HomeMy WebLinkAboutNC0085731_Compliance Evaluation Inspection_20160129 r PA MCCRORY
t
DONALD R. VAN DER VAAR f'
Water Resource.:;
S. JAY ZIMMERMAN
LNY)!?ON iLN!AL QUAL,:'Y .....
January 29, 2016
RECEIVED/NCDEGYDWR
Mr. Jesse Amundson, Hines Manager FEB 0 2 2016
Hines
227 W. Trade Street, Suite 330 Water Quality
Charlotte, NC 28202 Permitting Section
Subject: Compliance Evaluation Inspection
Carillion ground water remediation
NPDES Permit No. NC0085731
Mecklenburg County
Dear Mr. Amundson:
Enclosed is a copy of the Compliance Evaluation Inspection for the inspection conducted
at the subject facility on January 27, 2016 by Ori Tuvia and Ed Watson. Your representative
David Jarvis cooperation during the site visit was much appreciated. Please advise the staff
involved with this NPDES Permit by forwarding a copy of the enclosed report.
As was discussed on site,only mark Chronic Toxicity results for the dates mentioned on
Toxicity reports.
The report should be self-explanatory; however, should you have any questions
concerning this report, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at
ori.tuvia@ncdenr.gov.
Sincerely,
h..
Ori Tuvia, Environmental Engineer
Mooresville Regional Office
Division of Water Resources, DEQ
Cc: NPDES (Derek Denard)
MRO Files
Mooresville Regional Office
Location:610 East Center Ave.,Suite 301 Mooresville.NC 28115
Phone:(704)663-1699\Fax:(704)663-6040\Customer Service:1-877-623-6748
f
• United States Environmental Protection Agency Form Approved.
EPA Washington,D.C.20460 OMB No.2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A:National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 LI 2 ISI 3 I NC0085731 111 12 I 16/01/27 117 18 LI 191S I 20I I
21111111111111111111111111111111111111111111p6
Inspection Work Days Facility Setf-Monitoring Evaluation Rating B1 QA Reserved
67 11.o I 70 LJ Id I 71 IN I 72 I N I 731 I 174 79 111 1 1 I 180
1 Section B:Facility Data
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 09:45AM 16/01/27 15/09/01
Carillon Building
Exit Time/Date Permit Expiration Date
227 W Trade St
Charlotte NC 28202 11:15AM 16/01/27 20/06/30
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
David Jarvis//704-719-1100/
Travis Quinn//704-995-5481/
Name,Address of Responsible Official/Title/Phone and Fax Number
Contacted
Flora Jane D'Souza,9751 Southern Pines Blvd Charlotte NC 282731//
No
Section C:Areas Evaluated During Inspection(Check only those areas evaluated)
• Permit El Flow Measurement In Operations&Maintenance NI Records/Reports
Self-Monitoring Program IN Sludge Handling Disposal • Facility Site Review • Effluent/Receiving Waters
• Laboratory
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Edward Watson MRO GW///
On A Tuvia MRO WQ//704-663-1699/
/ C1 / I6
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
William C Basinger MRO WQ//704-235-2194/ ///
EPA Fo 6 --3(Rev 9-9 Previous editions are obsolete. ci>v/J Q — ' t'9 „ a. y,,0 , r l 4.
y'_+f Page# 1
NPDES yr/mo/day Inspection Type (Cont.) 1
31 NC0085731 111 121 16/01/27 117 18 U
Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Notes writen by Ed Watson.
The Quarterly report of groundwater contaminants indicate there are currently exceedance for
Manganese(Mn) of 17.2 ug/L, 1,2-DCE AT 100 UG/I,4-Bromoflurobenzene at 100 ug/L and Toluene
at 101 ug/L. Although these constituents are above the 2L standard for groundwater,they are reduced
from previously report groundwater laboratory results indicating,the system is operating to reduce
VOC impact to groundwater.
The waste carbon is extracted through an extraction port that is connected to the top of the Carbon
canister to allow for easy extraction of the spent Carbon. The system is set up as an in-line two
canister system which allows one tank to perform extraction of solids and the second tank to act as a
polishing tank. The system is reversible to allow for the tanks to be reversed to allow for extraction of
the spent Carbon in the lead tank making the second tank the primary tank.
The system has sample ports that allow for mid-point sampling which helps with monitoring
breakthrough of constituents in the activated Carbon in the vessels. A copy of the spent Carbo
Manifest was provided to see the spent Carbon was being properly disposed of by Evoqua and a copy
of the 10/28/2015 manifest was provided.
The files were up to date and in order. Samples are able to be extracted at the mid-point of the in-line
tanks and at the end of the treatment. Because the travel distance of the system drain line,we were
not able to view out-flow that empties into the un-named tributary to Erwin's Creek.
Page# 2
Permit: NC0085731 Owner-Facility: Carillon Building
Inspection Date: 01/27/2016 Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ 0 I 0
application?
Is the facility as described in the permit? • 0 0 0
#Are there any special conditions for the permit? 0 • 0 0
Is access to the plant site restricted to the general public? • 0 0 0
Is the inspector granted access to all areas for inspection? • 0 0 0
Comment: Special condition for ground water remediation pump and treat system. require to sample,
Flow,Tetraethlene, Iron, Manganese, and Chronic toxicity.
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit? • 0 0 0
Is all required information readily available,complete and current? • 0 0 0
Are all records maintained for 3 years(lab. reg.required 5 years)? • 0 0 0
Are analytical results consistent with data reported on DMRs? • 0 0 0
Is the chain-of-custody complete? • 0 0 0
Dates,times and location of sampling •
Name of individual performing the sampling •
Results of analysis and calibration •
Dates of analysis •
Name of person performing analyses •
Transported COCs •
Are DMRs complete:do they include all permit parameters? • 0 0 0
Has the facility submitted its annual compliance report to users and DWQ? 0 0 U 0
(If the facility is=or>5 MGD permitted flow)Do they operate 24/7 with a certified operator 0 0 MI 0
on each shift?
Is the ORC visitation log available and current? • 0 0 0
Is the ORC certified at grade equal to or higher than the facility classification? • 0 0 0
Is the backup operator certified at one grade less or greater than the facility classification? • 0 0 0
Is a copy of the current NPDES permit available on site? • 0 0 0
Facility has copy of previous year's Annual Report on file for review? U 0 0 0
Comment: Records are well maintained.the facility has been marking their Chronic Toxcitv results
wrong will correct.
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? • 0 0 0
Page# 3
Permit: NC0085731 Owner-Facility: Carillon Building
Inspection Date: 01/27/2016 Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
Is sample collected below all treatment units? • ❑ 0 0
Is proper volume collected? • ❑ 0 0
Is the tubing clean? ❑ 0 0 •
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees • 0 0 0
Celsius)?
Is the facility sampling performed as required by the permit(frequency,sampling type • ❑ ❑ ❑
representative)?
Comment: Composite Sampling done by ISCO sampling machine which was not on site at the time of
the inspection. ORC bring the sampler when needed.
Laboratory Yes No NA NE
Are field parameters performed by certified personnel or laboratory? U ❑ ❑ ❑
Are all other parameters(excluding field parameters)performed by a certified lab? • ❑ ❑ ❑
#Is the facility using a contract lab? • ❑ 0 ❑
#Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees • ❑ ❑ 0
Celsius)?
Incubator(Fecal Coliform)set to 44.5 degrees Celsius+/-0.2 degrees? ❑ ❑ U ❑
Incubator(BOD)set to 20.0 degrees Celsius+/-1.0 degrees? ❑ ❑ 11 ❑
Comment: PACE laboratory analyze samples for Tetraethlene, Iron and Manganese. ETS laboratory
analyze chronic toxicity sampling.
Flow Measurement -Effluent Yes No NA NE
#Is flow meter used for reporting? U 0 0 ❑
Is flow meter calibrated annually? ❑ • ❑ ❑
Is the flow meter operational? • ❑ 0 ❑
(If units are separated)Does the chart recorder match the flow meter? • ❑ ❑ ❑
Comment: Flow meter is replaced yearly.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • ❑ ❑ ❑
Does the facility analyze process control parameters,for ex:MLSS, MCRT,Settleable ❑ ❑ • ❑
Solids,pH, DO,Sludge Judge,and other that are applicable?
Comment: 8 recovery wells pump into a 10,000 gallon equalization tank,transferring into two charcoal
filters. Charcoal is replaced once a year by Haz-Met Environmental services.
Page# 4