Loading...
HomeMy WebLinkAboutNCG100040 DMR SW (2)January 11, 2016 Lawrence Hurdle { Plant Manager LKQ Self Service Greensboro CENITRA,L FILE 100 Ward Road�,�igl�:v Greensboro, North Carolina 27405 Re: 2nd Semi -Annual Storm Water Monitoring Results LKQ Self Service — Greensboro, NC Permit Dear Mr. Hurdle: Environmental Risk. Managed. confidential Via Electronic Mail 0v FEB o r Enclosed is your second semi-annual Stormwater Discharge Outfall (SDO) Monitoring Report. No samples were submitted for lab analysis by your facility for this monitoring period. You are required by the permit to submit your SDO Monitoring Report to the Division of Water Quality (DWQ). A cover letter to the DWQ for transmittal of the SDO Monitoring Report is also attached here for your convenience. Please print the cover letter and the SDO Monitoring Report, and sign and date inside the gray boxes of the cover letter. If no discharge occurred at your facility within operating hours for this monitoring period, please write "No Discharge" on the top line of the table on page 1 of the SDO Monitoring Report form to indicate that No Discharge occurred, and sign and date the form in the certification sections on the second page. Note that you must sign both the Solvent Management Plan certification on the top of the second page, and the permittee certification on the bottom on the second page. The original signed cover letter and SDO Monitoring Report should be sent via certified mail with a return receipt or via Fed -Ex to the DWQ at the address shown on the cover letter. You should make copies of the letter and fonn and file them in the monitoring section of your Storm Water Pollution Prevention Plan (SPPP). Please note that if discharge of storm water from your facility actually did occur during the referenced monitoring period and within operating hours, but you failed to collect a sample, you should not sign the SDO Monitoring Report to indicate that no discharge occurred. Please contact me via email (Seth.Ailiff@rpsgroup.com) and copy Brandon Walsh (bswalsh@lkgcorp.com), the LKQ corporate Environmental Compliance Manager, if discharge did occur from your facility during the monitoring period but you did not collect a sample. We will work with you to help you remain in compliance with your permit. If you should have any questions or comments, please do not hesitate to contact me at (404) 809-3877 or seth.ailiff@rpsgroup.com. Sincerely, Seth Ailiff Compliance Specialist Attachment 1 — Cover Letter to State Attachment 2 — SDO Monitoring Report United States I Canada I Brazil I UK I Ireland I Netherlands I Australia Asia Pacific I Russia I Middle East I Africa 3525 Piedmont Road N.E., Suite 520 -Bldg. 6, Atlanta, GA 30305 USA T +1-404-812-0001 F +1404-812-1992 W www rpsgroup.com I www gaiatech corn CERTIFIED MAIL, RETURN RECEIPT REQUESTED Date: 1 12 0%1 b Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RE: LKQ Self Service Greensboro Greensboro, North Carolina Permit # NCG100040 2nd Semi -Annual Stormwater Discharge Outfall Monitoring Report Sir/Madam: Please find attached the 2nd Semi -Annual Stormwater Discharge Outfall (SDO) Monitoring Report (DMR) for the LKQ Self Service Greensboro facility located in Greensboro, North Carolina. This submittal covers the reporting period July 1St to December 31s' 2015. Please call me at 619-315-4530 or Mr. Seth Ailiff of RPS GaiaTech, Inc. at 404-809-3877 if you have any comments, questions, or concerns about the information presented in this submittal. Sincerely, 419— Lawrence Hurdle Plant Manager Attachment cc: Seth Ailiff (seth.aiiiff@rpsgroup.com)