Loading...
HomeMy WebLinkAbout20140468 Ver 1_Certification of Completion_20160401PA'I' MCCRORY Gnnmor �•5 DONALU R. VAN D1iR VAART .. .1bcn'!mT WaterResources S. JAY ZIMMGRMAN ENVIRONMENiAL OUALITY r)���[l��� NCDWR Project No.: ��`�" D�%�fj County: C'yrz^� a�"'1 Applicanh _���/Z� Project Name: �7 — v''va �C3 � /� bN i �+ � Date af Issuance of 4D1 Water Quality Certification: 7� 0�3 l�� Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to retum this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This fortn may be retumed to NCDWR by the applicant, the applicanYs authorized agent, or the project engineer. It is not necessary to send certificates from all of these. App/icmiYs Certrficnliax 1, /�,�/� `j ,�?�//.S , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 40l Weter Quality Certification and Buffer Rules, the approved plans and specifications,��porti �a en Is. � Signature: �T n�n�/ Date: � � ��'� Agen('s Certifrcr.lioa � , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substatltial compliance and intent of the 401 Water Qualiry Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Eugineer's Cer(ificntion p��a� Final I as a duly registered Professional Engineer in the State of North Carolina, having been au[horized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in lhe observation of the construaion such that the construction was observed m be built within substantial compliance and intent of the 401 Water Quality CeRification and Buffer Rules, the app�aved plans and specifications, and other supporting materials. Signature Registration No. Date ---------- -- n��� 0 V� D �uu APR - 1 2016 �ENR • WA�R RESOURCES TRANSPOFiTATION PERMIT7ING UNR State of Nonh Cuolina �Fnvimnmcmal Quality � Wolcr Resourccs