HomeMy WebLinkAbout20071345 Ver 2_Initial Interest_2008012401/24!2008 17:47 9198511918 MULKEY INC PAGE 01
_ `
INITIAL INTEREST IN PARTICIPATION IN THE. EXPRESS REVIEW PROGRAM
WTI'HIN THE 401 OVERSITE/EXPRESS PFI2NIITTING UVIT - ""
October 1, 2006 ~ ~ 0 ~ _ ' 3 , l S
VersioA 4 `T
Applicant Name: North Carolina State University Mr Charles D Leffler tDW(~ #07 2345) Ver 2
Applicant Address: NCSU Holladay Hall B Campus Box 7201
Ralei h NC 27695
Applicant's phone number: _(919) 515-2155 Fax number: ' 19 515-5121
Applicant's email address: chazles leffler ncsu edu
Consultant Name (if applicable): ~Cin Carr Mulke Inc.
Consultant address (if applicable): 6750 Trvon Road Mail: P.O. Box 33127
Cary, NC 27518 Raleigh NC 27636 '
Consultant's phone number: (9191 858-1871 _ Fax number: L9191851-1918
Consultant's em~aiI address: ccarr(a,mulkevinc.com
Type of action requested under the Express Review Program {check all that apply):
~ 401 Water Quality Certification
^ Isolated Wetland Pennit
~ Riparian Buffer Approval (Modification to
DWQ #07-1345)
^ Riparian Buffer Minor Variance
^ Coastal General "Major" Variance
^ Stream Grigin Determination
# of Determinations Requested
^ Intermittent/Perennial Determination
# of Determinations Requested
^ Isolated Wetland Determination
linear feet or acres
^ Stormwater Management Plan (this fee is not additive when approval is combined with 40I Cert.}
# of Drainage Areas/Project Site
dame of Project: Main Cam us Drive Extension NCSU Centennial Campus_ County: Wake `
Total project acxeage: 9.42 (acres) Total built out impervious area: 3.58 (acres)
Nearest Named stream + River Basin (from USGS topo map): -South Creek Neuse River Basin 03-04-02
USGS 8-Di it 03020201
Please provide a brief description of this project (attach site plan. if available):
-The project will build the Main Campus Drive extension on new location and will span South Creek at the
NCSU Centennial Cam us. The new roadwa will connect the existin roadwa ~ se eats at the William & Ida
Frida Institute for Education Innovation and Centennial Cam us Ma et Middle School we nd and the
Dorothy & Roy Park AIumni Center (eastern end . Main Cam us Drive extension is an a ro ate! 3 000-foot
JAN-24-2008 THU 18:37 TEL:9197336893 NAME:DWQ-WETLANDS P. 1
01/2412008 17:47 9198511918 MULKEV INC PAGE 02
lon four-lane divided roadwa that will hay additional tie-ins for a service road connection to the ro osed
Chancellor's residence and a proposed stolf course maintenance building The roadwa ro~ect al includes
estrian facilities eenwa ath/sidewalks street 1i hts and other associated utilities. The roadwa desi
includes a brid a to s an South Creek. An existin sewer line runs arallel to the left side of the stream channel.
A permit for riparian buffer impacts has been granted b NCDWO for this proiect (DWQ Proiect # 07-1345,
dated Au st 16 2007) The bridge and roadway design was based on incorrect survey data and we have since
inco orated the correct data that shows a meander bend located near the a dbent of the southeastern comer of the
brid e. This has also resulted in recalculation of ri arian buffer im acts and sub uent i cr a in the im acts
from what was rmitted in Au st 2007. The location of the brid a also coincides with where an doned car
is located in the stream channel. Construction of the endbent near the top of bank will require larger concrete
footin s to stabilize the endbent and retainin wall su orts to revent erosion azound the endbent. It will also
create tem r im acts durin construction and from removal of the abandoned car. Stabilization of the fill
slope will create permanent stream impacts from rip-rap placed in the channel at the endbent location.
This Revised Express Permit request is for modification of the r~arian buffer impacts and for minor permanent
stream impacts from stabilization measures at the bridge endbent Adjustment to the bridge alignment are being
made in au effort to reduce impacts• a final design will be presented with the permit application. Mitigation for
ri arian buffer im acts will be r nested from NC Ecos stem Enhancement Pro
Please attach a map of site location using USGS 1:24,000 map and county soil survey.
See attached Figure 1 Project Vicinity (topo} Additional figures plan sheets and photos will be presented during
the Ex ess Review initial meetin .
Location of project site -please include reference to the county, nearest name town and highway number:
NCSU Centennial Campus, Ralei i, NC, approximately at 35.7b30228°N and -78.6755385°W
Proposed impacts: 0 Acres of 104/401 wetlands
0 Acres of isolated wetlands
<100 Linear feet of streams
0 Linear feet of isolated streams
Zone 1:6,046 sq_ft or less Square feet of protected stream buffers
Zone 2: 12,091 sq.ft. or less
Has consultant or applicant attended any DWQ-sponsored training sessions in the past two years? Tf so, please list
which ones. Yes several employees have attended various DWQ training sessions, including intermittent and
perennial stream identification and BMP and sediment and erosion control design.
Has any DWQ staff visited the site? Unknown , if yes, please provide DWQ staff name,
and date of visit:
JAN-24-2DD8 THU 18:38 TEL:9197336893 NAME:DWQ-WETLANDS P. 2
01!2412008 17:47 9198511918 MU'_KEV INC PAGE 03
V6'hich other environmental permits from other agencies will be needed for this project? Please list the permits and
issuing agencies below:
Sediment and Erosion Control permit has been issued by NCDENR.
Riparian Buffer Qermit has been issued (see previous note!.
Does this project require approval under the State Environmental Policy Act or National Environmental Policy Act?
A SEPA Environmental Assessment (EAl/1"inding_of No Significant Impact (FONSD was completed and has been
reviewed b, theState Clearinghouse and sig,~ned.
Ys this project an After-the-fact application or has this project received a previous Notice of Violation from DWQ?
_No Site clearing construction activities have begun but no work has impacted the stream channel. Sediment and
erosion control measures have been installed and are functionin ag_s designed. This request for Express Permit review
is being made in order to prevent the Qoint where the contractor must stop work pendine; further design and contract
Does this project require approval of a Variance from the NC Environmental Management Commission? No
Are you aware of any local controversy concerning this project? If so, please describe the controversy and any
measures that have been taken with respect to public involvement.
None.
This form must be submitted via email (c/o 401ex~ress(c~ncmail.net), faxed (919-733-6893) or hand-delivered to the
Parkview Building, 2321 Crabtree Blvd. Suite 250, Raleigh; NC 27604. Applicants who are selected to participate in
the Express Review Program will be notified via fax within 2 days. Successful applicants will then be instructed
regarding detailed procedures for full application (Note: ,Submittals of the review packages on Friday after I2: 00 pm
will be stamped as received on the next business day).
Please contact Cynthia Van Der Wiele at 919-715-3473 if you have any questions regarding this form.
3
JAN-24-2008 THU 18:38 TEL:9197336893 NAME:DWQ-WETLANDS P. 3
01/24/2008 17:47 9198511918 MULKEV INC PAGE B4
JAN-24-2888 THU 18:39 TEL:9197336893 NAME:DWQ-WETLANDS