HomeMy WebLinkAbout20160253 Ver 1_RE B-5360 Bridge 374 Randolph Co_20160330
Wanucha, Dave
From:Riffey, Deanna
Sent:Wednesday, March 30, 2016 9:57 AM
To:Wanucha, Dave
Subject:RE: B-5360 Bridge 374 Randolph Co
Hi Dave,
I apologize for the lat/long problem. We used what our consultant gave us. They are usually spot on. Just in case the
coordinates are: 35.785355, -79.665604 .
As for the temporary impacts at the existing bridge, the old bridge is being removed and we are providing bank
stabilization where the bents are being removed. The temporary impacts on the ends of the permanent impacts are
there to provide access to placement of bank stabilization and/or to catch any rogue rock pieces that may fall during
construction. There really should be nothing to remove in the temporary area at existing bridge. It is a standard
practice to have some temporary allowance where NCDOT places permanent bank stabilization. Also, the temporary
bank stabilization impact on the right side of the road for the ditch is done for the same reasoning as the existing bridge.
I hope this helps, if you have more questions or if I have caused more confusion let me know.
Deanna
Deanna Riffey
Environmental Program Consultant
Project Development & Environmental Analysis
North Carolina Department of Transportation
919 707 6151 office
driffey@ncdot.gov
Mail
1598 Mail Service Center Raleigh, NC 27699-1598
Physical Address
1020 Birch Ridge Drive Raleigh, NC 27610
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Wanucha, Dave
Sent: Wednesday, March 23, 2016 11:20 AM
To: Riffey, Deanna
Subject: B-5360 Bridge 374 Randolph Co
Hi Deanna,
1
Please provide a little more detail in regards to the temp impacts associated with bank stabilization. What type of
structures/materials will be employed? Are the temp impacts related to dewatering? I’m assuming that if they are
temp, the stabilization will be removed once the project is complete?
One other note was that the lat/long on the PCN provides the incorrect location for this project. In the future, please
double check lat/longs prior to submitting applications because those data are entered into our database upon
receipt. Not a big deal but takes time to correct. I made the correction for this one.
Thanks.
Dave W.
Dave Wanucha
Division of Water Resources
Transportation Permitting Unit
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2