Loading...
HomeMy WebLinkAbout20160352 Ver 1_CAMA Application_20160401K, Coastal Management ENVIRONMENTAL OUALITY March 21, 2016 MEMORANDUM TO: FROM: SUBJECT: Applicant: Project Location: Proposed Project: RECEIVED/NCDENR/DWR MAR 2 9 2016 WE 3, :::;a!;;y Regional Operations Section Washington Regional Offioe PAT MCCRORY Govemar DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Do,ecmr Robert Tankard, Environmental Engineer DWR - Water Quality, Aquifer Protection Section, WaRO Doug Huggett, Major Permits Coordinator Division of Coastal Management CAMA Permit Application Review NC Seafood Industrial Park Authority off Harbor Road, Broad Creek, in Wanchese, Dare County Broad Creek Pier System & Breakwater Please indicate below your agency's position or viewpoint on the proposed project and return this form by 04/11/16 to Courtney Spears, Assistant Major Permits Coordinator, 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: SIGNED This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE Nothing Compares State of North Carolina I Environmental Quality I Coastal Management 1367 US Hwy 17 South I Elimbeth City, NC 27909 252-264-39011252-264-3723 [fax] DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: NC Seafood Industrial Park Authority- Wanchese; Broad Creek Pier 2. LOCATION OF PROJECT SITE: Harbor Rd, Wanchese, Dare County on Broad Creek Photo Index -2006: 183-7197 (R,8) 2000: 183-2132 (H,7) State Plane Coordinates - X: 3000555 Y:778972 3. INVESTIGATION TYPE: CAMA 4. ` INVESTIGATIVE PROCEDURE: Dates of Site Visit — Feb. 23, 2016 Was Applicant Present - no 5. PROCESSING PROCEDURE: Application Received Complete — March 11, 2016 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Dare County Land Classification From LUP — Conservation, transitional (B) AEC(s) Involved: ES, EW, PTA, PTS (C) Water Dependent: yes (D) Intended Use: private (E) Wastewater Treatment: Existing —onsite system Planned - none (F) Type of Structures: Existing — commercial metal building, gravel boat storage area, stormwater infiltration basin, unused metal building associated with a wastewater system Planned — pier over wetlands, fixed pier, boatslips, breakwater (G) Estimated Annual Rate of Erosion: 2-3 ft Source - applicant 7. HABITAT DESCRIPTION: (AREA] DREDGED FILLED OTHER (A) Estuarine Shoreline (B) EW, PTA 17,976 sq ft shaded 1,808 sq ft (C) Coastal Wetlands (shaded) (D) Total Area Disturbed: 19,784 sq ft (E) Primary Nursery Area: no (F) Water Classification: SA Open: yes/no 0 Field Investigation Report Page 2 8. PROJECT SUMMARY: The applicant proposes to construct an 8 ft by 226 ft walkway over wetlands to an 8 ft by 1,812 ft pier with 29 boatslips and a 1,812 ft breakwater attached to the pier. Project Setting The site of the proposed development is on Lot 6 Harbor Rd, off of Mill Landing Rd (NC 345) within the village of Wanchese in Dare County. The site is within existing seafood industrial park and is adjacent to Broad Creek that connects to the Roanoke Sound. Elevation of the tract is approximately 6 ft above normal water level. The high ground areas are vegetated with typical lawn grasses and the wetland area adjacent to the creek is vegetated with Spartina Alterniflora, Juncus Roemerianus, and Typha. Existing structures on the property include a commercial metal building, a fenced in stormwater infiltration basin, a fenced in gravel boat storage area, and an unused metal building that is associated with a wastewater system. Adjacent properties are also developed with commercial marine structures. The waters of Broad Creek along the area of the applicant's property range from 31/2 ft to 5 ft deep and are classified as SA waters by the Division of Environmental Management. The waters immediately adjacent to Lot 6 are open to shellfish harvesting and they transition to closed approximately 900 ft eastward of the lot location. There are no known archeological sites associated with the applicant's property. Development Proposal The applicant proposes to construct an 8 ft wide by 226 ft long walkway over wetlands leading to an 8 ft by 1,812 ft fixed pier. The pier would begin on Lot 6 of the seafood industrial park and extend out approximately 180 ft then make a sharp turn to the right and extend another 1,384 ft and then make another 90 degree turn to the right for 248 ft. The pier would be constructed waterward of lots marked on the submitted plat as Leaseholds 7- 13. The proposed pier would have fourteen 6 ft by 20 ft finger piers creating twenty-nine 20 ft by 60 ft boatslips. The boatslips would be located on the portion of the pier that is within the shellfish closure area. The applicant would also construct a 1,812 ft breakwater attached to the waterward side of the pier. This breakwater would dampen the wave energy for the moored vessels and also lessen or slow the erosion along the shoreline. As previously mentioned this proposed pier structure would be constructed waterward of several other lots also owned by the NC Seafood Industrial Park. There are permitted marina structures on these lots. Lot 12 has a fixed pier with 28 boatslips and 2 boat lifts, another fixed pier without slips, and a breakwater structure and small floating pier adjacent to the breakwater. There are also 2 concrete boatramps located on this property. These structures were permitted under CAMA Major #90-02 Umphlett Marina. A modification has been issued to the permittee to reconfigure the existing structure to reduce the number of slips from 28 to 10 however this modification has not been built. Also CAMA Major #140-03 was issued for the construction of another pier and breakwater and 6 slips under Bailey Marina adjacent to Lot 13. These structures have not been built yet but are still planned. The newly proposed pier structure would maintain a minimum distance of 140 ft from the permitted and existing marina structures. Field Investigation Report Page 3 Anticipated Impacts The proposed project would shade 1,808 sq ft of coastal wetlands, 14,496 sq ft of Public Trust Area, Estuarine Waters Areas of Environmental Concern with the pier, finger piers, and walkway. The added 29 boatslips would shade 3,480 sq.ft of Public Trust Area, Estuarine Waters Areas of Environmental Concern. Temporary water turbidity would occur in the project area during construction. Kelly Russell March 17, 2016 MAJOR PERMIT FEE MATRIX Applicant: NC Seafood Industrial Park Authority — Broad Creek Selection Development TypeFee DCM % DWQ % (14300 1601 4351000931625 6253) (24300 1602 435100095 2341) 1 I. Private, non-commercial development that does not $250 100%($250) 0%($0) involve the filling or excavation of any wetlands oro en water areas: ll. Public or commercial development that does not $400 100%($400) 0%($0) involve the filling or excavation of any wetlands oro en water areas: Major Modification to a $250 100%($250) 0%($0) Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, HCAMA B, C, or D below applies: III(A). Private, non- commercial development, if $250 100% ($250) 0%($0) General Water Quality Certification No. 3490 (See attached can be a lied: III(B). Public or commercial EMdevelopment, if General $400 100%($400) 0%($0) Water Quality Certification No. 3490 (See attached) can be applied: III(C). If General Water Quality Certification No. $400 60%($240) 40%($160) 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or life: III(D). If General Water Quality Certification No. $400 60%($240) :400% ($160) Paquatic 3490 (see attached) cannot be applied: IV. For development that ED] involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or o en water areas: Received Lot 6- Broad Creek Pier System & Breakwater r 9 101. Wanchese Seafood Industrial Park CAMA Major- Project Narrative 2/18/2016 pp ®CM -EC Existing Conditions The site is a 2.99 acre (130,052 sq. ft.) parcel of land located along Harbor Road and owned by the N.C. Seafood Industrial Park Authority (Seafood Park) in Wanchese, Dare County, North Carolina. The parcel of land (Lot 6) is located adjacent to the Roanoke Sound (Broad Creek). The upland portion of the property is dominantly covered with maintained grasses, a gravel road and metal buildings. Hathaway Marine Inc. is located in a small gray metal building on the water ward end of lot 6. Joe's Marine Service is leasing a fenced gravel boat storage area at the front of lot 6 along Harbor Road. A fenced -in dry infiltration basin of maintained grass separates the two businesses and covers the majority of lot 6. There are currently marina related structures on lot 12 (to the south of lot 6) in place including a fixed pier with 28 slips and 2 boat lifts, another fixed pier without slips, a pile -supported breakwater structure and a small floating pier adjacent to the breakwater. Two concrete boat ramps are.also on site with the existing marina facilities. The existing pier and slips were permitted under CAMA Major 90-02 and this is referred to as Umphlett Marina. In 2013, after the expiration of 90-02, a new permit for Umphlett Marina reconfiguration was issued (CAMA Major 46-13). This permit reduced the total number of slips from 28 to 10. The larger concrete ramp and unbuilt pier system was permitted under CAMA Major 140-03. In 2013, a modification was issued to 140-03 to include the ramp. Also in 2013, another modification was issued to Bailey Marina to reconfigure the permitted mooring arrangement on the permitted (unbuilt) pier. This constituted a reduction from 26 to 6 total slips. To date, the finger pier removal and upgrades to Umphlett Marina have not occurred, but this work will occur at sometime within the life of the permit. The pier at Bailey Marina will aslo be constructed at some point prior to the expiration of the CAMA Major. All existing conditions are depicted on the CAMA Plan. Proposed Work Currently proposed work requiring CAMA permitting includes construction of an 8ft x 2,038 LF fixed pier with fourteen Eft x 20ft finger piers. The pier is proposed to begin on lot 6, and extend out into Broad Creek in a southeasterly direction and turn southward. The proposed pier is to contain twenty-nine 20ft by 60ft boat slips with finger piers and tie pilings dividing the slips. All slips are designed to be within the shellfish closure limits. Adjacent to the proposed pier, a 1,812 LF breakwater is proposed on the water ward side of the pier. The breakwater is to begin at the NWL and terminate at the end of the proposed pier. Some minor modifications to the original proposed design have taken place and are represented here, based on discussions with resource agencies. An interagency scoping meeting held at the WARD to discuss this project on 8/27/15. Need The Seafood Park currently contains several boat building operations and the Park has been catering to the new potential tenants, including boat builders and charter fleets. This pier will enable expansion of these services. Additionally, this shoreline has experienced consistent erosion over the years. The proposed slotted breakwater will serve to dampen wave energy that has washed out coastal marsh along the shoreline, and this breakwater will provide a safe mooring area for tenants. uaweeaeansay DCM MP -11 APPLICATION for ®CM -EC om Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT .1. Primary App'licant.1 Larldown6rIn-formation Business Name Project Name (if applicable) N.C. Seafood Industrial Park Authority-Wanchese Broad Creek Pier System and Breakwater Applicant 1: First Name Ml Last Name Bob Ml Peale; Director Applicant 2: First Name Ml Last Name If additional applicants, please attach an additional page(s) with names listed. MI Mailing Address PO Box City State city 549 Wanchese NC ZIP Country Phone No. FAX No. 27981 USA 252-473-5867 ext. 252-473-6139 Street Address (if different from above) City State FAX No. ZIP 615 Harbor Road Wanchese NC 27981 - Email ZIP 8466 Caratoke Highway Suite 400 bpeele@nccommerce.com Point NC 2..Agent/Contractor Informa -hon, Business Name Quible & Associates, P.C. Agent/ Contractor 1: First Name Ml Last Name Brian D Rubino Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box city State, 870 Kitty Hawk NC ZIP Phone No. 1 Phone No. 2 27949 252-261-3300 ext. ext. FAX No. Contractor If Street Address (if different from above) City 'y State ZIP 8466 Caratoke Highway Suite 400 Point NC 27966- Email brubino@quible.com <Form continues on back> 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net ' Form DCM MP -1 (Page 2 of 4) nuceiVeA APPLICATION for MAR 1 .-'_ (�'ir',� Major Development Permit 3. Project Location ': PullVI-r County (can be multiple) Street Address State Rd. # Dare Harbor Road 1140 Subdivision Name City State Zip Wanchese Seafood Industrial Park Wanchese NC 27981 - Phone No. Lot No.(s) (i/ many, attach additional page with list) 252 - 473 - 5867 ext. Lot 6, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Broad Creek c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Pamlico Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes [-]No work falls within. Hathaway Marine Inc. is located in a small gray metal building on the water ward end of lot 6 and Joe's Marine Service is Wanchese Industrial Seafood Park (NC SIPA) 4 Srte. Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 538 ft Seafood Park: 54 acres (2,352,223 sf) / Lot 6: 2.99 acres (130,052 at) c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or Lot 6: 130,052 sf, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 9' ❑NHW or SNW L e.. Vegetation on tract Uplands on site are mostly maintained grasses with areas of gravel and concrete. Wetlands along the shoreline contain Phragmites, wax myrtle, groundsel bush, black needle rush and smooth cordgrass. I. Man-made features and uses now on tract Hathaway Marine Inc. is located in a small gray metal building on the water ward end of lot 6 and Joe's Marine Service is leasing a fenced gravel boat storage area at the front of lot 6 along Harbor Road. A fenced -in dry infiltration basin of maintained grass separates the two businesses and covers a large portion of lot 6. On the North side of the property is a metal building associated with a wasterwater facility for the Industrial park that is currently not in use. g. Identify and describe the existing land uses adjacent to the proposed project site. Boat building operations and boat ramp h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? Wanchese Seafood Industrial Park Zone (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes SNo k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes SNo ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes SNo ❑NA National Register listed or eligible property? <Form continues on next page> 252.808.2808 :: 1.888.41RCOAST :: www.nccoastaimanagement.net Form DCM MP -1 (Page 3 of 4) APPLICATION for Received Major Development Permit m. (1) Are there wetlands on the site? jsi ,5„ t : �� � ®Yes []NO (ii) Are there coastal wetlands on the site?�p ®Yes [--]No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? DMEC Dyes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater is treated in approved on-site wastewater treatment systems consisting of septic tanks and drain fields. o. Describe existing drinking water supply source. Drinking water is provided by Dare County Water Distribution System p. Describe existing storm water management or treatment systems. The Wanchese Seafood Industrial Park utilizes an existing and permitted stormwater treatment system that combines an engineered system of swales and infiltration basins. 5. Activities and Impacts' a. Will the project be for commercial, public, or private use? ®Commercial ❑Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed slips will provide docking facilities for commercial fishing vessels. Daily operation will be consistent with the current facility operation. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Vibrating hammer and barge; equipment to be stored onsite d. List all development activities you propose. Construction of an 8' wide by 2,038 LF long fixed pier with twenty-nine 20' x 60' boat slips with 6'x 20' finger piers dividing the porposed slips. All proposed slips are within the shellfish closure limits. In addition, a 1,812 LF breakwater is proposed to be constructed on the waterward side of the proposed pier, beginning at the NWL and terminating at the pier's end. All of the proposed activities are shown on the enclosed site plan. e. Are the proposed activities maintenance of an existing project, new work, or both? New Work f. What is the approximate total disturbed land area resulting from the proposed project? NA ❑Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No [:INA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The Wanchese Seafood Industrial Park manages stormwater through a system of permitted and approved swales and stormwater infiltration basins. I. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No [INA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA I. Is there any mitigation proposed? ❑Yes ❑No ®NA If yes, attach a mitigation proposal. <Form continues on back> 252-808.2606 :: 1-888-4RCOAST :: www.nccoastaimanagement.net ' Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additionallnformation'; In addition to. this completed application form, (MP, 1) the following items below, if applicable, must be submitted in, order foi the application'.- package io be complete Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below a. A project narrative. � . p I b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. I. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Naive EtheridgeFamdy, Properties LLC ; : Phone No.,- . ,Address 69 Wanchese NC 27981 Name Willie E. Daniels Jr Phone No. Address 3652 Mill Landing Rd Wanchese, NC 27981 .•Phone No - Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, penmittee, and issuing dates. Blanket DWO SWMP SW7000323 8/29/2000 h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. .I understand that any permit issued in response to this application will allow only the development described in the application. The.project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name BOB PEELE ��C����d/� "° 1- Ili/1 Mil? j (ii Signature �^ Please indicate application attachments pertaining to your proposed project. ®MEC ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development ®DCM MP -4 Structures Information 252.808-2808 :: 1.888.411COAST :: www.nccoastaimanagement.net Received Form DCM MP -4 STRUCTURES FEB (Construction within Public Trust Areas) DMEC Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS, ❑This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ®Commercial ❑Public/Government ❑Private/Community ❑Yes ®No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? Eyes ❑No (ii) Number 1 If yes: (iii) Length 2.038 LF (ii) Number 14 (iv) Width 8 ft (iii) Length 20 ft (v) Floating ❑Yes ®No (iv) Width 6 ft (v) Floating ❑Yes ®No e. (i) Are Platforms included? ❑Yes ®No f. (i) Are Boatlifts included? ❑Yes ®No If yes: If yes: (ii) Number (ii) Number (iii) Length (iii) Length (iv) Width (iv) Width (v) Floating ❑Yes []No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 29 (ii) Number of slips existing 0 I. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: 50 fl m. (i) Will the facility have tie pilings? ®Yes []No (ii) It yes number of tie pilings? 28 h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or -maintenance service ❑ Dockage, fuel, and marine supplies E Dockage ("wet slips") only, number of slips: 29 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Sailboats and Charter Boats I. (i) Will the facility be open to the general public? ❑Yes ®No 252-808.2808 :: 1-Baa-4nCOAST :: www.nccoastalmanaaement.net revised: 12/27/06 Voir 7a BCM PAP-4 (Structures, Page 2 of 44) 2. DOCKING FACILITY/MARINA'OFERATIONS [I Th section not applicati/e a. Check each of the following sanitary facilities that will be included in the proposed project. Received ❑ Office Toilets Received ❑ Toilets for patrons; Number: _; Location: ❑ Showers ® Boatholding tank pumpout; Give type and location: Mobile pump and haul pumpout station ®MEQ b. Describe treatment type and disposal location for all sanitary wastewater. !lob eve All sanitary wastewater is disposed of using existing and permitted on-site septic tanks and drain fields. C. Describe the disposal of solid waste, fish offal and trash. All solid waste, fish offal and trash is disposed of using the Seafood Industrial Park trash cans and dumpsters. The Seafood Park disposes of all solid waste according to applicable regulations. d. How will overboard discharge of sewage from boats be controlled? Existing sewage pump-out facilities in the Seafood Park will be made available to all patrons. The existing sewage pump-out system is pump and haul. There is no overboard sewage dumping from vessels allowed. e. (i) Give the location and number of "No Sewage Discharge" signs proposed. N/A (ii) Give the location and number of "Pumpout Available" signs proposed. N/A f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. N/A g. Where will residue from vessel maintenance be disposed of? , No vessel maintenance will be conducted on site. h. Give the number of channel markers and "No Wake" signs proposed. N/A-Existing federal channel markers to be observed i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. N/A j. What will be the marina policy on overnight and live-aboard dockage? No live-aboard or overnight dockage is allowed. k. Describe design measures that promote boat basin flushing? N/A open water I. If this project is an expansion of an existing marina, what types of services are currently provided? 252-808.2808 :: 1.888-4RCOAST :: wvvwmccoastalmanagement.net revised: 12/27106 jl�brm OACM IVIP-21 (Structures, Page 3 of 4) Received m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ®No (C3 K11 n. Is the marinaldocking facility proposed within or adjacent to any shellfish harvesting area? �q ®Yes []No C o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WI-)? If any boxes are checked, provide the number of square feet affected. ®CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? [--]Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. J NA J. BOATHOUSE (including covered 1ikg)'r ®Thts section not applicable, a. (i) Is the boathouse structure(s): []Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length . (iv) Width Note: Roofed areas are calculated from ddplina dimensions. 4. GROIN (e.g., wood sheetpile, etc. -7f a rock groin, use MP 2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width ¢ BREAKWATER (e g wood, sheetpile, etc) ®TPos section not applicable a. Length 1,812 LF b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6 MOORING P/LINGS and BUOYS; ®Thrs section,not applicable__• a. Is the structure(s): []Commercial ❑Public/Government ❑Private/Community C. Distance to be placed beyond shoreline _ Note: This should be measured from marsh edge, if present. e. Arc of the swing _ -7 GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252-808.2808 :: 1-888-4RCOAST :: w .nccoastatmanagennent.net revised: 12/27/06 ff b,—r.n IC:;•) PJIP-41 1;3iructlares, Page A of 4) a. Proximity of structure(s) to adjacent riparian property lines There are no established adjacent riparian property lines in the Wanchese Seafood Park Harbor. Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 8.570 ft e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. 597 ft d. Water depth at waterward end of structure at NLW or NWL 4.50' 8. OTHER - ®This section not applicable a. Give complete description: Under 7 b. the proximity was determined by measureing from a georeferenced aerial photo. ,Date, Received FEB d r 211-J 252-808-2808 :: 1-868.4RCOA5T : www.nccoastalrnana9ement.net revised: 12127106