Name: Cochran XS Number: 2
Reach Name: Cochran lb XS Type: Riffle
Station: 105+08
Left Descending Bank
Cochran Stream and Wetland Restoration Project 47
NCDMS Project No. 95720
Monitoring Year 1 of 7
Right Descending Bank
Equinox
Annual Monitoring Report
2161
2160
2159
y 2158
2157
0 2156 ------------------------------
-----------
-------- ------------------------------- --------
2155
b 2154
2153
2152
2151
0+00
0+05 0+10 0+15
0+20
MYO
0+25 0+30 0+35 0+40 0+45 0+50 0, r
Station (feet)
MYI ----- BKF
CHANNEL DIMENSIONS SUMMARY
MYO
MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankful Width (ft)
17.3
17.1
Floodprone Width (ft)
173.5
173.5
Bankfull Mean Depth (ft)
1.0
0.9
BankfiillMax Depth (ft)
1.5
1.4
Bankfull Cross -Sectional Area (ft )
16.6
15.2
Width/Depth Ratio
18.1
19.2
Entrenchment Ratio
10.0
10.2
Bank Height Ratio
1.0
1.0
Left Descending Bank
Cochran Stream and Wetland Restoration Project 47
NCDMS Project No. 95720
Monitoring Year 1 of 7
Right Descending Bank
Equinox
Annual Monitoring Report
Project Name: Cochran XS Number: 3
Reach Name: Cochran lb XS Type: Riffle
Station: 110+60
Left Descending Bank
Cochran Stream and Wetland Restoration Project 48
NCDMS Project No. 95720
Monitoring Year 1 of 7
Right Descending Bank
Equinox
Annual Monitoring Report
2157
2156
2155
y 2154
2153
------
-----------------
-
---- - ------------- --------------------- --- -----------
0 2152
2151
b 2150
2149
2148
2147
0+00
0+05 0+10 0+15
0+20
0+25 0+30 0+35 0+40 0+45 0+50 0+55 0+60
Station (feet)
MYO MYI ----- BKF
CHANNEL DIMENSIONS SUMMARY
MYO
MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankful Width (ft)
14.6
15.4
Floodprone Width (ft)
135.0
135.0
Bankfull Mean Depth (ft)
0.8
0.7
BankftillMax Depth (ft)
1.0
1.1
Bankfull Cross -Sectional Area (ft )
11.0
11.3
Width/Depth Ratio
19.2
20.8
Entrenchment Ratio
9.3
8.8
Bank Height Ratio
1.0
1.0 -
Left Descending Bank
Cochran Stream and Wetland Restoration Project 48
NCDMS Project No. 95720
Monitoring Year 1 of 7
Right Descending Bank
Equinox
Annual Monitoring Report
Project Name: Cochran XS Number: 4
Reach Name: Cochran lb XS Type: Pool
Station: 110+90
Left Descending Bank
Cochran Stream and Wetland Restoration Project 49
NCDMS Project No. 95720
Monitoring Year 1 of 7
Right Descending Bank
Equinox
Annual Monitoring Report
2157
2156
2155
y 2154
2153
0 2152
2151
b 2150
2149
2148
2147
0+00
0+05 0+10 0+15
0+20
0+25 0+30 0+35 0+40 0+45 0+50 0+55 0+60
Station (feet)
MYO MYI ----- BKF
CHANNEL DIMEVSIONS SUMMARY
MYO
MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankful Width (ft)
16.2
17.4
Floodprone Width (ft)
217.5
217.5
Bankfull Mean Depth (ft)
1.9
1.8
Bankfull Max Depth (ft)
3.5
4.3
Bankfull Cross -Sectional Area (ft )
31.0
31.3
Width/Depth Ratio
8.5
9.7
Entrenchment Ratio
13.4
12.5
Bank Height Ratio
1.0
1.0
Left Descending Bank
Cochran Stream and Wetland Restoration Project 49
NCDMS Project No. 95720
Monitoring Year 1 of 7
Right Descending Bank
Equinox
Annual Monitoring Report
Project Name: Cochran XS Number: 5
Reach Name: Cochran lb XS Type: Pool
Station: 113+08
Left Descending Bank
Cochran Stream and Wetland Restoration Project 50
NCDMS Project No. 95720
Monitoring Year 1 of 7
Right Descending Bank
Equinox
Annual Monitoring Report
2155
2154
2153
y 2152
2151
0 2150 --------
2149
-------
---- - -------
- ---------------------------------------
b 2148
2147
2146
2145
0+00
0+05 0+10 0+15
0+20
MYO
0+25 0+30 0+35 0+40 0+45 0+50 0+55
Station (feet)
MYI ----- BKF
CHANNEL DIMENSIONS SUMMARY
MYO
MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankful Width (ft)
17.0
17.3
Floodprone Width (ft)
236.5
236.5
Bankfull Mean Depth (ft)
1.5
1.5
Bankfull Max Depth (ft)
3.3
3.4
Bankfull Cross -Sectional Area (ft )
25.4
26.4
Width/Depth Ratio
11.4
11.4
Entrenchment Ratio
13.9
13.7
Bank Height Ratio
1.0
1.0 -
Left Descending Bank
Cochran Stream and Wetland Restoration Project 50
NCDMS Project No. 95720
Monitoring Year 1 of 7
Right Descending Bank
Equinox
Annual Monitoring Report
Project Name: Cochran XS Number: 6
Reach Name: Cochran lb XS Type: Riffle
Station: 113+44
Left Descending Bank
Cochran Stream and Wetland Restoration Project 51
NCDMS Project No. 95720
Monitoring Year 1 of 7
Right Descending Bank
Equinox
Annual Monitoring Report
2155
2154
2153
y 2152
2151
0 2150
______
_-------
-------- --- --------------------- ------ --------2149
b 2148
2147
2146
2145
0+00
0+05 0+10 0+15
0+20
MYO
0+25 0+30 0+35 0+40 0+45 0+50 0, r
Station (feet)
_ MYI ----- BKF
CHANNEL DIMENSIONS SUMMARY
MYO
MY1 MY2 MY3 MY4 MY5 MY6 MY7
Bankful Width (ft)
17.8
17.9
Floodprone Width (ft)
197.0
197.0
Bankfull Mean Depth (ft)
0.8
0.8
BankfiillMax Depth (ft)
1.1
1.2
Bankfull Cross -Sectional Area (ft )
13.6
13.6
Width/Depth Ratio
23.4
23.4
Entrenchment Ratio
11.0
11.()
Bank Height Ratio
1.0
1.0
Left Descending Bank
Cochran Stream and Wetland Restoration Project 51
NCDMS Project No. 95720
Monitoring Year 1 of 7
Right Descending Bank
Equinox
Annual Monitoring Report
Project Name: Cochran XS Number: 7 Station: 200+88
Reach Name: Parrish XS Tvve: Riffle
Left Descending Bank
Right Descending Bank
Cochran Stream and Wetland Restoration Project 52 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
2163
2162
v
2161
c
0
� 2160
b
2159
2158
0+00 0+05
0+10
MYO
0+15 0+20 0+25 0+30
Station (feet)
- MYl ----- BK
CHANNEL DEMENS IONS SUMMARY
MYO
MY1
MY2 MY3 MY4 MY5 MY6 MY7
Bankful Width (ft)
4.4
4.5
Floodprone Width (ft)
14.2
14.2
Bankfull Mean Depth (ft)
0.4
0.4
Bankfull Max Depth (ft)
0.6
0.7
Bankfull Cross -Sectional Area (ft)
1.8
2.0
Width/Depth Ratio
10.9
10.4
Entrenchment Ratio
3.2
3.1
Bank Height Ratio
1.0
1.0
-
Left Descending Bank
Right Descending Bank
Cochran Stream and Wetland Restoration Project 52 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Project Name: Cochran XS Number: 8 Station: 201+07
Reach Name: Parrish XS Tvve: Pool
Left Descending Bank
Right Descending Bank
Cochran Stream and Wetland Restoration Project 53 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
2162
2161
v
2160
c
0
---------------
-----------
-------------------
-------------------------------------
2159
b
2158
2157
0+00 0+05
0+10
MYO
0+15 0+20 0+25 0+30
Station (feet)
- MYl ----- BK
CHANNEL DEMENS IONS SUMMARY
MYO MYl
MY2 MY3 MY4 MY5 MY6 MY7
Bankful Width (ft)
6.8 7.2
Floodprone Width (ft)
93.7 93.7
Bankfull Mean Depth (ft)
0.8 0.8
Bankfull Max Depth (ft)
1.8 2.0
Bankfull Cross -Sectional Area (ft)
5.2 5.5
Width/Depth Ratio
9.0 9.6
Entrenchment Ratio
13.7 12.9
Bank Height Ratio
1.0 1.0
Left Descending Bank
Right Descending Bank
Cochran Stream and Wetland Restoration Project 53 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Project Name: Cochran XS Number: 9 Station: 202+86
Reach Name: Parrish XS Tvve: Riffle
Left Descending Bank
Right Descending Bank
Cochran Stream and Wetland Restoration Project 54 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
2157
2156
v
2155
0
------------
---------------
------------
-------------
--------
---
-------------
---------------------------------------
2154
b
2153
2152
0+00 0+05 0+10
0+15 0+20 0+25 0+30 0+35
Station (feet)
MYO - MYl ----- BK
CHANNEL DEMENS IONS SUMMARY
MYO
MYl MY2 MY3 MY4 MY5 MY6 MY7
Bankful Width (ft)
5.9
6.6
Floodprone Width (ft)
24.0
24.0
Bankfull Mean Depth (ft)
0.4
0.3
Bankfull Max Depth (ft)
0.6
0.6
Bankfull Cross -Sectional Area (ft)
2.1
2.0
WidthMepth Ratio
16.6
21.7
Entrenchment Ratio
4.0
3.7
Bank Height Ratio
1.0
1.0
Left Descending Bank
Right Descending Bank
Cochran Stream and Wetland Restoration Project 54 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran
Cross Section 2 - Rifle
Monitorin Year - 2015; MY1
Bed Surface Material
Particle Size Class (mm)
Number
%
Individual
%
Cumulative
0-0.062
4
3.7%
4%
0.062 - 0.125
18
16.8%
21%
0.125-0.25
11
10.3%
31%
0.25-0.5
5
4.7%
36%
0.5-1.0
9
8.4%
44%
1-2
14
13.1%
57%
2-4
1
0.9%
58%
4 - 8
11
10.3%
68%
8-16
5
4.7%
73%
16-32
15
14.0%
87%
32-64
10
9.3%
96%
64-128
2
1.9%
98%
128-256
2
1.9%
100%
256-512
0
0.0%
100%
512-1024
0
0.0%
100%
1024-2048
0
0.0%
100%
2048-4096
0
0.0%
100%
Bedrock
0
0.0%
100%
Total
107
100%
100%
Summary Data
D50
1.4
D84
26
D95
57
Cochran Stream and Wetland Restoration Project 55
NCDMS Project No. 95720
Monitoring Year 1 of 7
Equinox
Annual Monitoring Report
100%
Cochran Stream and Wetland Restoration Project
Pebble Count Percent Cumulative
Cross Section 2 - Riffle
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
pyti
py
0o
1ti5 tih Oh ,y0 'L d W yO .S'L pb ,yW
yyy' p�, p. 1 3 p
p.
tMY1 Cumulative %
hO
titi
y'L
tis goy
tia
1p
ytiti
4
'L�
pyA
ti
�(�
Pp
pa9i
ti
ato
�e
100%
Cochran Stream and Wetland Restoration Project
Pebble Count Percent Individual
Cross Section 2 - Riffle
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
6'L
04
p0(O
,y5 tih h O ti d 4 ye ,�'L pb ,ti'b
oti o 5 °' S ti ti ti a'
Oti
■ MY1 % by Size Group
h�
yti
.l,A
p
1
0�O
'L
Cochran Stream and Wetland Restoration Project 56 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran
Cross Section 3 - Riffle
Monitorin Year - 2015; MY1
Bed Surface Material
Particle Size Class (mm)
Number
%
Individual
%
Cumulative
0-0.062
19
16.7%
17%
0.062 - 0.125
0
0.0%
17%
0.125-0.25
1
0.9%
18%
0.25-0.5
1
0.9%
18%
0.5 - 1.0
1
0.9%
19%
1 - 2
8
7.0%
26%
2-4
0
0.0%
26%
4 - 8
0
0.0%
26%
8-16
15
13.2%
39%
16-32
16
14.0%
54%
32-64
30
26.3%
80%
64-128
20
17.5%
97%
128-256
3
2.6%
100%
256-512
0
0.0%
100%
512-1024
0
0.0%
100%
1024-2048
0
0.0%
100%
2048-4096
0
0.0%
100%
Bedrock
0
0.0%
100%
Total
114
100%
1 100%
Summary Data
D50
28
D84
71
D95
110
Cochran Stream and Wetland Restoration Project 57
NCDMS Project No. 95720
Monitoring Year 1 of 7
Equinox
Annual Monitoring Report
100%
Cochran Stream and Wetland Restoration Project
Pebble Count Percent Cumulative
Cross Section 3 - Riffle
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
pyti
py
0o
1ti5 It, Oy ,y0
yyy' p�, p.
p
'L d W yO .S'L pb ,yW hO
1 3 p titi
tMY1 Cumulative %
y'L
tis
tia
ytiti
4
pyA
ti
to
Pp
IZP
ti
ato
�e
100%
Cochran Stream and Wetland Restoration Project
Pebble Count Percent Individual
Cross Section 3 - Riffle
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
�'L
04
p0(O
,y5 tih h O
oti o• 5 °' S ti•
Oti
ti d 4
ti ti a' � �, ti ti ��'
■ MY1 % by Size Group
�`'
ti°
do
1
a°
'L
a�°
Cochran Stream and Wetland Restoration Project 58 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran
Cross Section 6 - Riffle
Monitorin Year - 2015; MY1
Bed Surface Material
Particle Size Class (mm)
Number
%
Individual
%
Cumulative
0-0.062
0
0.0%
0%
0.062 - 0.125
11
10.0%
10%
0.125-0.25
11
10.0%
20%
0.25-0.5
4
3.6%
24%
0.5 - 1.0
9
8.2%
32%
1 - 2
7
6.4%
38%
2-4
3
2.7%
41%
4 - 8
5
4.5%
45%
8-16
14
12.7%
58%
16-32
22
20.0%
78%
32-64
13
11.8%
90%
64-128
7
6.4%
96%
128-256
4
3.6%
100%
256-512
0
0.0%
100%
512-1024
0
0.0%
100%
1024-2048
0
0.0%
100%
2048-4096
0
0.0%
100%
Bedrock
0
0.0%
100%
Total
110
100%
1 100%
Summary Data
D50
11
D84
42
D95
120
Cochran Stream and Wetland Restoration Project 59
NCDMS Project No. 95720
Monitoring Year 1 of 7
Equinox
Annual Monitoring Report
100%
Cochran Stream and Wetland Restoration Project
Pebble Count Percent Cumulative
Cross Section 6 - Riffle
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
pyti
py
0o
1ti5 It, Oy ,y0 'L d W yO .S'L pb ,yW
yyy' p�, p. 1 3 p
p
tMY1 Cumulative %
hO
titi
y'L
tis
tia
ytiti
4
pyA
ti
to
Pp
IZP
ti
ato
�e
100%
Cochran Stream and Wetland Restoration Project
Pebble Count Percent Individual
Cross Section 6 - Riffle
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
�'L
04
p0(O
,y5 tih h O ti d
oti o 5 °' S ti ti ti a'
Oti
■ MY1 % by Size Group
1
'L
Cochran Stream and Wetland Restoration Project 60 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran
Cross Section 7 - Riffle
Monitorin Year - 2015; MY1
Bed Surface Material
Particle Size Class (mm)
Number
%
Individual
%
Cumulative
0-0.062
4
3.8%
4%
0.062 - 0.125
21
20.2%
24%
0.125-0.25
5
4.8%
29%
0.25-0.5
6
5.8%
35%
0.5 - 1.0
3
2.9%
38%
1 - 2
8
7.7%
45%
2-4
4
3.8%
49%
4-8
12
11.5%
61%
8-16
18
17.3%
78%
16-32
12
11.5%
89%
32-64
9
8.7%
98%
64-128
2
1.9%
100%
128-256
0
0.0%
100%
256-512
0
0.0%
100%
512-1024
0
0.0%
100%
1024-2048
0
0.0%
100%
2048-4096
0
0.0%
100%
Bedrock
0
0.0%
100%
Total
104
100%
1 100%
Summary Data
D50
4.3
D84
24
D95
41
Cochran Stream and Wetland Restoration Project 61
NCDMS Project No. 95720
Monitoring Year 1 of 7
Equinox
Annual Monitoring Report
100%
Cochran Stream and Wetland Restoration Project
Pebble Count Percent Cumulative
Cross Section 7 - Riffle
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
pyti
py
0o
1ti5 tih Oh ,y0
yyy' p�, p.
p.
'L d W yO .S'L pb ,yW
1 3 p
tMY1 Cumulative %
hO
titi
y'L
tis goy
tia
1p
ytiti
4
'L�
pyA
ti
�(�
Pp
pa9i
ti
ato
�e
100%
Cochran Stream and Wetland Restoration Project
Pebble Count Percent Individual
Cross Section 7 - Riffle
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
6'L
04
p0(O
,yh by h O
oti o• 5 °' S ti•
Oti
ti b 4 .yO ,�'L pb ,ti'b
ti ti a'
■ MY1 % by Size Group
h�
yti
.tih �`'
.l,A
y1�%
Q0
do
pyG
1
Np
pb�
'L
0e
Cochran Stream and Wetland Restoration Project 62 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Cochran
Cross Section 9 - Riffle
Monitorin Year - 2015; MY1
Bed Surface Material
Particle Size Class (mm)
Number
%
Individual
%
Cumulative
0-0.062
13
12.1%
12%
0.062 - 0.125
20
18.7%
31%
0.125-0.25
3
2.8%
34%
0.25-0.5
0
0.0%
34%
0.5 - 1.0
2
1.9%
36%
1-2
6
5.6%
41%
2-4
10
9.3%
50%
4 - 8
7
6.5%
57%
8-16
17
15.9%
73%
16-32
25
23.4%
96%
32-64
4
3.7%
100%
64-128
0
0.0%
100%
128-256
0
0.0%
100%
256-512
0
0.0%
100%
512-1024
0
0.0%
100%
1024-2048
0
0.0%
100%
2048-4096
0
0.0%
100%
Bedrock
0
0.0%
100%
Total
107
100%
1 100%
Summary Data
D50
3.9
D84
21
D95
30
Cochran Stream and Wetland Restoration Project 63
NCDMS Project No. 95720
Monitoring Year 1 of 7
Equinox
Annual Monitoring Report
100%
Cochran Stream and Wetland Restoration Project
Pebble Count Percent Cumulative
Cross Section 9 - Riffle
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
pyti
py
0o
1ti5 tih Oh ,y0
yyy' p�, p.
p.
'L d W yO .S'L pb ,yW
1 3 p
tMY1 Cumulative %
hO
titi
y'L
tis
tia
ytiti
4
pyA
ti
�(�
pa9i
ti
�e
100%
Cochran Stream and Wetland Restoration Project
Pebble Count Percent Individual
Cross Section 9 - Riffle
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
�'L
04
p0(O
,y5 tih h O
oti o 5 °' S ti
Oti
ti d 4 ye 'L pb 'b
ti ti a'
■ MY1 % by Size Group
h�
yti
.l,A
p
1
0�O
'L
Cochran Stream and Wetland Restoration Project 64 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Appendix E
Hydrologic Data
This Page Intentionally Left Blank
Table 13. Verification ofBankfull Events
Cochran Stream and Wetland Restoration Project
Date of Data Collection
Date of Occurrence
Method
Feet Above Bankfull
Elevation
Photo #
(if available)
Cochran Branch
12/29/2015 Unknown Crest Gauge 0.86
Parrish Branch
None Since Construction Completed
'Potential Date is 12/24/2015
Photo Verification of Bankfull Events
Photo #1- Cochran Branch Crest Gauge
Cochran Stream and Wetland Restoration Project 67 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Figure 3. Daily Precipitation Totals for the Cochran Stream and Wetland Restoration Site
3.5
3
2.5
2
1.5
1
0.5
0
1 -Jan -15 1 -Feb -15 1 -Mar -15 1 -Apr -15 1 -May -15 1 -Jun -15 1 -Ju I-15 1 -Aug -15 1 -Sep -15 1 -Oct -15 1 -Nov -15 1 -Dec -15
■ Daily Rainfall
re 4. Monthly Precipitation Data Compared to 301h and 70th Percentiles for Macon Count
14.0
12.0
10.0
y
Gf
t
V
8.0
C
O
r 6.0
.Q
O
L
a 4.0
2.0
0.0
Jan -15 Feb -15 Mar -15 Apr -15 May -15 Jun -15 Jul -15 Aug -15 Sep -15 Oct -15 Nov -15 Dec -15
Monthly Rainfall - - - • 30th Percentile — — 70th Percentile Average
Cochran Stream and Wetland Restoration Project 68 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Table 14. Wetland Gauge Attainment Data
Summary of Groundwater Monitoring Results
Cochran Stream & Wetland Restoration Site
Success Criteria Achieved/ Max Consecutive Days During Growing Season
Percent
Gauge ID
Year 11
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
2015
(2016)
(2017)
(2018)
(2019)
(2020)
(2021)
Yes/ 18
GW -1
13.6%
Yes/ 132
GW -2
100%
Yes/ 132
GW -3
100%
Yes/ 132
GW -4
100%
Yes/ 132
GW -5
100%
Yes/ 132
GW -6
100%
Yes/ 132
GW -7
100%
Yes/ 132
GW -8
100%
Hydrology Success Criteria = 8%; Crowing season = 187 days
'Max consecutive days daring growing season limited to 132 days due to shortened growing season. Percent based on full 187 day growing season
Cochran Stream and Wetland Restoration Project 69 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
C
C
Gauge ID: 1
Total Number of Consecutive; Days Water Table within 12 inches of Soil Surface: 18
Percentage of Growing Season Water Table within 12 inches of Soil Surface: 13.6%
5.0
End
25.0
Beginning
Grow ing Season
of
� Grow
of
ing Season
20.0
4.5
Beginning
of
End of
Grow ing Season
Grow
ing Season
15.0
4.0
10.0
Ground
Surface
5.0
3.5
__..
0.0
0.0
3.0
Required
WWW\3.0
Required
-5.0
5.0
Depth
\,4
1�
/ Depth
-10.0
2.5
-10.0
2.5
-15.0
2.0
-15.0
2.0
-20.0
-20.0
-25.0
1.5
-25.0
1.5
-30.0
1.0
-30.0
1.0
-35.0
-35.0
40.0
0.5
-40.0
0.5
-45.0
0.0
In
N N
M
V7 N
V) V7
-45.0
0.0
{(�
In N
V7
N O
V7 V7
V7 V7
N V7
V7 N
V7 N
1n
V7
V7
N
V7
N
N V7 N
-50.0
N V7
O
N
O O
N N
N Of
O
N
f�
O O
N N
--
O O
N N
- O
O O
N N
M n
O O
N N
O O
N N
N
O O
N N
rD O
O
N
M
O
N
h
O
N
O
O
N
�
O
N
a0
O
N
N
O O O
N N N
1!Y Of M
O O
N N
n
M
M r
N
a0 N fD
N
N
N
N
N
MN
N
47 T M
r
N
!-1!
N
00
Gauge ID: 2
Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132
Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100%
5.0
25.0
20.0
4.5
Beginning
of
End of
Grow ing Season
Grow
ing Season
15.0
4.0
10.0
Ground Surface
5.0
3.5
__..
0.0
WWW\3.0
Required
-5.0
1�
/ Depth
-10.0
2.5
-15.0
2.0
-20.0
-25.0
1.5
-30.0
1.0
-35.0
40.0
0.5
-45.0
0.0
In
N N
M
V7 N
V) V7
K1 N
V7 O
N N rr1
N
N
HI
N
V7
N
N
O V7 N
N
-50.0
V7
O
N
O O
N N
O
N
O O
N N
O O
N N
O O
N N
O O
N N
�
O O O
N N N
O
N
O
N
O
N
O
N
O
N
O
N
O
N
O O O
N N N
O O
N N
N Of
f�
t0 N
tD O
M r
�
a0 N fD
O
M
r
O
V
a0
N
47 T M
r
C
C
Cochran Stream and Wetland Restoration Project 70 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
C
C
Gauge ID: 3
Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132
Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100%
5.0
25.0
Beginning
Grow ing
of
Season
Grow
End of
ing Season
20.0
4.5
Grow ing
Season
;Grow
of
ing Season
�'
/
15.0
4.0
r
10.0
Ground
Surface
5.0
3.5
'
- -
0.0
3.0
Required
Depth
-5.0
-10.0
2.5
-15.0
2.0
20.0
-25.0
1.5
-30.0
1.0
-35.0
-40.0
0.5
-45.0
0.0
{()
In N
V7
V) O
V7 V7
V7 V7
V) V7
V7 N
V7 N
1n
V7
V7
V)
N
N
N V7 N
-50.0
LL) V7
O
N
O O
N N
N M
O
N
N
O O
N N
f0 N
O O
N N
t0 0
O O
N N
M n
O O
N N
v
O O
N N
c0 N
O O
N N
t0 O
O
N
M
O
N
h
O
N
O
O
N
O
N
ao
O
N
N
O O O
N N N
M M M
�
O O
N N
n
M
O O
N N
N
N M
NN
a
N M
N
�
M
O
N
r
N
V
N
� N
47 M M
r
N
N M
M
7
N
(0
h r
W
M
M
a-
-
O
- -
N N
Gauge ID: 4
Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132
Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100%
5.0
25.0
Beginning
of
End
20.0
4.5
Grow ing
Season
;Grow
of
ing Season
�'
/
15.0
4.0
r
10.0
Ground
Surface
5.0
3.5
'
0.0
3.0
Required
Depth
-5.0
-10.0
2.5
-15.0
2.0
-20.0
-25.0
1.5
-30.0
1.0
-35.0
-40.0
0.5
-45.0
0.0
In
N N
1(1
V) N
V) V7
K1 N
V7 O
N N �
N
e7
HI
N
V7
N
N
O N N
N
-50.0
N
O
N
O O
N N
O
N
O O
N N
O O
N N
O O
N N
O O
N N
�
O O O
N N N
O
N
O
N
O
N
O
N
O
N
O
N
O
N
O O O
N N N
O O
N N
N M
N
t0 N
t0 O
M r
�
a0 N M
O
M
r
O
V
ao
N
47 M M
r
C
C
Gf
R
C
7
O
0
Q
Q
0
Cochran Stream and Wetland Restoration Project 71 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
C
C
Gauge ID: 5
Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132
Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100%
5.0
25.0
Beginning
of
Grow
End of
20.0
4.5
Grow ing
Season
Grow
ing Season
-/
15.0
4.0
10.0
Ground
Surface
5.0
3.5
`
1►s
1�i�llr
0.0
0.0
3.0
Required
Depth
Required
Depth
-5.0
-5.0
-10.0
-10.0
2.5
-15.0
-15.0
2.0
-20.0
20.0
-25.0
25.0
1.5
-30.0
-30.0
1.0
-35.0
-35.0
-40.0
-40.0
0.5
]1-50.0
-45.0
-45.0
0.0
{()
In V7
V7
V7 O
V7 V7
V7 V7
V7 V7
V7 V7
V7 N
1n
V7
V7
V7
N
N
N V7 N
u7 V7
O
N
O O
N N
N M
O
N
N
O O
N N
f0 N
O O
N N
t0 0
O O
N N
M n
O O
N N
v
O O
N N
c0 N
O O
N N
t0 O
O
N
M
O
N
h
O
N
O
O
N
O
N
ao
O
N
N
O O O
N N N
M M M
�
O O
N N
n
M
N
N
NN
a
N M
N
�
M
M
N
O
N
G
N
� N
r
N
N M
M
7
N
(0
h r
W
M
M
a-
-
O
- -
N N
Gauge ID: 6
Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132
Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100%
5.0
25.0
Beginning
of
Grow
End of
ing Season
20.0
4.5
Grow ing Season
-/
15.0
4.0
10.0
Ground
Surface
5.0
3.5
`
1►s
1�i�llr
0.0
3.0
Required
Depth
-5.0
-10.0
2.5
-15.0
2.0
-20.0
-25.0
1.5
-30.0
1.0
-35.0
-40.0
0.5
-45.0
0.0
In
N V7
1r1
V7 N
V) V7
Kl N
V7 O
N N �
N
u7
HI
N
V7
N
N
O N N
LL7
50.0
N
O
N
O O
N N
O
N
O O
N N
O O
N N
O O
N N
O O
N N
�
O O O
N N N
O
N
O
N
O
N
O
N
O
N
O
N
O
N
O O O
N N N
O O
N N
N M
N
t0 N
t0 O
M r
�
a0 N M
O
M
r
O
V
ao
N
47 M M
r
C
C
r
R
C
7
O
a
0
Q
Q
0
Cochran Stream and Wetland Restoration Project 72 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
C
C
Gauge ID: 7
Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132
Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100%
5.0
End of
25.0
Beginning
of
Grow
ing Season
20.0
4.5
Grow ing Season
/
�'
.(/
15.0
4.0
10.0
Ground
Ground
Surface
5.0
3.5
1
r __ ww
0.0
3.0
3.0
Required
Depth
Required
Depth
-5.0
-5.0
-10.0
2.5
2.5
-15.0
2.0
2.0
-20.0
-20.0
-25.0
1.5
1.5
-30.0
1.0
1.0
-35.0
-35.0
-40.0
0.5
0.5
11
-45.0
0.0+
1()
i i
In N
+ i
V7
+ i i
N O
i i i i
N {9
i i I 1
2 l9
N 1r1
lhhILL"Ll-
N N
N N
19
l9
N
N
N
N
N N 12
-50.0
N I9
O
N
O O
N N
N 0
O
N
N
O O
N N
10 N
O O
N N
t0 0
O O
N N
M n
O O
N N
- v
O O
N N
c0 N
O O
N N
10 O
O
N
M
O
N
h
O
N
O
O
N
4
O
N
ro
O
N
N
O O O
N N N
M 0 M
O O
N N
n
M
O O O
N N N
N
NN
a
N M"
t0 O
�
M
a0 N fD
N
M
N
G
N
N
N
47 T M
r
N
N M
M
7
N
(0
h iz
M
W
M
T
r
O
N N
Gauge ID: 8
Total Number of Consecutive Days Water Table within 12 inches of Soil Surface: 132
Percentage of Growing Season Water Table within 12 inches of Soil Surface: 100%
5.0
End
25.0
Beginning
of
Grow
of
ing Season
20.0
4.5
Grow ing Season
/
�'
.(/
15.0
4.0
10.0
Ground
Surface
5.0
3.5
0.0
3.0
Required
Depth
-5.0
10.0
2.5
-15.0
2.0
-20.0
-25.0
1.5
-30.0
1.0
-35.0
40.0
0.5
45.0
0.050.0
M
N N
1(1
N N
N N
1f1 N
N tr1
Ln N 1r1
N
O
Ln
N
N
1(1
N
1r1 N N
N
N
O
N
O O
N N
O
N
O O
N N
O O
N N
O O
N N
O O
N N
�
O O O
N N N
O
N
O
N
O
N
O
N
O
N
O
N
O
N
O O O
N N N
O O
N N
N Of
N
t0 N
t0 O
M r
�
a0 N fD
O
M
r
O
V
ao
N
47 T M
r
C
C
d
R
C
7
O
0
t
Q
Q
0
Cochran Stream and Wetland Restoration Project 73 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7
Gauge ID: Reference -Cat Creek (MW13)
Total Number of Consecuti\,e Days Water Table within 12 inches of Soil Surface: 130
Percentage of Growing Season Water Table within 12 inches of Soil Surface: 70
5.0
25.0
End of
Grow ing Season
20.0
4.5
Beginning
Grow
of
ing Season
15.0
4.0
10.0
Ground Surface
5.0
3.5
���s-
• ��l
—
0.0
3.0
Required
Depth
-5.0
-10.0
2 5
15.0
2.0
-20.0
-25.0
1.5
-30.0
1.0
-35.0
-40.0
0.5
-45.0
0.0
Yi YY lr1 Y]
4Y 1f1 N
In
N Y'l
�n If1
N In
Y] 1{')
47 1(i
N
1f1
In V7
50.0
V7 V) N V7 V)
O O O O
N N N N
O O O
N N N
O
N
O O
N Q
O O
N N
—
O O
N N
O O
N N
O O
N N
O
N
O
N
O O
N N
O O O O O
N N N N N
10 M N
W N O
OM
n
V
W N
O O
M r-
O
V
w N
m M M r
` N r
r r N
r
N N N M M
V
N N
a
N O
M
r
O
r
ro a0
M
M
O
r N N
C
Cochran Stream and Wetland Restoration Project 74 Equinox
NCDMS Project No. 95720 Annual Monitoring Report
Monitoring Year 1 of 7