Loading...
HomeMy WebLinkAbout20160328 Ver 1_Riparian Buffer Authorization_20160401BaldwinDesign Consultants, Pa ENGINEERING - SURVEYING • PLANNING March 24, 2016 Karen Higgins NCDWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 20160328 REF: Riparian Buffer Authorization Form for Brookfield Sections 2 & 3 in Winterville, NC Dear Karen: Attached you will find the following documents relative to the above referenced project. 3 complete submittals containing the following information: 1. Riparian Buffer Authorization Form 2. Agent Authorization Form 3. Compliance With Wetland & Buffer Regulations Form 4. Deed Book 3188 Pages 526-528 of the Pitt County Register of Deeds 5. Map Book 69 Page 50 of the Pitt County Register of Deeds 6. Greenville SW, NC 7.5 minute quadrangle map with site and GPS coordinates depicted 7. Pitt County Soil Survey Map No.56 with site and GPS coordinates depicted 8. Google Earth GPS coordinates of approximate location of buffer impact zones 9. Letter dated 3/11/16 from Ms. Ramona M. Bartos of North Carolina Department of Natural and Cultural Resources State Historic Preservation Office stating that the project will not affect any historic resources 10. Letter dated 3/10/16 from Mr. Pete Benjamin of United States Department of the Interior Fish and Wildlife Service stating that the project will not adversely affect any federally -listed endangered or threatened species 11. Email dated 2/17/16 from Mr. Ken Riley of National Oceanic and Atmospheric Administration stating that the project is not likely to adversely affect essential fish habitat or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the NMFS. 12. BMP stormwater wetland supplement form 13. SA/DA sheet showing drawdown calculations 14. Drainage area map for runoff that is collected by stormwater wetland #2 15. Minimum Design Criteria (MDC) for stormwater wetlands 16. Stormwater Wetland Operation and Maintenance Agreement 17. Soils report by Aston Soil Works, Inc. 18. Stormwater wetland management plan with narrative and HydroCAD calculations 19. Sheets 1 and 2 of Brookfield Sections 2 and 3 plans 1700-D EAST ARLINGTON BOULEVARD, GREENVILLE. NORTH CAROLINA 27858 TEL 252.756 1390 FAx 252.321.1412 www.BALDWINDESIGNCONSULTANTS.com Please note that minimum design criteria (MDC) for stormwater wetlands was used to design stormwater wetland #2 in Brookfield Sections 2 and 3. Per attached minimum design criteria (MDC) it is acceptable to have a 15" temporary pool depth instead of a threshold maximum value of 12" that is indicated in automated BMP supplement form. In regards to seasonally high water table, since the proposed stormwater wetland #2 will be located in hydrologic soil group C, where soils are saturated, option 1 was used because no liner would be required. See stormwater management narrative for more details. Upon receipt and review of this information please contact me if you have any questions concerning this permit application. Sincerely, Ir $+-C'-� Igor Palyvoda, PE Vice President Attachments Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) — Buffer Authorization FORM: BA 10-2013 Riparian Buffer Authorization Form A. Applicant Information ME nn11 1919ule I 1. Project Information 11U1 191 2616 1 a. Name of project: Brookfield Sections 2 & 3 1 b. County: Pitt 1c. Nearest municipality: Winterville 401 &BUFF R P P 1d. Subdivision name: Brookfield le. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer 1f below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: Cooper Island Development, LLC 2b. Deed Book and Page No. Book 3188 Page 526-528 Of The Pitt County Register Of Deeds 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): Book 69 Page 50 Of The Pitt County Register Of Deeds 2d. Responsible Party (for Corporations): William Kuhn 2e. Street address: 300 Cotanche Street 2f. City, state, zip: Greenville, NC, 27858 2g. Telephone no.: (252) 205-7121 2h. Fax no.: 2i. Email address: 3. Applicant Information (if different from owner) 3a. Applicant is: ® Agent ❑ Other, specify: 3b. Name: Igor Palyvoda 3c. Business name (if applicable): Baldwin Design Consultants, PA 3d. Street address: 1700-D East Arlington Boulevard 3e. City, state, zip: Greenville, NC, 27858 3f. Telephone no.: (252) 756-1390 3g. Fax no.: (252) 321-1412 3h. Email address: ipalyvoda@baldwindesignconsultants.com FORM: BA 10-2013 Page 1 of 6 INTERNAL DRAFT- NOT FOR PUBLIC USE Section A. Applicant Information, continued 4. AgentfConsultant Information (if applicable) 4a. Name: Igor Palyvoda 4b. Business name (if applicable): Baldwin Design Consultants, PA 4c. Street address: 1700-D East Arlington Boulevard 4d. City, state, zip: Greenville, NC, 27858 4e. Telephone no.: (252) 756-1390 4f. Fax no.: (252) 321-1412 4g. Email address: ipalyvoda@baidwindesignconsultants.com FORM: SSGP3080 8-13 Page 2 of 6 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Parcel 76198, NC PIN 4674973734 1 b. Site coordinates (in decimal degrees): Latitude: 35.518734 Longitude: -77.390019 1 c. Property size: 17.77 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Unnamed tributary to Fork Swamp 2b. Water Quality Classification of nearest receiving water: C; Sw, NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing land at the proposed project site consists mostly of open field, grass, woods, and pine saplings. There is residential development in the vicinity surrounding project site on 3 sides that consists mostly of % acre residential lots from other subdivisions and section 1 of Brookfield subdivision. 3b. Attach an 8'/ x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 2438 3e. Explain the purpose of the proposed project: The purpose of the project is to complete construction of residential lots in Brookfield subdivision sections 2 and 3 and stormwater wetland #2 that will treat runoff and discharge it into unnamed tributary to Fork Swamp. 3f. Describe the overall project in detail, including the type of equipment to be used: It is anticipated that all conventional types of earthmoving equipment will be used during construction. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (if known): Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ®yes ❑ No 6b. If yes, explain. Phase 1 of the project has been approved in 2008 and has been constructed already. Phases 2 and 3 have been reviewed by Town of Winterville and are to be resumed and completed in 2016. FORM: BA 10-2013 Page 3 of 6 ' C. Proposed Impacts Inventory 1. Buffer Impacts 1a. Project is in which protected basin? ® Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact number — Permanent (P) or Temporary Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) 61 ® P ❑ T New stormwater outfall through riparian buffer Allowable Unnamed tributary to Fork Swamp ❑ Yes ® No 252 168 B2 ❑ P ❑ T ❑ Yes ❑ No B3 ❑P El ❑Yes [:]No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 252 168 1c. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Stormwater wetland #1 of section 1 was constructed far away from the blue -line stream so that its outlet would not interfere with riparian buffer in order to avoid any impacts from stormwater wetland #1. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction limits will be precisely located in the field to avoid further additional impacts. Silt fence will be provided along entire riparian buffer length as part of erosion control measures whose purpose is to avoid and minimize impacts from the construction of the project. FORM: BA 10-2013 Page 4 of 6 C. Impact Justification and Mitigation, continued 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact s uare feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: FORM: SSGP3080 8-13 Page 5 of 6 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ® Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. la. If due to site constraints, a BMP other than a level spreader is proposed, please provide a ❑ Yes ® No plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP of public (federal/state) land? Manual and attach a BMP Supplement Form. 1 b. F. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use ❑ Yes ® No of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (if so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H.0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after -the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): . )PC l y V ad 1�--z3--IDW A0I licant/Agent's Printed Name U Applicant/Ag nt's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service: NC DWR, Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 For all other projects sent by First Class Mail via the US Postal Service Karen Higgins NCDWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 For government transportation projects sent by delivery service (UPS, FedEx, etc.): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, FedEx, etc.): OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 FORM: BA 10-2013 Page 6 of 6 SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. I-7.77 V PLAN NO. PARCEL ID: % 0 9 s STREET ADDRESS: O.-; n % Ie S S ©V +� O 4-e \ y of S 2 G % pyl 14 Please print: Property Owner: C o Property Owner: Dzvo 6 c -,vv -evit . U - The undersigned, registered property owners of the above noted property, do hereby authorize �0Po,Cvv'a ca- ,of % d wi n )Desi` �aYtSv[[ V\r)-�5, (Contractor / Ag nt) (Name of consulting firm to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Gceemrril��_ N("_. 1--7 -S 0 06 Telephone: We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. W��b- Authorizedignattu/re I Date: - - Authorized Signature Date: Date: March 24, 2016 COMPLIANCE WITH WETLAND & BUFFER REGULATIONS In accordance with Title 15 A NCAC 2H .0500, the following DEED NOTIFICATION shall be recorded in the Pitt County Registry prior to the conveyance of lots. Said Deed Notification shall apply to name of subdivision, lot numbers in Pitt County, North Carolina as shown on plans titled Brookfield. Sections 2 & 3 prepared by Baldwin Design Consultants, PA dated: 02/18/16. "A portion of this lot has been determined to meet the requirements for designation as a wetland, stream or protected stream buffer. Any subsequent fill or alteration of this area shall conform to the requirements of the state rules adopted by the State of North Carolina in force at the time of the proposed alteration. The intent of this provision is to prevent additional wetland, stream or buffer filling or draining, so the property owner should not assume that a future application for filling or draining would be approved. The property owner shall report the name of the subdivision in any application pertaining to said rules. This covenant is intended to ensure continued compliance with' all rules adopted by the State of North Carolina and therefore the State of North Carolina may enforce benefits. This covenant is to run with the land and shall be binding on all Parties and all persons claiming under them." Signature: I-6, William Kuhn, M ber Owner's name: Cooper Island Development, LLC Address: P.O. Box 606 City, State, Zip Code: Greenville, NC 27835-0606 Phone Number: 252-205-7121 STATE OF North Carolina Pitt County I, Dawn L. Poaletti, a Notary Public of the State of North Carolina, Pitt County, hereby certify that the owner, William Kuhn, Member, Cooper Island Development, LLC personally appeared before me this day and executed the above certification. Witness my hand and notarial seal, this 'Zq -�' day of March, 2016 — ��aA-e� Notary Public My commission expires: 03/28/2019 I IIit/4 Q�•'• • ••. �.A �. Q.. XOTARk •�� puwo • ! Page 1 of 3 I Nu�IVllll I����YIIIYUI�VII�I���V��VIIIVII� � DoeID: 012184690003 Type: CRP Recorded: 01/14/2014 at 10:50:03 AM Fee Amt: $686.00 Pape 1 of 3 Revenue Tax: $660.00 Pitt County, NC Lisa P. Nichols REO OF DEEDS BK3188 PD526-528 ----------------------[SPACE ABOVE THIS LINE RESERVED FOR RECORDING DATA) -------------- NORTH CAROLINA Prepared By: HORNE & HORNE, PLLC COUNTY PITT Return To: Cooper Island Development, LLC Parcel Number: 76198 300 Cotanche Street Revenue Stamps 660, °' Greenville, NC 27858 GENERAL WARRANTY DEED The Preparer is informed that all or a portion of the property herein conveyed does not include the principal residence of the Grantor. THIS DEED, made and entered into this the 3" day of January, 2014, by and between BB&D, a North Carolina General Partnership, consisting of WILLIAM C. BOWEN, SR., General Partner, DEREK P. DUNN. General Partnerwhose address is 1990 Smythewyck Drive, Suite 200, Greenville, North Carolina hereinafter called GRANTOR, and COOPER ISLAND DEVELOPMENT, LLC, a North Carolina limited liability company whose address is 300 Cotanche Street, Greenville, North Carolina, hereinafter called GRANTEE; WITNESSETH: That Grantor. for and in consideration of TEN DOLLARS ($10.00) and other good and valuable consideration to him in hand paid by Grantee, the receipt of which is hereby acknowledged, has given, granted, bargained, sold and conveyed and by these presents does give, grant, bargain, sell and convey unto the said Grantee, his heirs and assigns, in fee simple, the following described real property, to -wit: Lying on the West side of Old Tar Road in Winterville Township, Pitt County, North Carolina and being all that certain tract of land containing 28.439 acres as shown on the plat entitled "Boundary Survey for MKRR Development, LLC", and recorded in Map Book 69 at Page 50 in the Office of Book: 3188 Page: 526 Beq: 1 Book: 3188 Page: 526 Page 1 of 3 Page 2 of 3 the Pitt County Register of Deeds, to which map is herein referenced for a more complete and accurate description. TO IIAVE. AND TO I[OLD the above described real property with all the rights, privileges and appurtenances thereunto belonging or in anywise appertaining unto the said Grantee, his heirs and assigns, in fee simple forever. And the Grantor, for himself, his heirs and assigns, covenants with Grantee, his heirs and assigns, that he is seized of said premises in fee and has the right to convey the same in fee simple; that the same is lice and clear from all encumbrances except easements and restrictions of record and 2014 ad valorem taxes which are to be prorated between Grantor and Grantee at the time of closing, noncompliance with local, county, state or federal governmental laws, ordinances, or regulations relative to zoning, subdivision, occupancy, use, construction or the development of the subject property, if any, and that he will warrant and defend the title to the same against the lawful claims of all persons whomsoever. When reference is made to the Grantor or Grantee, the singular shall include the plural, and any reference to gender shall include masculine, feminine and neuter. IN WITNESS WHEREOF, Grantor has adopted the word "SEAL" as his seal and has hereunto set his hand and seal on this the day and year first above written. BB&D, A North Carolina General Partnership BY: G -0 s y(SEAL) WILLIAM C. BOWEN, SR., General Partner SEAL DEREK P. DU , General Partner Book: 3188 Page: 526 Seq:2 Book: 3188 Page: 526 Page 2 of 3 Page 3of3 STATE' OF NORTI I CAROLINA COUNTY OF PITT I certify that the following person(s) personally appeared before me this day, each acknowledging to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: WILLIAM C. BOWEN, SR., General Partner. Witness my hand and Notarial Seal, this the /O f4 day of January, 2014. a�auululr/l�k i Norg9 NOTARY PgBLIC Prin I'yped Name: Wit. GBl,lp • i. My Commission Expires: STATE Ol COUNTY I certify that the following person(s) personally appeared before me this day, each acknowledging to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated: DFiREK P. DUNN, General Partner. Witness my hand and Notarial Seal, this the 1� - day of Januar). 2014. Book: 3188 Page: 526 Seq:3 Book: 3188 Page: 526 Page 3 of 3 � ®v1v®nommen X°eO.w:°J:Jiaam MIT, an Xnvru. son v o1rX asosR mJm v Im "van w-h JNv J. TafF NP1Na, of NMa X69 -50 SITE S -acPARK PMIIQRAr @old " anam ,EER alt SPOT .SET NNDN MNL XUTAON� fUl, �� SP - SET IRON PIPE PP . POWER POIE can/0-30-eY O/L - COIIOEl1E RMPIPE OFH6 � SPICE yQy CRAFT WPM 9 VICINITY MAP SM1OR2 w ]R w ,u g s s�ryEt' x SECIION X vxllt ,OXY C 7) i I(t'C 1 )� xm' JrtrA,t 10 xWn% msn RE]Ayt _ M 172T �IDY N SCSYO I{) 1! ATIt M Yn '61' C 9 ,,rt 1(1J R' N xpt t S Or 07 Ip' X {Yl l'Mt S 1-&W t S IOZYRSt M SI lY� ^ IXC s �T sS.iT I1 1 M VII'00'[ f1E01 "plq f uiu,p $! I.�pyt S 1pJ7 IE]D _ � �ayp, A. -.. YM 1 I - oa ,So; ,o : . RC5EWRDOD FARYsTsS, LLG s IYds�yti 1 TA •I f " ATO] 0. pIW I,EtAy LIM V. MdANIOM w NS. PC a.V WApf�y���y� A Y. KVM n � � IA IT] dL IOD NO (at0 OR FaC) I`_' ��s.� Cl]ETi1f�lIDM TIC 6 ,O mmY THAT M ,w Ira OPMR, r r IIOI® BOUNDARY SIAM1ET FOR aE R w o MIO AC,I,at Pm IMO S[IRET R16UISm UWI w OSR.T,OI tl0 SVOR>m, IIMT M OSOI t� OAST 1. AIL ACAS GANAIFD w COOIOSN7E GEOIE7IT. f MKRR DEVELOPMENT, LLC DE QDRlC b EMQAM<D [n L]IIIIIO[S A,O p` XissEp y 2 Tlt Y1P 6 AX FXfiPil011 ro ME OEilAT10N Q" A SA®AlA011. t Y O. TES PROPERTY 6 NOT LOCOED N A SPECIAL PLOOO IIATAIIOf.K DfIRR11Ar! 6 1,10.0o0.TMT M DDIIOIIO NOT NsscYm I,S! 9,OSN AS o,Slm TAE nwr ` gK AREA AS OER]IIIm BY M OEPARIIO/T OF NNISIIIG MO IEFERENM BON A PORTION OF ME PROPERTY OFSO® N ESTATE TES wr w ,vAIED N A4 ANPZ OIN 41 .7 O AS MOIDD, WIASS ,N 1D LAM M DEVELOPbENr FILE 4 Nl OF M PRT COUNIT 4usT a COURTS DPPIa. p i k {. NO PONIS SET N MON UNLESS ONEINT E NOTEDWICTERIALLE . GIUX'� w Mm PITIr _m Baldwin Asmum eN"law N'ERO�@ SID nre ,D/a/zm ,v t-«N { arnEo sw Ea,c ,• - au mom"'? vD Enc clsawr surRr ,Harr sacs 3nfN tit • .'n �> ; 22.1 Sf `~ inteoffie - - - a 1131 NMI If ' Yr , ,127 ` \ • _ I !I d 4! _ Ji- ,1 I fl) 1712 ll� 400 p tin I � „ V r ,yid I I ,r r jam/ • ' r ~` 'v �'I 1 O 1117 •\-• � � ! 0 � y 1�1 ' •'� � -, � --- -- 1171 f- O 279 '80 25• 281 282 '83 '84 SCALE 1:24 000 INTERIOR - GEOLOGICAL SURVEY, RESTON, VII STATE OF NORTH CAROLINA AA 11 S U-S-13-ARTNIENTOFTHE INTERIOR DMATMENTOFEWM GREENVILIE SW QUADRANGLE U.S. GEOLOGICAL SURVEY L_DRMUR� mwimiIcARouuA-MTTC0. NORMCAROUN 7 &MNM SERMS (fOPOGRAI'HIC) Y� f/ `Ir'F�•, A _1._-.-�_ _�� 1 M T, _71 j • r J_ zi mji ik. vs lilt; -4l" i 1:01.1 4 cs AL % V G 0 MI 43.1=9�S— SCALEM"m MME RECEIVED q- 3 0 2001 ... 4 GREENVILLE SIN. 14C LINA — SHEET NUMBER 66 l iy �yY Hr$ a e, a! ay NrA Go y 94 EbA was Nr H hir Ly" GvI►t f _ t GOA TWA LY aQB > h CinA Z fl`=$Y t 1 De$ Etat �� 4LD+i -! 1 �_ NPA ; • i i, Ly % lr- .. r C. Hd Nr .rte � � C L)k a 04 s 111 Ly fia C�tl� .._ Ya"7H S 1 ' Gah I ENr$ R `} l �f t �+1 .' Mr 15 L r QoA GOA Nroz :. t '+ a ♦ EnA r@ v J,' ktir ar LY WOO ; 5 a " N t3o9 r �i r Cb t CrBP Nr r q LY GOA t,� FsA Nrfl G+A G, Rb Lr C7 Ra tf ,4 { sib, GO Cr LY JEW f r� r Ly LxA I E A ra •�° C n aA I - 13u8 t - MtB Ra wao �. Ly . ,. ' LFA I h �irA •• � Ri'�,� .6 N G� ti ! was .. (inA t VIM i f ti• �'` Mrspf FA r $ F ,a � a JRA " gq 0019 T % - R" Nr$'r NrA f �} GOV • t Y: 6y t r ►l '' Boat - _Lo c N Nos We6 t a: s W QoA Hila }4 CroA d a 0 Ca 0`Lk Rb 1 OtA ! WiB s j gyp'•- �, Age WA8 1h LY 4y o 6 Wath �3- 1 -.'I *�,'- _.. Citi ,~_ .. �' 'aU 1/ Nrr� N` r8 — -- ' N H -- s- r " ' , F _ � 1 A l ' r- 1 North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Pat McCrory Secretary Susan Kluttz March 11, 2016 Igor Palyvoda Baldwin Design Consultants, PA 1700-D East Arlington Boulevard Greenville, NC 27858 Office of Archives and History Deputy Secretary Kevin Cherry Re: Construct Brookfield Subdivision Sections 2 & 3, 639 Brookfield Drive, Winterville, Pitt County, ER 16-0297 Dear Mr. Palyvoda: Thank you for your email of February 17, 2016, concerning the above project. We have conducted a review of the project and are aware of no historic resources which would be affected by the project. Therefore, we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill -Earley, environmental review coordinator, at 919-807-6579 or environmental.reviewgncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, (� LOQ4� 600"Ramona M. Bartos Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 276994617 Telephone/Fax: (919) 807-6570/807-6599 United States Department of the Interior FISH AND WILDLIFE SERVICE Raleigh ES Field Office Post Office Box 33726 Raleigh, North Carolina 27636-3726 March 10, 2016 Igor Palyvoda Baldwin Design Consultants, PA 1700-D East Arlington Boulevard Greenville, NC 27858 Re: Brookfield Sections 2 & 3 PCN — Pitt County, NC Dear Mr. Palyvoda: RECEIVED MAR 14 2016 Baldwin Design This letter is to inform you that a list of all federally -protected endangered and threatened species with known occurrences in North Carolina is now available on the U.S. Fish and Wildlife Service's (Service) web:.page at.http://www.fws.gov/raleigh.. Therefore, if you have projects that occur within the Raleigh Field Office's area of responsibility. (see attached county list), you no longer need to contact the'Raleigh Field Office fora list of federally -protected species. Our web page contains a complete and frequently updated list of all endangered and threatened species protected by the provisions of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.)(Act), and a list of federal species of concern] that are known to occur in each county in North Carolina. Section 7 of the Act requires that all federal agencies (or their designated non-federal representative), in consultation with the Service, insure that any action federally authorized, funded, or carried out by such agencies is not likely to jeopardize the continued existence of any federally -listed endangered or threatened species. A biological assessment or evaluation tnay be prepared to fulfill that requirement and in determining whether additional consultation with the Service is necessary. In addition to the federally -protected species list, information on the species' life histories and habitats and information on completing a biological assessment or evaluation and can be found on our web page at http://www.f\vs.gov./raleigh. Please check the web site often for updated information or changes. 1 The term "federal species of concern" refers to those species which the Service believes might be in need of concentrated conservation actions. Federal species.ofconcern receive no.legal protection and their designation does not necessarily imply that the species will eventually be proposed for listing as a federally endangered or threatened species. However, we recominend that all practicable measures be taken to avoid or minimize adverse impacts to federal species of concern. If your project contains suitable habitat for any of the federally -listed species known to be present within the county where your project occurs, the proposed action has the potential to adversely affect those species. As such, we recommend that surveys be conducted to determine the species' presence or absence within the project area. The use of North Carolina Natural Heritage program data should not be substituted for actual field surveys. If you determine that the proposed action may affect (i.e., likely to adversely affect or not likely to adversely affect) a federally -protected species, you should notify this office with your determination, the results of your surveys, survey methodologies, and an analysis of the effects of the action on listed species, including consideration of direct, indirect, and cumulative effects, before conducting any activities that might affect the species. If you determine that the proposed action will have no effect (i.e., no beneficial or adverse, direct or indirect effect) on federally listed species, then you are not required to contaef our office for .concurrence (unless an Environmental Impact Statement is prepared). However, you should maintain a complete record of the assessment, including steps leading to your determination of effect, the qualified personnel conducting the assessment, habitat conditions, site photographs, and any other related articles. With regard to the above -referenced project, we offer the following remarks. Our comments are submitted pursuant to, and in accordance with, provisions of the Endangered Species Act. Based on the information provided and other information available, it appears that the proposed action is not likely, to adversely affect any federally -listed endangered or threatened species, their formally designated critical habitat, or species currently proposed for listing under the Act at these sites. We believe that the requirements of section 7(a)(2) of the Act have been satisfied for your project. Please remember that obligations under section 7 consultation must be reconsidered if: (1) new information reveals impacts of this identified action that may affect listed species or critical habitat in a manner not previously considered; (2) this action is subsequently modified in a manner that was not considered in this review; or, (3) a new species is listed or critical habitat determined that may be affected by the identified action. However, the Service is concerned about the potential impacts the proposed action might have on aquatic species. Aquatic resources are highly susceptible to sedimentation. Therefore, we recommend that all practicable measures be taken to avoid adverse impacts to aquatic species, including implementing directional boring methods and stringent sediment and erosion control measures. An erosion and sedimentation control plan should be submitted to and approved by the North Carolina Division of Land Resources, Land Quality Section prior to construction. Erosion and sedimentation controls should be installed and maintained between the construction site and any nearby down -gradient surface waters. In addition, we recommend maintaining natural, vegetated buffers on all streams and creeks adjacent to the project site. The North Carolina Wildlife Resources Commission has developed a Guidance Memorandum (a copy can be found on our website at (http://www.fws.gov/raleigh) to address and mitigate secondary and cumulative impacts to aquatic and terrestrial wildlife resources and water quality. We recommend that you consider this document in the development of your projects and in completing an initiation package for consultation (if necessary). 2 We hope you find our web page usefiil and informative and that following the process described above will reduce the time required, and eliminate the need, for general correspondence for species' lists. If you have any questions or comments, please contact John Ellis of this office at (919) 856-4520 ext. 26. Sincerely, IA' 41- P e Benjamin Field Supervisor 3 List of Counties in the Service's Raleigh Field Office Area of Responsibility Alamance Beaufort Bertie Bladen Brunswick Camden Carteret Caswell Chatham Chowan Columbus Craven Cumberland Currituck Dare Duplin Durham Edgecombe Franklin Gates Granville Greene Guilford Halifax Harnett Hertford Hoke Hyde Johnston Jones Lee Lenoir Martin Montgomery Moore Nash New Hanover Northampton Onslow Orange Pamlico Pasquotank Pender M Perquimans Person Pitt Randolph Richmond Robeson Rockingham Sampson Scotland Tyrrell Vance Wake Warren Washington Wayne Wilson Igor Palyvoda From: Ken Riley - NOAA Federal <ken.riley@noaa.gov> Sent: Wednesday, February 17, 2016 12:41 PM To: Igor Palyvoda Cc: Dunn, Maria T.; Staples, Shane; Bodnar, Gregg Subject: Re: Brookfield Subdivision Sections 2 & 3 Essential Fish Habitat Hi Igor - It was nice meeting with you today to review and discuss your plans for the Brookfield Subdivision in Winterville, NC. The National Marine Fisheries Service (NMFS) initial determination is that the proposed project is not likely to adversely affect essential fish habitat or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the NMFS. The NMFS also has no concerns about the proposed project given best management practices (BMPs) are employed to control runoff, turbidity, and sedimentation during construction. The NMFS encourages projects of this nature to utilize Stormwater Best Management Practices for construction and management of stormwater systems. Degradation of water quality is a widespread habitat problem. Stormwater BMPs are implemented as a way to improve water quality, reduce runoff and stream erosion, and reduce pollution and nutrient loading in rivers, estuaries, and coastal waters. In developing your site plan, the NMFS encourages you to adopt a stornwater BMP that considers the unique conditions of your site and meets all of the applicable regulations, including the water quality and watershed planning objectives for the Neuse River basin. Thank you for the opportunity to review your project and provide these comments. Please let me know if you have further questions or concerns. Sincerely, 9 Kenneth Riley, Ph.D. Fishery Biologist Habitat Conservation Division National Marine Fisheries Service Southeast Region ioi Pivers Island Road, Beaufort, NC 28516 Office: 2 ,2-728-8Z5o I Cell: 2ri2-864-61c):q I Email: ken.riley(@noaa.gov On Wed, Feb 17, 2016 at 9:39 AM, Igor Palyvoda <ipal yoda@baldwindesiRnconsultants.com> wrote: February 17, 2016 Ken Riley NOAA National Ocean Service 101 Pivers Island Road Beaufort, NC 28516 RE: Brookfield Subdivision Sections 2 & 3 Pre -Construction Notification (PCN) Form Concerning Essential Fish Habitat Mr. Riley, My name is Igor Palyvoda and I work with Baldwin Design Consultants, PA. I was referred to you by Maria Dunn of NCDENR for your expert opinion regarding essential fish habitat that may or may not exist at our proposed project site. We are working on developing a subdivision located in Winterville, NC. To meet local stormwater management requirements at this subdivision we are required to construct a stormwater wetland to treat and attenuate post -development runoff. In order to discharge treated water from stormwater wetland into an unnamed tributary to Fork Swamp we have to cross a riparian buffer. Our plan is to bury a 36" diameter pipe in the riparian buffer and then cover it with backfill. In order to do this we have to fill out a pre - construction notification (PCN) form. One of the questions on PCN form requires us to coordinate with an expert in order to determine if our development will adversely impact essential fish habitat that may be in the project area. I have attached several maps showing location of the project and included additional information below for your review. Project Name: Brookfield Subdivision Sections 2 & 3 This project has not been reviewed yet. Project Location: 639 Brookfield Drive Winterville, NC 28590 Pitt County NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be panted, filled out and submitted along with all the required information. L PROJECT INFORMATION Project name Brookfield Sections 2 & 3 Contact name Igor Palyvoda, PE Phone number (252) 756-1390 Date March 23, 2016 Drainage area number 9.75 ac oc1�f W ATegQG O T IL DESIGN INFORMATION 3.10 Site Characteristics 1 -yr, 24 -hr intensity Drainage area 424,710.00 ft2 Impervious area 192,970.80 ft2 Percent impervious 45.4% % Design rainfall depth 1.00 inch Peak Flow Calculations 1 -yr, 24 -hr rainfall depth 3.10 in 1 -yr, 24 -hr intensity 5.28 in/hr Pre -development 1 -yr, 24 -hr runoff 8.12 ft3/sec Post -development 1 -yr, 24 -hr runoff 25.72 ft3/sec Pre/Post 1 -yr, 24 -hr peak control 17.60 ft3/sec Storage Volume: Non -SA Waters Minimum required volume 16,244.00 ft3 Volume provided (temporary pool volume) 16,671.00 ft3 OK Storage Volume: SA Waters Parameters 1.5 runoff volumeft3 Pre -development 1 -yr, 24 -hr runoff volume It Post -development 1 -yr, 24 -hr runoff volume ft3 Minimum volume required ft3 Volume provided ft3 Outlet Design ......__........._. . Depth of temporary pool/ponding depth (Dp1,,,) 15.00 in Insufficient depth of temp. pool. Drawdown time 2.34 days OK Diameter of orifice 2.25 in OK Coefficient of discharge (Co) used in orifice diameter 0.60 (unitless) calculation Driving head (Ho) used in the orifice diameter calculation 0.39 ft Provide calculations to support this driving head. Form SW401-Wetland-Rev.6-11/16/09 Parts I and 11 Project Design Summary, Page 1 of 3 Surface Areas of Wetland Zones Surface Area of Entire Wetland --' :14;40$;00: ft OK Shallow Land =__=�_-= 410; 0 fe OK The shallow land percentage is: 35%% Number of Plants recommended in Shallow Land Area: Shallow Water =�_==580Q0 ft2 OK The shallow water percentage is: 40%% Trees (3 gallon or larger) and Herbaceous (4+ cubic -inch) Deep Pool =_` - `!; r';,57;39: ft amsl Forebay portion of deep pool (pretreatment) - :1;444 0.0 ftz OK The forebay surface area percentage is: 10% =.1,300 OK Non-forebay portion of deep pool = - _ -2 T60_00 fe OK The non-forebay deep pool surface area percentage is: 15%% PPE Not Within 6 in of SHWT, Must Use Option #2 Total of wetland zone areas 14,403.00 ft' OK Add or subtract the following area from the zones 0.00 fe Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top)- :6'[:64. ft amsl kre cattails included in the planting plans -_=__:=:=_ Permanent Pool Elevation (PPE) Number of Plants recommended in Shallow Water Area: Shallow Water/Deep Pool (top) -_60 39_ ft amsl Number of Plants recommended in Shallow Land Area: Shallow Water bottom _ --- - =_5_9:89_ ft amsl 1,300 Most shallow point of deep pool's bottom- _= -=--_-_=-57139 ft amsl Trees (3 gallon or larger) and Herbaceous (4+ cubic -inch) Deepest point of deep pool's bottom =_` - `!; r';,57;39: ft amsl Design must meet one of the following two options: _ :.1;450' OK Number of Plants provided in Shallow Land Area: This design meets Option #1, _ _Y_______ (Y or N) =.1,300 OK Top of PPE is within 6" of SHWT, If yes: _-_ Trees (3 gallon or larger) and SHWT (Seasonally High Water Table) - O _ � Additional Information Can the design volume be contained? Does project drain to SA waters? If yes, What is the length of the vegetated filter? Are calculations for supporting the design volume provided in the application? Is BMP sized to handle all runoff from ultimate build -out? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? The length to width ratio is: Approximate wetland length Approximate wetland width Approximate surface area using length and width provided Will the wetland be stabilized within 14 days of construction? (Y or N) OK (Y or N) Excess volume must pass through filter. (Y or N) OK (Y or N) OK 3.25 :1 OK Z4400'ft ft 18,300.00 ft This approx. surface area is within this number of square feet of the entire wetland surface area reported above: OK Form SW401-Wetland-Rev.6-11/16/09 Parts I and II. Project Design Summary, Page 3 of 3 Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Page/ Plan Sheet No. �- verma No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, (to be provided by DWQ) [(1 r W4�J -D �� . ��.,.�. x lCL�fS �� � •:, ��� .. �, �° �� �� �e �.�.�.�. �.� � �;�� �d .:ate.. Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Page/ Plan Sheet No. �- - I— 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Wetland dimensions (and length to width ratio), - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Plan details (1" = 50' or larger) for the wetland showing: - Wetland dimensions (and length to width ratio) - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off-site drainage (if applicable), - Overflow device, and - Boundaries of drainage easement. n 1 . 2 3. Section view of the wetland (1" = 20' or larger) showing: - Side slopes, 3:1 or lower - Wetland layers All wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no clay liner: SLWT depth Option 2, clay liner: Depth of topsoil on top of liner, liner specifications 4. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: - A variety of several suitable species (not including cattails), - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, - The source nursery for the plants, and - Fertilizer and watering requirements to establish vegetation. 0. _ 5. A construction sequence that shows how the wetland will be protected from sediment until the entire cn drainage area is stabilized. 6. The supporting calculations (including drawdown calculations). M, -mf 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). �. ' 49. A soils report that is based upon an actual field investigation and soil borings. County soil maps are not (-"VvmzV'f(fan acceptable source of soils information. SW401-Wetland-Rev.6-11/16/09 Part III, page 1 of 1 Baldwin Design Consultants, PA JOB Brookfield Sections 2 & 3 Design, Land Planning & Surveying SHEET NO. 1 OF 1 1700-0 East Arlington Boulevard CALCULATED BY IP DATE 323/2016 Greenville, NC 27866 CHECKED BY DATE (262)756-1390 SCALE Stormwater Wetland Surface Area Sizing Drainage Area 9u15 iAcres % Drainage Area Impervious =g 45 J^ % Runoff Storaae Volume Requirements Runoff volume from 1.0 Inch storm Rv = 0.05+,009(1) 1= 45.44 % Rv = 0.46 inches/inches Volume = (Design rainfall)(Rv)(Drainage Area) = (1.0 inches)(0.47 infin)(9.75 acre) Volume = 0.37 ac -ft 16,244 of Actual Volume = a66 !') of OK cumulative volume provided at the temporary ool elevation Stormwater Wetland Surface Area Requirements Total Required Surface Area = Runoff Volume / Depth of Temporary Pool Depth of Temporary Pool = Total Required Surface Area Surface Area provided = 16,244 or / 1.25 ft 12.995 sf 14;°03 SF OK (at the temporary pool elevation) BMP's provided by this stornwater wetland = 1.1 Size Outlet Device for Control Structure Invert elevation = a,rtl339 feet msl Estimated orifice center elevation = 60.48 feet msi Proposed water surface elevation = fr6feet msi Available head (h) _ = 0.39 feet 1/3 head Discharge (d) ds pre -development flow Coefficient of discharge r9 6r � J?j Orifice equation Q = C A 2gh 1.86 Inches SAY CiE4233 Inches Q of orifice = 0.08 cis Orifice will drain temporary storage in 2.34 days Depth Distribution of Permanent Pool to Meet Stormwater Wetland Criteria Permanent Pool Elevation =T 60 39 Temporary Pool Elevation Total Area of Wetland = 14,403 SF Required Depth Distribution Surface Areas Shallow Land (15" depth) = 35% = 5,041 SF from PPE to 61.64 Temporary Inundation Zone Shallow Water (6" depth) = 40% = 5,761 SF from TPE to 61.14 Deep Pools (36" depth) = 25% = 3,601 SF from PPE to 57.39 Forebay = 10% = 1,440 SF from PPE to 57.39 Non-Forebay = 15% = 2,160 SF from PPE to 57.39 Provided Depth Distribution Surface Areas Provided Shallow Land (15" depth) = 35% _ SF from PPE to 45;780;, 61.64 Temporary Inundation Zone - Shallow Water (6" depth) = 40% = a:. SF from TPE to 61.14 Deep Pools (36" depth) = 25% _ � Xs-- ^60tf SF from PPE to 57.39 Forebay = 10 /o.+,;pfVyT�4,44 � SF from PPE to 57.39 Non-Forebay = 15% „y:>.,2,160 SF from PPE to 57.39 Number of plants required: Shallow Land (15" depth) 1,300 Swamp Milkweed, Cardinal Flower, Joe Pyeweed Shallow Water (3"-6" depth) 1,450 Sweet Flag, Arrow Arum, Duck Potato, Pickerelweed A minimum of 10 different species, total of which 5 are emergent species with no more than 30% of a single species. i z o � a N 0234' N W 'ft 1 7.3 N 66'21'1151' N 63'28'3¢' E f, 27.17 5r577'601' E Q 1&11.757 TOTAL DRAINAGE AREA.. . 9.75 ACRES1.2,. ;. " RIGHT OF WAY IMPERVIOUS. AREA ..... .1.77 ACRES > ee RIGHT OF WAY PERVIOUS AREA.. .0.98 ACRE s` ° `Q5D4 Sl 1 1A ACRE RESIDENTIAL LOTS 7 00 ACRES N 46'4541• es ' i o SCALE = NOT TO SCALE . . . . . . . . . . t) 1j0 e.d the 'ii7S�°S.i. �., ,13� S.F. ,���'• 17478 Sl e.. N 38'58'02' E 1 ' S • g+? Ss'. j -t'L 97.42' N 27>;51aj' E ti J� WNEUSE NtBUFF� a ,'I N 49'32'00' E S 64.38• E 40.92' 1 N ,q) `V •.„. f4S.78 _ t7,c7 iJ 5.. 757'10* E q`' es. .... 221 ei.r 150.53 .71 .02 -va.9 •° _s ,_ 2.1 s / :"'; .. .}_ a ,e°e z 32. • 7; - ° `w . 1 108.33 w 6.04' ' ,?.'12,673.5i t o W T FEN6E(IYp h <e r19 1E/y b PVC � w.pg• f�` �. Fu.taa w6� un m �, ty S.F a• *.. y M73d,,.-.h„�.� 610RMYIA � wf0,123 S.F. ,ase 70' :45 Y 6`J.tStt' 80.00 f80.00' pf N ACCESS 9. Eau►1ExF 1 723 SP11.00 .~ 91.00 i 1bB Si F. : q C? iUC 0 •. � WJ NA / :' •,• • / e).9 �^T os / PRCPCEP 6 0 910.5£ �1 as- F � fl3% kCfl4ltd 2—C f.Y 66 1d9.0it1 Sf 10.050 42 <:, a:. 1, ,��,y w 0 fO dl .ek'ei. "' ,e .074 Stn 10.010 SF 53.794 3f �J l m r.. os.c UWM ag `QY$•S.F.'- _.&?e "Y n W BE YUUO:D OVF Alm W/ 5l1LCF WIERYL 5.73' -- N 8705'3 ' W i • , s s.a 171.52 • , , ' P • - ri aSR COMPACTION REQUMED 1086.92$ °se do ee.a' i n � UfKffy i o SCALE = NOT TO SCALE March 12, 2015 Minimum Design Criteria for Stormwater Control Measures Page 7 of 12 Request for Public Input and Option to Begin Using the MDC Immediately MDC FOR STORMWATER WETLANDS: (1) TEMPORARY PONDING DEPTH AND SURFACE AREA. The ponding depth for the design volume shall be 15 inches above the permanent pool. The surface area of the wetland is based on the surface area at the designed temporary pool elevation. The surface area shall be sized sufficiently to limit the ponding depth to 15 inches. (2) PEAK ATTENUATION DEPTH. The wetland may be designed to temporarily pond peak attenuation volume at a depth exceeding 15 inches. (3) SOIL AMENDMENTS. The pH, compaction and other attributes of the first 12 inches depth of the soil shall be adjusted if necessary to promote plant establishment and growth. (4) LOCATION OF INLET AND OUTLET STRUCTURES. The inlet and outlet structures shall be located in a manner that avoids short circuiting. (5) FOREBAY. A forebay shall be provided at the inlet to the stormwater wetland. The forebay shall comprise approximately 10 to 15 percent of the wetland surface area as measured at the temporary pool elevation. The forebay shall be 24 to 40 inches in depth with respect to the permanent pool. The forebay entrance shall be deeper than the exit. (6) NON-FOREBAY DEEP POOLS. Deep pools shall be provided throughout the wetland. A deep pool shall be located adjacent to the outlet structure to prevent clogging. The non-forebay deep pools shall comprise 5 to 15 percent of the wetland surface area and shall be designed to retain water between storm events. The minimum depth of a deep pool at its deepest point is 18 inches below the top of the permanent pool. (7) SHALLOW WATER ZONE. The shallow water zone shall be zero to nine inches deep with respect to the permanent pool and shall comprise approximately 40 percent of the wetland surface area. It is recommended to only plant the six to nine inch depth range if there is an adjustable outlet structure to keep the permanent pool at a lower depth during the first year. (8) TEMPORARY INUNDATION ZONE. The temporary inundation zone shall be between 0 and 15 inches above the permanent pool elevation. The temporary inundation zones shall comprise approximately 30 to 45 percent of the surface area of the stormwater wetland. (9) DRAWDOWN TIME. The design volume shall draw down to the permanent pool level between two and five days. (10) DISCHARGE RATE. The wetland shall discharge the storage volume at a rate equal to or less than the predevelopment discharge rate for the one-year, 24-hour storm. (Note: The MDC Team is still studying this item.) (11) LANDSCAPING PLAN. A landscape plan prepared by a qualified design professional licensed in North Carolina shall be provided. The landscaping plan shall include the following: i. Delineation of planting zones; ii. Plant layout with species names and locations; and iii. Total number and sizes of all plant species. (12) SHALLOW WATER PLANTINGS. The shallow water zone shall be planted at a minimum density of 50 herbaceous plants per 200 square feet (equivalent to 2 foot on center spacing). A biodegradable mat is recommended to hold the plantings in place. (Note: The MDC Team is still studying this item.) Vi March 12, 2015 Minimum Design Criteria for Stormwater Control Measures Page 8 of 12 Request for Public Input and Option to Begin Using the MDC Immediately (13) TEMPORARY INUNDATION ZONE PLANTINGS. The temporary inundation zone shall be planted according to one of the following options (Note: The MDC Team is still studying this item.): i. 50 herbaceous plants per 200 square feet (equivalent to 2 foot on center spacing); ii. 8 shrubs per 200 square feet (equivalent to 5 foot on center spacing); or iii. One tree and 40 grass -like herbaceous plants per 100 square feet. (14) VEGETATION. The following requirements apply to vegetation: L Trees and woody shrubs shall not be planted on the dam structure; ii. Cattails shall not be planted; iii. Turf grass shall be provided on the tops of berms and on the exterior slopes of dams; and iv. Weeping love grass shall not be planted on vegetated side slopes. (15) TRASH RACK. A trash rack or other device to trap debris shall be provided on piped outlet structures. MDC FOR LEVEL SPREADER -FILTER STRIPS (1) LEVEL SPREADER LENGTH. The level spreader shall be ten feet in length per cubic feet per second of stormwater flow that is directed to it. A level spreader that receives flow directly from the drainage area shall be sized based on the flow rate during the 0.75 inch per hour storm, with a flow bypass system for larger storm events. A level spreader that receives flow from an SCM shall be sized based on the draw down rate of the design volume, with a flow bypass for larger storm events. A flow bypass system is not needed if the level spreader is sized to handle the flow during 10 -year storm event. (2) BLIND SWALE. Immediately upslope of the level spreader, there shall be a blind swale or other method of ponding water. The blind swale shall be designed to provide for uniform overtopping of the level spreader. (3) LEVEL SPREADER SPECIFICATIONS. The lip of the level spreader shall be at a uniform elevation with a construction tolerance of plus or minus %" at any point along its length. The level spreader shall be constructed of concrete or other stable material. (4) LEVEL SPREADER SHAPE. The level spreader shall be straight or convex. (5) TRANSITION ZONE. Immediately downslope of the level spreader, there shall be a one to three inch drop followed by an area that is protected against erosion via aggregate or high performance turf reinforcement matting. The minimum width of this protected area is 12 inches. (6) MINIMUM WIDTH OF THE FILTER STRIP. The minimum width measured perpendicular to the level spreader lip of the filter strip shall be 30 feet. (7) NO DRAWS OR CHANNELS IN THE FILTER STRIP. The filter strip shall not contain draws or channels. (8) FILTER STRIP SPECIFICATIONS. Filter strips shall be graded with a uniform transverse slope of eight percent or less. The pH, compaction and other attributes of the first 12 inches of the soil shall be adjusted if necessary to promote plant establishment and growth. The filter strip and side slopes shall be planted with non -clumping, deep-rooted grass sod. E3 Permit Number: (to be provided by DWQ) Drainage Area Number: Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks). — No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. — Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, I will inspect it monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. .:.;ieat•, , , {. Potential roblem: vill+Xeze .xlern Entire BMP Trash/ debris is present. Remove the trash/debris. Perimeter of wetland Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Inlet device: pipe or The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment Swale offsite. The pipe is cracked or otherwise Replace the pipe. damaged if applicable). Erosion is occurring in the swale (if Regrade the swale if necessary to smooth applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Wetland O&M-Rev.4 Page 1 of 3 Permit Number: (to be provided hyDWQ) 1:-.... .. ........ Forebay Sediment has accumulated in the Search for the source of the sediment and forebay to a depth that inhibits the remedy the problem if possible. Remove forebay from functioning well. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Deep pool, shallow water Algal growth covers over 50 % of the Consult a professional to remove and and shallow land areas deep pool and shallow water areas. control the algal growth. Cattails, phragmites or other invasive Remove invasives by physical removal or plants cover 50% of the deep pool and by wiping them with pesticide (do not shallow water areas. ) - consult a professional. spray Shallow land remains flooded more Unclog the outlet device immediately. than 5 days after a storm event. Plants are dead, diseased or dying. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Best professional practices show that Prune according to best professional pruning is needed to maintain optimal practices. plant health Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth of the deep the sediment and dispose of it in a location pools. where it will not cause impacts to streams or the BMP. Embankment A tree has started to grow on the Consult a dam safety specialist to remove embankment. the tree. An annual inspection by appropriate Make all needed repairs. professional shows that the embankment needs repair. Evidence of muskrat or beaver activity Consult a professional to remove muskrats is present. or beavers. Micropool Sediment has accumulated and Search for the source of the sediment and reduced the depth to 75% of the remedy the problem if possible. Remove original design depth. the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage have Contact the NC Division of Water Quality occurred at the outlet. 401 Oversi ht Unit at 919-733-1786. Form SW40 I -Wetland O&M-Rev.4 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Brookfield Subdivision - Phase 2 and 3 BMP drainage area number:2 Print name: Will Kuhn - Cooper Island Development, LLC Title:Member / Manaizer Address:4226 Dunhagan Road, Greenville NC 27858 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, DpcAA� L • PDO A" , a Notary Public for the State of NC , County of KR- , do hereby certify that 1A. Lt V-ujwx 1Jlp.� loef / eve personally appeared before me this l l day of -Toru-o-r , Zot b , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, .0/ ��TAgr • '+ AU1300 Op CpV�.1`,e��• SEAL My commission expires .D � A -0I of Form SW401-Wetland O&M-Rev.4 Page 3 of 3 a Aston Soil Works, Inc. P.O. Box 86 Simpson, NC 27879 Mike Baldwin Baldwin Design Consultants 1700 D East Arlington Blvd Greenville, NC 27858 November 12, 2015 Re: Soil Seasonal High Water Table Determination for a stormwater retention pond (Brookfield Subdivision) located off Brookfield Drive in Pitt County, NC. Dear Mr. Baldwin, As requested, soil seasonal high water table testing was conducted on November 3, 2015 for Brookfield development in Pitt County, NC. The method of soil evaluation for seasonal high water table utilized one hand auger boring to a depth of 30 inches. The boring location was based on a plan provided by Baldwin Design Consultants. An enclosed map identifies the approximate location of the boring conducted within the proposed retention pond area. The findings of this investigation suggest a seasonal high water table is approximately 12 inches from the surface based on soil morphology. The soil morphology method of determination was based on the presence of redoximorphic features within the profile. The soil profile description contained: 1. 0-12 inches: very dark gray (10YR 3/1) sandy loam; weak fine granular structure; friable. 12-30 inches: dark gray (10YR 4/1) sandy clay loam; weak fine subangular blocky structure. This data is presented for the purposes of aiding in the design of the above-mentioned stormwater system. If I can be of further assistance feel free to contact me at 252 341 9707. Sincerely, Gene Aston Licensed Soil Scientist # 1261 O g�.tySt 4y3'rY•.. ! _ R R 4 Test Location Map for Storrnwater Retention Pond Brookfietoi Subdivision Pitt County, NC (Proposed) 33 1 • - Test Location Castteford Drive (Proposed) (Proposed) G . 0 60' SCALE: 1 °= 60' Aston Soil Works, Inc. 2858 Madison Grove Greenville, NC 27Eg8 `- Baldwin.Desl gn COnSUR n�,PA DESIGN - LANO PLANNING • SURVEYING STORMWATER MANAGEMENT BROOKFIELD SECTIONS 2 & 3 Winterville, Pitt County, NC March 23, 2016 7 i PD"E=�� Igor Palyv da, PE Date %W6111 SEAL - 043249 - 1700-D EAST ARLINGTON BOULEVARD, GREENVILLE. NORTH CAROLINA 27858 TEL 252.756 1390 FAx 252.321.1412 www.BALDWINDESIGNCONSULTANTS.com I STORMWATER MANAGEMENT NARRATIVE BROOKFIELD SECTIONS 2 & 3 WINTERVILLE, PITT COUNTY, NORTH CAROLINA March 23, 2016 Project Name: Brookfield Section 2 & 3 Location: Winterville, Pitt County, NC Developer: Cooper Island Development, LLC P.O. Box 606 Greenville, NC 27835 Consultant: Baldwin Design Consultants, PA 1700-D East Arlington Boulevard Greenville, NC 27858 Phone: (252) 756-1390 GENERAL PROJECT INFORMATION The site is located on Old Tar Road in Winterville, North Carolina, approximately 0.3 miles south of the intersection of Old Tar Road and Worthington Road. The original approved design, called Brookfield Subdivision, was done by Baldwin & Janowski, PA in 2008 and it was divided into 3 phases. The purpose of the original design was to develop 76 residential lots and route and attenuate stormwater runoff from 28.4 acres through two dry detention ponds. The existing site is partially developed. Construction of Brookfield — Phase 1 was started in 2008. Only phase 1 of the project has been constructed. The developer (MKRR Development, LLC) stopped prior to completing the improvements. In 2014, dry detention pond #1, which is located in phase 1 of the project and which was designed to attenuate stormwater runoff from the entire phase 1 and most of phase 2 of the project, was converted into stormwater wetland per the request of Public Works Director by Rivers and Associates, Inc. A new developer (Cooper Island Development, LLC) has purchased the property and intends to complete construction of phase 2 and phase 3 of the project based upon the original approved construction drawings with some minor alterations such as adding a cul-de-sac in phase 3 thereby reducing number of residential lots and converting dry detention pond #2, which was never built, into a stormwater wetland in order to meet new regulations by capturing and removing the required 85% of total suspended solids. The purpose of this project is to develop phase 2 and 3 of Brookfield Subdivision and to route and treat stormwater runoff from phase 3 of the project and the remainder of phase 2 of the project that is not draining into existing retrofitted stormwater wetland #1 located in phase 1 of the project. Stormwater runoff from these areas will be treated in the proposed stormwater wetland #2. I The total post -development area draining into the proposed stormwater wetland #2 is 9.75 acres and 4.57 acres of it will be impervious. This impervious area includes sidewalk, curb and gutter, roads, buildings and driveways. HydroCAD's default setting considers 38% of '% acre lots to be impervious, which is consistent with information provided by NRCS. STORMWATER INFORMATION Following the completion of phases 2 and 3, the runoff from approximately 9.75 acres of on-site drainage area will be routed to stormwater wetland #2. This stormwater wetland will treat the design rainfall of 1" and attenuate the peak runoff from the 1 -year and 10 - year storms (as required by the Town of Winterville's stormwater ordinance). This stormwater wetland is designed in accordance with the NCDENR Minimum Design Criteria for Stormwater Control Measures (MDC) enacted on March 12, 2015, which is an alternative design to NCDENR Stormwater BMP Manual Chapter 9 — Stormwater Wetland as revised in July 2009. Simple Method was used to determine first flush volume based on 1" design rainfall. A program called HydroCAD was used for routing and sizing the pond based on SCS method for computing discharges and storage - indication method for routing. Relation of SHWT to Permanent Pool Elevation of Stormwater Wetland A seasonal high water table (SHWT) determination was made by Gene Aston of Aston Soil Works, Inc. for this project on November 3, 2015. The SHWT in the location of the proposed stormwater wetland was found to be approximately 1.0 feet below the average existing ground elevation of approximately 64.50 ft msl based on soil morphology, giving a SHWT elevation of approximately 63.50 ft msl. The proposed permanent pool elevation of the stormwater wetland is 60.39 ft msl. Per Pitt County Soils Map the soil located at the proposed stormwater wetland #2 site is Rains soil, which is in hydrologic soil group C according to NRCS Southeast Coastal States Wetlands Team (see attached). Also, according to BMP Manual Table 3-4 (pg. 3- 7 and 3-8) Rains soil can fall between hydrologic soil group B and D depending on how saturated it is. Since SHWT is fairly close to surface it was reasonable to assume and agree with NRCS on using hydrologic soil group C in this case. Furthermore, attached aerial photo shows that the soil is mucked at the proposed stormwater wetland site, indicating a high degree of saturation and therefore low further permeability. While the SHWT is not within six inches of the proposed permanent pool elevation (PPE) of the stormwater wetland, the pond is located in an area with hydrologic soil group C. Therefore, since hydrologic soil groups C and D have low permeability rates no liner is required to be installed in the stormwater wetland. PROJECT SITE AREA BREAKDOWN Total Pre -Development Area Pervious Area Impervious Area Total Post -Development Area Pervious Area Impervious Area PEAK FLOW SUMMARY 9.75 ac 9.75 ac 0.00 ac 9.75 ac 5.18 ac 4.57 ac The stormwater wetland was sized and the outlet structure designed in order to attenuate the peak storm water runoff from the 1 year and 10 year storms to the pre - developed condition. The 1 -year pre -development flow is estimated to be 8.12 cfs, with a post -development flow of 25.72 cfs. Using a 2.25" orifice, with a two-tier weir system for flow attenuation, the post -developed flow leaving the site is 4.90 cfs. This is 60% of the peak rate of outflow from the pre -developed rate. The 10 -year pre -development flow is estimated to be 24.73 cfs, with a post -development flow of 52.09 cfs. The post - developed flow leaving the site is attenuated to 21.74 cfs. This is 88% of the peak rate of outflow from the pre -developed rate. Storm Pre -Development Post -Development Post -Development Peak Flow Peak Flow (Pre- Peak Flow (Post - Attenuation in Attenuation in Constr. Wetland) Constr. Wetland) 1- ear 8.12 cfs 25.72 cfs 4.90 cfs 10- ear 24.73 cfs 52.09 cfs 21.74 cfs 100 -year 45.56 cfs 79.63 cfs 56.91 cfs CONCLUSION The impacts to downstream drainage structures have been mitigated by the installation of a stormwater wetland that attenuates the post -development peak flow from the 1 -year and 10 -year storms to less than the pre -developed peak flow, satisfying NCDENR Minimum Design Criteria. Top of the outlet structure is at 63.89 ft and top of the pond is at 64.89 ft. The weir is sufficiently sized per HydroCAD calculations to safely pass 100 - year storm and there is sufficient 1 ft of freeboard provided above top of outlet structure per Town of Winterville MSDD. OCT.01'2002 11:34 2529751399 J ACE WASH =7656 P_--Yv NRCS Southeast Coastal States Wetlands Team June 1993 Sandy Category Groau no sons Grout) B Bibb Meggett Pelham Stockade Group C Oiustee Raids Group D Carteret Duckston lr=okalee Leon Lynn Haven Mascotte Murville Nakina Osier Plummer Rutledge 7 Pre -Development Post -Development Subcat Reach Pon Llllk Stormwater Wetland Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 1 -yr Rainfall=3.10" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCAD® 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment IS: Pre -Development Time of concentration, Tc, was obtained by Kirpich Method per Appendix B (pg.111-30) of NCDENR Stormwater BMP Manual and Winterville Manual of Standard Designs and Details (Chart SD -2) using formula below. Tc = [(L^3/H)^0.385]/128 where L = Hydraulic length of watershed = 680 ft H= Height of most remote point in watershed above outlet = 3.5 ft Tc was multiplied by a factor of 2.0 for overland flow of grassed pre -development surfaces per Winterville MSDD (Chart SD -2). Tc = 2 x [((680^3)/3.5)^0.385]/128 = 18 minutes Runoff = 8.12 cfs @ 12.23 hrs, Volume= 0.673 af,- Depth> 0.83" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 2.00-20.00 hrs, dt= 0.05 hrs NC -Greenville 24 -hr S1 1 -yr Rainfall=3.10" Area (ac) CN Description 2.110 70 Woods, Good, HSG C 2.020 72 Woods/grass comb., Good, HSG C 5.620 74 >75% Grass cover, Good, HSG C 9.750 73 Weighted Average 9.750 73 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.0 Direct Entry, Kirpich Method Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 1 -yr Rainfall=3.10" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HvdroCADO 10.00-16 s/n 09193 © 2015 HvdroCAD Software Solutions LLC a w 3 0 LL Subcatchment 1S: Pre -Development Hydrograph 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 1 -yr Rainfall=3.10" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCAD® 10.00-16 s/n 09193 © 2015 HvdroCAD Software Solutions LLC Summary for Subcatchment 2S: Post -Development Time of concentration, Tc, was obtained by Kirpich Method per Appendix B (pg.11 1-30) of NCDENR Stormwater BMP Manual and Winterville Manual of Standard Designs and Details (Chart SD -2) using formula below. Tc = [(L^3/H)^0.385]/128 where L = Hydraulic length of watershed = 422 ft for overland flow of impervious concrete surface H= Height of most remote point in watershed above outlet = 2.74 ft for overland flow of impervious concrete surface L = Hydraulic length of watershed = 317 ft for channelized flow H= Height of most remote point in watershed above outlet = 1.68 ft for channelized flow Tc was multiplied by a factor of 0.4 for overland flow of concrete impervious post -development surface and 0.2 for channelized pipe flow per Winterville MSDD (Chart SD -2). Tc = 0.4 x [((422^3)/2.74)^0.385]/128 + 0.2 x [((317^3)/1.68)^0.385]/128 < 5 minutes Therefore a minimum Tc of 5 minutes was used. [49] Hint: Tc<2dt may require smaller dt Runoff = 25.72 cfs @ 12.03 hrs, Volume= 1.264 af, Depth> 1.56" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 2.00-20.00 hrs, dt= 0.05 hrs NC -Greenville 24 -hr S1 1 -yr Rainfall=3.10" Area (ac) CN Description 1.770 98 Paved roads w/curbs & sewers, HSG C 7.000 83 1/4 acre lots, 38% imp, HSG C 0.980 74 >75% Grass cover. Good, HSG C 9.750 85 Weighted Average 5.320 74 54.56% Pervious Area 4.430 98 45.44% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Kirpich Method Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 1 -yr Rainfall=3.10" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCADO 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Subcatchment 2S: Post -Development Hydrograph 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 1 -yr Rainfall=3.10" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCAD® 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Summary for Pond 1 P: Stormwater Wetland Inflow Area = 9.750 ac, 45.44% Impervious, Inflow Depth > 1.56" for 1 -yr event Inflow = 25.72 cfs @ 12.03 hrs, Volume= 1.264 of Outflow = 4.90 cfs @ 12.55 hrs, Volume= 0.839 af, Atten= 81 %, Lag= 30.9 min Primary = 4.90 cfs @ 12.55 hrs, Volume= 0.839 of Routing by Stor-Ind method, Time Span= 2.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 62.47'@ 12.55 hrs Surf.Area= 15,867 sf Storage= 29,276 cf Plug -Flow detention time= 140.9 min calculated for 0.839 of (66% of inflow) Center -of -Mass det. time= 75.9 min ( 860.2 - 784.2 ) Volume Invert Avail.Storage Storage Description #1 60.39' 72,963 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 60.39 12,277 0 0 61.39 13,972 13,125 13,125 61.64 14,403 3,547 16,671 62.39 15,718 11,295 27,967 63.39 17,520 16,619 44,586 64.39 19,379 18,450 63,035 64.89 20,330 9,927 72,963 Device Routing Invert Outlet Devices #1 Primary 60.39' 2.2" Vert. Orifice/Grate C= 0.600 #2 Primary 61.64' 2.0' long x 0.7' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 Coef. (English) 2.76 2.82 2.93 3.09 3.18 3.22 3.27 3.30 3.32 3.31 3.32 #3 Primary 63.89' 14.7' long x 0.7' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 Coef. (English) 2.76 2.82 2.93 3.09 3.18 3.22 3.27 3.30 3.32 3.31 3.32 Primary OutFlow Max=4.89 cfs @ 12.55 hrs HW=62.47' (Free Discharge) 11=Orifice/Grate (Orifice Controls 0.18 cfs @ 6.79 fps) 2=Broad-Crested Rectangular Weir (Weir Controls 4.71 cfs @ 2.83 fps) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 1 -yr Rainfall=3.10" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCADO 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Pond 1 P: Stormwater Wetland N U 3 0 LL Hydrograph 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Inflow ❑ Primary Brookfield Sections 2 & 3 NC -Greenville 24 -hr S9 10 -yr Rainfall=5.81" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCAD®10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 1 S: Pre -Development Time of concentration, Tc, was obtained by Kirpich Method per Appendix B (pg.111-30) of NCDENR Stormwater BMP Manual and Winterville Manual of Standard Designs and Details (Chart SD -2) using formula below. Tc = [(L^3/H)"0.385]/128 where L = Hydraulic length of watershed = 680 ft H= Height of most remote point in watershed above outlet = 3.5 ft Tc was multiplied by a factor of 2.0 for overland flow of grassed pre -development surfaces per Winterville MSDD (Chart SD -2). Tc = 2 x [((680^3)/3.5)"0.385]/128 = 18 minutes Runoff = 24.73 cfs @ 12.21 hrs, Volume= 2.177 af, Depth> 2.68" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 2.00-20.00 hrs, dt= 0.05 hrs NC -Greenville 24 -hr S1 10 -yr Rainfall=5.81" Area (ac) CN Description 2.110 70 Woods, Good, HSG C 2.020 72 Woods/grass comb., Good, HSG C 5.620 74 >75% Grass cover, Good, HSG C 9.750 73 Weighted Average 9.750 73 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.0 Direct Entry, Kirpich Method Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 10 -yr Rainfall=5.81 " Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCADO 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Subcatchment 1S: Pre -Development Hydrograph 26. ' 24- NC -Greenville 24_hrS1 10 -yr 22- Rainfall=5.81" 20 - --- Runoff Area=9 750 ac .-- 18 .....-- ..--... Runoff Volume=2.177 of y 16 w Runoff Depth>268" U 3 14 Tc=18.0 min' O LL 12 CN=73 10 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 10 -yr Rainfall=5.81 " Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCAD®10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: Post -Development Time of concentration, Tc, was obtained by Kirpich Method per Appendix B (pg.111-30) of NCDENR Stormwater BMP Manual and Winterville Manual of Standard Designs and Details (Chart SD -2) using formula below. Tc = [(L^3/H)^0.385]/128 where L = Hydraulic length of watershed = 422 ft for overland flow of impervious concrete surface H= Height of most remote point in watershed above outlet = 2.74 ft for overland flow of impervious concrete surface L = Hydraulic length of watershed = 317 ft for channelized flow H= Height of most remote point in watershed above outlet = 1.68 ft for channelized flow Tc was multiplied by a factor of 0.4 for overland flow of concrete impervious post -development surface and 0.2 for channelized pipe flow per Winterville MSDD (Chart SD -2). Tc = 0.4 x [((422"3)/2.74)^0.385]/128 + 0.2 x [((317^3)/1.68)^0.385]/128 < 5 minutes Therefore a minimum Tc of 5 minutes was used. [49] Hint: Tc<2dt may require smaller dt Runoff = 52.09 cfs @ 12.03 hrs, Volume= 3.128 af, Depth> 3.85" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 2.00-20.00 hrs, dt= 0.05 hrs NC -Greenville 24 -hr S1 10 -yr Rainfall=5.81" Area (ac) CN Description 1.770 98 Paved roads w/curbs & sewers, HSG C 7.000 83 1/4 acre lots, 38% imp, HSG C 0.980 74 >75% Grass cover, Good, HSG C 9.750 85 Weighted Average 5.320 74 54.56% Pervious Area 4.430 98 45.44% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Kirpich Method Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 10 -yr Rainfall=5.81" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCADO 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Subcatchment 2S: Post -Development Hydrograph 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 10 -yr Rainfall=5.81" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCAD010.00-16 s/n 09193 02015 HydroCAD Software Solutions LLC Summary for Pond 1 P: Stormwater Wetland Inflow Area = 9.750 ac, 45.44% Impervious, Inflow Depth > 3.85" for 10 -yr event Inflow = 52.09 cfs @ 12.03 hrs, Volume= 3.128 of Outflow = 21.74 cfs @ 12.21 hrs, Volume= 2.660 af, Atten= 58%, Lag= 11.1 min Primary = 21.74 cfs @ 12.21 hrs, Volume= 2.660 of Routing by Stor-Ind method, Time Span= 2.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 63.83'@ 12.21 hrs Surf.Area= 18,341 sf Storage= 52,505 cf Plug -Flow detention time= 96.4 min calculated for 2.653 of (85% of inflow) Center -of -Mass det. time= 51.5 min ( 818.3 - 766.8) Volume Invert Avail.Storage Storage Description #1 60.39' 72,963 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 60.39 12,277 0 0 61.39 13,972 13,125 13,125 61.64 14,403 3,547 16,671 62.39 15,718 11,295 27,967 63.39 17,520 16,619 44,586 64.39 19,379 18,450 63,035 64.89 20,330 9,927 72,963 Device Routing Invert Outlet Devices #1 Primary 60.39' 2.2" Vert. Orifice/Grate C= 0.600 #2 Primary 61.64' 2.0' long x 0.7' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 Coef. (English) 2.76 2.82 2.93 3.09 3.18 3.22 3.27 3.30 3.32 3.31 3.32 #3 Primary 63.89' 14.7' long x 0.7' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 Coef. (English) 2.76 2.82 2.93 3.09 3.18 3.22 3.27 3.30 3.32 3.31 3.32 Primary OutFlow Max=21.68 cfs @ 12.21 hrs HW=63.83' (Free Discharge) 11=Orifice/Grate (Orifice Controls 0.23 cfs @ 8.81 fps) 2=Broad-Crested Rectangular Weir (Weir Controls 21.45 cfs @ 4.90 fps) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 10 -yr Rainfall=5.81" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCADO 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Pond 1 P: Stormwater Wetland Time (hours) I E Inflow p Primary Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 100 -yr Rainfall=9.84" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCAD® 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 1 S: Pre -Development Time of concentration, Tc, was obtained by Kirpich Method per Appendix B (pg.11 1-30) of NCDENR Stormwater BMP Manual and Winterville Manual of Standard Designs and Details (Chart SD -2) using formula below. Tc = [(L"3/H)^0.385]/128 where L = Hydraulic length of watershed = 680 ft H= Height of most remote point in watershed above outlet = 3.5 ft Tc was multiplied by a factor of 2.0 for overland flow of grassed pre -development surfaces per Winterville MSDD (Chart SD -2). Tc = 2 x [((680^3)/3.5)^0.385]/128 = 18 minutes Runoff = 45.56 cfs @ 12.20 hrs, Volume= 4.808 af, Depth> 5.92" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 2.00-20.00 hrs, dt= 0.05 hrs NC -Greenville 24 -hr S1 100 -yr Rainfall=9.84" Area (ac) CN Description 2.110 70 Woods, Good, HSG C 2.020 72 Woods/grass comb., Good, HSG C 5.620 74 >75% Grass cover, Good, HSG C 9.750 73 Weighted Average 9.750 73 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.0 Direct Entry, Kirpich Method • Brookfield ections 2 & 3 NC -Greenville 24 -hr S1 100 -yr Rainfall=9.84" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCADO 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Subcatchment 1S: Pre -Development Hydrograph ❑ Runoff as NC -Greenville 24 -hr S1 100 -yr 42 Rainfall=9.84" 40 38 _ : - ----------- ------- - -------- ----- ----- -------- -------- Runoff Area=9.750 ac 3a Runoff Volume=4.808 of 32 30 Runoff Depth>5.92" - 28 zs Tc=18.0 min 0 24 CN=73 F 22 . _..- ..._ .... 20 18 l.. --- .___ _..__L-_.___.. 16 ...... ------------ _.-_.. __......._.. 14 12 ........ 10 .._ - _ _ ......... :...... 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 100 -yr Rainfall=9.84" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCAD® 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 2S: Post -Development Time of concentration, Tc, was obtained by Kirpich Method per Appendix B (pg.111-30) of NCDENR Stormwater BMP Manual and Winterville Manual of Standard Designs and Details (Chart SD_ -2) using formula below. Tc = [(L"3/H)^0.385]/128 where L = Hydraulic length of watershed = 422 ft for overland flow of impervious concrete surface H= Height of most remote point in watershed above outlet = 2.74 ft for overland flow of impervious concrete surface L = Hydraulic length of watershed = 317 ft for channelized flow H= Height of most remote point in watershed above outlet = 1.68 ft for channelized flow Tc was multiplied by a factor of 0.4 for overland flow of concrete impervious post -development surface and 0.2 for channelized pipe flow per Winterville MSDD (Chart SD -2). Tc = 0.4 x [((422"3)/2.74)^0.385]/128 + 0.2 x [((317^3)/1.68)^0.385]/128 < 5 minutes Therefore a minimum Tc of 5 minutes was used. [49] Hint: Tc<2dt may require smaller dt Runoff = 79.63 cfs @ 12.02 hrs, Volume= 6.046 af, Depth> 7.44" Runoff by SCS TR -20 method, UH=SCS, Weighted -CN, Time Span= 2.00-20.00 hrs, dt= 0.05 hrs NC -Greenville 24 -hr S1 100 -yr Rainfall=9.84" Area (ac) CN Description 1.770 98 Paved roads w/curbs & sewers, HSG C 7.000 83 1/4 acre lots, 38% imp, HSG C 0.980 74 >75% Grass cover, Good, HSG C 9.750 85 Weighted Average 5.320 74 54.56% Pervious Area 4.430 98 45.44% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Kirpich Method Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 100 -yr Rainfall=9.84" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCADO 10.00-16 s/n 09193 C 2015 HydroCAD Software Solutions LLC Subcatchment 2S: Post -Development Hydrograph 85- 79.63 t(5 80 NG -Greenville 24 -hr S1 100 -yr 75- Rainfail=9.84" 70 65-. Runoff Area=9.750 ac 60 Runoff Volume=6.046 of 55 Runoff Depth>7.44" y so asTc=5.0 min 3 0FL 40-CN=85 35 30 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 100 -yr Rainfall=9.84" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCAD®10.00-16 s/n 09193 0 2015 HydroCAD Software Solutions LLC Summary for Pond 1 P: Stormwater Wetland Inflow Area = 9.750 ac, 45.44% Impervious, Inflow Depth > 7.44" for 100 -yr event Inflow = 79.63 cfs @ 12.02 hrs, Volume= 6.046 of Outflow = 56.91 cfs @ 12.11 hrs, Volume= 5.522 af, Atten= 29%, Lag= 5.1 min Primary = 56.91 cfs @ 12.11 hrs, Volume= 5.522 of Routing by Stor-Ind method, Time Span= 2.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 64.55'@ 12.11 hrs Surf.Area= 19,689 sf Storage= 66,221 cf Plug -Flow detention time= 78.8 min calculated for 5.522 of (91% of inflow) Center -of -Mass det. time= 46.2 min ( 795.7 - 749.4 ) Volume Invert Avail.Storage Storage Description #1 60.39' 72,963 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 60.39 12,277 0 0 61.39 13,972 13,125 13,125 61.64 14,403 3,547 16,671 62.39 15,718 11,295 27,967 63.39 17,520 16,619 44,586 64.39 19,379 18,450 63,035 64.89 20,330 9,927 72,963 Device Routing Invert Outlet Devices #1 Primary 60.39' 2.2" Vert. Orifice/Grate C= 0.600 #2 Primary 61.64' 2.0' long x 0.7' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 Coef. (English) 2.76 2.82 2.93 3.09 3.18 3.22 3.27 3.30 3.32 3.31 3.32 #3 Primary 63.89' 14.7' long x 0.7' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 Coef. (English) 2.76 2.82 2.93 3.09 3.18 3.22 3.27 3.30 3.32 3.31 3.32 Primary OutFlow Max=55.92 cfs @ 12.11 hrs HW=64.54' (Free Discharge) 1=Orifice/Grate (Orifice Controls 0.26 cfs @ 9.70 fps) 2=Broad-Crested Rectangular Weir (Weir Controls 32.79 cfs @ 5.65 fps) 3=Broad-Crested Rectangular Weir (Weir Controls 22.87 cfs @ 2.39 fps) 1 r Brookfield Sections 2 & 3 NC -Greenville 24 -hr S1 100 -yr Rainfall=9.84" Prepared by Baldwin Design Consultants, PA Printed 3/24/2016 HydroCADO 10.00-16 s/n 09193 © 2015 HydroCAD Software Solutions LLC m v 3 0 LL Pond 1 P: Stormwater Wetland Hydrograph 2 3 4 5 6 7 8 9 10 11 12 13 14 1b ld 1/ is 1a to Time (hours) Inflow ❑ Primary