Loading...
HomeMy WebLinkAbout20140327 Ver 1_Certification of Completion_20160401I^ � , . !, , I 3 ��`Y ' ' 1.,.� �. `� ' WaterResources ENVIRONMENTAL OUALITY NCDWR Project No.: Applicant: �G1 rn•r n�ccaoitv t;unrnnr DONALD R. VAN U131t VAART SrrrtP<nY' S. JAY ZIMMERMA7V U1r.�lnr County: � Project Name: i / � Date of Issnance of 401 Water Quality Cerfification: �'�`7' �� Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificete to the 401 Transportation Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessazy to send certificates from all of these. App(icm+r's Ce�7ificatioee I, /"/y�/ �j �Cl�// s , hereby state that, to the best of my abilities, due care and diligence was usedin the observation of the construction such that the construction was observed to be built wi[hin substantial compliance and intent of the 40I Water Quali[ Certification and Buffer Rules, the approved plans and specifications, and ather suppoRing materia . Signature: � iL✓7�1� Date: �'����Co Ager+Ps Cerfificr.11ou I , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the constructian such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and BuffBr Rules, the approved ptans and specifications, and other supporting materials. Signa[ure: Exgineer's Cerlifirntiou Partial Final I as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the conshuction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed ro be built within substantial compliance and intent of the 401 Water Quality Certification and Buff'er Rules, the app�oved plans and specificalions, and other supporting materials. Signa[ure Registration No. Date --------- ' n��� � l/ � D �uu APR - 1 2016 ' DENR-WATERRESOURCES SlateofNotlhCemlina�EnvironmenlalQualilyl����MResourca TRANSPORTATIONPERMITTINGUNR