Loading...
HomeMy WebLinkAbout20160081 Ver 1_More Info Received_20160405U.S. ARMY CORPS OF ENGINEERS COPY WILMINGTON DISTRICT Action Id. SAW -2014-01190 County: Wake U.S.G.S. Quad: NC -NEW HILL GENERAL PER HT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Meritage Homes of the Carolinas Attn: Brian Ketchem Address: 5400 Trinity Road Suite 107 Raleigh, NC, 27607 Telephone Number: 919-926-2616 Size (acres) 37 Nearest Town Apex Nearest Waterway Beaver Creek River Basin Haw USGS HUC 03030002 Coordinates Latitude: 35.7240211330089 Longitude: -78.9235630624688 Location description: The prolect site is approximately 37 acres located southeast of the intersection of Olive Chapel Rd. and Richardson Rd _near the town of Apex, Wake Countv, North Carolina, and contains wetlands with drain to Beaver Creek in the Cane Fear River basin. Description of projects area and activity: This Permit verification allows for 0.24 acre of permanent wetland impacts from till associated with the installation of roads and lot till for the construction of the Arcadia Rid a residential subdivision. Mitigation is required for this proposal. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: NWP 29 Residential Developments. SEE ATTACHED RGP or NIVP GENERAL, REGIONAL AND SPECL4L CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated 1/21/2016 and 03/16/2016. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact James Lastinger at 919-5544884 x32 or James.C.LastingerOusace.army.mil. Corps Regulatory Officia • Date: 03/30/2016 Expiration Date of Veri ion: 03/18/2017 SAW -2014-01190 SPECIAL CONDITIONS In order to compensate for impacts associated with this permit, mitisation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form are hereby incorporated asspecial conditions of this permit authorization. U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: Meritage Homes of the Carolinas Attn: Brian Ketchem Action ID: SAW -2014-01190 Project Name: Arcadia Ridge subdivision County: Wake Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, It is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USAGE) Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur In more than one 8 -digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation' 8 -digit HUC and Basin: 03030002, Cape Fear River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool J Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.24 *If more than one mitigation sponsor will be used for the permit, only include Impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8 -digit HUC and Basin: 03030002, Cave Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Nan-Riverine Non -Riparian Coastal 0.48 Mitigation Site Debited:Restoration Systems -Cripple Creek Stream and Wetland Mitigation Bank (i_ist the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mftfgotlon Sponsor Statement of Mitigation Liability Acceptance: 1, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation Identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor falls to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: of Sponsor's Authorized Representative Date of Page 1 of 2 Form Updated 23 November, 2015 USACE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit Identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. D If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls of Neuse Road, Wake Forest, NC 27587 (email: todd.tugwell@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the USACE Project Manager below. USACE Project Manager: James Lastinger USACE Field Office: Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: James.c.lastinger@usace.army.mil V March 30, 2016 USACE Project Ma ger Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://rlbits.usace.army.mil. Page 2 of 2 The Wilmington District Is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at htto://reaulatorv.usacesurvey.com/ to complete the survey online. SAW -2014-01190 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our customer Satisfaction Survey online at httn:Nregulatory.usacesurvey.com/. Copy furnished: Agent: Environmental Services, Inc. Attn: Jeff Harbour Address: 4901 Trademark Drive Raleigh, NC, 27610 Telephone Number: Action ID Number: SAW -2014-01190 County: Wake Permittee: Meritage Homes of the Carolinas Attn: Brian Ketchem Project Name: 2713 Olive Chanel Rd./Welton Property/Apex/Wake County/Arcadia Ridge Date Verification Issued: 03/30/2016 Project Manager: James Lastinger Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Raleigh Regulatory Field Office Attn: James Lastinger, Regulatory Specialist 3331 Heritage Trade Dr., suite 105 Wake Forest, NC 27587 Please note that your permitted Activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date SAN -2014-01190 Determination of Jurisdiction: A. ® Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued Action ID: SAW - Basis For Determination: Remarks: Please see the attached preliminary jurisdictional determination E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in 0 and C above). This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 33 I.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official:_,lev"O James Lastinger Date of JD: 03/30/2016 PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): March 30, 2016 B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Agent: Environmental Services, Inc. Attn: Jeff Harbour Address: 4901 Trademark Drive Raleigh, NC, 27610 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, 2713 Olive Chanel Rd./Welton PropertylApex/Wake County/Arcadin Ridge, SAW -2014-01190 D. PROJECT LOCATIONS) AND BACKGROUND INFORMATION: The nrolect site is approximately 37 acres located southeast of the intersection of Olive Chanel Rd. and Richardson Rd., near the town of Apex. Wake County, North Carolina, and contains wetlands with drain to Beaver Creek In the Cane Fear River basin. Please see the attached map and waters inventory table for itirisdictional features on site. (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State: NC County/parishlborough: Wake City: Apex Center coordinates of site (Int/long in degree decimal format): Lat. 35.7240211330089° N, Long. -78.92356306246880 W. Universal Transverse Mercator: Name of nearest water body: Beaver Creek Identify (estimate) amount of waters in the review area: Non -wetland waters: linear feet: width (ft) and/or acres. Cowardin Class: Stream Flow: Wetlands: 0.24 acres. Cowardin Class: Forested Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: Non -Tidal: E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLIES): ❑ Office (Desk) Determination. Date: ® Field Determination. Date(s): 3/14/2016 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. This preliminary JD finds that there "may be" waters of the United States on the subject project site, and identifies all aquatic features on the site that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for preliminary JD (check oil that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): ® Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: ESI. ® Data sheets prepared/submitted by or on behalf of the applicant/consultant. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data shects/delineation report. ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ® USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name.- USDA ame:USDA Natural Resources Conservation Service Soil Survey. Citation: ® National wetlands inventory map(s). Cite name: ❑ State/Local wetland inventory mop(s): ® FEMAIFIRM maps: ❑ I00 -year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ® Aerial (Name & Date): or ® Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): . IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corns and should not be relied upon for later iurisdictional determinations. u� j3o %tL Signa re d date o 67 Regulatory Project Manager (REQUIRED) Signature and date of person requesting preliminary JD (REQUIRED, unless obtaining the signature is Impracticable) Waters tnventory ta61e Site Class u Estimated amount of Class aquatic number Latitude Longitude Class Aquatic resource in resource ce review area Wetland 35.7243 -78.9234 Palustrine 0.24 acre non -section 10 — 1 I wetland SECTION I - The following: identifies your iigllts and options regarding an administrative appeal of the above decision. AdditionaLinformation may be fn nd atar h Ifwww.usace.armv.mil/Missions/Civ€iWorks/Re�ulatoryProgmmandPermits.aspx or the Corps regulations ai<33- GFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C. PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. Applicant: Meritage Homes of the Carolinas Brian Ketchem File Number: SAW -2014-01190 Date: 03/30/2016 Attached is: See Section below INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A PROFFERED PERMIT Standard Permit or Letter of ermission B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D EJ PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following: identifies your iigllts and options regarding an administrative appeal of the above decision. AdditionaLinformation may be fn nd atar h Ifwww.usace.armv.mil/Missions/Civ€iWorks/Re�ulatoryProgmmandPermits.aspx or the Corps regulations ai<33- GFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C. PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. AIso you may provide new information for further consideration by the Corps to reevaluate the JD. 'SEGtT1ON IZ - RE UFST FOR APPEAL or'OBJEOVONS TO AN INITIAL PROFFERED PERMIT 7] REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the Iocation of information that is already in the administrative record. POINT OF CONTA&T FOR QPjESfrIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Jason Steele, Administrative Appeal Review Officer Raleigh Regulatory Field Office CESAD-PDO Attn: James Lastinger, Regulatory Specialist U.S. Army Corps of Engineers, South Atlantic Division 3331 Heritage Trade Dr., suite 105 60 Forsyth Street, Room 10M15 Wake Forest, NC 27587 Atlanta, Georgia 30303-8801 919-5544884 ext 32 Phone: 404 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the o ortuni to partici2ate in all site investigations. Date: I Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: James Lastinger, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this farm to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-FDO, 60 Forsyth Street, Room IOM15, Atlanta, Georgia 30303-8801 Picone: (404) 562»5137