HomeMy WebLinkAbout20160253 Ver 1_RE B-5360 Bridge 374 Randolph Co_20160330 Wanucha, Dave From:Riffey, Deanna Sent:Wednesday, March 30, 2016 9:57 AM To:Wanucha, Dave Subject:RE: B-5360 Bridge 374 Randolph Co Hi Dave, I apologize for the lat/long problem. We used what our consultant gave us. They are usually spot on. Just in case the coordinates are: 35.785355, -79.665604 . As for the temporary impacts at the existing bridge, the old bridge is being removed and we are providing bank stabilization where the bents are being removed. The temporary impacts on the ends of the permanent impacts are there to provide access to placement of bank stabilization and/or to catch any rogue rock pieces that may fall during construction. There really should be nothing to remove in the temporary area at existing bridge. It is a standard practice to have some temporary allowance where NCDOT places permanent bank stabilization. Also, the temporary bank stabilization impact on the right side of the road for the ditch is done for the same reasoning as the existing bridge. I hope this helps, if you have more questions or if I have caused more confusion let me know. Deanna Deanna Riffey Environmental Program Consultant Project Development & Environmental Analysis North Carolina Department of Transportation 919 707 6151 office driffey@ncdot.gov Mail 1598 Mail Service Center Raleigh, NC 27699-1598 Physical Address 1020 Birch Ridge Drive Raleigh, NC 27610 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Wanucha, Dave Sent: Wednesday, March 23, 2016 11:20 AM To: Riffey, Deanna Subject: B-5360 Bridge 374 Randolph Co Hi Deanna, 1 Please provide a little more detail in regards to the temp impacts associated with bank stabilization. What type of structures/materials will be employed? Are the temp impacts related to dewatering? I’m assuming that if they are temp, the stabilization will be removed once the project is complete? One other note was that the lat/long on the PCN provides the incorrect location for this project. In the future, please double check lat/longs prior to submitting applications because those data are entered into our database upon receipt. Not a big deal but takes time to correct. I made the correction for this one. Thanks. Dave W. Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2