Loading...
HomeMy WebLinkAbout20070184 Ver 1_Approval Letter_20080128o~~~ w A r~9Q~ ~ ~ o ~ Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality January 28, 2008 Mr. Bruce Blackmon Carolina Lakes Development Company P.O. Box 2284 Matthews, NC 28106-2284 Re: Carolina Lakes Block T, Harnett County Little Bridge Branch (030614, 18-23-29-2-1, C) DWQ #20070184; USACE Action ID. No. 2006-41496-043 APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Blackmon: Attached hereto is a copy of Certification No. 3726 issued to Mr. Bruce Blackmon and Carolina Lakes Development Company, dated January 28, 2008. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. 0' // CHS/cbk/~m Attachments: Certificate of Completion cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789 U.S. Army Corps of Engineers, Wilmington Regulatory Field Office, Wilmington District, USACOE Ken Averitte, DWQ, Fayetteville Regional Office DLR Fayetteville Regional Office File Copy Central Files Michael Wolfe, Water Oak, 301 Water Oak Lane, Matthews, NC 28104 Filename: 070184CarolinaLakesBlockT(Ha rnett)401_IC 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone (919)733-1786 / Fax (919) 733-6893 Internet: http://www.ncwaterquality.org Noe Carolina ~turally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Carolina Lakes Development Company Page 2 of 6 January 28, 2008 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 to Mr. Bruce Blackmon and Carolina Lakes Development Company to fill impact 3.465 acres of 404/wetland (0.886 acres permanent impact, 2.75 acres temporary impact) of jurisdictional wetlands in the Cape Fear River Basin, associated with the construction of the Carolina Lakes Subdivision, located adjacent to and east of Carolina Lakes subdivision, northeast of Spout Springs, Harnett County, North Carolina, pursuant to an application dated the 6`~ day of June of 2007, and received by the DWQ on July 13, 2007, by Public Notice by the U.S. Army Corps of Engineers issued on the 13`h day of July of 2007 (received by DWQ on July 13, 2007), with additional information received from you on October 17, 2007, December 17, 2007, and December 27, 2007. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate. the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: T e of Im act Amount A roved Units Plan Location or Reference 404/Non-Riparian Wetlands 3.465 [(acres) of 404/wetland Application and Public Notice (0.886 acres permanent impact, 2.75 acres tem or im act Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. Carolina Lakes Development Company Page 3 of 6 January 28, 2008 b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices -shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project; Continuing Compliance: 5. Mr. Bruce Blackmon and Carolina Lakes Development Company, shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. Bruce Blackmon and Carolina Lakes Development Company and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Bruce Blackmon and Carolina Lakes Development Company in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; 6. Written Stormwater Management Plan (Final Approval Needed) A final, written Stormwater management plan (including a signed and notarized Operation and Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604) within 60 days of the issuance of this Certification, and the stormwater management plans shall be approved in writing by this Office before the impacts specified in this Certification occur. You have the option of using the Express Review Program for expedited approval of these plans. If you propose to use the Express Review Program, remember to include the appropriate fee with the plan. The stormwater management plan must include plans, specifications, and worksheets for stormwater management facilities that are appropriate for the surface water classification and designed to remove at least Carolina Lakes Development Company Page 4 of 6 January 28, 2008 85% TSS according to the most recent version of the NC DENR Stormwater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the Stormwater management plan (as approved by this Office) shall be implemented. The structural Stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural Stormwater practices shall be made without written authorization from the Division of Water Quality. Additionally, in watersheds within one mile and draining to watersheds that are classified as nutrient sensitive waters (NSW), water supply waters (WS), trout waters (Tr), high quality waters (HQW), and outstanding resource waters (ORW), the Division shall require that extended detention wetlands, bio-retention areas, and ponds followed by forested filter strips (designed according to latest version of the NCDENR Stormwater Best Management Practices Manual) be constructed as part of the stormwater management plan when asite-specific stormwater management plan is required. Miti ation: 7. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. Per correspondence from you dated December 17, 2007, we understand that you have agreed to provide 2:1 wetland mitigation for proposed wetland impacts and wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement and additional mitigation commitment. Until the EEP receives and clears your check (made payable to: DENR -Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5205 if you have any questions concerning payment into a restoration fund. You have 60 days from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Wetlands Restoration Fund to meet the following compensatory mitigation requirement: T e of Wetland Com ensato Miti ation Re aired River and Sub-basin Number 404/Wetland 1.772 (acres) Ca e Fear/03030004 Road Crossings: 8. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (http://www.ncdot.or doh/onerations/BMP manuaUdownload/BMP Manual.pdf) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of Carolina Lakes Development Company Page 5 of 6 January 28, 2008 the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re- installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Therefore, you must provide plans with adequate details that indicate that the current stability of the stream will be maintained or enhanced. You must receive written approval from this Office for the above plans before the culvert(s) is installed. Culvert(s) must be installed according to approved plans. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please send photographs upstream and downstream of each culvert site to document correct installation along with the Certificate of Completion form. Other conditions: 9. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place at the time of recording of the property, or of individual lots, whichever is appropriate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. Carolina Lakes Development Company Page 6 of 6 January 28, 2008 10. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached Certificate of Completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 28`" day of J DNISION OF WA oleen H. Sullins 3726 CHS/cbk/ijm O~O~ W A r~9pG ~ ~ o -r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality North Carolina Division of Water Quality 401 Water Quality Certification Summary of Permitted Impacts and Mitigation Requirements In accordance with 15A NCAC 2H.0500, Mr. Bruce Blackmon and Carolina Lakes Development Company, have permission as outlined below to fill or otherwise impact 3.465 acres of 404/wetland (0.886 acres permanent impact, 2.75 acres temporary impact) in the Cape Fear River Basin, as described in your application dated the 6`}' day of June of 2007, and received by the DWQ on July 13, 2007, by Public Notice by the U.S. Army Corps of Engineers issued on the 13`j' day of July of 2007 (received by DWQ on July 13, 2007), with additional information received from you on October 17, 2007, December 17, 2007, and December 27, 2007, to construct the proposed Carolina Lakes Subdivision Block T, located adjacent to and east of Carolina Lakes subdivision, northeast of Spout Springs, Harnett County, North Carolina. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached Permit transmittal letter. THIS CERTIFICATION IS NOT VALID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM DWQ PROJECT #: 20070184 LOCATION: Spout Springs COUNTY Harnett BASIN/ SUB BASIN Cape Fear/03030004 As required by I SA NCAC 2H.0500, and the conditions of this Certification, you are required to compensate for the above mitigable impacts through the restoration, creation, enhancement or preservation of wetlands, surface waters and riparian buffers as outlined below prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be rounded to one-quarter acre increments and linear foot requirements must be rounded up to the nearest foot according to 15 2R.0503(b). Im acts Miti ation 0.886 Acres Non-Ri arian 404/Wetlands 1.772 Acres Non-Ri arian 404/Wetlands One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of a fee to the Wetlands Restoration Fund per NCAC 2R.0503. If you choose this option, please sign this form and mail the form along with a copy of your 401 Certification or Buffer Approval to the Ecosystem Enhancement Program at the address below. An invoice for the appropriate amount of payment will be sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTHORIZED UNTIL YOU RECEIVE NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE ECOSYTEM ENHANCMENT PROGRAM. Signature Date ECOSYSTEM ENHANCEMENT PROGRAM 1652 Mail Service Center RALEIGH, N.C. 27699-1652 (919)733-5205 Filename: 070184CarolinaLakesBlockT(Hamett~01 _IC_EEP Nose Carolina 401 Oversight/Express Review Permitting Unit ~~IfCQ~~l, 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone (919) 733-1786 / Fax (919) 733-6893 Internet: http://www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Certification of Completion DWQ Project No.: County: Applicant: Project Name: Date of Issuance of Certification or Authorization: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer.. It is not necessary to send certificates from all of these. Applicant's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within .substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional ~`" I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built witfiin substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date