Loading...
HomeMy WebLinkAbout20061554 Ver 1_Stormwater Plans_20080124 1 1 1 1 p~- ~SS+~ STORMWATER MANAGEMENT PLAN (SMP) WATER QUALITY AND DETENTION CALCULATIONS FoR DEB ~.~.~ACRE I~IV~I CORNER CES( PROJECT 071021.000 DATE: JANUARY 22, 2008 ~~~~~NlCAR~~~~~i ~~~~ pF~s PROJECT MANAGER: DAVID REESE, PE - 332216 ~ ~o ~ 0~ PROJECT ENGINEER: JEREMIA S. MURPHY, P.E. Q-.'~a ~~i~~p ' : yGI NEB 'Q`~,\\~~ /,~~,y~A ~S i'MV~~~~ PO Box 268 ~ l-~ ~ ~ ~~~ ~~~~ CONCORD, NC 28026-0268 ~~~ w~'~ JAN 2 4 2008 DENR - WATER QUAUT7 WcTIANDS AND ST(KZMWATER BRANCh WATER QUALITY AND DETENTION 1 ~;~ u CES~ EB SWM Plan CESI Land Development Services OB NO.: mo2f.oao BY: usn~ P.O. Box 268 ATE: otoz.oe P.M.: s=aR Concord, NC 28026 REVISED: WATER QUALITY DESIGN ^ ~IVATER QUALITY REQUIREMENTS FOR BASIN #1 To meet the Water Quality requirements, the procedure outlined in the "Stormwater Best Management Practio ublished by NCDENR will be used. This guide gives the required pond surface area and storage volume meet an 85 % pollutant removal efficiency. Also, the pond must detain the first 1" of rainfall and release is volume over a period of 2 to 5 days. Calculations for these requirements are as follows: urface area re uirements rainage area to pond (Da)= 36.89 Ac ost-development impervious percentage = g0% Average pool depth = 4.5 ft Designed permanent pool elevation = 858,5 ~rom table 1.1 in the BMP guidelines the required Surface Area to Drainage Area atio (SA/DA) for a permanent pool depth of 4.5 feet = ~equired surface area = SA/DA / 100 x Drainage area= urface area of pond as designed at permanent pool elevation = " rainfall requirements sing the runoff volume calculations in the "Simple Method" PERA+IANEPIT PpOL DEPTH Imp. 3 4 ~ g 7 8 9 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 2.88 1.06 Ac 46,280 1.12 Ac 48,973 s.f. Rv = 0.05 + .009 (I) Rv= 0.86 in/in ~olume = (Design rainfall) (Rv) (Drainage Area) olume = 1" rainfall x Rv in/in x 1/12 in/ft x Da = 2.64 ac-ft or 115,163 ft^3 his volume must be released over a period of 2-5 days low Calculations: (Detention calculations were performed with Hydraflow Hydrographs 2007 and utilize SCS method) BMP WET DETENTION POND STAGE STORAGE SUMMARY ater Qua1R Basin Stara ®Volumes E4evatiDn "1 Ar~~" free ~ 'lo!~~ne dolurne - '. 1243 ).0000 ..659 ~ 3.2298 ~ 25,u35 0.5886 nn: 12949 80,f_:_C .8509 <66 t 1.3613 l 138,480`, ' 3.1791 - ~ 1290 195.254 4.5742 3C ^ I f 5.L53 1.4980 ~ ~ .263:005 6:0378 1.5683 329,789 7.5709 665 ~1,433~ 1.8399 r 399,683 ~-1750 - ~--'.o1i% 1.7127 472,683 10.8513 ~ .. Fluvatinn Intnrnnl atin.. Elev Stora e Volume Stora e:Area 660 660.7 661 80,626 120,818 138,480 56,408 58,42fi 59,300 toga a ele . 2.20 ff.-above erm: 001 elev. Q Stora e Elev. = 660.70 To of Box ~ fi64.30 ination of Orifice size for 2-5 day drawdown a= 2Ax SEaI't(hj F-~~I„g ~~a;: equa~ior ct{sgrt{2t~} i a= Area of orifice a sgft t= Time to drawdown 172800 sec A= Average pond surface area 53700 sf g= Gravity constant 322 ftls^2 h= Change in head 2.20 ft C= Orifice constant 0.6 ?+riaximamo~ficearea- 01615 sgft _Maximiam orificeBtze = 6 inche ~/OLUME BELOW PERMANENT POOL 2 day min. s (2 day d T~18iiiP~nd rorebay~' RxeL~:'?+t _ TOTAL Navation hncll Rrea Sfl Volume !~o4t~ Area isfl Volun~,e icy-f0 Nree isfl Vo~.um E~ fcu-hi Volume fcu-ftj I ~U ...- ~ -- - ... =.838 <'..~53 2,269 - - - t g - x,330 _ 3.185 _5;139 _ ~ C ~ ~ 1 ~h6 95.784 ;6 ~ ~ 541 b&2 8,673 -- 127,97& :.i0 - ~ 1@;936 ~C 445 658.5 36.010 145,311 6.901 18,609 6,055 15,610 179,530 i ~~ai i uicuay vViun~C JY,L ly Forebay Volume 19.06% Volume at top of shelf 205,166 Hydraflow Table of Contents Detention 01-22-08.gpw ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hydrograph Return Period Recap .................................................................... 1 1 -Year Summary Report ............................................................................................................... Hydrograph Reports ......................................................................................................... . 2 . 3 Hydrograph No. 1, SCS Runoff, Offsite DA 1 .................................................................. 3 TR-55 Tc Worksheet ................................................................................................... Hydrograph No. 2, SCS Runoff, Offsite DA 2 ................................................................. 5 . TR-55 Tc Worksheet ................................................................................................... 6 ' Hydrograph No. 3, SCS Runoff, Site PreDevelopment-DA 1 ......................................... . 7 TR-55 Tc Worksheet .................................................................................................. . 8 Hydrograph No. 4, SCS Runoff, Site PreDevelopment-DA 2 ......................................... . 9 ' TR-55 Tc Worksheet ................................................................................................. 0 Hydrograph No. 5, Combine, Total Pre Development Point A ...................................... 1 Hydrograph No. 6, Combine, Site Pre Combined .......................................................... 12 ' Hydrograph No. 7, SCS Runoff, Site Post Development ............................................... 13 Hydrograph No. 8, Reservoir, BMP Pond Routed ......................................................... 14 Pond Report -DEB SWM BMP WQ Orifice~ .............................................................. 15 ' Hydrograph No. 9, Combine, Total Post to Point A ....................................................... 17 2 -Year ' ' Summary Report .............................................................................................................. Hydrograph Reports ........................................................................................................ Hydrograph No. 1, SCS Runoff, Offsite DA 1 ................................................................ Hydrograph No. 2, SCS Runoff, Offsite DA 2 ................................................................ 18 19 19 20 Hydrograph No. 3, SCS Runoff, Site PreDevelopment-DA 1 ........................................ 21 ' Hydrograph No. 4, SCS Runoff, Site PreDevelopment-DA 2 ........................................ Hydrograph No. 5, Combine, Total Pre Development Point A ...................................... 22 23 Hydrograph No. 6, Combine, Site Pre Combined .......................................................... 24 ' Hydrograph No. 7, SCS Runoff, Site Post Development ............................................... Hydrograph No. 8, Reservoir, BMP Pond Routed ......................................................... Hydrograph No. 9, Combine, Total Post to Point A ....................................................... 25 26 27 ' 10 -Year Summary Report .............................................................................................................. 28 Hydrograph Reports ........................................................................................................ 29 ' Hydrograph No. 1, SCS Runoff, Offsite DA 1 ................................................................ 29 Hydrograph No. 2, SCS Runoff, Offsite DA 2 ................................................................ 30 Hydrograph No. 3, SCS Runoff, Site PreDevelopment-DA 1 ........................................ 31 ' Hydrograph No. 4, SCS Runoff, Site PreDevelopment-DA 2 ........................................ 32 Hydrograph No. 5, Combine, Total Pre Development Point A ...................................... 33 Hydrograph No. 6, Combine, Site Pre Combined .......................................................... 34 ' Hydrograph No. 7, SCS Runoff, Site Post Development ............................................... 35 Hydrograph No. 8, Reservoir, BMP Pond Routed ......................................................... 36 Hydrograph No. 9, Combine, Total Post to Point A ....................................................... 37 ' 50 -Year Contents continued... Detention 01-22-08.gpw ' Summary Report .............................................................................................................. 38 Hydrograph Reports ........................................................................................................ 39 Hydrograph No. 1, SCS Runoff, Offsite DA 1 ................................................................ 39 Hydrograph No. 2, SCS Runoff, Offsite DA 2 ................................................................ 40 Hydrograph No. 3, SCS Runoff, Site PreDevelopment-DA 1 ........................................ 41 ' Hydrograph No. 4, SCS Runoff, Site PreDevelopment-DA 2 ........................................ 42 Hydrograph No. 5, Combine, Total Pre Development Point A ...................................... 43 Hydrograph No. 6, Combine, Site Pre Combined .......................................................... 44 ' Hydrograph No. 7, SCS Runoff, Site Post Development ::::.::. :::.:.:::.:.::.::::...::::.::.:::..: 45 Hydrograph No. 8, Reservoir, BMP Pond Routed 46 Hydrograph No. 9, Combine, Total Post to Point A ....................................................... 47 1 1 1 1 1 1 ii Hydrograph Return Period Recap 1 Hydraflow Hvdrograohs by Intelisolve v9.1 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No t e H d . yp y (s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- 292.27 415.52 ------- ------- 769.63 ------- 093.68 ------- Offsite DA 1 2 SCS Runoff ------- 82.57 104.34 ------- ------- 162.08 ------- 212.19 ------- Offsite DA 2 3 SCS Runoff ------- 5.401 13.21 ------- ------- 43.30 ------- 75.59 ------- Site PreDevelopment-DA 1 4 SCS Runoff ------- 2.578 6.250 ------- ------- 19.76 ------- 34.09 ------- Site PreDevelopment-DA 2 5 Combine 1, 2, 3, 4 321.61 454.13 ------- ------- 834.53 ------- 183.11 ------- Total Pre Development Point A 6 Combine 3, 4, 7.709 18.91 ------- ------- 61.43 ------- 106.97 ------- Site Pre Combined 7 SCS Runoff ------- 118.10 148.63 ------- ------- 229.34 ------- 299.19 ------- Site Post Development 8 Reservoir 7 1.737 1.974 ------- ------- 12.47 ------- 102.98 ------- BMP Pond Routed 9 Combine 1, 2, 8 320.37 450.94 ------- ------- 827.46 ------- 204.54 ------- Total Post to Point A Proj. file: Detention 01-22-08.gpw Tuesday, Jan 22, 2008 Hydrograph Summary Report [] u 2 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 SCS Runoff 292.27 1 749 1,911,851 ---- ------ ------ Offsite DA 1 2 SCS Runoff 82.57 1 728 297,776 ---- ------ ------ Offsite DA 2 3 SCS Runoff 5.401 1 727 29,386 ---- ------ ------ Site PreDevelopment-DA 1 4 SCS Runoff 2.578 1 723 11,077 ---- ------ ------ Site PreDevelopment-DA 2 5 Combine 321.61 1 747 2,250,090 1, 2, 3, 4 ------ ------ Total Pre Development Point A 6 Combine 7.709 1 725 40,463 3, 4, ------ ------ Site Pre Combined 7 SCS Runoff 118.10 1 719 276,769 ---- ------ ------ Site Post Development 8 Reservoir 1.737 1 1105 196,809 7 662.13 207,240 BMP Pond Routed 9 Combine 320.37 1 747 2,406,437 1, 2, 8 ------ ------ Total Post to Point A Detention 01-22-08.gpw Return Period: 1 Year Tuesday, Jan 22, 2008 3 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 1 ' Offsite DA 1 Hydrograph type = SCS Runoff Peak discharge = 292.27 cfs Storm frequency = 1 yrs Time to peak = 749 min Time interval = 1 min Hyd. volume = 1,911,851 cult Drainage area = 449.650 ac Curve number = 80 Basin Slope = 0.0 % Hydraulic length = 0 ft 1 Tc method = TR55 Time of conc. (Tc) = 58.60 min Total precip. = 2.90 in Distribution = Type II ' Storm duration = 24 hrs Shape factor = 484 ' Offsite DA 1 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 32 ' 0.00 ' 280.00 ' 240.00 ' 200.00 ' 160.00 ' 120.00 ' 80.00 40.00 0.00 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0.00 ' 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) TR55 Tc Worksheet 4 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 1 Offsite DA 1 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 3.50 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 35.75 + 0.00 + 0.00 = 35.75 Shallow Concentrated Flow Flow length (ft) = 146.00 0.00 0.00 Watercourse slope (%) = 9.60 0.00 0.00 Surface description =Unpaved Paved Paved Average velocity (ft/s) = 5.00 0.00 0.00 Travel Time (min) = 0.49 + 0.00 + 0.00 = 0.49 Channel Flow X sectional flow area (sgft) = 3.00 101.00 3.00 Wetted perimeter (ft) = 5.47 10.20 5.47 Channel slope (%) = 2.00 0.78 0.98 Manning's n-value = 0.030 0.024 0.030 Velocity (ftls) = 4.70 25.48 3.29 Flow length (ft) = 3665.0 101.0 1839.0 Travel Time (min) = 13.01 + 0.07 + 9.32 = 22.39 Total Travel Time, Tc .............. ................................................................ 58.60 min Hydrograph Report 5 ' Hydraflow Hydrographs by Intelisolve v9.1 Hya. No. 2 ' Offsite DA 2 Hydrograph type = SCS Runoff Storm frequency = 1 yrs ' Time interval = 1 min Drainage area = 39.690 ac Basin Slope = 0.0 ' Tc method = TR55 Total precip. = 2.90 in ' Storm duration = 24 hrs Tuesday, Jan 22, 2008 Peak discharge = 82.57 cfs Time to peak = 728 min Hyd. volume = 297,776 cult Curve number = 92 Hydraulic length = 0 ft Time of conc. (Tc) = 25.30 min Distribution = Type II Shape factor = 484 ' Offsite DA 2 Q (cfs) Hyd. No. 2 -- 1 Year ' 90.00 80.00 _ _ _ _ ___ 70.00 E 60.00 50.00 L ' 40.00 I_ ~ 30.00 __ ' 20.00 10.00 I i ~ 0 00 ~ I_ L Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 ' ~ o.oo 0 120 240 360 480 600 720 840 960 1080. 1200 1320 1440 1560 Hyd No. 2 Time (min) TR55 Tc Worksheet 6 Hydraflow Hydrographs by Intefisolve v9.1 Hyd. No. 2 Offsite DA 2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 3.50 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 13.64 + 0.00 + 0.00 = 13.64 Shallow Concentrated Flow Flow length (ft) = 262.00 0.00 0.00 Watercourse slope (%) = 2.00 0.00 0.00 Surface description =Paved Paved Paved Average velocity (ft/s) = 2.87 0.00 0.00 Travel Time (min) = 1.52 + 0.00 + 0.00 = 1.52 Channel Flow X sectional flow area (sgft) = 3.14 3.00 0.00 Wetted perimeter (ft) = 6.28 5.47 0.00 Channel slope (%) = 1.00 1.60 0.00 Manning's n-value = 0.013 0.030 0.015 Velocity (ft/s) = 7.20 4.20 0.00 Flow length (ft) = 1632.0 1612.0 0.0 Travel Time (min) = 3.78 + 6.40 + 0.00 = 10.17 Total Travel Time, Tc .............................................................................. 25.30 min ' Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 3 ' Site PreDevelopment-DA 1 Hydrograph type = SCS Runoff Storm frequency = 1 yrs ' Time interval = 1 min Drainage area = 26.830 ac Basin Slope = 0.0 ' Tc method = TR55 Total precip. = 2.90 in ' Storm duration = 24 hrs 7 Tuesday, Jan 22, 2008 Peak discharge = 5.401 cfs Time to peak = 727 min Hyd. volume = 29,386 cult Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 15.50 min Distribution = Type II Shape factor = 484 ' Q (cfs) ' 6.00 ' 5.00 4.00 L __ 3.00 I I ' 2.00 ' 1.00 L 1 ~~ 0.00 Site PreDevelopment-DA 1 Hyd. No. 3 -- 1 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet 8 Hydraflow Hydrographs by Intelisolve vg.1 Hyd. No. 3 Site PreDevelopment-DA 1 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 3.50 0.00 Land slope (%) = 10.50 0.00 0.00 Travel Time (min) = 12.24 + 0.00 + 0.00 = 12.24 Shallow Concentrated Flow Flow length (ft) = 124.00 0.00 0.00 Watercourse slope (%) = 13.70 0.00 0.00 Surface description =Unpaved Paved Paved Average velocity (ft/s) = 5.97 0.00 0.00 Travel Time (min) = 0.35 + 0.00 + 0.00 = 0.35 Channel Flow X sectional flow area (sgft) = 3.00 0.00 0.00 Wetted perimeter (ft) = 5.47 0.00 0.00 Channel slope (%) = 3.30 0.00 0.00 Manning's n-value = 0.030 0.015 0.015 Velocity (ft/s) = 6.03 0.00 0.00 Flow length (ft) _ .1043.0 0.0 0.0 Travel Time (min) = 2.88 + 0.00 + 0.00 = 2.88 Total Travel Time, Tc .............................................................................. 15.50 min 1 9 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 4 Site PreDevelopme nt-DA 2 Hydrograph type = SCS Runoff Peak discharge = 2.578 cfs ' Storm frequency = 1 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 11,077 cult Drainage area = 10.060 ac Curve number = 60 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.90 min Total precip. = 2.90 in Distribution =Type II ' Storm duration = 24 hrs Shape factor = 484 ' Site PreDevelopment-DA 2 Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 30 3.00 1 j ~ i II ~ ~ I ~ __ _ I _ __ 2.00 2.00 ~ ~ _ ' I i I ~ I ~ ~ I I II 1.00 ~ ~ ~ ~ i ~ ~ ~ 1.00 __ ~ I __ ~_ 0.00 ~ ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet 10 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 4 Site PreDevelopment-DA 2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.50 3.50 0.00 Land slope (%) = 10.70 0.00 0.00 Travel Time (min) = 9.65 + 0.00 + 0.00 = 9.65 Shallow Concentrated Flow Flow length (ft) = 65.00 0.00 0.00 Watercourse slope (%) = 16.90 0.00 0.00 Surface description =Unpaved Paved Paved Average velocity (ft/s) = 6.63 0.00 0.00 Travel Time (min) = 0.16 + 0.00 + 0.00 = 0.16 Channel Flow X sectional flow area (sgft) = 3.00 0.00 0.00 Wetted perimeter (ft) = 5.47 0.00 0.00 Channel slope (%) = 4.60 0.00 0.00 Manning's n-value = 0.030 0.015 0.015 Velocity (ft/s) = 7.12 0.00 0.00 Flow length (ft) = 474.0 0.0 0.0 Travel Time (min) = 1.11 + 0.00 + 0.00 = 1.11 Total Travel Time, Tc .............................................................................. 10.90 min ~, Hydrograph Report 11 Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 5 ' Total Pre Development Point A Hydrograph type =Combine Peak discharge = 321.61 cfs ' Storm frequency = 1 yrs Time to peak = 747 min Time interval = 1 min Hyd. volume = 2,250,090 cult Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area= 526.230 ac ' Total Pre Development Point A Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 350.00 ' 300.00 250.00 ' 200.00 ' 150.00 100.00 50.00 0.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 ' Hyd No. 4 ~ 12 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 6 Site Pre Combined Hydrograph type = Combine Peak discharge = 7.709 cfs Storm frequency = 1 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 40,463 cult Inflow hyds. = 3, 4 Contrib. drain. area= 36.890 ac Q (cfs) 8.00 6.00 4.00 2.00 Q (cfs) 8.00 6.00 4.00 2.00 _ 0.00 ~ ~ ~ ~ ~ ,, ~ ~ ~ ~ ~ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 3 Hyd No. 4 Site Pre Combined Hyd. No. 6 -- 1 Year ' Hydrograph Report 13 ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. IVo. 7 ' Site Post Development Hydrograph type = SCS Runoff Peak discharge = 118.10 cfs ' Storm frequency = 1 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 276,769 cult Drainage area = 36.890 ac Curve number = 92 ' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method =USER Time of conc. (Tc) = 10.00 min Total precip. = 2.90 in Distribution = Type II ' Storm duration = 24 hrs Shape factor = 484 ' Site Post Development Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 120 0 ' 0 ' 100.00 80.00 ' 60.00 ' 40.00 ' 20.00 t 0.00 120.00 100.00 80.00 60.00 40.00 20.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 7 1 H d ro ra h Y g p Re o rt p ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 8 ' BMP Pond Routed Hydrograph type =Reservoir ' Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 7 -Site Post Development ' Reservoir name =DEB SWM BMP WQ Orifice Storage Indication method used. 1 ' Q (cfs) ' 120.00 ' 100.00 ' 80.00 1 ' 60.00 ' 40.00 ' 20.00 1 ' 0.00 0 14 Tuesday, Jan 22, 2008 Peak discharge = 1.737 cfs Time to peak = 1105 min Hyd. volume = 196,809 cult Max. Elevation = 662.13 ft Max. Storage = 207,240 cult BMP Pond Routed Hyd. No. 8 -- 1 Year 300 600 900 1200 Hyd No. 8 Hyd No. 7 1500 1800 2100 2400 2700 ~' Total storage used = 207,240 cuft Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0.00 3000 Time (min) Pond Report 15 Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Pond No. 1 -DEB SWM BMP WQ Orifice Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 658.50 ft Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 658.50 48,973 0 0 0.50 659.00 53,572 25,636 25,636 1.50 660.00 56,408 54,990 80,626 2.50 661.00 59,300 57,854 138,480 3.50 662.00 62,248 60,774 199,254 4.50 663.00 65,253 63,751 263,005 5.50 664.00 68,315 66,784 329,789 6.50 665.00 71,433 69,874 399,663 7.50 666.00 74,607 73,020 472,683 Culvert /Orifice Structu res Weir Structures [A] [B] [C] [PrFRsr] [A] [B] [C] [D] Rise (in) = 48.00 6.00 0.00 0.00 Crest Len (ft) = 24.00 0.00 30.00 0.00 Span (in) = 48.00 6.00 0.00 0.00 Crest EI. (ft) = 664.30 0.00 664.60 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert EI. (ft) = 654.00 658.50 0.00 0.00 Weir Type =Riser Rect Ciplti --- Length (ft) = 50.00 0.00 0.00 0.00 Multi-Stage =Yes Yes No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: CulverUOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 658.50 0.00 0.00 --- --- 0.00 --- 0.00 --- --- --- 0.00 0.05 2,564 658.55 76.33 oc 0.01 is --- --- 0.00 --- 0.00 --- --- --- 0.01 0.10 5,127 658.60 76.33 oc 0.03 is --- --- 0.00 --- 0.00 --- --- --- 0.03 0.15 7,691 658.65 76.33 oc 0.07 is -- --- 0.00 --- 0.00 --- --- --- 0.07 0.20 10,255 658.70 76.33 oc 0.11 is --- --- 0.00 --- 0.00 --- --- --- 0.11 0.25 12,818 658.75 76.33 oc 0.17 is --- --- 0.00 --- 0.00 --- --- --- 0.17 0.30 15,382 658.80 76.33 oc 0.23 is --- --- 0.00 --- 0.00 --- --- --- 0.23 0.35 17,945 658.85 76.33 oc 0.30 is --- --- 0.00 --- 0.00 --- --- --- 0.30 0.40 20,509 658.90 76.33 oc 0.36 is --- --- 0.00 --- 0.00 --- --- --- 0.36 0.45 23,073 658.95 76.33 oc 0.43 is --- --- 0.00 --- 0.00 --- --- --- 0.43 0.50 25,636 659.00 76.33 oc 0.47 is --- --- 0.00 --- 0.00 --- --- --- 0.47 0.60 31,135 659.10 76.33 oc 0.56 is --- --- 0.00 --- 0.00 --- --- --- 0.56 0.70 36,634 659.20 76.33 oc 0.63 is --- --- 0.00 --- 0.00 --- --- --- 0.63 0.80 42,133 659.30 76.33 oc 0.70 is --- --- 0.00 --- 0.00 --- --- --- 0.70 0.90 47,632 659.40 76.33 oc 0.76 is --- --- 0.00 --- 0.00 --- --- --- 0.76 1.00 53,131 659.50 76.33 oc 0.82 is --- --- 0.00 --- 0.00 --- --- --- 0.82 1.10 58,630 659.60 76.33 oc 0.87 is --- --- 0.00 --- 0.00 --- --- --- 0.87 1.20 64,129 659.70 76.33 oc 0.92 is --- --- 0.00 --- 0.00 --- --- --- 0.92 1.30 69,628 659.80 76.33 oc 0.97 is --- --- 0.00 --- 0.00 --- --- --- O.g7 1.40 75,127 659.90 76.33 oc 1.01 is --- --- 0.00 --- 0.00 --- --- --- 1.01 1.50 80,626 660.00 76.33 oc 1.06 is --- --- 0.00 --- 0.00 --- --- --- 1.06 1.60 86,412 660.10 76.33 oc 1.10 is --- --- 0.00 --- 0.00 --- --- --- 1.10 1.70 92,197 660.20 76.33 oc 1.14 is --- --- 0.00 --- 0.00 --- --- --- 1.14 1.80 97,982 660.30 76.33 oc 1.18 is --- --- 0.00 --- 0.00 --- --- --- 1.18 1.90 103,768 660.40 76.33 oc 1.21 is --- --- 0.00 --- 0.00 --- --- --- 1.21 2.00 109,553 660.50 76.33 oc 1.25 is --- --- 0.00 --- 0.00 --- --- --- 1.25 2.10 115,339 660.60 76.33 oc 1.29 is --- --- 0.00 --- 0.00 --- --- --- 1.2g 2.20 121,124 660.70 76.33 oc 1.32 is --- --- 0.00 --- 0.00 --- --- -- 1.32 2.30 126,909 660.80 76.33 oc 1.35 is --- --- 0.00 --- 0.00 --- --- --- 1.35 2.40 132,695 660.90 76.33 oc 1.39 is --- --- 0.00 --- 0.00 --- --- --- 1.39 2.50 138,480 661.00 76.33 oc 1.42 is -- --- 0.00 --- 0.00 --- --- --- 1.42 2.60 144,558 661.10 76.33 oc 1.45 is --- --- 0.00 --- 0.00 --- --- --- 1.45 Continues on next page.. 16 DEB SWM BMP WO Orifice Stage /Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.70 150,635 661.20 76.33 oc 1.48 is --- --- 0.00 --- 0.00 --- --- --- 1 48 ' 2.80 156,713 661.30 76.33 oc 1.51 is --- --- 0.00 --- 0.00 --- --- --- . 1 51 2.90 162,790 661.40 76.33 oc 1.54 is --- --- 0.00 --- 0.00 --- --- --- . 1 54 3.00 168,867 661.50 76.33 oc 1.57 is --- --- 0.00 --- 0.00 --- --- --- . 1 57 3.10 3.20 174,945 181,022 661.60 661.70 76.33 oc 76.33 oc 1.60 is 1.62 is --- --- --- --- 0.00 0.00 --- --- 0.00 0 00 --- --- --- --- --- --- . 1.60 1 62 3.30 187,100 661.80 76.33 oc 1.65 is --- --- 0.00 --- . 0.00 --- --- --- . 1 65 3.40 193,177 661.90 76.33 oc 1.68 is --- --- 0.00 --- 0.00 --- --- --- . 1 68 3.50 199,254 662.00 76.33 oc 1.70 is --- --- 0.00 --- 0.00 --- --- --- . 1 70 3.60 205,629 662.10 76.33 oc 1.73 is 0.00 0.00 . 1 73 ' 3.70 212,004 662.20 76.33 oc 1.76 is ___ ___ 0.00 ___ 0.00 ___ ___ ___ . 1 76 3.80 218,379 662.30 76.33 oc 1.78 is --- --- 0.00 --- 0.00 --- --- --- . 1 78 3.90 224,754 662.40 76.33 oc 1.81 is --- --- 0.00 --- 0.00 --- --- --- . 1 81 ' 4.00 4.10 231,130 237,505 662.50 662.60 76.33 oc 76.33 oc 1.83 is 1.85 is --- --- --- - - 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- --- -- . 1.83 1 85 4.20 243,880 662.70 76.33 oc 1.88 is --- --- 0.00 --- 0.00 _ --- --- __ . 1 88 4.30 250,255 662.80 76.33 oc 1.90 is --- --- 0.00 --- 0.00 --- --- --- . 1 90 4.40 256,630 662.90 76.33 oc 1.93 is --- --- 0.00 --- 0.00 --- --- --- . 1 93 4.50 263,005 663.00 76.33 oc 1.95 is 0.00 0.00 - . 1 95 ' 4.60 269,683 663.10 76.33 oc 1.97 is =__ ___ 0.00 ___ 0.00 ___ ___ _ _ . 1 97 4.70 276,362 663.20 76.33 oc 1.99 is --- 0.00 --- 0.00 --- --- --- , 1 99 4.80 283,040 663.30 76.33 oc 2.02 is --- --- 0.00 --- 0.00 --- --- --- . 2 02 4.90 5.00 289,718 296,397 663.40 663.50 76.33 oc 76.33 oc 2.04 is 2.06 is --- --- --- -- 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- --- --- , 2.04 2 06 5.10 303,075 663.60 76.33 oc 2.08 is --- --- 0.00 --- 0.00 --- --- --- . 2 08 5.20 309,754 663.70 76.33 oc 2.10 is --- --- 0.00 --- 0.00 --- --- --- , 2 10 5.30 316,432 663.80 76.33 oc 2.12 is --- --- 0.00 --- 0.00 -- --- ___ . 2 12 5.40 323,110 663.90 76.33 oc 2.15 is --- --- 0.00 --- 0.00 --- --- -- . 2 15 ' 5.50 329,789 664.00 76.33 oc 2.17 is --- --- 0.00 --- 0.00 _ --- --- -- . 2 17 5.60 336,776 664.10 76.33 oc 2.19 is --- --- 0.00 --- 0.00 --- --- --- , 2 19 5.70 343,764 664.20 76.33 oc 2.21 is --- --- 0.00 --- 0.00 --- --- ___ . 2 21 ' 5.80 5.90 350,751 357,738 664.30 664.40 76.33 oc 76.33 oc 2.23 is 2.25 is --- --- -- 0.00 2.52 --- 0.00 0.00 _- - _ . 2.23 4 77 6.00 364,726 664.50 76.33 oc 2.27 is =__ _ 7.14 ___ 0.00 _ _ _ _ , 9 41 6.10 371,713 664.60 76.33 oc 2.29 is --- --- 13.12 --- 0.00 --- --- --- . 15 41 6.20 378,701 664.70 76.33 oc 2.31 is --- --- 20.21 --- 3.15 --- --- --- . 25 66 6.30 385,688 664.80 76.33 oc 2.33 is --- -- 28.24 8.92 - . 39 49 ' 6.40 392,675 664.90 76.33 oc 2.34 is = 37.12 __ 16.40 ___ ___ __ . 55 87 6.50 399,663 665.00 76.33 oc 2.36 is --- 46.81 --- 25.28 --- --- --- . 74 45 6.60 406,965 665.10 76.33 oc 2.38 is -- --- 57.18 --- 35.32 --- --- --- . 94 89 ' 6.70 6.80 414,267 421,569 665.20 665.30 76.33 oc 82.34 oc 2.40 is 2.42 is --- --- 68.23 79.91 --- 46.43 58.50 _ - - , 117.06 140 83 6.90 428,871 665.40 94.58 oc 2.38 is ___ __= 92.19 ___ 71.47 ___ _ __ . 166 05 7.00 436,173 665.50 107.36 oc 2.32 is --- --- 105.04 --- 85.28 --- --- --- . 192 65 7.10 443,475 665.60 120.68 oc 2.24 is --- --- 118.44 --- 99.88 --- --- --- . 220 56 7.20 450,777 665.70 134.43 is 2.06 is _- - 132.37 115.23 . 249 66 7.30 458,079 665.80 148.63 is 1.83 is = __ 146.80 ___ 131.29 ___ ___ ___ . 27g g2 7.40 465,381 665.90 163.25 is 1.53 is 161.72 --- 148.04 --- --- --- . 311 29 7.50 472,683 666.00 176.10 is 1.17 is --- --- 174.93 s --- 165.49 --- --- --- . 341.58 ' ...End 1 ' H d ro ra h Y 9 p Re o rt p ~' ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 9 ' Total Post to Point A Hydrograph type =Combine Peak discharge = 320.37 cfs ' Storm frequency = 1 yrs Time to peak = 747 min Time interval = 1 min Hyd. volume = 2,406,437 cult Inflow hyds. = 1, 2, 8 Contrib. drain. area= 489.340 ac ' Total Post to Point A Q (cfs) Hyd. No. 9 -- 1 Year Q (cfs) ' 350.00 ' 300.00 ' 250.00 ' 200.00 ' 150.00 100.00 50.00 0.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Hyd No. 1 Hyd No. 2 Hyd No. 8 Time (min) 0 1 1 1 1 1 1 18 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 SCS Runoff 415.52 1 749 2,661,382 ---- ------ ------ Offsite DA 1 2 SCS Runoff 104.34 1 728 379,888 ---- ------ ------ Offsite DA 2 3 SCS Runoff 13.21 1 726 52,401 ---- ------ ------ Site PreDevelopment-DA 1 4 SCS Runoff 6.250 1 722 19,752 ---- ------ ------ Site PreDevelopment-DA 2 5 Combine 454.13 1 747 3,113,423 1, 2, 3, 4 ------ ------ Total Pre Development Point A 6 Combine 18.91 1 724 72,152 3, 4, ------ ------ Site Pre Combined 7 SCS Runoff 148.63 1 719 353,088 ---- ------ ------ Site Post Development 8 Reservoir 1.974 1 1137 231,446 7 663.11 270,294 BMP Pond Routed 9 Combine 450.94 1 747 3,272,717 1, 2, 8 ------ ------ Total Post to Point A Detention 01-22-08.gpw Return Period: 2 Year Tuesday, Jan 22, 2008 ' 19 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 1 Offsite DA 1 Hydrograph type = SCS Runoff Peak discharge = 415.52 cfs ' Storm frequency = 2 yrs Time to peak = 749 min Time interval = 1 min Hyd. volume = 2,661,382 cult Drainage area = 449.650 ac Curve number = 80 t Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 58.60 min Total precip. = 3.50 in Distribution = Type II ' Storm duration = 24 hrs Shape factor = 484 ' Offsite DA 1 Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) ' 420.00 ' 360.00 300.00 240.00 180.00 120.00 60.00 1 0.00 420.00 360.00 300.00 240.00 180.00 120.00 60.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 ' 20 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 2 ' Offsite DA 2 Hydrograph type = SCS Runoff Peak discharge = 104.34 cfs Storm frequency = 2 yrs Time to peak = 728 min ' Time interval = 1 min Hyd. volume = 379 888 cult Drainage area = 39.690 ac Curve number , = 92 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 25.30 min Total precip. = 3.50 in Distribution =Type II ' Storm duration = 24 hrs Shape factor = 484 ' Offsite DA 2 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) ' 120.00 ' 100.00 ' 80.00 t 60.00 ' 40.00 t 20.00 t 0.00 120.00 100.00 80.00 60.00 40.00 20.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 21 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 3 Site PreDevelopment-DA 1 Hydrograph type = SCS Runoff Peak discharge = 13.21 cfs ' Storm frequency = 2 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 52,401 cult Drainage area = 26.830 ac Curve number = 60 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 15.50 min Total precip. = 3.50 in Distribution = Type II ' Storm duration = 24 hrs Shape factor = 484 ' Site PreDevelopment-DA 1 Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) ' 14.00 14.00 __ t ' 12.00 12.00 ~ , ~ I, i _ i__ _ ~ 10.00 10.00 ~ ' 8.00 i 8.00 ' i 6.00 ~ ~ 6.00 I, I I ~ I I I 4.00 i ~ 4.00 _ ~i i __ __ __ I I - _ _ __ 2.00 , ~ ~ ~ 2.00 ~ ~ ~ ~ ~ ~ 0.00 ~ ~ ~ ~ ' 0.00 0 120 240 360 480 600 720 840 960 1080 120 1 0 320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report 22 ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 4 ' Site PreDevelopment-DA 2 Hydrograph type SCS Runoff ' Storm frequency = 2 yrs Time interval = 1 min Drainage area = 10.060 ac Basin Slope = 0.0 Tc method = TR55 Total precip. = 3.50 in ' Storm duration = 24 hrs Tuesday, Jan 22, 2008 Peak discharge = 6.250 cfs Time to peak = 722 min Hyd. volume = 19,752 cult Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 10.90 min Distribution = Type II Shape factor = 484 ' Q (cfs) ' 7.00 ' 6.00 ' 5.00 ' 4 00 . 3.00 2.00 1.00 0.00 Site PreDevelopment-DA 2 Hyd. No. 4 -- 2 Year Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) ' H d ro ra h Y g p Re o rt p ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 5 ' Total Pre Development Point A Hydrograph type =Combine Storm frequency = 2 yrs ' Time interval = 1 min Inflow hyds. = 1, 2, 3, 4 ' Q (cfs) ' 480.00 420.00 ' 360.00 I ' 300.00 s 240.00 ' 180.00 -~ 120.00 60.00 0.00 ~- 0 1 23 Tuesday, Jan 22, 2008 Peak discharge = 454.13 cfs Time to peak = 747 min Hyd. volume = 3,113,423 cult Contrib. drain. area= 526.230 ac Total Pre Development Point A Hyd. No. 5 -- 2 Year Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 60.00 n nn 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560v vv Time (min) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hyd No. 4 24 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 6 ' Site Pre Combined Hydrograph type =Combine Peak discharge = 18.91 cfs Storm frequency = 2 yrs Time to peak = 724 min ' Time interval = 1 min Hyd. volume = 72,152 cult Inflow hyds. = 3, 4 Contrib. drain. area= 36.890 ac ' Site Pre Combined Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) ' 21.00 ' 18.00 ' 15.00 ' 12 00 . 9.00 6.00 3.00 0 00 21.00 18.00 15.00 12.00 9.00 6.00 3.00 . 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 Hyd No. 3 Hyd No. 4 ' Hydrograph Report 25 ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 7 ' Site Post Development Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 36.890 ac Basin Slope = 0.0 Tc method =USER Total precip. = 3.50 in ' Storm duration = 24 hrs Tuesday, Jan 22, 2008 Peak discharge = 148.63 cfs Time to peak = 719 min Hyd. volume = 353,088 cult Curve number = 92 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 ' Site Post Development Q (cfs) Hyd. No. 7 -- 2 Year ' 160.00 140.00 i - 120.00 100.00 ~ __ 80.00 ~ 60.00 40.00 ~ i __ 20.00 __ 0 00 ; ;~ ~ ~ , _: Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 ' ~ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 7 Time (min) ' Hydrograph Report 26 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 8 ' BMP Pond Routed Hydrograph type = Reservoir ' Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 7 -Site Post Development ' Reservoir name = DEB SWM BMP WQ Orifice Tuesday, Jan 22, 2008 Peak discharge = 1.974 cfs Time to peak = 1137 min Hyd. volume = 231,446 cult Max. Elevation = 663.11 ft Max. Storage = 270,294 cult Storage Indication method used. ' BMP Pond Routed Q (cfs) Hyd. No. 8 -- 2 Year ' 160.00 ' 140.00 ' 120.00 ' 100.00 80.00 ' 60.00 ' 40.00 ' 20.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 8 Hyd No. 7 ~__._.....k_+._.i.-( Total storage used = 270,294 cuft Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 --L 0.00 3000 Time (min) Hydrograph Report 27 ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 9 ' Total Post to Point A Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 1, 2, 8 Tuesday, Jan 22, 2008 Peak discharge = 450.94 cfs Time to peak = 747 min Hyd. volume = 3,272,717 cult Contrib. drain. area= 489.340 ac ^ ' Q (cfs) ' 480.00 420.00 360.00 300.00 L 240.00 180.00 L ~ 120.00 _i 60.00 0.00 ~ _ ~ ~ _ I Total Post to Point A Hyd. No. 9 -- 2 Year Q (cfs) 480.00 420.00 360.00 300.00 240.00 180.00 120.00 60.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 1 Hyd No. 2 Hyd No. 8 i~ 28 Hydrograph Summary Report HydraflowHydrographsbylntelisolvev9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 SCS Runoff 769.63 1 749 4,847,135 ---- ------ ------ Offsite DA 1 2 SCS Runoff 162.08 1 727 603,239 ---- ------ ------ Offsite DA 2 3 SCS Runoff 43.30 1 724 134,095 ---- ------ ------ Site PreDevelopment-DA 1 4 SCS Runoff 19.76 1 721 50,546 ---- ------ ------ Site PreDevelopment-DA 2 5 Combine 834.53 1 747 5,635,012 1, 2, 3, 4 ------ ------ Total Pre Development Point A 6 Combine 61.43 1 723 184,641 3, 4, ------ ------ Site Pre Combined 7 SCS Runoff 229.34 1 719 560,683 ---- ------ ------ Site Post Development 8 Reservoir 12.47 1 779 377,065 7 664.55 368,288 BMP Pond Routed 9 Combine 827.46 1 747 5,827,438 1, 2, 8 ------ ------ Total Post to Point A Detention 01-22-08.gpw Return Period: 10 Year Tuesday, Jan 22, 2008 ' 29 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 1 ' Offsite DA 1 Hydrograph type = SCS Runoff Peak discharge = 769.63 cfs ' Storm frequency = 10 yrs Time to peak = 749 min Time interval = 1 min Hyd. volume = 4,847,135 cult Drainage area = 449.650 ac Curve number = 80 ' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 58.60 min Total precip. = 5.10 in Distribution = Type II ' Storm duration = 24 hrs Shape factor = 484 ' Offsite DA 1 Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs ) 770.00 ' 660.00 ' 550.00 ' 440.00 ' 330.00 220.00 110.00 0.00 770.00 660.00 550.00 440.00 330.00 220.00 110.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 H d ro ra h Y g p Re o rt p Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 2 ' Offsite DA 2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 39.690 ac Basin Slope = 0.0 ' Tc method = TR55 Total precip. = 5.10 in Storm duration = 24 hrs Q (cfs) 180.00 - 160.00 - 1 140.00 -~ 120.00 ' 100.00 80.00 60.00 ~ ' 40.00 i 20.00 0.00 I 0 Offsite DA 2 Hyd. No. 2 -- 10 Year Tuesday, Jan 22, 2008 Peak discharge = 162.08 cfs Time to peak = 727 min Hyd. volume = 603,239 cult Curve number = 92 Hydraulic length = 0 ft Time of conc. (Tc) = 25.30 min Distribution = Type II Shape factor = 484 30 Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 n nn 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560V Vv Time (min) Hyd No. 2 ' 31 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 3 ' Site PreDevelopment-DA 1 Hydrograph type = SCS Runoff Peak discharge = 43.30 cfs ' Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 134,095 cult Drainage area = 26.830 ac Curve number = 60 ' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 15.50 min Total precip. = 5.10 in Distribution = Type II ' Storm duration = 24 hrs Shape factor = 484 ' Site PreDevelopment-DA 1 Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) ' 50.00 40.00 ' 30.00 20.00 10.00 0.00 50.00 40.00 30.00 20.00 10.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 1 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 4 ' Site PreDevelopment-DA 2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs ' Time interval = 1 min Drainage area = 10.060 ac Basin Slope = 0.0 ' Tc method = TR55 Total precip. = 5.10 in Storm duration = 24 hrs 1 ' Q (cfs) ' 21.00 18.00 15.00 ' 12.00 - 9.00 - 6.00 - 3.00 - 0.00 - Tuesday, Jan 22, 2008 Peak discharge = 19.76 cfs Time to peak = 721 min Hyd. volume = 50,546 cult Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 10.90 min Distribution = Type II Shape factor = 484 Site PreDevelopment-DA 2 Hyd. No. 4 -- 10 Year 32 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 n nn 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560v vv Hyd No. 4 Time (min) ' Hydrograph Report 33 ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 5 Total Pre Development Point A Hydrograph type =Combine Peak discharge = 834.53 cfs ' Storm frequency = 10 yrs Time to peak = 747 min Time interval = 1 min Hyd. volume = 5,635,012 cult Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area= 526.230 ac ' Total Pre Development Point A Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) ' 840.00 ' 720.00 ' 600.00 ' 480.00 360.00 ' 240.00 120.00 1 0.00 840.00 720.00 600.00 480.00 360.00 240.00 120.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 ' Hyd No. 4 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 6 ' Site Pre Combined Hydrograph type =Combine Storm frequency = 10 yrs. ' Time interval Inflow hyds. = 1 min = 3, 4 ' Q (cfs) 70.00 ' 60.00 50.00 40.00 30.00 ' 20.00 10.00 -F 0.00 -~ ' 0 1 Site Pre Combined Hyd. No. 6 -- 10 Year Tuesday, Jan 22, 2008 Peak discharge = 61.43 cfs Time to peak = 723 min Hyd. volume = 184,641 cult Contrib. drain. area= 36.890 ac 34 Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 n nn 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 vv Hyd No. 6 Hyd No. 3 Hyd No. 4 Time (min) Hydrograph Report Site Post Development Hyd. No. 7 -- 10 Year ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 7 ' Site Post Development Hydrograph type = SCS Runoff Storm frequency = 10 yrs ' Time interval = 1 min Drainage area = 36.890 ac Basin Slope = 0.0 ' Tc method =USER Total precip. = 5.10 in ' Storm duration = 24 hrs ' Q (cfs) ' 240.00 ' 210.00 ' 180.00 150.00 120.00 ' 90.00 60.00 30.00 0.00 Tuesday, Jan 22, 2008 Peak discharge = 229.34 cfs Time to peak = 719 min Hyd. volume = 560,683 cult Curve number = 92 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 35 Q (cfs) 240.00 210.00 180.00 150.00 120.00 ~ _ _I _ ~ _~ ~ _ ;: 90.00 60.00 30.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 7 Hydrograph Report 36 ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 8 ' BMP Pond Routed Hydrograph type = Reservoir Storm frequency 10 yrs ' Time interval = 1 min Inflow hyd. No. = 7 -Site Post Development ' Reservoir name = DEB SWM BMP WQ Orifice Tuesday, Jan 22, 2008 Peak discharge = 12.47 cfs Time to peak = 779 min Hyd. volume = 377,065 cult Max. Elevation = 664.55 ft Max. Storage = 368,288 cult Storage Indication method used. ' BMP Pond Routed Q (cfs) Hyd. No. 8 -- 10 Year ' 240.00 210.00 180.00 ' 150.00 120.00 ' 90.00 ' 60.00 30.00 o.oo i_ ~ ~ ~_ i ~ ~ Q (cfs) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 ' o.oo 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 8 Hyd No. 7 i' Total storage used = 368,288 cult Hydrograph Report 37 ' Hydraflow Hydrographs by Intelisolve vg.1 Tuesday, Jan 22, 2008 Hyd. No. 9 ' Total Post to Point A Hydrograph type =Combine Peak discharge = 827.46 cfs Storm frequency = 10 yrs Time to peak = 747 min ' Time interval = 1 min Hyd. volume = 5,827,438 cult Inflow hyds. = 1, 2, 8 Contrib. drain. area= 489.340 ac Total Post to Point A ' Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) ' 833.00 ' 714.00 595.00 ' 476.00 357.00 ' 238.00 119.00 0.00 833.00 714.00 595.00 476.00 357.00 238.00 119.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Hyd No. 1 Hyd No. 2 Hyd No. 8 Time (min) Hydrograph Summary Report 1 1 1 ii 1 1 38 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 SCS Runoff 1093.68 1 748 6,888,291 ---- ------ ------ Offsite DA 1 2 SCS Runoff 212.19 1 727 801,286 ---- ------ ------ Offsite DA 2 3 SCS Runoff 75.59 1 724 222,452 ---- ------ ------ Site PreDevelopment-DA 1 4 SCS Runoff 34.09 1 721 83,850 ---- ------ ------ Site PreDevelopment-DA 2 5 Combine 1183.11 1 746 7,995,878 1, 2, 3, 4 ------ ------ Total Pre Development Point A 6 Combine 106.97 1 723 306,302 3, 4, ------ ------ Site Pre Combined 7 SCS Runoff 299.19 1 719 744,759 ---- ------ ------ Site Post Development 8 Reservoir 102.98 1 728 559,824 7 665.14 409,631 BMP Pond Routed 9 Combine 1204.54 1 746 8,249,396 1, 2, 8 ------ ------ Total Post to Point A Detention 01-22-08.gpw Return Period: 50 Year Tuesday, Jan 22, 2008 Hydrograph Report 3s ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 1 Offsite DA 1 Hydrograph type = SCS Runoff Peak discharge = 1093.68 cfs ' Storm frequency = 50 yrs Time to peak = 748 min Time interval = 1 min Hyd. volume = 6,888,291 cult Drainage area = 449.650 ac Curve number = 80 ' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 58.60 min Total precip. = 6.50 in Distribution = Type II ' Storm duration = 24 hrs Shape factor = 484 Offsite DA 1 ' Q (cfs) Hyd. No. 1 -- 50 Year Q (cfs) 1099 ' .00 ' 942.00 ' 785.00 ' 628.00 471.00 314.00 157.00 0.00 1099.00 942.00 785.00 628.00 471.00 314.00 157.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 40 ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 2 ' Offsite DA 2 Hydrograph type = SCS Runoff Peak discharge = 212.19 cfs Storm frequency = 50 yrs Time to peak = 727 min Time interval = 1 min Hyd. volume = 801,286 cult Drainage area = 39.690 ac Curve number = 92 ' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 25.30 min Total precip. = 6.50 in Distribution = Type II ' Storm duration = 24 hrs Shape factor = 484 Offsite DA 2 Q (cfs) Hyd. No. 2 -- 50 Year Q cfs ( ) ' 240.00 210.00 180.00 150.00 120.00 90.00 1 60.00 30.00 0.00 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report 41 ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 3 ' Site PreDevelopme nt-DA 1 Hydrograph type = SCS Runoff Peak discharge = 75.59 cfs ' Storm frequency = 50 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 222,452 cult Drainage area = 26.830 ac Curve number = 60 ' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 15.50 min Total precip. = 6.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ' Site PreDevelopment-DA 1 Q (cfs) Hyd. No. 3 -- 50 Year Q (cfs) 80 ' .00 80.00 70.00 ' 70.00 I 60.00 60.00 1 50.00 L I _ I ' ' ~ _ 50.00 40.00 40.00 I_ I 30.00 ~ ~ i ~ 30.00 20.00 - 20.00 1 10.00 , ' 10.00 ~ , ~~ ~ ~ ~ 0.00 0.00 ' 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report 42 ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 4 ' Site PreDevelopment-DA 2 Hydrograph type = SCS Runoff Peak discharge = 34.09 cfs Storm frequency = 50 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 83,850 cult Drainage area = 10.060 ac Curve number = 60 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.90 min Total precip. = 6.50 in Distribution = Type II ' Storm duration = 24 hrs Shape factor = 484 ' Site PreDevelopment-DA 2 Q (cfs) Hyd. No. 4 -- 50 Year Q (cfs) ' 35.00 30.00 25.00 ' 20.00 15.00 ' 10.00 5.00 0.00 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) ' Hydrograph Report 43 ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 5 ' Total Pre Development Point A Hydrograph type =Combine Peak discharge = 1183.11 cfs Storm frequency = 50 yrs Time to peak = 746 min Time interval = 1 min Hyd. volume = 7,995,878 cult Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area= 526.230 ac 1 ' Total Pre Development Point A C1 (cfs) Hyd. No. 5 -- 50 Year C1(cfs) 11 90.00 1 1020.00 ' 850.00 ' 680.00 510.00 ' 340.00 170.00 0.00 1190.OC 1020.00 850.00 680.00 510.00 340.00 170.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3 Time (min) ' Hyd No. 4 Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 6 ' Site Pre Combined Hydrograph type =Combine Storm frequency = 50 yrs 1 Time interval = 1 min Inflow hyds. = 3, 4 ' Q (cfs) 120.00 1 100.00 ' 80.00 60.00 ' 40.00 - ' 20.00 - 0.00 - I Site Pre Combined Hyd. No. 6 -- 50 Year Tuesday, Jan 22, 2008 Peak discharge = 106.97 cfs Time to peak = 723 min Hyd. volume = 306,302 cult Contrib. drain. area= 36.890 ac 44 Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 n nn 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560v vv Hyd No. 6 Hyd No. 3 Hyd No. 4 Time (min) Hydrograph Report 45 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 7 Site Post Development Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 1 min Drainage area = 36.890 ac Basin Slope = 0.0 ' Tc method =USER Total precip. = 6.50 in ' Storm duration = 24 hrs Tuesday, Jan 22, 2008 Peak discharge = 299.19 cfs Time to peak = 719 min Hyd. volume = 744,759 cult Curve number = 92 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 Q (cfs) ' 320.00 280.00 , i 240.00 ' 200.00 160.00 120.00 1 i i ~ 80.00 1 40.00 ~ ~ ~ + _ __ 0 00 ~L Site Post Development Hyd. No. 7 -- 50 Year 0 120 240 360 Hyd No. 7 480 600 720 840 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0.00 960 1080 1200 1320 Time (min) Hydrograph Report ' Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 8 ' BMP Pond Routed Hydrograph type = Reservoir Storm frequency = 50 yrs ' Time interval = 1 min Inflow hyd. No. = 7 -Site Post Development ' Reservoir name = DEB SWM BMP WQ Orifice 46 Tuesday, Jan 22, 2008 Peak discharge = 102.98 cfs Time to peak = 728 min Hyd. volume = 559,824 cult Max. Elevation = 665.14 ft Max. Storage = 409,631 cult Storage Indication method used. ' BMP Pond Routed Q (cfs) Hyd. No. 8 -- 50 Year 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0 00 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0.00 ' 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 8 Hyd No. 7 = ` ~ ~_~_i ~I Total storage used = 409,631 cult Hydrograph Report 47 ' Hydraflow Hydrographs by Intelisolve v9.1 Tuesday, Jan 22, 2008 Hyd. No. 9 ' Total Post to Point A Hydrograph type =Combine Peak discharge = 1204.54 cfs Storm frequency = 50 yrs Time to peak = 746 min ' Time interval = 1 min Hyd. volume = 8,249,396 cult Inflow hyds. = 1, 2, 8 Contrib. drain. area= 489.340 ac Total Post to Point A ' Q (cfs) Hyd. No. 9 -- 50 Year Q (cfs) ' 1211.00 ' 1038.00 ' 865.00 ' 692.00 1 519.00 ' 346.00 173.00 0.00 1211.00 1038.00 865.00 692.00 519.00 346.00 173.00 0.00 ' 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 9 Hyd No. 1 Hyd No. 2 Hyd No. 8 t 1 1 1 ~ROSIOI~t C.OI~ITROL CES~- 1 1 1 1 1 1 1 1 1 1 RIP-RAP APRON 1 PROJECT NO. 071021.000 - i7Et3 5wP 'Yo 410 GuT`Er DATE: 01 /21 /08 30„ /'~ Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < D.5 diameter). 050 (CFS) = 82.29 Do (ft) = 4 3Do (ft) = 12 La (ft) = 26 W (ft) = 30 d50 (ft) = 1 d(in) = 18 Discharge (ft3/sec) y JuV 1VVV