September 12, 2007
Steve Sollod
NC Division of Coastal Management
1638 Mail Service Center
Raleigh, N.C. 27699-1 1 3 8
Dear Mr. Sollod:
SUBJECT: Regnest !or Revision of Ezisting CAMA Major Development Permit: Permit
# 20-07 for Second Bridge to Oak Island in Brunswick County; TIP R-2245; Federal
Aid Project STP-1105(06); State Project 8.2231201; WBS # 34407.1.1.
The North Carolina Deportment of Transportation would like to request a revision to CAMA Major Permit
# 20-07 for the construction of Second Bridge to Oak Island in Brunswick County, TIP R-2245.
NCDOT's co~acLor for this project has requested a revision to the proposed layout of the temporary work
bridges within the AIW W (Site 5, Sheet 7) and excavation of high ground within the AEC boundary to
provide access to these temporary structures. As currentty authorized, the work bridges are not accessible
by barge due to inadequate water depths and can not be accessed from lend due to the vertical bank along
the shorelines.
Therefore an the south (island side) of the AIW W, NCDOT is requesting approval to excavate a temporary
access road beginning at approximately Station 54+35 down to an elevation of 7 ft at the existing bulkhead.
The contractor also proposes to place a temporary sheet pile bulkhead along the shoreline between the
existing bulkhead and the work bridge to protect the shoreline and prevent discharges imo the AIWW. In
addition, the contractor is n~questing to shift the work bridge 20-ft to the west to assist in the construction
of the new permanent bulkhead. The contractor's proposal also eliminates the work bridge finger that is
parallel to the shoreline, reducing temporary impacts at this location by 2700 sq. ft. (Sheet 5-26, revised).
On the north side of the AIWW, the contractor is proposing to build a temporary access road beginning at
approximately Station 63+00 down to an elevation 7.5-ft at the proposed work bridges Temporary sheet
pile will also be installed along the shoreline where the access road joins the work bridges to help protect
the shoreline and prevem discharges into the AIWW. A reconfiguration ofthe work bridge is also required
which will eliminate the work bridge finger that runs parallel with the shoreline and replaces it with a 32 ft
x 120 ft work bridge parallel with the authorized work bridge and perpendicular to the shoreline (Sheet S-
27 revised). This reconfiguration increases temporary impacts for work bridges on the north side by 340
sq. ft.
In summary, this proposal reduces the open water temporary impacts for the work bridges by 2360 sq. ft
and does not include any additional encroachment toward the navigational channel. Furthermore, all
proposed excavation for the temporary access roads and installation of temporary sheet pile is within high
124 Division Drive, Wilmington, NC 28401
PHONE: (910) 251-5724 FAX: (910) 251-5727
ground above mean high water with no impacts to 404 or coastal wetlands. All sheet piling and work
bridges will be removed when the required work as been completed and the access road will be back filled
and restored to the natural contours as much as possible. NCDOT will make every effort to stabilize these
areas with matting and naturnl vegetation, however given the steep vertical banks at this location the
Department would also request approval to stabilize these slopes with rip rap if required.
Therefore, NCDOT is hereby requesting a revision to CAMA Major Permit #20-07 to allow for these
proposed changes to the temporary work bridges and the eonstrudion of a temporary access road as
descn'bed above and depicted on the attached drawings. NCDOT acknowledges that 5100.00 may have to
be debited against the WBS element provided above if it is determined that this request is deemed as a
minor modification rather than a refinement.
Based upon comments from Mr. Dave Timpy (USAGE) and Ken Averitte (DWQ) at tbe field meeting on
September 6'~, the proposed revisions as described above would not require a modification to USAGE
Permit No. 199506041 and DWQ Individual Certification No.3609. Therefore by copy of this
correspondence, NCDOT is hereby providing the USAGE and DWQ with revised plan sheets for their files
as requested.
If you have any questions or need additional information please contact me at (910) 251-5724.
Sincerely,
~~
Mason Herndon
Division 3 Environmental Officer
W/attaehment
Mr. Dave Timpy, USAGE, Wilmington
Mr. Stephen Lane, CAMA, Morehead City
Mr. David Wainwright, DWQ, Raleigh
Mr. Ken Averitte, DWQ, Fayetteville
Mr. Brett Feuhier, NCDOT NEU
Mr. Jce Blair, NCDOT Division 3
124 Division Drive, Wilmington, NC 28401
PHONE: (910) 251-5724 FAX: (910) 2S1~T27
~ 0O'SO + 69 'd.LS -~`~ 8 .L~I~S ASS S11IIT HJtL dW
5 ~ ~ ~'
s N
a ~~ / o~~ a ~ \ b
,~ z o u_ ~,
~ •• ~ w b
w a ~ ~
. .. ..
r
U W~ ~ ~ F F f
~o`C . ~ .. ..a. ~ .. ~ .. f:?
U ~3
C~ ~ O ~~~o Qa
o ~ ~ ~ (3 (3
.... ..
~, ...
~y ~~ ~ ~
p O ~~
~ ~ ~~~~
h o ~ ~ ~ ~ __ ~,f...._...--.. .. s
zo a
N ,~
~
o
sub j'= $
Q~y« ~
~~~ ~ >,
~ ~
p 0° ~ d3 W~~~ ~$ ,
~ i
.,I ~ ~ Q ' Z . 2 ~ W
€~ N O U
R' w
ZF
~ ~ ~ I
Q~
~ J
~ ~KWSTµ rY[M••r
. s eS' x
' ~r' N
w• __.__
10WN Oi OAK to AN~
~
s e1. ~.n.. io.ai•
^-'-" YOWN OF OAK ISLAI~O H
~
E ~
~
~, ~ 8 ~ ~ ~
~ ~ g
~ O ~ I °~C ~ '
F ~ 3
s
~ ~~flfl
r,~ii ~
¢~
4~~ 4
~ '
t tt
~'l M
Q
t
~ ,~I
'" ~ L~I
~ ,
I I c
~
i
N e}' S0'. I5' r
i w
r ~ s~
~~ ~
~O®
yl V
.. ~~
~~ ~~
b/(I/8 I
~ 4 ~ ,
^
~J a ~ 54 ~E sg f ~~` a"R at ~; ~~
~~ ~~ ~°~b~ G3 I ( E
^ a1 b : q ~' ya I ]Y ~a' 62'
SLi ~ 1 ~ (3 7 1 Z S s 7rw'ts'E s esm'orc
H ~ ~ ~ I I ~ ~ s. , i . eox:, w.is• D
1 1 K er so' : • • . ~ . s9sr
a.~x' co.oe' ~- ]
'1 a I
•. ~ ~ ~ '6 ~~ •. $ F 71 W
~~q' 1 ~ 1 u _ 1 1"
4 a ~ s 11=
~ 1~1 a ~ i ~ ~~ 1 sl
11S ``•'
r,o,i _ 1 so ~ J
O
~~ ~i x
,(- ~ 1 I
--- - "s~~~M.. I
Q~~ ns~ne n '• 1 I
gg 1 >sId {~ 1 1
C OO ~ ~` 1
p e ~ ~ ~ ~ • 1
it h ~ _, 000 I r ~ LL' ~ ~ZZ
C~: Q a I ~ •1.95 ~ G O
r ~ ® • Fi
` ~ ,<x i ~ •,~ OE
s.,e...~ ~- 7~
5 77•~6'trE
N t7• ~ }r r ~x`g~ ~ i . rro.o~•
. 59.1-t~ O _ u
's r
'ems a
I I , ~ O n.u•
~ ~ ~ ~
I „ m ~ ~ of
-a ~ ~ ~
Q .. .. _ _1 I ,, 1 :Q~ ~
•N 77 ~i'xl'r•'~ ~.~ r~ el' ~~ 71~i'xl'f ~~ ~ r ,-~ ~
W .•
t tQt
•e~ ~ ~ O n s7 ,~®~ 1 ~ ` vii ~' i
:_~ _ _ I ~ ~
..ee.ir -~ ~e.3~ ~ •. Y
• ~ ~ ~ ~
OO'OZ+DS'dtS JI- 9 Z3~AS ~S HNI'I H~(LdW
u6p•Ce .{<d ~cw.ad
~~~
~~~q
~~ a
~~~
~~~~
9y~~ y
~~~ ~
O
O
°aa ~ a
~~~~
•i N ~'1ah
9E'~I 9t0%-J371.61
i
3
1
i
~,
3
{{~ '
,~
fIL1 FACE Q END BENT °1
STA,53+10.00 -L-
,;RADE POINT EL63.320
SPAN A
1'-0"BERM
i tMINJ
i'-6" EXP.
4'CONCRETE SLOPE
PROTECTION
2:1 SLOPE
~FILL~
HP 12 X 53
STEEL PILES EL 22t
EL. 22t
APPROX,EXISTING
GROUND LINE
END BENT #1
SPAN B
FIX. EXP. FIX,
EL 20.59T ~
TOP OF PROPOSED
FOOTING BULKHEAD
-- --------------------E --} - - _ _-
EL. 24 t
HP 12 X 53 EL. 23+- .16t
STEEL PILES
6'-0'0 DRILLED
BENT ~1
F.A. PROJECT N0: STP-1105 (1~)
52000'/. -5.20ppy
PI= 58+00.00 -L- ~ ,• ,~. „', 'K„y.
EL: 88.80 ,,.4t '
VC= 800' .-
GRADE DATA -L- °~ w ~°
SPAN C
NOTE: 65'-O'MIN.VERTICAL CLEARANCE
(A MHW ELEV.
tL. y. ruu 0100 EL 1L6
TOP OF ~ 050 EL. 10.1
FDOTINC
- ~MHW EL. 2.T
-^---- -.._ __^ - ~lW EL.-1.5
.0` EL.Ot
EL.-5t
BENT e2 EL.-1St EL,-l5t EL.-IOt
w
SHEETS FOR DETAILS.
~, R-2245
iWICK COUNTY
58+00.00 -L-
BRIDGE N0. 229
PLAN
(PILES AND DRILLED PIERS
NDT SHOWN FOR CLARITY)
er , R,D. MARTIN oarE ~
6Y , B.C, NANKS Date :
- 6Fal
23929
ss~a~cL
i/.e/-r
7~h a Noon cuanu
IT OF TRANSPORTATION
~~
GENERAL DRAWING
FOR BRIDGE ON SR 1105
NORTH MIDDLETON AVE. OVER
THE INTRACOASTAL WATERWAY
BETWEEN SR 1104 AND NC211
aevisioNS ~ sxEEr Na.
r~ 6Y, uarE, ~, T" uatfi~ s-z6
98
~9-,uw-zoos os~~9
~ I C.H. rttuucu i ivu: s i c
FILL FACE A END BENT 'I 5.20002• -
STA.53+10.00 -L- PI= 58+00,00 -L- r" ~ ~ ~
GRADE POINT EL.63.320 EL.= 88.60 ~~,~-~_;:,~F~. ... , - . ,
SPAN A vc= soa .
GRADE DATA -L- ~~ ~ _ ~ _ "~' ~~-
i'-O'BERM SPAN B
(MI"•' SPAN C
FIX. EXP. FIX.
1'-6' EXP. NOTE: 65'-4'MIN, VERTICAL CLEARANCE
4'CONCRETE SLOPE r A NHw ELEY.
PROTECTION caiw G ~ `~ y, /
2:1 SLOPE ~~a EL. 20.591 ~mjQ ~Ok6!
~ ~w FOOTING PROPOSED
FILL Nu BULKHEAD EL. 9.100 0100 EL. 11.6
------------- - - ~ ---- - --- ------------------------ - TOP OF
- - ~l-.- f00TING ~ 050 EL.10.1
HP 12 X 53 EL.23t ~ ~% Ul~~~ ~,~/ ~~ ~ NHw EL. 2.7
STEEL PILES EL.22s EL.2gs ` / ~~~ .. _ _ ~ r14LN EL. -l.5
EL 22 s __II__
EL.23s EL16s - ------~-_
HP 12X53 ---
APPROX. EXISTING STEEL PILES EL. 7± - -- -''
____..
,_`-
GROUND LINE 6'-0'0 DRILLED PIERS E .Os EL Os -_------
EL. -5s O
END BENT #1 BENT ~1 BENT #2 EL. -15s EL. -15s EL l0 ~
H ~~
SECTION ALONG -L- Tim/• ~tif~r p~~c f3,vcxHEbv~ o
_ _ _ _ . _..__. ~ ~ /,~, x G M/~ W/~ s
f+ ?.nrec/ gunk ~~z7 ~ ~ ~/ir.~C r' ~ 9 c~
TEMPORARY ~/ rO ~ /O ~ SEE BULKHEAD SHEETS FOR ' 1
..-- ~ WORK BRIDGE J x (O ~
4'CONCRETE SLOPE ~. ~ Q
PROTECTION - pGG ~I ~
Y6- \
l N N
159'-9 m
MIIL HORIZONTAL CLEARANCE Z
1'-O'BERM (MIN.1 ~ S 3+ - - ~ ~- z
L.52,243 (LEYEU f STA. 11+90.80 -Y6- :. s/f/~T ~ l~ I ~
~ ONTROL LINE I I BENT •2 ~GLE!I'lZ. ~(IL.Y~ O f~f i°n~
I ~ CONTROL LINE BRIDGE I.D.
I PROPOSED ~ ~<:D ~
BEGIN APPROACH SLAB I BULKHEAD STA. 58+00.00 -L-
STA.52+06,00 -L- I ~
I ~
I m
~ r~' ~Or ,QEOV/% s
TD..--_~ I ftT Tif/S 7/N~E
I
1
_ f)
90'-00'-00'
D ~'~ D
FILL FACE A END BENT s1 ~ v1> z
STA. 53+10.00 -L- m ~ pp s2 Flo z
z STA. 54+35.00 -L- ml'; / BENT'2 ~
~ I ml~ TEMPORARY BENT STA. 56+60.00 -L- a
Zil FOR CONSTRUCTION
MIN. HORIZONTAL I
CLEARANCE= 20'-8" (
t40'-0"
PROJECT N0, R-2245
12s-o•(sraN a) 2zs-o•(sPaN a) 2eo'-o'(sPaN c) BRUNSWICK COUNTY
980'-O'ROTAL LENGTH OF BRIDGE FILL FACE TO FILL FACE)' STATION: 58+00.00 -L-
J SHEET 1 DE 6 BRIDGE N0.229
nAre ~ «a~x unanu
DEPARTI~NT OF TRANSPORTATION
~~
PLAN GENERAL DRAWING
(PILES ANO DRILLED PIERS ~ Rp//9Ul~G ~,rjfD ~a~lyru~ u~~ „„,.,,,„4 FOR BRIDGE ON SR 1105
NOT SHOwN FOR CLARITY)
"°~"`~ ~` NORTH I~IDDLETON AVE. OVER
Lee Construction Company of the ; :~ `~''_;
Carolinas, lnc ~/Or~ f~~L1CfyC qnd' ~~f~~i~ ~ _~ - THE INTRACOASTAL WATERWAY
P.O. Box 7667 ""` ~ ~ BETWEEN SR 1104 AND NC211
Charlotte. NC 28241 ~"`~~ac,x~~~'' ~YISI~+S ~T ~.
.s~t~~ B+~ wtt. or. o~~ 5-26
awn eY : R.D. MARTIN p~,T~ ; 4/8/05 +GB/ z 9 $ sibs
~ECKEO g~y_ B,C. NANKS OArE : 9/6/06 g8
~I
a_____. -.--
5 r 1 Su Sti' UO y
5.2000'1• -5,2000%
PT= S8+D0.00 -L-
EL: 88.80
YC= 800'
GRADE DATA -L-
SPAN C
NOTE: 65'-O'MIN.VERTICAL CLEARANCE
~ MHW ELEV.
FIX. EXP. FIX.
~k<uY' ~i
/~QQ~' EL.3L59i
TOP OF
0100 EL.11.6 ti
050 ELl0.1 Ff
' ~MHW El. 2.i
----- - ~MLW EL.-t,5 -- -~
EL. -5t EL. -3i
EL. -10t
EL -15! EL -15 r;
BENT #3
w
z
H
z
U
F-
CQ
L
A.
-L-
M
m
m
H
Z
p
Cpl
Io
p
F
f
n
s
s '~
r
z o
z o
~ o
SPAN D
F,A. PROJ. NU; 51 t'-t1t~,
FILL FACE ~ END BENT °2
STA. 62+9D,00 -L- ~ ~"'y'~~~(~'~<~
~~
GRADE PRINT EL.63.320 ~;
SPAN E BECIN FRONT SLOPE
STA. 63+09.02 -L-
1'-O'lMIN.)
RT GRADE POINT EL.62.331
H BERM
EA
CLA55 II RIP RAP EXP ~ 1'-6'
f2'-0' THICK!
L
201 SLOPE FIL
FOOTING - _ ---- -'
~~~~ i~r(. EL.7.S ~ --~ l-r-- EL.43>
EL.32t EL.31t 36Y STEEL PILES APPROX. EXISTING
GROUND LINE
EL.26r EL 383
EL.Ot EL.It
6'-0"0 DRILLED PIERS
NP 12 X 53 EL.38i
i STEEL PILES
BENT #4 END BENT #2
SECTION ALONG -L-
" TEIu~ORARY /. ~O ~~ /So 2t
~WORK•BRIOGE
a. 3z `X ~zo `~ ~-
I
O
STA. 59+40.00 -L-
.. ',
.....
T~rrl~ . ff l~l%
/110 s'~}ownl
!¢~~iE ~.
225'-O'(SPAN Dl
80'-0"fTDTAL LENGTH OF BRIDGE FILL FACE TO FILL
,1
PLAN
~~ ~Y = R.O. MARTIN
---~` DATF: 4/8/05
Lee Consmlction Company of the
Caro]inas, Inc
P.O. Box 7667
Charlotte, NC 28241
(PILES AND ORILLED PIF~RS
NOT SHOWN FOR CLARItYI
N ~ ~ ~ '•/'' ..
CLASS II RIP RAP
~'-O'THICKI ~ ~.
1"'
s~r~r ,~~ ~ cuss
I~ ~ ~ 5243 BEGIN FRONT SI
~f ~~~D ~ CONTROL LINE ~ 4.EYEU STA. 63+09.OZ
/~/d/CGlr S!al~s
END APPROACH SU
_~ STA. 63+]4.00 -L-
. Mir
NCG~`f
f~~li~k TO NC 211
----
A.
._~.
TYPJ
r~ES~DlIE ijs REfr~/iJi?~'
Whr~/ Goat f/c ~~~
STA.
;;2Q~'%
S~
!1926
`C,..
/,el~,
r '2
PROJECT N0. R-2245
BRUNSWICK COUNTY
STATION: 56+00.00 -L-
SHEET 2 OF 6
n~tE a wnx v~wM
DEPARTMENT OF TRANSPORTATION
wtia
GENERA(. DRAWING
FOR BRIDGE ON SR 1105
NORTH ~iIDDLETON AVE. OVER
THE INTRACOASTAL WATERWAY
BETWEEN SR 1104 AND NC211
NEYISIOrSS SffFT ND.
ar, o~r~ m, oAt~ S-2T
9 ~5
98