Loading...
HomeMy WebLinkAbout20160123 Ver 1_BMP OMA bioretention_20160323Burdette, Jennifer a From: Burdette, Jennifer a Sent: Wednesday, March 23, 2016 2:18 PM To: 'Julie Quinn' Subject: RE: 2700 Manning Place Fwd: Mid Century Modern Renovation Attachments: BMPMan-OMA-Bioretention-20080206-DWQ-SPU.doc Julie, Please see the following link for guidance on designing and planning a rain garden. At the end, it includes a list of the maintenance items that are required to ensure proper function of the rain garden. Also attached is the O&M agreement for bioretention areas. Replace the table section of the bioretention form with the table at the end of the rain garden document. We require treatment of stormwater runoff from impervious surfaces at least equivalent to the amount of proposed buffer impact. https://brunswicl<.ces.ncsu.edu/wp-content/uploads/2013/04/Bacl<yard-Rain-Garden-Manual.pdf?fwd=no As we discussed via telephone, a drainage easement around the rain garden that connects to the public ROW is required. A deed restriction is also required that ensures the rain garden/drainage easement will be maintained in perpetuity. Also, if you submit a revised site plan that involves more buffer impact, please include an explanation as to why the revised plan is necessary and an updated application form including securing a revised statement of availability for mitigation. Thanks, Jennifer Jennifer Burdette 401/Buffer Coordinator Division of Water Resources - 401 & Buffer Permitting Branch Department of Environmental Quality 919 807 6364 office iennifer.burdetteQncdenr.gov 1617 Mail Service Center Raleigh, NC 27699-1617 (Physical Address: 512 N. Salisbury St, Raleigh, NC 27604 - 9t" Flr Archdale Bldg — Room 942F) Email cor etil'.)onc'lence to and ii`orn thio; address o; sutYect to t1he P,Iodhl Carolina Public Rai:'o1"ds L w and 1`Y7ay be disclosed to thloi d I'.'s' dies, From: Julie Quinn[mailto:julie@bwwattsconstruction.com] Sent: Thursday, March 17, 2016 12:16 PM To: Burdette, Jennifer a <Jennifer.Burdette@ncdenr.gov> Subject: 2700 Manning Place Fwd: Mid Century Modern Renovation Julie Quinn Project Manager Phone: (919)757-6380 Julie@bwwattsconstruction.com PO Box 162 Rolesville NC 27571 www.bwwattsconstruction.com www.facebook.com/bwwattsconstruction.com Begin forwarded message: From: <rick@mcmillan-design.com> Date: March 11, 2016 at 6:00:02 PM EST To: <julie@bwwattsconstruction.com> Cc: <michael@mcmillan-design.com> Subject: Mid Century Modern Renovation Julie, Attached is the preliminary floor plan of the Mid Century Modern for your review and comment. Mike had several key suggestions and we are both very excited about the new plan. Please contact us with any questions. We look forward to working with you and this project. Thank you, Rick Michaels, McMillan Design Permit Number: (to be provided by DWQ) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will remediate theproblem: The entire BMP Trash/ debris is present. Remove the trash/ debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention O&M-Rev.3 Page 1 of 4 BMP element: Potentialproblems: How I will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off-site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Foran SW401-Bioretention O&M-Rev.3 Page 2 of 4 BMP element: Potentialproblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off-site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919 - outlet. 733-1786. Foran SW401-Bioretention O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print name: Title: Address: Phone: Signature:_ Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, day of a Notary Public for the State of County of , do hereby certify that personally appeared before me this and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4