HomeMy WebLinkAbout20070047 Ver 2_Request for Revision_20071023,.
.,,,,.,s
STATE of NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDO TIPPETT
GOVERNOR SECRETARY
October 23, 2007
Stephen Lane
NC Division of Coastal Management
400 Commerce Ave.
Morehead City, N.C. 28557
Dear Mr. Lane:
SUBJECT: Regaest for Revision of Eiistiag CAMA Mnjor Development Permit: Permit
# 20-07 for Second Bridge to Oak Island in Brunswick County; TIP R-2245; Federal Aid
Project STP-1105 (06); State Project 8.2231201; WBS #34407.1.1.
The North Carolina Department of Transportation would hlce to request a revision to CAMA Major Permit
# 20-07 for the conswction of Second Bridge to Oak Island in Brunswick County, TIP R 2245. NCDOT
is requesting authoriTation for temporary work trestles at the Davis Canal crossing on Middleton Ave.
According to the contractor, the existing bridge's substructure will not support the weight of the equipment
required to construct the interior bents. Therefore he has submitted a proposal for a temporary 30 ft x 30 ft
work trestle on both the sides of Davis Canal (Sites 3 & 4). Each work trestle will require two 24" pipe
piles to be installed in open water within the permitted footprint of the bridge. A total of 12.57 square feet
of open water will be temporarily impacted by this request.
Therefore, NCDOT is hereby requesting a revision to CAMA Major Permit #20-07 to allow for the
proposed temporary work trestles at Davis Canal as descn'bed above and depicted on the attached drawings.
NCDOT acknowledges that $100.00 may have to be debited against the WBS element provided above if it
is determined that this request is deemed as a minor modification rather than a refinement.
Per Mr. Dave Timpy (USAGE) and Ken Averitte (DWQ), since the trestle will not resuh in any additional
penvanent impacts and will be constructed within the existing permitted footprint, a modification to
USAGE Permit No. 199506041 and DWQ Individual Certification No.3608, DWQ Project No. 20070047
will not be required. Therefore by copy of this correspondence, NCDOT is hereby providing the USAGE
and DWQ with revised plan sheets for their files as requested.
If you have any questions or need additional information please contact me at (910) 251-5724.
Sincerely,
i~~ ~~
Mason Herndon
Division 3 Environmental Offiicer
124 Division Drive, Wilmington, NC 28401
PHONE: (910) 251-5724 FAX: (9l0) 251-5727
cc w/attachment
Mr. Steve Sollod, DCM, Raleigh
Mt. Dave Timpy, USACE, Wilmington
Mr. David wainwright, DWQ, Raleigh
Mr. Ken Averitte, DWQ, Fayetteville
Mr. Brett Feulner, NCDOT NEU
Mr. Jce Blair, NCDOT Division 3
124 Division Drive, Wflmington, NC 2$401
PRONE: (910) 2515721 FAX: (910) 251 5727
10
0
r4 8292%
GRADE DATA r u~ r at~t w t.n. ~1
ELEY? 0 0314 L
PI STA. 16+10.00 -L-
ELEV.=20.62
YC ~ 250'
BEGIN FRONT SLOPE
STa 20+61.35 -L-
EL.20.046 ~
_~~ r .. ~--~ ----
APPROZIMATE W
NATURAL GROlX10
HP 12 X 53
STEEL PIL
(TYPJ
®LAICLASSIFIED
STRUCTURE EXCAVATION
-o°-AIN. SPAN A
1RTH BERN (TYP.)
EXP.
ri SLOPE 1%:l
NORMAL TO
~• ~ CAP (TYPJ
w
0
END BENT *1
/ CLASS II
" RIP RAP
KJ'Q
QQOSJ~ 1'-0" 11IN,
o UOOO 0 ~ EARTH BERM
. EL 14.150
II
~I
II
w.P. =1
STa 20+66A/ -L- 1 I
TO SR 1104 BEGIN FRONT aoPE
fN AIIDDLETON AYE. ST ~
A. 20+61.35 -L- I I
J ~ '
_ I
I
1
FILL FACE 4ir
END BENT =1 ~
I
I
1'-T"MIN. BERM
II
II
II
II
II
II
rh.,
LI
[1+50
1
SPAN 8
22+00
SPAN C
Fix. FIX.
FIX. FIX.
BENT •1
CONTROL LINE BENT •2
CONTROL tINE~ ! EXIST.
I~ SUBSTRUCTUR
EXIST. ~
EXIST. SUBSTRUCTURE
r- `SUBSTRUCTURE
TORE l.-.1 LLL
~. f i15 OCT, 941 I 1
II rr r
II ~
II MHM2.1 II jj
II ~ II ~ II
I I MTL 0.6 I I I I' w
II II
).~ 11 ~ _ II
*~l`` ILL I1 C
-- ^o lam!
e M -
N N 17
Ifj Y) I
~ ~ J
W
. -2Si: w w I6'TH STEEL LPILE
BENT *1 TIPS (TYPJ
BENT *2
SECTION ALONG ~, -L-
M ~.
EXISTING
~~ lI1E STRUCTURE
(TYPJ.
~T '
' ~s>'rlr
' II
1 I II
I ~ II
I I II
--I 1
I
I
I
(SPAN
II
I I 4 -L-
II
II
II
II
LJ
BIG DAVIS
CANAL
CLASS II
RIP RAP
22+50
FILL FACE A E.B. =2
STA. 22+33.56 -L-
EL.19.529
BEGIN FRONT SLOPE
STA. 22+3g,61 -L-
® E1.19.514
F~ ~ N
/ p_ w
END-BENT *2
F.A. No. STP-1105l17)
~- N ~
m (/~St~t
a
BENT =2
/ ~ CONTROL IINE~
a ,
E
1 I I
II
t I ~
BRIDGE ID I
STa 21+50.00. -L- , NP
j j STa
II
~'~'~'
(TYPJ I I I
iI
II ~
" f
LJ
27'-6•
(SPAN ~
FACE A END BENT =1 TO FILL FACE 0
'21
EKP.
1'-7"MIN.
BERM tTYP.)
« q
* ul ~
o M
ri ~
w
I\
I~
it
~ i\
II
II
LJ
N
EARTH
EL. (3.648 r.
1'-T"MIN. BERM '
c)
I
I
I
I
I w.P. =4
sra 22+3366
I BEGIN FR
I STa 22+3
I
I,
I
I
I
I
I
'~"FOeFE~~Tn
1
I
I
I
M ~
TO SR 1190
~ ~ TO TMTf~OASTAI
MATFRIIAY
END
M
PROJECT N0. R-2245
_ BRUNSWICK Col1WTY
STATION: 21+50.00 -L-
~'~ slfEr 1 GF 3 eEPLncFS BRIDGE =20
~..~I~I.~I,
IttT4 OEQAATI~NT Of TRAHSPdRTATYQN
' ~ .aa~.
CUSS II
RIP RAP
qU~ aY ~ AI`M.P/ MD.PISO LATE : }0 /2006
QECKED BY ~ I FR CATS ~ 09/2006
PLAN
IPIlES NOT SHOWN FOR CIARITYI
EXTE?q RIP RAP TO
EXISTING 81nKUCan
905
N
~, ,~~,yp S-1
9N(Inl. 1 ~1°F~4s
'~~~°~ GENERAL DRAWING
A
FOR BRIDGE OVER
.~
BETWcEN SR 11 4 &NSRR11
r ~Lrsuaa s+EET
00 M14 115 01114 .
y
~A
1 ~
~~
~~
~~
I ~~
n~
fr4V~T Ltl!\WI4IA learn
ti
~^
~~
~w
~~ d y ~~ ~
~ y ~ ~ '~
`-'~il'n
~,
a
a~
~~
~~ I~
,~~ ~ ~
~n1 ~j
2ti ~
~!
><><
~~
~~
~~
~I/\
S IV
~N
1~
~~ ~~
~ ~~ ~~
><k
~~
v
t
~AA~
2A~
2
t
t
~~
~~
~~
~c !
~k
~~
ti~
~k
a
C
h~
h~
z
t
~r~
~~~~~e
m~~~
k
W~~
~~~~;
~~~~
~~
H
0 I~
A
_._~_.
ti
k
a
---~-
F ~ M
a ~a
b ~ _ ~ ~
~; °x ~ ~ ~;
~ -~
a~~ ~~ ~"
~niinumuo ~ ~ ~ ~ v
~~~~~~a ~ ~ ~~ ~~~~;~~~~~
~. a
~ a ~~ ~ ~^~ ~ ~ ~ ~~~~
~ ~ ~ ~ g ~ ~~~ ~~ ~~ ~ ~~ ~
~ ~ ~ ~ ~ ~ ~ ~~ ~ ~~< ~ ~ ~a ~~ a
o ~~ ~~
~ ~ ~ ~ ~ ~ ~ ~~ A~~ ~~~ ~ ~ ~' ~~s
c5$ _ '~ ly .~ . c~ ~ ~ ~~~ ~~~ to v q u ~ ~~~ v~C ~ ~ ~ aQ~
~~~ ~ ~ ~ ~~~~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~ ~~~.~ ~ ~~~~ ~ p~~ ~~ ~ a~~ ~~ ~Q~ ~~~
~c~, g ~ ~ u y ~ ~ ~ ~ ~~~ ~~~ `~ ~ ~ mac., y ~~ . Q~ m
a O ~ ~ ~ ~ ~ $ a a sa ~ a ~ ~ ~~i ~ ~ ~ ~
~ ~ ~~ ~ ~ ~ ~~~ ~~~ ~ ~ ~ ~ ~ ~~ ~~ $~ s~~
v I V „7 » ~ N N ~~~2 ~ my
~~ ~a ~ ~g~
~~ ~o~
~~
~ y~ z
~~ o
~_"
~~ ~~
~~~
~
~~
a ~~ ~
~~y
`°. T{,
~~ ~ ~
~~~
9~
a~ ~
~2 ~~m
~h
~
~~
~~ QC
~~
~ ~~
~~
~
~
a ~
~~ ~
~~a
~~~
~~
M
Q Q
~ ~j~
~