HomeMy WebLinkAbout20071638 Ver 2_More Info Received_20080123GRAY ENGINEERING CONSULTANTS, I N C . engineering sitework land planning ~xp o 'i - - ~ 3 ~ Y 2. January 22, 2008 Mr. David E. Meyer, NCLSS 710 West North Street Raleigh, NC 27603-1419 Phone: 919-210-6547 RE: Response To Request For More Information Stormwater Wetland Pond Design Report East Park Plaza Commercial Retail Center NC Highway 42 and Interstate 40 Johnston County, North Carolina GEC#270205-D Dear Mr. Meyer: Enclosed please find four (4) copies of the following Stormwater Management Package submittal package for the re-submittal to the NCDENR Division of Water Quality (DWQ) (2 copies) and the US Army Corps of Engineers (USAGE) (1 copy) as part of the PCN Express Review Permit for the above referenced project. The extra copy is for your files. The package includes the relevant information on the design of the stormwater wetland ponds and the overall stormwater management plan for the project. ^ Full Size Plan Sheets Signed and Sealed o Existing Conditions Plan, EC-1 o Subdivision Survey Plan 4~~ D o Site Plan, CV-1 ~~ o Grading Plan, CV-2 p o Pond Details, Cv-9 SAN 2 3 Zpp8 ^ FullostoFul Stormwater Manageme t Narrative ~:~t NQST~-,~w ~ku~ o Site Location Maps ~~,NOSa o USGS Site Map o NRCS Soils Map o Johnston County Stormwater Statement Summary o Pre- and Post-Construction Drainage Area Maps o Hydrology and Hydraulic Calculations for Both Ponds o Stormwater Wetland Pond Calculations o DWQ SW401 Supplemental Wetland Forms for Both Ponds o Energy Dissipater Calculations o Storm Drain Design, Buoyancy and Anti-seep collar Calculations ^ Detailed Construction Sequencing ^ Landscape Plan for Wetland Ponds No. 1 and No. 2 132 Pilgrim Road -Greenville, SC 29607 PH: (864) 297-3027 Fax: (864) 297-5187 www. grayengineering. com GRAY E N G I N E E R I N G CONSULTANTS, I N C . engineering sitework land planning Mr. David E. Meyer, NCLSS East Park Plaza Commercial Retail Center Page Two The following is a point by point response to the review comment letter from the DWQ, dated January 16, 2008. 1. Diffuse Flow Requirements: a. Please provide BMP outflow calculations for the 1" and 10-year storm events. Response: Enclosed is the full Stormwater Management Report. Appendix B includes the supporting calculations for all storm events analyzed for both ponds. The storm events analyzed include the 1, 2, 10, 25 and 100-year storm events. The 1-year storm was analyzed per the DWQ requirement that the post-development 1-year, 24-hour storm event may not exceed the pre-development peak flow rate. The 10-and 25-year storm events were analyzed per the County requirement that these storms peaks be less than pre- development conditions. The 100-year storm is always analyzed for emergency spillway design. Refer to pages 6 and 7 of the Report for a summary of pre- and post-development peak flows for each pond and for the overall site. Also included in the Report in Appendix C, the 1"first flush storm has been used in the calculations for the surface area, temporary pool design, orifice sizing and drawdown rate. b. Please provide calculations for the sizing of the energy dissipater for both outlet structures based on the 10-year storm. Response: The calculations for the riprap design at the pond outlet structures are included in Appendix C of the Report. Our energy dissipater design structure includes a 48" diameter concrete riser structure at the end of the pond outfall pipe. The design as shown on plan sheet CV-9 is such that it has 4 smaller orifices on the sides of the structure in order to diffuse flow to zero velocity at the pipe outfall. Furthermore, the calculations show a typical design for a riprap outlet protection for the 10-year storm event. Our details show more riprap than the minimum required for the 10-year storm. It is placed around the concrete riser. In addition to that, a 2-foot high stone check dam ring is shown providing further diffuse flow. Refer to the Report for details and plan sheet CV-9 for the details. c. Please include the construction sequence of the BMPs on the plan sheets. Response: On plan sheet CV-9 and attached separately to this letter is the detailed Construction Sequencing of the entire construction project. Upon completion of the Erosion Design, we prepared the construction sequence based on three (3) phases of construction: 1) Phase I to include initial BMP installation, 2) Phase II to include main pond Sediment Basin Construction and begin mass grading, and 3) Phase III to include parking lot sediment traps, finished grading, pavement installation, grassing and landscape stabilization and wetland pond construction and wetland landscape installation. 132 Pilgrim Road -Greenville, SC 29607 PH: (864) 297-3027 Fax: (864) 297-5187 www. grayengineering. com GRAY E N G I N E E R I N G CONSUL ?"ANTS, INC. engineering sitework land planning Mr. David E. Meyer, NCLSS East Park Plaza Commercial Retail Center Page Three d. Wetland 1: In the sizing of the required surface area, a temporary pool (Dp,a~ts) depth of 12 inches was used with temporary pool elevation set at 246.5 feet used in sizing the orifice. Meanwhile, plan sheet #CV-9 indicates a permanent pool elevation at 245.0 feet, high marsh (shallow land) elevation at 245.5 feet, and temporary pool elevation at 246.0 feet. The result is that there is only 0.5 feet of temporary pool elevation and since the entire treatment volume for the 1" storm should be above the high marsh elevation. Please revise the plan sheets and calculations to eliminate these discrepancies. Response: In Appendix C of the Report, the revised Stormwater Wetland Calculations for pond No is shown to have revised the storage elevation to be 1 foot above the permanent pool instead of 1.5' as previously shown. Also, the Grading Plan (sheet CV-2) has been revised to eliminate the 245.5 contour so that the high marsh (shallow land) is at the permanent pool elevation of 245.0. Therefore the temporary pool will be 12" above the high marsh throughout the pond. e. Wetland 2: In the sizing of the required surface area, a temporary pool (Dp,a„ts) depth of 12 inches was used with temporary pool elevation set at 206.5 feet used in sizing the orifice. Meanwhile, plan sheet #CV-9 indicates a permanent pool elevation at 205.0 feet, high marsh (shallow land) elevation at 205.5 feet, and temporary pool elevation at 206.0 feet. The result is that there is only 0.5 feet of temporary pool elevation and since the entire treatment volume for the 1"storm should be above the high marsh elevation. Please revise the plan sheets and calculations to eliminate these discrepancies. Response: In Appendix C of the Report, the revised Stormwater Wetland Calculations for pond No. 2 is shown to have revised the storage elevation to be 1 foot above the permanent pool instead of 1.5' as previously shown. Also, the Grading Plan (sheet CV-2) has been revised to eliminate the 205.5 contour so that the high marsh (shallow land) is at the permanent pool elevation of 205.0. Therefore the temporary pool will be 12" above the high marsh throughout the pond. f. Please see section 3.5.2 of the NC DWQ Stormwater Best Management Practices Manual for the driving head used in the computation of the draw down. It shall be Ho/3 where Ho is the temporary pool depth above the high marsh elevation, Ho = 1.0 foot in this case. Response: In Appendix C of the Report, the revised Stormwater Wetland Calculations for both ponds have been revised to use the Ho/3 value, which is 1.0/3 = 0.33 feet. The resulting orifices were calculating using the 2-day drawdown period. The resulting draw down is just over 2 days. 132 Pilgrim Road -Greenville, SC 29607 PH: (864) 297-3027 Fax: (864) 297-5187 www. grayengineering. c om GRAY E N G I N E E R I N G CONSUL T A N T S, I N C. engineering sitework land planning Mr. David E. Meyer, NCLSS East Park Plaza Commercial Retail Center Page Four 2. Stream Impact: a. Your PCN application requests 149.5 lineal feet of perennial stream impact. Since this impact is so close to the mitigation threshold of 150 lineal feet, field verification was required. On January 14, 2008, a field meeting was conducted with Mr. David Meyer and a stake was placed at the location that is 149.5 lineal feet of stream impact. Mr. Meyer stated that he would have the stake surveyed in and would coordinate with the engineers. If the actual stream impact is greater than 150 lineal feet, then stream mitigation will be required. If your project utilizes NCEEP for mitigation credits, then an EEP acceptance form must be submitted to this office. Response: As shown on plan sheet CV-2, the End Stream Impact pgint is shown. This represents the 149.5 lineal feet of stream impact. Additionally, per verbal review comments from the DWQ, the Landscape Plans for the Wetland Ponds are included and revisions have been made to the Wetland Supplemental Forms and plan sheets. Also, the Johnston County Utilities Department is currently reviewing our submitted Stormwater Management Calculations. To date, the County has said that a response will be forthcoming this week. Upon receipt of comments and/or approval from Johnston County, we can forward this response to the DWQ. Should you have any questions or comments, or need any additional information, please call me direct and we can revise the plans or provide any additional information. Sincerely, ~ YEN IN ERING CONSULTANTS, INC. ID J. I .E. Enclosure cc: Jason Hudak, Garner Development Partners, LLC DJG/djg o-closet\270205\dave meyer01-22-08 132 Pilgrim Road -Greenville, SC 29607 PH: (864) 297-3027 Fax: (864) 297-5187 www. grayengineering. c o m Permit Number (to be provided by OWQ) ~~~ ~.`Y NCDENR STORN1WATER MANAGEMENT PERfv11T APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part lll) must be printed, filled out and submitted along with all the required information. aka W A TE'9 O~ ~i ~ -:.~ ~ K I. PROJECT INFORMATION Project name East Park Plaza Contact name Eric Cornett Phone number 304-255-2240 Date January 15, 2008 Drainage area number Wetland Pond No. 1 II. DESIGN INFORMATION Site Characteristics Drainage area 1,437,480 ftz Impervious area 871,200 ft2 Percent impervious 60.6% Design rainfall depth 1.0 inch Peak Flow Calculations Does this project require pre/post control of the 1-yr 24-hr peak Y (Y or N) flow? 1-yr, 24-hr runoff depth 3.2 in 1-yr, 24-hr intensity 4 in/hr Pre-development 1-yr, 24-hr runoff 3.56 ft3/sec Post-development 1-yr, 24-hr runoff 1.86 ft3/sec Pre/Post 1-yr, 24-hr peak control -1.7 ft3/sec Storage Volume: Non-SR Waters Design volume (temporary pool volume) 71,275 ft3 Depth of temporary pool/ponding depth (DPla~,s) 12 in Drawdown time 2.00 days Diameter of orifice 5.00 in Coefficient of discharge (Cp) used in orifice diameter calculation 0.60 (unitless) Driving head (H°) used in the orifice diameter calculation 0.330 ft Storage Volume: SR Waters Parameters OK OK OK OK Provide calculations to support this driving head. 1-yr, 24-hr depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 fvlinimum volume required ft3 Volume provided ft3 Form SW401-Wetland-Rev.1 Parts I and II. Project Design Summary, Page 1 of 3 Permit Number (to be provided by DWQ) • Surface Areas of Wetland Zones Surface Area of Entire Wetland Shallow Land The shallow land percentage is: Shallow NJater The shallow water percentage is: Deep Pool Forebay portion of deep pool (pretreatment) The Forebay surface area percentage is: Non-forebay portion of deep pool The non-forebay deep pcol surface area percentage is: Total of wetland zone areas Atld or subtract the following area from the zones Topographic Zone Elevations Temporary Pool Shallow Land (top) Permanent Pool Shallow Water (top) Deep Pool (top) Most shallow point of deep pool's bottom Deepest point of deep pool's bottom Design must meet one of the following two options: This design meets Option #1, Deep pool is 6'inches below SLWT, If yes: SLWT (Seasonally Low Water Table) This design meets Option #2, Has a clay liner If yes: Depth of topsoil above clay liner Topographic Zone Depths Temporary Pool Shallow Land Permanent Pool Shallow Water Deep Pool (shallowest) Deep Pool (deepest) Planting Plan Are cattails included in the planting plan? Number of Plants in planting plan recommended: Herbacious (4'inch diameter) Shrubs/small trees (1 gallon or larger) Trees (1.5" dbh) Number of Plants in planting plan provided (several species of each plant type are recommended): Herbacious (4`inch diameter) Shrubs'small trees (1 gallon or larger) Trees (1.5"dbh) 71,817 ftZ OK 28,726 ft2 OK 40% 28,726 ftZ OK 7,183 ft'` OK 10% 7,182 ftZ OK 10% 71,817 ft2 OK 0.00 ftz 245.00 fmsl 245.00 fmsl 244.50 fmsl 242.00 fmsl 242.00 fmsl N (Y or N) fmsl Y 4 in 12 in OK 6 in OK 30 in OK 30 in OK N (Y or N) OK 2,160 1,440 360 5,387 OK 1,579 OK 360 OK Form SWd01-N/etland-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3 Permit Number (to be provided by OWQ) Y Additional Information Can the design volume be contained? Y (Y or N) OK Does volume in excess of the design volume flow evenly N (Y or N) Excess volume must pass through filter. distributed through a vegetated filter? What is the length of the vegetated filter? N/A ft Dces the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed. Are calculations for supporting the design volume provided in the Y (Y or N) OK application? Is BMP sized to handle all runoff from ultimate build-out? Y (Y or N) OK Is the Biv1P located in a recorded drainage easement with a Y (Y or N) OK recorded access easement to a public Right of Way (ROV•1)? The length to width ratio is: 1,9 :1 OK Approximate wetland length 375.0 ft Approximate wetland width 200.0 ft Approximate surface area using length and width provided z 75,000 ft This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK Form SW401-Wetland-Rev.1 Parts I and II. Project Design Summary, Page 3 of 3 Permit Number (to be provided by DWQJ ` ~~~ OF Yd A TF9 ~~ 9 NCDENR STORMUVATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name East Park Plaza Contact name Eric Cornett Phone number 304-255-2240 Date January 15, 2008 Drainage area number Wetland Pond No. 2 II. DESIGN INFORMATION Site Characteristics Drainage area 335,412 ftz Impervious area 217,800 ftz Percent impervious 64.9% Design rainfall depth 1.0 inch Peak Flow Calculations Does this project require pre/post control of the 1-yr 24-hr peak Y (Y or N) flow? 1-yr, 24-hr runoff depth 3.2 in 1-yr, 24-hr intensity 4 in/hr Pre-development 1-yr, 24-hr runoff 0.89 ft3/sec Post-development 1-yr, 24-hr runoff 0.66 ft3/sec Pre/Post 1-yr, 24-hr peak control -0.2 ft3/sec Storage Volume: Non-SR Waters Design volume (temporary pool volume) 17,720 ft3 Depth of temporary pool/ponding depth (DPlants) 12 in Drawdown time 2.00 days Diameter of orifice 2.50 in Coefficient of discharge (Cc) used in orifice diameter calculation 0.60 (unitless) Driving head (H°) used in the orifice diameter calculation 0.330 ft Storage Volume: SR Waters Parameters 1-yr, 24-hr depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 OK OK OK OK Provide calculations to support this driving head. Form SNJ401-Wetland-Rev.1 Parts I and II. Project Design Summand, Page 1 of 3 Permit Number (to be provided by DWQ) + Surface Areas of Wetland Zones Surface Area of Entire Wetland 18,900 ft2 OK Shallow Lantl 7,560 ft2 OK The shallow land percentage is: 40% Shallow Water 7,560 ftz OK The shallow water percentage is: 40°io Deep Pool Forebay portion of deep pool (pretreatment) 1,890 ft' OK The forebay surface area percentage is: 10% Non-forebay portion of deep pool 1,890 ft2 OK The non-forebay deep pool surface area percentage is: 10% Total of wetland zone areas 18,900 ft2 OK Atld or subtract the following area from the zones 0.00 ftz Topographic Zone Elevations Temporary Pool Shallow Land (top) 205.00 fmsl Permanent Pool Shallow Water (top) 205.00 fmsl Deep Pool (top) 204.50 fmsl Most shallow point of deep pool's bottom 202.00 fmsl Deepest point of deep pool's bottom 202.00 fmsl Design must meet one of the following two options: This design meets Option #1, Deep pool is 6'inches below SLWT, If yes: N (Y or N) SLWT (Seasonally Low Water Table) fmsl This design meets Option #2, Has a clay liner Y If yes: Depth of topsoil above clay liner 4 in Topographic Zone Depths Temporary Pool Shallow Land 12 in OK Permanent Pooi Shallow Water 6 in OK Deep Pool (shallowest) 30 in OK Deep Pool (deepest) 30 in OK Planting Plan Are cattails included in the planting plan? N (Y or N) OK Number of Plants in planting plan recommended: Herbacious (4`inch diameter) 570 Shrubs/small trees (1 gallon or larger) 380 Trees (1.5"dbh) 95 Number of Plants in planting plan provided (several species of each plant type are recommended): Herbacious (4'inch diameter) 1,350 OK Shrubsismall trees (1 gallon or larger) 426 OK Trees (1.5"dbh) 95 OK Form SW401-Wetland-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3 Permit Number (to be provided by DWQJ ( Additional Information Can the design volume be contained? Y (Y or N) OK Does volume in excess of the design volume flow evenly N (Y or N) Excess volume must pass through filter. distributed through a vegetated filter? NJhat is the length of the vegetated filter? NIA ft Does the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed. Are calculations for supporting the design volume provided in the Y (Y or N) OK application? Is BMP sized to handle all runoff from ultimate build-out? Y (Y or N) OK Is the BPi1P located in a recorded drainage easement with a Y (Y or N) OK recorded access easement to a public Right of Way (ROW)? The length to width ratio is: 1.9 :1 OK Approximate wetland length 190.0 ft Approximate wetland width 100.0 ft Approximate surface area using length and width provided 19,000 ft'- This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK Form SW401-Wetland-Rev.1 Parts I and II. Project Design Summary, Page 3 of 3 CONSTRUCTIO~i SEQtiENCING: Described below are the major construction activities that are the subject of this S~VPPP. Also included in the sequence are BvIP uistallation activities that must take place prior to construction activities. NOTE: Do~~~n slope protective measures must ah~~ays be in place before soil is disturbed. Activities are presented in the order (sequence) they are expected to be completed. The sequence of construction is as follows: NOTE: Upon implementation and installation of the following areas: trailer, parking, lay down, ports-potty, wheel wash. concrete washout, mason's area, fuel and material storage containers, solid waste containers, etc., immediately denote them on the Site IV1aps and note any changes in location as they occur throughout the construction process. In addition, note any off-site areas where lill is imported from or soil is exported to on the Site Maps. Phase I Erosion Control Sequence: The construction manager and foreman shall visit the site initially and familiar themselves with the site and the existing stream and the specific constraints that shall remain undisturbed throughout the construction. These include the Colonial Gas Pipeline Easement everywhere except as noted, the wetland boundary everywhere except as noted below the temporary sediment trap no. 2 and permanent pond 2, the floodplain line and the existing stream and associated Neuse Buffers. Particularly no disturbance of the stream shall occur downstream of the "End Stream Impact" point noted on the plan. The contractor shall clearly mark this point in the field with guard stakes and brightly colored ribbon. All disturbance including silt fence shall be upstream of this point. Install stabilized construction exits and SbY""PPP Informatia2 Sign as shotirn on the Phase Orze Erosion Control Plcan, ES-1 ticith the exception of tl~e main access at this point. The contractor shall utilise tJie existing stabilized dr•ivetivay just north of the proposed driveway access in order to n~~obili.e equipment and set up an initial staging area before the proposed stabilised construction exit is constructed at the main driveway. Also, the contractor shall utilize a temporary construction exit at the existing driti•etivay from the Lotive's property as shown on the plan sheet ES-1 but should not construct the stone exit at this time until the "geotech fl!"issue is resolved later in phase one. TITe contractor may artilize the second Lotive's driveway to access t12e site for light vehicle use only. Should the contr•ractor wish to utilize this access for• construction equipment, then a construction exit shail be installed at this location per the detail and denoted on the SII'PPP plans. The contractor shall ensure that no mud or dirt is tracked out onto the Lowe's driveways, parking areas or out onto Cleveland Crossing Road or NC Hishw•ay 42. The contractor shall clean these public roads on a daily basis throughout the construction process. Install silt. fence(s) on the site (clear only those areas neeessa~y to install silt fence). The contractor shall install all the silt fencing shown on the plan sheet ES-1. Please note that a double role of silt fencing is shown along the eastern side of the project site which is along the floodplain, wwetland and buffer areas. Also, it should clear that ice need the Colonial Pipeline Easement to have the silt fence just outside t{xis easement in order to ensure that no cortstrttction traffic or distta-bance shall occur tie•ithin this easement. Install a ternporcny stone check dam just upstream ojthe "end stream impact " point prior to silt, fence installation in this as•ea. q. Prepare temporary parking and storage area. The contractor may utilize the area along NC Highway 4? at the existing access and'or may utilize the higher elevated area at the two driveways off the Lowe's property along the exiting dirt path. Both areas are relatively flat and have direct access to the project site for consmiction. Halt all activities and contact Gray Engineering to perform inspection and certification of BlIPs. General contractor shall schedule and conduct the storm water pre-construction meeting with the Gray Engineering, ~`'al-dart Construction Manager, ~CDE\R Division of Land Quality and ground-disturbing contractors before proceeding with construction. All exceptions noted on the B~iP Certification form must be added to the first Daily report as a deficiency or deficiencies and resolved within 2~-hours. BMPs CAS\OT be certified if any exception requires greater than 24-hours to resoh~e. Daily inspections and reporting using the S~VPPP Management Tool must start the day of or immediately after BMP Certification. 5. Contractor shall line the exiting drainage ditch along NC Higl:wgy 43 tivith stone to just past the temporary construction exit and install the stone check da»1s in the ditch as shoticn. 6. Contractor shall install the temporary storm drain pipe rtnd stone construction exit and roadway into the site at the main driveway as shotivn on the plan sheet ES-1 and per the Temporary• Driveticay Profile Detail. 7. Contractor s6~all install stone french drains along the natural drainage channels that traverse the site as shoi~cn on plan sheet ES-1 and per the french drain detail. Install t1~e stone drains from tl7e lotivest point and proceed upstream. 8. Construct the sediment basins with rock dams ~Vo. 1 cmd 2 as shown on plan sheet ES-1. Install baffles as shown upstream of the rock dam and across the stone french drains. 9. Construct and stabilize sediment sediment traps No. 1, 2, 3 and 4 ~.vith appropriate stone embankment outfcalls (clear only those areas necessary to install basins and traps). 10. Install and stabilize all the diversions as shown to intercept construction ramoff into the temporary sediment basins and traps. Stabilize channels with erosion control blanket and install stone check dams as necessary within the diversion channel. 1 1. Contractor may now proceed with overall clearinG and GrubbinG the site within the limits of disturbance on the plan sheet ES-1. 12. Contractor shall address the ";eotech fill" issue at the northern Lowe's driveway. Contractor shall install a stone filter inlet protection over the one existing catch basin at the end of the drive. Contractor shall then demolisr, the existing pavement and curb as necessary to undercut and remove and replace the material per the Qeotechnical engineer. Contractor shall ensure no mud or debris is tracked onto the Lowe's driveways or public roads. 13. Contractor shall be;in mass Grading the site. Fill placement should commence in the lower part of the site and progress upward Phase II Erosion Control Sequence: 1. Temporarily seed, througlaotrt construction, denuded areas that tivill be inactive for 1 ~1 days or more. ?. Contractor shall install the construction exit at the Love's driveway as soon as the old fill is removed and replaced adequately. 3. Contractor shall focus consn•uction of fill placement in the reinforced slope per the design including benching the toe of the slope into die existing soil. Contractor shall work- closely with the geotechnical engineer and wall design to ensure proper construction of the slope. 4. Contractor shall maintain temporary sediment trap No. 1 but remove temporary sediment basin No. 2 in order to install the fill slope embcrnl<ments as shown. ~. Contractor shall utili=e temporary slope drains and dii~ersions at the top of the slope as it is being constr•trcted in order to Keep rtrnofffi•ont flowing directly over the neticly installed fill slope. 6. Contractor shall be filling on top of the sediment basin rock dam embankments in order to build the fill slope and compact the fill necessary to bring the site to grade. Contractor shall utilize ternpor-ary diversions at the top of the slope cmd utilize temporary slope drains into temporary sediment trap No. 1 while fill is being placed and tichile the phase t~-vo sediment basins cn-e being constructed in the location of the permanent ponds No. 1 and No. 2. Permanently stabilize areas to be vegetated as soon as they are brought to final grade. 7. Contractor shall install the temporary construction road connecting the ttico construction exits to ensure adequate construction access across the project site. Contractor shall constncct fill slope of road to final grade. This will require sediment basin No. 4 to be partially filled in. Maintain the stone outlet for this sediment trap until tl:e slope has been adequately stabilized. 8. Contractor shall install the final storm drain system relocating the drainage ditch along NC Highway 42 as shol~vn on plan sheet ES-?. Contractor shall line the existing drainage ditch tivith stone and install the stone check dam upstream from the temporary storm drain. Contractor shall fill over the final storm drain line upstream of the drivel-vay. 9. Contractor shall install the storm drain outlet structures and otrtfall pipe system from the h-vo sediment basins as soon as practical. Contractor shall also install the energy dissipater structures and stone check darns with them. As soon as tlae sediment basins are constructed to the grades shol~vn on plan sheet ES-?, contractor shall install the skimmer dercatering device in sediment basin No. 1 and 1Vo. ?. 10. Contractor shall begin installing final storm drainage as soon as practical and beginning with the storm drains from the ponds as shown on plan sheet ES-?. 1. Contractor shall commence with construction of building pads. As soon as the building pads and tops of fill slopes reach final grade, the geotech engineer recommends the installation of at least three (3) monitoring points equally spaced along the eastern limits of the site to measure ground settlements relative to a filed bench mark. Awaiting period of 1 to 2 months is recommended for consolidation settlements to occur. Once the settlement has occurred to the satisfaction of the ~eotechnical engineer, then the contractor may begin installation of building footings and structures. 1?. Once the contractor completes the entire cut slope along the western and southwestern portions of the project, french drains need to be installed along the toe of the cut slopes to intercept and pernianently control ground water in this area. The contractor shall continue this french drain and tie it into the stone french drains installed in the natural channel. Refer to the plan sheet ES-2 and french drain details. 13. Install riprap aprons cn•otrnd all inlet grad outlet structures as each outlet structure is being installed. Install inlet protection at all storm structures as ececlt inlet is being installed. Phase III Erosion Control Sequence: 1. Contractor may begin installing water and sanitary sewer utilities as soon as practical. 2. Install utilities, underdrains, storm sewers, curbs and gutters. 3. Contractor shall install temporary sediment traps arocznd storm catch basins within the parking lot as shoe-vn until the entire site is stabili=ed tivith stone subbase and vegetation. 4. Install rip rap mound outlet strucncres as each outlet structure is installed. 5. Install inlet protection at all storm sewer sb•uctures as each inlet stnrcture is installed. 6. Permanently stabili_e areas to be vegetated as they are broczght to final gr~czde. 7. Prepare site for pacing. 8. Install curb and gutter and Pave site. 9. Install appropriate inlet protection devices for paved areas as work progresses. 10. Complete grading and installation of permanent stabilisation over all areas including outlots. ll. Contractor shall remove all accumulated sediment from sediment basins and begin fine grading pond interiors to the grades shown on the plan sheet CV-2!ES-3 in order to obtain the necessary wetland pond grades. Contractor shall immediately install the wetland landscaping per the installation requirements in order to establish the wetland vegetation. 1?. Obtain concurrence with the Wal-ivlart Construction Manager that the site has been fully stabilized then: a. Remove all remaining temporary erosion and sediment control devices, b. Stabilize any areas disturbed by the removal of BMPs, and c. Ask the CM to contact the CEC to complete the CEC NOT site inspection and report. 13. Continue Daily Inspection Reports until the Final Daily inspection report, marked `Ready to Terminate Permit', is sieved by the Construction Manager and submitted via the S~VPPP Management Tool. NOTE: The General Contractor may complete construction-related activities concurrently only if all preceding BMPs have been completely installed. BMP-related steps in the above sequence are italicized for clarity. The actual schedule for implementing pollutant control measures will be determined by project construction progress and recorded by the General Contractor on the Soil Erosion;'Sedimentation Control Operation Time Schedule on the Erosion and Sedimentation Control plans (Site Maps}. Down slope protective measures must always be in place before soil is disturbed. i y t r 1 STORMWATER MANAGEMENT REPORT For The Proposed EAST PARK PLAZA Along NC Highway 42 Johnston County, North Carolina Prepared for ~X.p d~--t1~38 ~~ ~ ~~;e JAN 2 3 2008 DENR -'NAPEk i:2UAL11~' WETUWDS AND STDRMWATER [3RAPe(:M GARNER DEVELOPMENT PARTNERS, LLC 607 Briarwood Drive, Suite 5 Myrtle Beach, SC 29572 Prepared by Gray Engineering Consultants, Inc. 132 Pilgrim Road Greenville, SC 29607 January 8, 2008 REVISED January 16, 2008 \~~~~ ~ ~' C A R ~~~iii ~ . '' '.~ i°-i L 't' . 1+297 i ~ i I r t i r 1 1 1 1 i 1 i 1 ~~P ~-~c~3g v2 TABLE OF CONTENTS Project Description. .1 Soils .1 Site Location Map .2 USGS Topographic Map.. .3 Soils Map .4 Hydrology and Hydraulogic Conditions. .S Pre-Development Conditions . .S Post-Development Conditions. .6 Storm Drain Design. .8 Appendices: APPENDIX A Johnston County Stormwater Statement APPENDIX B Pre-Development Conditions Map Post-Development Conditions Map Pre-Dev. & Post Dev. Conditions HYDRAFLOW Calculations Curve Number Determination Stormwater Wetland Pond 1 & 2 Volume Calculations Johnston County Precipitation Values APPENDIX C Constructed Stormwater Wetlands Calculations NCDENR DWQ SW401 Wetland Form Energy Dissipater Rip Rap Design Storm Drain Design Storm Drain Area Map Precipitation Calculations Buoyancy Calculations Anti Seep Collar Design STORMWATER MANAGEMENT REPORT EAST PARK PLAZA JOHNSTON COUNTY, NORTH CAROLINA Project Description Garner Development Partners, LLC is proposing the construction of a commercial retail center located in Johnston County, North Carolina. The project site is located on an approximately +/-56-acre tract of land along NC Highway 42 approximately 0.5 miles east of Interstate 40. Refer to the Site Location Map and copy of the USGS map on the following pages. The site is currently undeveloped. The site is bound to the west by a 180' CP&L powerline easement (on the Lowe's property), to the north by NC Highway 42, to the east by the Swift Creek floodplain, and to the south by vacant property. There is a 50' Colonial Pipeline easement running northwest to southeast through the property. The existing ground cover in this area consists of wooded areas and a mix of brush and open field areas. The project will consist of the construction of a 203,704 SF Wal-Mart, 41,300 SF of shops, associated drives, associated improvements to NC Highway 42, parking and loading areas, utility mains and services, stormwater management controls and conveyances, two outparcels, and landscaping. This stormwater management report considers the pre-development and the post- development conditions for the entire watershed on the project site. The stormwater detention facilities were sized for the post-development conditions per the North Carolina Division of Water Quality (DWQ) and Johnston County Stormwater regulations including the full build-out of the Wal-Mart, Shops and two outparcels. The total disturbed area for this project will be approximately +/- 36-acres. Soils i f According the USDA Soil Survey for Johnston County, North Carolina the existing soils on site are Altavista fine sandy loam with slopes ranging from 0 to 2 percent, Rion sandy loam with slopes ranging from 15 to 40 percent, Wedowee sandy loam with slopes ranging from 2 to 8 percent, and Wedowee sandy loam with slopes ranging from 8 to 15 percent. The majority of the onsite soils, the Wedowee and Rion soils, are in Hydrologic Soil Group "B." A small portion of the site, mostly the wetlands area, are Altavista soils in Hydrologic Soil Group "C." Refer to the soils map. u` m r~ ; ~i: ;-Rar` O r.~.~, _ kt7y~^ Y~ `~. .- aG.4 ~ J t '1 I A2 c t 3~ r ~ ... ', Csyr ^. ... ,,. '.~, a •,tf_C_.a_.... , c 4~ ~a O .7° r+• ~' d2 F,, I~.1 [ v ,J Fyn T y ~' 1 e .. Q° . ,. r F.:~ ; ,i 4~J 42 42 SITE ~?. Via, ~`>; a. .r""., ' y>3 nl~ ~~ _"a, u~ar L,... ~' v R~d9s 7r ert «~~ O ~~ .~'• S Ci O' s - y,o SITE VICINITY MAP PROPOSED RETAIL SHOPPING CENTER NC Highway 42 Johnston County, North Carolina Not to Scale 2 SITE TOPOGRAPHIC MAP PROPOSED RETAIL SHOPPING CENTER NC Highway 42 Johnston County, North Carolina Not to Scale 3 ^ k~r ,~~ . ~, '~µ 4z.. ~x . _1'! ~~~~ ~ ~y~ ~ ,., ~a ~~ ~ vat; °? ~Oo n~ of a I~ M O w O O N ~ r O v ~ N (d ~a a z o~ N'Q T(n N °o .~., > r 7 ;_, N (n N O Q O 4 U O m Z 0 m 0 0 0 0 N O N O O ~ U_ m 2 U N 0 o N O ~ ~ 19 y j N fC O ZQ ZU c~ ~i i Hydrology and Hydraulic Conditions The proposed development's site stormwater management plan has been designed such that the post-development peak runoff rates are less than the pre-development peak runoff rates for the 1, 2, 10, and 25 year storm events with the 100 year storm passing through the emergency spillway. Rainfall data and attenuation requirements were taken from the North Carolina Johnston County Stormwater Ordinance. The HYDRAFLOW method of analysis was utilized to produce the pre- and post-development peak runoff rates. All CN values are weighted values. All data and computations reported in the following narrative and presented in the Appendices reflect the HYDRAFLOW method of analysis. Refer to Appendix B for pre-development ~, calculations, post-development calculations, and detention pond calculations. Pre Development Conditions ~ Under pre-development conditions the site's runoff generally drains from west to east towards the wetland area. An existing high point of 301.2 is located near the southwest corner of the site. Within the proposed construction site, two watershed areas that discharge to the same wetland have been analyzed and are described below. The majority of the site's runoff flows directly into the wetland along the eastern side of the site. Within the wetland the stormwater flows through a shallow, flat unnamed tributary approximately 1,200 feet to the initial receiving stream which is Swift Creek. Approximately 4.4 acres of off-site undisturbed land along the southern property line flows onto the site. Pre-Development Area No. 1 is generally defined as the area of the site that is south of the 50' Colonial Pipeline easement. The stormwater flows generally towards the east and northeast and drains into the existing wetland on the eastern side of the site. This area consists of 33.0 acres and is a mix of wooded area with some brush with open space with a weighted CN of 56. ~' 1 Pre-Development Area No. 2 is generally defined as the area of the site that is north of the 50' Colonial Pipeline easement., The stormwater flows generally towards the east and southeast and drains into the existing wetland on the eastern side of the site. This area consists of 7.7 acres and is mostly brush with some open space with a small portion of wooded area with a weighted CN of 56. Storm Event (Year) Precip- itation (in.) Area No. 1 Pre-Dev. Flow (cfs) Area No. 2 Pre-Dev. Flow (cfs) Total Pre- Development Flow (cfs) 1 3.2 3.56 0.89 4.45 2 3.7 7.87 2.00 9.87 10 5.8 38.72 9.82 48.54 25 6.7 55.86 14.16 70.02 100 8.4 91.83 23.22 115.05 Post-Development Conditions Two (2) on-site constructed stormwater wetland ponds have been designed to meet the 30% Nitrogen reduction requirements by the DWQ. All stormwater from the development of the site will flow to either stormwater wetland pond 1 or stormwater wetland pond 2. The post development areas are comprised of the same two areas under pre development conditions. The outlets from both stormwater wetland ponds will outlet into the existing wetland on the eastern side of the property. Stormwater outflows will avoid immediate discharge to the defined Neuse River Buffers and outfall directly to the wetland with an energy dissipater as allowed by the DWQ. Post Development Area No. 1 is generally defined as the area south of the 50' Colonial Pipeline easement. All of the post development stormwater flows into stormwater wetland pond 1. The stormwater wetland pond 1 area consists of Wal-Mart's roof drainage and parking lot, the eastern shop's roof drainage and parking lot, and associated drives. There is also a 4.4 acre off- site area south of the site. This area consists of approximately 33.0 acres with a weighted CN value of 83. Post Development Area No. 2 is generally defined as the area north of the 50' Colonial Pipeline easement. All of the post development stormwater flows into stormwater wetland pond 2. The stormwater wetland pond 2 area consists of the northern shop's roof drainage and parking lot, outlot 1, outlot 2, and associated drives. This area consists of approximately 7.7 acres with a weighted CN value of 85. Both stormwater wetland ponds were designed to meet all of North Carolina's Division of Water Quality and Johnston County's requirements for wetland ponds and were each sized to handle the first 1" of runoff from their respective drainage areas. See Appendix C for the stormwater wetland pond calculations. Supporting hydrologic data and post-development calculations can be found in the Appendix B. 1 1 Stormwater Wetland Pond No. 1 PEAK FLOW SUMMARY Storm Event (Year) Peak Flow to Pond (cfs) Peak Outflow from Pond (cfs) Maximum Water Surface Elevation 1 75.13 1.86 246.72 2 94.55 2.42 247.14 10 178.85 20.42 248.34 25 215.38 45.52 248.80 100 284.31 161.87 249.36 TOP OF DIKE = 249.80 E.S. CREST = 248.80 Stormwater Wetland Pond No. 2 PEAK FLOW SUMMARY Storm Event (Year) Peak Flow to Pond (cfs) Peak Outflow from Pond (cfs) Maximum Water Surface Elevation 1 22.54 0.66 206.49 2 27.93 0.92 206.80 10 50.96 1.63 208.24 25 60.85 3.90 208.63 100 79.44 25.07 209.11 e TOP OF DIKE = 210.00 E.S. CREST = 209.00 Area No. Area No. Storm Precip- Total Post- 1 Post- 2 Post- Event itation Development Dev. Flow Dev. Flow (Year) (in.) Flow (cfs) (cfs) (cfs) 1 3.2 1.86 0.66 2.52 2 3.7 2.42 0.92 3.34 10 5.8 20.42 1.63 22.05 25 6.7 45.52 3.90 49.92 100 8.4 161.87 25.07 186.94 TOTAL SITE OUTFLOW SUMMARY Total Site Storm Total Site Pre- Precip, Post- Event (in.) Development Development (Year) Outflow (cfs) Outflow (cfs) 1 3.2 4.45 2.52 2 3.7 9.87 3.34 10 5.8 48.54 22.05 25 6.7 70.02 49.92 100 8.4 115.05 186.94 7 1 1 Storm Drain Design Refer to the site Grading and Drainage Plan (Sheet CV-2) for stormwater wetland pond locations, grading, and layout configuration of the storm water collection and conveyance system. The storm water conveyance system was designed using the Rational method. For the 10-year storm for Johnston County, North Carolina a rainfall intensity of 7.6 inches per hour was used for design. Also, inlet capacity calculations were completed to ensure proper sizing of inlets per their individual surface drainage area. f 1 1 1 1 1 1 1 1 1 APPENDIX A ' JOHNSTON COUNTYSTORMWATER STATEMENT 1 1 1 i t 1 1 t 1 GRAY ENGINEERING CONSUL T A N T S, I N C. engineering sitework land planning January 3, 2007, Revised January 16, 2008 To: Johnston County Department of Utilities (Local Stormwater Review Entity) PO Box 2263, Smithfield, NC 27577 Phone: 919-209-8333 Project Name: East Park Plaza Location: Along NC Highway 42, 0.25 miles east of its intersection with Interstate 40. rl Located within the Environmentally Sensitive Area (ESA) ^ Developer: Garner Development Partners, LLC 607 Briarwood Drive, Suite 5 Myrtle Beach, SC 29572 Contact: David Harner ,>>~~~t1~iU~ll~ Phone: 843-361-4433 ~~~` ~H ~~~'o~,/il ~2•'Q Consultant: Gray Engineering Consultants, Inc. = ,4e- Sf:AI y~'p'9 132 Pilgrim Road ;• 02 4 • Greenville, SC 29607 .• Contact: David Graffius, P.E. °9 .G •'~~~~`` Phone: 864-297-3027 pia ~)~ ~F~~F~~~`~l~~d D General Information The developer is proposing the construction of a commercial retail center to include a Wal-Mart Store, small shop buildings and 2 outparcels located within Johnston County, North Carolina. The project site is located along NC Highway 42, about 0.5 miles east of its intersection with Interstate 40. The project site is bound by NC Highway 42 to the north, an existing Lowe's store to the west, vacant property to the south and Swift Creek floodplain to the east. The total site acreage for this project is 56.06 acres. This project area encompasses 3 existing parcels: 1) PIN 163700-26-0654, 2) PIN 163700-36-0944 and 3) PIN 163700-27-8890. The existing parcels consist of a combination of forest/woods and open/meadow. Present land use is vacant. There are 2 ditches that run on the project site. From the existing Lowe's site, the Lowe's pond outfalls into a ditch that runs onto the project site, to the north running from west to east along NC Highway 42. This ditch which runs through the project is not jurisdictional and outfalls under NC Highway 42 through an existing 42" RCP culvert. The other ditch on site is in the middle of the project which flows from west to east toward Swift Creek. See next section for jurisdictional streams and wetlands on the project site. 132 Pilgrim Road -Greenville, SC 29607 PH: (864) 297-3027 Fax: (864) 297-5187 www.grayengineering.com L__I GRAY E N G I N E E R I N G CONSULTANTS, INC. engineering sitework land planning Stream and Wetland Information The entire site has been investigated for jurisdictional streams and wetlands. The stream in the middle of the site has been determined to be a intermittent to start (2' wide and 392' long) and then turning perennial at a certain point as determined by the wetland consultant and verified by both the USACE and NCDENR. There has also been a wetland boundary identified on the project which runs in close proximity to the floodplain boundary line. A notification of jurisdictional determination has been received for both the stream and wetland area by the USACE and verified by the NCDENR DWQ. It was determined that the Neuse River Buffers shall apply to the delineated perennial stream on site at a point identified as "A3-B1." From this point to downstream, the 50-foot Neuse River Buffers shall apply. The stream is 2 feet wide 1 from top of bank to top of bank. The 50-foot Buffers are measured from the top of bank which has been determined to be the edge of the stream. For the purpose of delineating the 50-foot buffers, a 4' wide top of bank to top of bank was used. It has been required by the DWQ that no impacts shall occur within the Neuse River Buffers. It has also been required by Johnston County (due to project being located within the Environmentally Sensitive Area) that no development shall occur within the floodplain. These are given environmental site constraints where no development of any kind will occur. It should be noted that there will be a 149.5' impact to the stream on site and impacts of 0.026 acres to the wetlands on site. These impacts are outside the site constraints area as noted above and will be permitted as part of the Express Review Option by the DWQ for the Pre-Construction Notification Water Quality Certification Permit. This Permit is under review by the DWQ. Avoidance and Minimization of Delineated Streams and Wetlands During the design development phase, the wetland assessment determined the location of delineated stream and wetlands boundary on site. Based on these locations, the site has been re-designed by moving the entire development to the west as far as it can go, abutting against the existing Lowe's property (which is also the Lowe's dry detention pond under a 150' CP&L Easement). By moving the entire site to the west, the Neuse River Buffer has been completely avoided with the use of reinforced steepened slopes. Also, the proposed shop's building has been reduced in size. It should be noted that other physical constraints exist on the project site, which had to be considered and overcome in the overall design of the project. These include the 100 elevation difference from the Lowe's to the floodplain, the existing 50' Colonial Pipeline that runs through the center of the site cannot be disturbed and the 100-year floodplain line which cannot be disturbed. 132 Pilgrim Road -Greenville, SC 29607 PH: (864) 297-3027 Fax: (864) 297-5187 www.grayengineering.com GRAY ENGINEERING ~~~~~~ CONSUL 7"ANTS, INC. `~ ~,~°~ ~ c ' a engineering sitework land planning .~ 1 a ~ Impervious Area Calculations The existing impervious area can be considered zero. The proposed construction will consist of impervious surfaces for building areas, parking areas and access driveways. The 56- acre site will be subdivided into five (5) separate parcels. This will be a commercial development within the Environmentally Sensitive Area; therefore, the total maximum impervious area limitation is 50% as required by Johnston County. Parcel Size Impervious Area Wal-Mart Tract 40.89 acres 17.30 acres Shops 1 Tract 8.83 acres 2.37 acres 1 Shops 2 Tract 2.63 acres 1.32 acres Outparcel No. 1 1.77 acres 1.45 acres Outparcel No. 2 1.58 acres 1.29 acres Total Project 55.70 acres 23.73 acres (42.60%) The expected impervious area for the full build-out of all parcels is below the allowable impervious area of 50%. Therefore, Land Dedication will not be required. Stormwater Pond Design, Peak Runoff Reduction and Downstream Analysis There are two main drainage areas on this project due to the existing 50-foot gas easement bisecting the project site. The upper drainage area to Pond 1 or large pond has been sized for the full build-out of the Wal-Mart and Shops 1 Tract. The lower drainage area to Pond 2 or small pond has been sized for the full build-out of the Shops 2 Tract, Main Driveway and Outparcels No. 1 and 2. Both ponds have been designed as Constructed Stormwater Wetlands per the NCDENR DWQ requirements. Due to steep slope constraints and limited property constraints, no other combination of BMPs could achieve the minimum 30% Nitrogen Reduction required by the DWQ. Therefore, the wetland ponds are proposed and will achieve 40% Nitrogen Reduction thus achieving the minimum requirements. Per the NCDENR DWQ, no other outfall requirements are necessary other than ponds must discharge with an energy dissipater device directly to the wetland and not to the Neuse River Buffers. The 1-year storm will discharge 1.11 cfs and the energy dissipater structure will eliminate flow velocity to zero. Both ponds have been additionally sized to attenuate the peak flow runoff for the 1, 2, 10 and 25-year storm events as required by the County; therefore no additional downstream impact analysis is required. Both ponds outfall directly to the large existing wetland and floodplain associated with very large Swift Creek River. Swift Creek is located approximately 1,000 feet to the east of the project site. Since the drainage area for the project will be less than 10% of the total drainage area to Swift Creek, it will have an insignificant impact to the creek. 132 Pilgrim Road -Greenville, SC 29607 PH: (864) 297-3027 Fax: (864) 297-5187 www.grayengineering.com 1 1 1 1 1 1 1 ~~ U 1 GRAY E N G I N E E R I N G CONSUL T A N T S, I N C. engineering sitework land planning Johnston County Nitrogen Reduction Calculations (~) (2) (3) (4) Type of Land Cover Area TN Export Coeff. TN export from Acres Ibs/ac/ r use Ibs/ r Permanently protected 19.81 0.6 11.886 undisturbed open space (forest, un-mown meadow, etc. Permanently protected 12.16 1.2 14.592 managed open space (lawn, grass, landscaping, etc. Impervious surfaces 23.73 21.2 503.076 (roads, parking lots, driveways, roofs, paved or graveled storage areas, raveled roads, etc. TOTAL 55.70 529.554 The total Nitrogen Loading from the site is 529.554 Ibs/yr / 55.70 acres = 9.507Ibs/ac/yr, greater than 8.0 Ibs/ac/yr limit per the development being inside the ESA; therefore, it must be reduced below 8.0 Ibs/ac/yr before an offset payment can be made. It is required that the total nitrogen load export must be 3.6 Ibs/ac/yr or less. The ponds on site will be constructed stormwater wetlands. The BMP reduction credit for ponds will be 40%. Applying a 40% reduction factor, the total Nitrogen Loading is reduced to 5.704 Ibs/ac/yr which is less than 8.0 Ibs/ac/yr. TN = [ 9.507 Ibs/ac/yr - 0.40 (9.507) ] = 5.704 Ibs/ac/yr Since no other BMPs are possible to achieve further reduction of the total nitrogen load, the offset payment fee is calculated as follows per the latest Johnston County requirements. The payment is based on the difference of 3.6 Ibs/ac/yr - 5.704 Ibs/ac/yr, which is equal to 2.104 Ibs/ac/yr. Nitrogen Payment = [ ($28.35/Ib)(# of Ibs/ac/yr)(# of Acres)(30 years) ] Nitrogen Payment = [ ($28.35/Ib)(2.104 Ibslac/yr)(55.71 acres)(30 years) ] Nitrogen Payment = $99,690.37 132 Pilgrim Road -Greenville, SC 29607 PH: (864) 297-3027 Fax: (864) 297-5187 www.grayengineering.com 1 1 JOB NAME JOB N'U'{7MBEq g'~ PAt3E NO. JOB DESCRIPTION BY DATE __.~. __~~ ~.-- F ....~._ ... }_ .__v ~ _.__ _.._.._~ . ~ . _. __.. _. _ .: _ . ~~ _._ ~ v_ ~. 1 1 1 1 t 1 [I 1 __ __ _ __. ~. w~ ~_ ..,.~.... t _ ~.. _ Sl,r~~~.~ _ ~G~f~~?~ ~ _. _ ._ _~_ _ --W ._ _. _. _ x_ (~v _ C' ~ 5 ~. ~, ~.~ ~~ . . ~- r ; _.. . _r ... ~.. _. F... ._...,. ~.~ __ ~ . c~ `~ ; ~ ~~ ~. -x M ~ ~~-~~r P~~~ y 4 ~ ~ o .. ~ ,. .. , . ~~ wQ~- y7py~ ~j~) s p p~ ~j~ @. . , - ....r.. ..~ ,. .. ..... c- .. ~.. ,_. _:,.... __ . .....,. _...1,\$l_. ,lJ.. tJ: ~ , A ..~ Lev A/~ - ~ lA :- ~ _ ~ .. _ _ .. ._ ..... - ~ 3 _. _.. .. _. ,4 w _ _. _ .. ... ~. ~ ~_ ~ _ ~ _.. M.. ~' _._. .__ _. .. _. ~ v _. U~L!_ ~~.~ . V~~~~~~ f ~..~ ~ ,w .._ ,_ ... ~ __ _ _ _ _ . ,. .~ .. .... ,~ _ , , ' ..(.-,~ ~~, ~ ~~ .!-N+,~ fit 1'0 ~'a~Q _ _~_ ~. ~ `,~. v v~o o / Q . ~ ~ ~,_ t ~.~_ y _ _ - _- _ ~ i GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 1 1 1 [' t 1 1 1 1 1 J08 NAME JOB--N77U((M~~BER PAGE NO. Z t V ~~.~ JOB DESCRIPTION BY DATE// 5~~~~~ ~ ~~'`1;~: ,C'~~~r~;i~°~~ ~-~~~ ~ ~ ~ x``01 ~®~ GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 1 1 1 1 f1 1 1 1 1 t 1 1 1 '~ NAME JOB NUMBEA PAGE NO. Z 7oZ~5 JOB DESCAlPTION BY DATE GRAY ENGINEERING CONSULTANTS, iNC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 1 t 1 1 i 1 ii i 1 1 '~ NAME JOB NUMBER PA(;E NO. ~~~~~~ JOB DESCRIPTION BY DATE GI:3AY lENG1NEI:RING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 t 1 1 i 1 1 1 i 1 1 1 1 1 1 1 1 1 1 ~' i ii ~ ~ ~/ i i! // i i; ~ ( i j ~ / I ~ / / ~ ~ i ~ // i ~ / ~~ ~(~ / ~~ ;'; RCN i P.`i / ;~ ~~ ~ Ca~x~~,va ~ / ~~ ! I `~' ~ ~ ~ ~~DRI`/= l / ti~ i ' ~ i ~ t ,~~. -~ / ~, `, 1` ~~ ~ ~ / i~ -~ 1,, ~, ' ! `mac ~~ CC/ /j ~1\\ i _ _ _ '~ _ C ~` ~' G , ~, J1 ~ C ~j ~ o,, -7~~ '~ I ,~ CL~`J:ri A~i~ CRQj=.iNG ~~ ; ~ ~ ~C /~ 9p~ 'li wJ P IiL W / ~~ ~G \ `~`~~, ~ I --i W -9 ~~~,~, ~ I ~ ~ / ~ C W ~ ~- 1 Gam; ~~ ~ I O ~ ~~ ~ is (N i.~.~ ~ b_-~.: ~~ ~z• - - 1 .,~. - O ,~ - u , ~.h4 rV - - r ' ~ SITE J eZ -_ pl 1 ~ ,~`- ,o -7, .wry. ~ ~ r s" ,a' _ _ Mye J~ s. g ,~ _ _ '~ " x - ~~ ~ ._ e ,.. .. SITE VICI1vITY iVIAP PROPOSED RETAIL SHOPPING CENTER NC Hi~hwav 42 Johnston County, North Carolina Not to Scale ~i .~~ ;t~ II'.~,\~ i~ 'L~.1~ '~®.__ r r; ti~ ~~ ~} ~. ~~~~ r~~, ~ .~ '!~1 ~. ~~~ ,/ `, ~~ ~y SITE TOPOGRAPHIC ~IAP PROPOSED RETAIL SHOPPING CENTER NC Highway 42 Johnston County, North Carolina Not to Scale ~ -- ,` J197 .-- ~', ;~ , -' ~~~ ~ ~,-„ '~ ~`/ ~ .-. ~~ -~ -. - I ~. ~-. ~. ~.., ~~~.: ~ O ~s a, '~` ~, , '., .wqqpp 73i"i r ~4k 9 0 a a L ~~ o~ 0 0 N ~ r ~ ~ ~ N m ~- a T N 7 O ~ N'p T~ ~ O j N ~ a ~ r ~ ~, ~i (n m m o n cn o ~ o ~U m c 0 °' m °' Z ~o 0 m °m 0 0 0 0 0 a 0 o ~ `~ U_ y U ~ 7 0 o y CO N '._ ~ m m y 7 y .~ C mo Z~ ZU .,• .^. ~~~a :9~ ~~ d ~~ ~ o ~~ 7~ o ~ d ~ \ `\ \\\ ~ \ ~ \ ~ ~ V Post Construction Stormwater Inspection and Maintenance Agreement i for Constructed Storm~,vater Wetland Ponds Garner Development Partners, LLC (Garner. LLC1 accepts responsibility for ownership and proper ' maintenance of the permanent ponds. all storm drainage structures and pipes, swales and permanent stabilization at the East Park Plaza. NC Highway 42. Johnston County, North Carolina per the approved maintenance agreement. Garner, LLC will complete any necessary repairs and/or preventive maintenance procedures in a timely manner and at its sole cost and expense to ensure proper functioning of the ponds and drainage system as stormwater management devices. Garner, LLC will continue to o~,vn and maintain the ponds and s"term drainage systems until Johnston County Utilities Department is notified in writing of a transfer in ownership and maintenance responsibility. The notification will include a date for the transfer of responsibility and a letter of acceptance from the new owner General Maintenance Plan: '°' 1 Grassing & Mowing: a. Owner to maintain proper vegetative cover on side slopes, top of dam, and bottom of pond. b. Owner to mow grass in detention areas 3 times a year according to the growing season of the grass. c. Keep cattails from clogging the pond and spillways.. 2. Tree and Brush Maintenance: a. Owner must keep all trees & brush out of detention area including the bottom of pond. side slopes, and the top of the dam. 3 Trash Maintenance /Sediment Maintenance /Pond Bottom Maintenance: a. Owner must remove all trash accumulated in the detention pond, outlet structure, and ' outfall pipe areas and pond side slopes. b. Owner must remove all accumulated sediment from pond every six months. c. Pond bottom to be maintained where positive flow to outlet structure is achievable. 4. Outlet Structure /Pipe Outfall Protection /Emergency Spillway Maintenance: a. Owner to inspect outlet structure and pipe outfall periodically Any erosion/structural problems are to be repaired promptly. b. Orifices on Outlet Structure to be inspected and maintained periodically. Any `clogging' of orifices to be removed promptly. Remove debris from trash rack. Check and clear orifice from any obstructions. c. Emergency Spillway to be inspected periodically and any erosion/structural problems are to be repaired promptly. d. Side Slopes to be inspected periodically Any erosion must be repaired promptly. 5. Storm Drainage/lnlet/Swale Maintenance: a. Owner to inspect all storm drains, inlet structures, outlet protection and all swales periodically, any erosion/structural problems are to be repaired promptly. Attached below is a copy of Table 9-2 from the NCDENR stormwater BMP Manual, July 2007. Inspecfion activities shall be performed as follows. Any problems that are found shall be repaired immediately. 9.x.2 Sample Inspection and Maintenance Provisions ' Innportant maintenance procedures: - I1lunecliatels- after the stormGt~ater GtTetland is established, the ct-etland plalnts will be Gvate~red tGVice Gveekly iE needed until the plants become established ~COLIILTIOr11F SLY 4veeks). - NO p02'tlOn Of the stOrnlG-Vater G\%etland Gt%111 be tel't1llZeCl atter the t1rSt Llnltlal fertilization that is required to establish the ct~etlalul plants. -- Stable ~TrOL11nC1COT--eT Gt%111 ~?t_' 1nlarntallneCl In the CII'clllage area t0 redlTCe the ' Sed1IlleIlt load t0 the G1'et detenhOn basin. - Once a ~-ear, a da111 safety expert c•vrll unspect the en1ba11kment. Auer the Duet detention pond is established, I Gt~ill inspect it once a month and within 24 hours after every storm event ~ eater than 1.0 inches (or 1.5 inches if in a Coastal County). Pecorcls of inspecrian and maintenance Gvill be kept in a knoGa~n set location and Gvill be available upon request . Inspection activities shall be performed as follows. A11e problems that sue foG.und shall be repairediullnecliately. Table 9-2 Sample Inspection alnd Maintenance Agreement for Stornncvater Wetlands 1 B~[P eleruenh The entire B~Il' The perimeter of the wetland 1 f Potential problem: j How to remediate the problem: Trash debris is present. Pemove the trash/debris. areas of bare soil and/ or ', P.egrade the soil if necessar`- to erosive. gullies have formed. remove the grtlh, and then plant a ground cover and. water until. it is ~ established. Provide lime and a one-time fertilizer application. Vegetation is too short or too i Itlaintain vegetation at a height of long. I approximatelc• six ilnches. The pipe is a~acl;ed or otherwise damaged (if applicable). Erosion is occurring in the s\t-ale (ifapplicablej. P.egrade the stt'ale Lf necessary to smooth it over and provide erosion I control devices such as reinforced ~; htrf matting or riprap to avoid fu lure problems n. ith erosion. Stonnc.°ater ~~: etl~u~ds ~-'3 1~,. ,OR- Pep(ace the pipe. 1 1 1 1 1 1 1 t 1 C~ 1 1 1 Table 9-2, continued Sample Inspe~l-ion and lfai]ltenance .~~eemellt for Storm~vater ~^l'etlands ti:~ll' element: IheEorebay Potential problem: How to remediate the problem: Sediment has acnunulated in i `earth for the source of the the fcreba: to a depth that ,sediment and remedy the prolilenl if inhibits the forebily fl'01]I posSlble. RelllC~ e the Sedlnlellt clad functioning well. dispose of it in a location ~~ here it ~yi11 not cause impacts to streams or -- ;the R~;Il'. Erosion has occurred 6Veeds are present Prot-ide additional erosion protection such as reinforceci turf matting or riprap it needed to prevent fuhue erosion problems. Remo-e the t~:eects, preferably- b~- hand. If a pesticide is used, wipe it on the plants rather than spraying. Consult a professional to remove i and conhol the algal growth. lire deep pool, shallow Algal gro~yth cot ers over water and shallow land ~0 ~ of the deep poo[ and areas shallo~c water areas. Cattails, phragmites or other ! Remo-e the plants ba wiping them invasive plants cover ~0 0 of ~ with pesticide (c(o not spnly} - the deep pool and shallow I consult a professional. ~yater areas. Shallo4v land reulains flooded ~ Unclog the outlet device more than ~ days after a ~ immerliately. storm event. ~ J i Plants are deac(, diseased or dying. Determine the source of the problem: soils, hvdrologt ,disease, etc. Remedy the problem and replace plants. Provide aone-Hale fertilizer application to establish the ground cover if a soil test indicates it is necessary. Best professional practices show that priming is needed to maintain optimal plant ~ health. Se.climent has accumulated ~ Search for the source of the and reduces{ Hle depth to ~"o ' seciinlent and remedy the problem if of the original design depltl possible. Reulo~-e the seclimentancl of the deep pools (see dispose of it in a location Fchere it diagram beloly). c~: iLl not cause impacts to streams or the B~tP. Prune according to best professional practices. Stoan~.ater iVetiands ~-=~ 1 1 1 1 1 i 1 ill u 1 Table 9-?, continued Sample Inspection and il~faitltenance .yJ Bement for Stornl\\~ater `v~_ etlands BLIP element: Potential problem: PIow to remediate the problem: The emt~ankment ~ hee has started to grog\- on Consult a dam safety spet:ialist to Nle enlbanknlent. _ rerlo\ e the tree. _ ?.n annual inspection b\- an ___ Itfake all needed repairs. appropriate professional sho\\~s that the embankment 1leeds 1'l' i11C. Evidence of musl:rator Use baps to remo\:e Muskrats and bear. er actin it4 is present. consult a professional to remo\ e beaC-e1"s. The micropoot Sediment has accumulated Search for the source of the and reduced the depth to ; ~'a sediment and remedc the problem if of the original ciesign depth possible. Remo~-e the sediment Bind (see diagram belotiv). dispose of it in a location where it ~\.ill not cause impacts to streams or ~ _ ___ Ehe B~'IP. _ Plants aIe gl'O~\~ lIlg In the ~ I~e1110~'e the plants, pl'eferab(v bt-' nLCrOpOOI• ~''~ helld. lfa pestllade is Used, talpe It _ __ _____ ~ on the plants rather than spray-ina. The outlet det,~ice Clogjing has occurred. _ ;Clean obit the outlet deG-ice. Dispose of the sediment ofE-site. The outlet deeice is tianla~eti ' P.e air or re lace the outlet ties. ice. The receiti ing water Erosion or other sighs of j Contact the NC Di~~ision of Water damage have occurred at the ;Quality X01 ~~-ersight U11it at 919- outlet. __ _ ~ 733-1756. __ Stour\c. ater `a`, ettar;ds ~~-=~ i~ilv 2Q(77 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1, .for Garner Development Partners. LLC, hereby ackno+~iledge that we are the financially responsible party for maintenance and inspection of the detention ponds for this project. U+/e will perorm the maintenance as outlined above; to comply with the Johnston County Stormwater Management Ordinance and the Stormwater Management permit received for this project. Furthermore, we attest that this Inspection, and Maintenance Agreement is on file with the Register of Deeds. Signature Date I, , a Notary Public for the state of County of , do hereby certify that personally appeared before me this day of , 20 ,and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, Seal My Commission expiries 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 APPENDIX B PRE-DEVELOPMENT CONDITIONS MAP POST-DEVELOPMENT CONDITIONS MAP PRE DEVELOPMENT AND POST DEVELOPMENT CONDITIONS HYDRAFLOW CALCULATIONS CURVE NUMBER DETERMINATION STORMWA TER WETLAND POND 1 & 2 VOLUME CALCULATIONS JOHNSTON CO LINTY PRECIPITA TION VALUES ~~ ~~ ~,~ ,~- / ~~~ ,~ -~i~, -% \ '~ -~-- i -~ .~ l ins _% ~ ~ -' ~ ~ ~'/~ i~ ~ \ ~\ ~ PRE DEVELOPMENT AREA 2 j .i ~ ' ` ~~ ~ - -~ , - ~ ~ ARE = RES ~~ A 7.7 AC / -~ `: , --~~ \ ~. ~,~~~ ~ ~ ~ ~~ ~ ~ ~ . ~ ~~. ~~~~ ~~~~ ~~~~ ~~~~_ ~~ \..~ ,~; PRE DEVELOPMENT AREA MAP N.T.S. 1 .,~ ,,/ ~~ a = ~::~-; ~ ~ ~ ~-. - % ~-- r, ~ F `w 6 ice' / ~ 1-- _%+9 - \~ /' ~.. G _ ~~ ~ ` / ~~~ ,- , _ ~Ff ~ ~~ ST VEL ME T A A 2 1 %~~~ ~/// AR = .7 C / - ~ %~ ~ ~~ CN 85 :. • ~/~ _ ~ i r ~ ~ A er N ~ • ~~ ~. I ~ ~ ~= I ~ \ 1 ,~= ~ ~ _~ ` t/T 9 ~ \ ` ~ ~ I 5000 'iF ~ ' I Z ~ ~ E,500 3 ~ I w fi/~ o I 9 1 ~_ ~, '~ "~Z o' - r iii POST DEVELOPMENT AREA 1"' ~ I ~ ~ ~~ Ur ~ iii AREA = 33.0 ACRES •~ ~' _ I J ' ~ b~ ~ iii CN = 83 ~ :~~` ~I ~ ~ , ~ I ~ e~ I _, ..a . _ . _.. .. ~ I __,__ - - ______. e I~I)1~,)J)Jl ,~ '~- t ' ~~ ~ ~r ~ ~ ~, ~ ~ IMPERVIOUS AREA ' ( I I ~ POST DEVELPMENT AREA 1 ~ 0 POST DEVELPMENT AREA 2 i ~ I POST DEVELOPMENT AREA MAP N.T.S. Table of Contents 270205 Pre and Post Dev Pond 1 WMC.gpw Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:18 AM Hydrograph Return Period Recap ...................................................................... 1 1 -Year Summary Report ................................................................................................................. 2 Hydrograph Reports ........................................................................................................... 3 Hydrograph No. 1, SCS Runoff, Pre Development Area 1 ............................................... 3 TR-55 Tc Worksheet .................................................................................................... 5 Hydrograph No. 2, SCS Runoff, Post Development Area 1 ............................................. TR-55 Tc Worksheet .................................................................................................... 6 Hydrograph No. 3, Reservoir, Pond 1 ............................................................................... 7 Pond Report ................................................................................................................. 8 ' 2 -Year Summary Report ................................................................................................................ Hydrograph Reports ............................................................ . . 9 10 . ........................................... Hydrograph No. 1, SCS Runoff, Pre Development Area 1 ............................................. 10 TR-55 Tc Worksheet .................................................................................................. 11 Hydrograph No. 2, SCS Runoff, Post Development Area 1 ........................................... TR-55 Tc Worksheet .................................................................................................. 12 13 Hydrograph No. 3, Reservoir, Pond 1 ............................................................................. 14 Pond Report ............................................................................................................... 15 ' 10 -Year Summary Report ............................................................................................................... Hydrograph Reports ......................................................................................................... 16 17 Hydrograph No. 1, SCS Runoff, Pre Development Area 1 ............................................. 17 i TR-55 Tc Worksheet .................................................................................................. Hydrograph No. 2, SCS Runoff, Post Development Area 1 ........................................... 18 19 TR-55 Tc Worksheet .................................................................................................. 20 Hydrograph No. 3, Reservoir, Pond 1 ............................................................................. Pond Re ort 21 p ............................................................................................................... 22 25 -Year Summary Report ............................................................................................................... 23 Hydrograph Reports ......................................................................................................... 24 Hydrograph No. 1, SCS Runoff, Pre Development Area 1 ............................................. 24 TR-55 Tc Worksheet .................................................................................................. 25 Hydrograph No. 2, SCS Runoff, Post Development Area 1 ........................................... 26 TR-55 Tc Worksheet .................................................................................................. 27 Hydrograph No. 3, Reservoir, Pond 1 ............................................................................. 28 Pond Report ............................................................................................................... 29 i 100 -Year Summary Report ............................................................................................................... 30 Hydrograph Reports ......................................................................................................... 31 Hydrograph No. 1, SCS Runoff, Pre Development Area 1 ............................................. 31 TR-55 Tc Worksheet .................................................................................................. 32 ' Hydrograph No. 2, SCS Runoff, Post Development Area 1 ........................................... 33 Contents 270205 Pre and Post Dev Pond 1 WMC.gpw TR-55 Tc Worksheet .................................................................................................. 34 Hydrograph No. 3, Reservoir, Pond 1 ............................................................................. 35 Pond Report ............................................................................................................... 36 ~II 1 r 1 1 FI 1 ydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- 3.559 7.869 ------- ------- 38.72 55.86 ------- 91.83 Pre Development Area 1 2 SCS Runoff ------- 75.13 94.55 ------- ------- 178.85 215.38 ------- 284.31 Post Development Area 1 3 Reservoir 2 1.855 2.420 ------- ------- 20.42 45.52 ------- 161.87 Pond 1 Proj. file: 270205 Pre and Post Dev Pond 1 WMC.gpw Tuesday, Jan 15 2008, 11:17 AM Hydraflow Hydrographs by Intelisolve ydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 3.559 1 739 33,494 ---- ------ ------ Pre Development Area 1 2 SCS Runoff 75.13 1 721 189,752 ---- ------ ------ Post Development Area 1 3 Reservoir 1.855 1 984 136,765 2 246.72 179,798 Pond 1 270205 Pre and Post Dev Pond 1 W ~ Period: 1 Year Tuesday, Jan 15 2008, 11:17 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 1 Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:17 AM Hyd. No. 1 Pre Development Area 1 Hydrograph type Storm frequency = SCS Runoff = 1 yrs Peak discharge Time interval = 3.559 cfs = 1 min Drainage area = 33.000 ac Curve number = 56 Basin Slope Tc method = 0.0 % = TR55 Hydraulic length Time of conc. (Tc) = 0 ft = 29.70 min Total precip. = 3.20 in Distribution =Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 33,494 tuft Pre Development Area 1 Q (cfs) Hyd. No. 1 -- 1 Yr Q (cfs) 4.00 ' 3.00 2.00 1.00 0 00 4.00 3.00 2.00 1.00 0.00 0 150 300 450 600 750 900 1050 1200 1350 1500 Hyd No. 1 Time (min) 3 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 1 Description A B C Totals Sheet Flow Manning's n-value = 0.300 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 27.62 + 0.00 + 0.00 = 27.62 Shallow Concentrated Flow Flow length (ft) = 100.00 180.00 0.00 Watercourse slope (%) = 3.70 3.30 0.00 Surface description =Unpaved Unpaved Paved Average velocity (ft/s) = 3.10 2.93 0.00 Travel Time (min) = 0.54 + 1.02 + 0.00 = 1.56 Channel Flow X sectional flow area (sgft) = 4.00 0.00 0.00 Wetted perimeter (ft) = 6.00 0.00 0.00 Channel slope (%) = 13.50 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) = 16.05 0.00 0.00 Flow length (ft) = 520.0 0.0 0.0 Travel Time (min) = 0.54 + 0.00 + 0.00 = 0.54 Total Travel Time, Tc .............. ............................................. ................... 29.70 min 4 ' Hydrograph Plot r Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 1 Hydrograph type Storm frequency = SCS Runoff = 1 yrs Drainage area = 33.000 ac Basin Slope = 0.0 Tc method = TR55 Total precip. = 3.20 in Storm duration = 24 hrs Q (cfs) 80.00 70.00 so.oo 50.00 40.00 30.00 ~, 20.00 10.00 0 00 Tuesday, Jan 15 2008, 11:17 AM Peak discharge = 75.13 cfs Time interval = 1 min Curve number = 83 Hydraulic length = 0 ft Time of conc. (Tc) = 12.40 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 189,752 cuft Post Development Area 1 Hyd. No. 2 -- 1 Yr 0 2 5 7 ' Hyd No. 2 9 12 14 16 19 21 23 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 --~ 0.00 26 Time (hrs) 5 1 1 1 1 1 1 1 1 f A 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 5.20 0.00 0.00 Travel Time (min) = 8.60 + 0.00 + 0.00 = 8.60 Shallow Concentrated Flow Flow length (ft) = 150.00 430.00 0.00 Watercourse slope (%) = 5.20 8.00 0.00 Surface description =Unpaved Paved Paved Average velocity (ft/s) = 3.68 5.75 0.00 Travel Time (min) = 0.68 + 1.25 + 0.00 = 1.93 Channel Flow X sectional flow area (sgft) = 9.62 0.00 0.00 Wetted perimeter (ft) = 10.99 0.00 0.00 Channel slope (%) = 0.50 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) = 7.41 0.00 0.00 Flow length (ft) = 850.0 0.0 0.0 Travel Time (min) = 1.91 + 0.00 + 0.00 = 1.91 Total Travel Time, Tc .............................................................................. 12.40 min r Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:17 AM Hyd. No. 3 Pond 1 Hydrograph type = Reservoir Peak discharge = 1.855 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 246.72 ft Reservoir name = Pond 1 Max. Storage = 179,798 tuft ~1 Stora a Indication method used. Wet and routin start elevation = 245.00 ft. 9 P 9 H dro ra h Volume = 136 765 tuft Y 9 P . Pond 1 Q (cfs) Hyd. No. 3 -- 1 Yr Q (cfs) 80 00 . 80.00 70 00 1 . 70.00 60 00 I ~ . 60.00 50 00 i ~ . I 50.00 40 00 ~ . i 40.00 30 00 I 1 . i i 30.00 20 00 . 20.00 10 00 ~ i . I 10.00 ~ ~~ 0.00 ~ ~ ' ~ ~ 0.00 0 5 10 1 5 19 24 29 34 39 44 48 ---- Hyd No. 3 Hyd No. 2 Time (hrs) t Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 1 -Pond 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 242.00 5,965 0 0 1.00 243.00 8,126 7,046 7,046 2.00 244.00 10,640 9,383 16,429 ~I 2.50 244.50 27,914 9,639 26,067 3.00 245.00 71,817 24,933 51,000 4.00 246.00 75,012 73,415 124,414 5.00 247.00 78,264 76,638 201,052 6.00 248.00 81,572 79,918 280,970 7.00 249.00 84,937 83,255 364,225 7.80 249.80 87,670 69,043 433,268 Tuesday, Jan 15 2008, 11:17 AM Culvert /Orifice Structures Weir Structures IAl [B] [C] IDI [AI IBl [C] IDl Rise (in) = 30.00 5.00 8.00 0.00 Crest Len (ft) = 12.56 75.00 0.00 0.00 Span (in) = 30.00 5.00 8.00 0.00 Crest EI. (ft) = 247.80 248.80 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert EI. (ft) = 242.00 245.00 246.00 0.00 Weir Type =Riser Ciplti --- --- Length (ft) = 96.00 0.00 0.00 0.00 Multi-Stage =Yes No No No Slope (%) = 5.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes Yes No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: CuIveNOrifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifce conditions. Stage (ft; 8.00 6.00 4.00 1 2.00 Stage /Discharge Stage (ft) 8.00 6.00 4.00 2.00 0.00 i 0.00 30.00 Total Q 60.00 90.00 120.00 150.00 0.00 180.00 210.00 240.00 270.00 300.00 330.00 Discharge (cfs) s 1 ydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 7.869 1 735 54,345 ---- ------ ------ Pre Development Area 1 2 SCS Runoff 94.55 1 721 239,136 ---- ------ ------ Post Development Area 1 3 Reservoir 2.420 1 959 179,582 2 247.14 212,157 Pond 1 270205 Pre and Post Dev Pond 1 W ~ Period: 2 Year Tuesday, Jan 15 2008, 11:17 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 ment v l P D Area 1 re e e op Hydrograph type Storm frequency = SCS Runoff = 2 yrs Drainage area = 33.000 ac Basin Slope Tc method = 0.0 = TR55 Total precip. = 3.70 in Storm duration = 24 hrs Q (cfs) j 8.00 6.00 4.00 2.00 0 00 Tuesday, Jan 15 2008, 11:17 AM Peak discharge = 7.869 cfs Time interval = 1 min Curve number = 56 Hydraulic length = 0 ft Time of conc. (Tc) = 29.70 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 54,345 cult Pre Development Area 1 Hyd. No. 1 -- 2 Yr 0 3 5 8 Hyd No. 1 10 13 15 18 20 23 Q (cfs) 8.00 6.00 4.00 2.00 -'~ 0.00 25 Time (hrs) 10 t i f 1 1 1 1 1 1 1 1 t 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 1 Description A B C Totals Sheet Flow Manning's n-value = 0.300 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 27.62 + 0.00 + 0.00 = 27.62 Shallow Concentrated Flow Flow length (ft) = 100.00 180.00 0.00 Watercourse slope (%) = 3.70 3.30 0.00 Surface description =Unpaved Unpaved Paved Average velocity (ft/s) = 3.10 2.93 0.00 Travel Time (min) = 0.54 + 1.02 + 0.00 = 1.56 Channel Flow X sectional flow area (sgft) = 4.00 0.00 0.00 Wetted perimeter (ft) = 6.00 0.00 0.00 Channel slope (%) = 13.50 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) = 16.05 0.00 0.00 Flow length (ft) = 520.0 0.0 0.0 Travel Time (min) = 0.54 + 0.00 + 0.00 = 0.54 Total Travel Time, Tc .............................................................................. 29.70 min 11 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 1 Hydrograph type Storm frequency = SCS Runoff = 2 yrs Drainage area = 33.000 ac Basin Slope Tc method = 0.0 = TR55 Total precip. = 3.70 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 ' 10.00 0 00 Tuesday, Jan 15 2008, 11:17 AM Peak discharge = 94.55 cfs Time interval = 1 min Curve number = 83 Hydraulic length = 0 ft Time of conc. (Tc) = 12.40 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 239,136 cult Post Development Area 1 Hyd. No. 2 -- 2 Yr Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 2 5 7 Hyd No. 2 9 12 14 16 19 21 23 26 Time (hrs) 12 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 5.20 0.00 0.00 Travel Time (min) = 8.60 + 0.00 + 0.00 = 8.60 Shallow Concentrated Flow Flow length (ft) = 150.00 430.00 0.00 Watercourse slope (%) = 5.20 8.00 0.00 Surface description =Unpaved Paved Paved Average velocity (ft/s) = 3.68 5.75 0.00 Travel Time (min) = 0.68 + 1.25 + 0.00 = 1.93 Channel Flow X sectional flow area (sgft) = 9.62 0.00 0.00 Wetted perimeter (ft) = 10.99 0.00 0.00 Channel slope (%) = 0.50 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) = 7.41 0.00 0.00 Flow length (ft) = 850.0 0.0 0.0 Travel Time (min) = 1.91 + 0.00 + 0.00 = 1.91 Total Travel Time, Tc .............................................................................. 12.40 min 13 14 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:17 AM Hyd. No. 3 Pond 1 Hydrograph type Storm frequency =Reservoir = 2 yrs Peak discharge = 2.420 cfs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 247.14 ft Reservoir name =Pond 1 Max. Storage = 212,157 cuft Storage Indication method used. Wet pond routing start elevation = 245.00 ft. Hydrograph Volume = 179,582 cuft Pond 1 Q (cfs) Hyd. No. 3 -- 2 Yr Q (cfs) 100 00 100.00 . I 90 00 90.00 i i . 80 00 80.00 . 70 00 70.00 i . 60 00 60.00 . 00 50 50.00 ~ . i 40 00 40.00 i i ~ . ~ ~ 30 00 30.00 . ~ I i I ~~ 20 00 20.00 , . i ~ ~ i I 10 00 10.00 I , . 4 ~ ' i 0 00 0.00 - -- . 0 5 10 15 19 24 29 34 39 44 48 ~~~-- Hyd No. 3 Hyd No. 2 Time (hrs) Pond Report Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:17 AM Pond No. 1 -Pond 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 242.00 5,965 0 0 1.00 243.00 8,126 7,046 7,046 40 9 383 16 429 2.00 244.00 10,6 , 2.50 244.50 27,914 9,639 26,067 3.00 245.00 71,817 24,933 51,000 4.00 246.00 75,012 73,415 124,414 5.00 247.00 78,264 76,638 201,052 6.00 248.00 81,572 79,918 280,970 7.00 249.00 84,937 83,255 364,225 7.80 249.80 87,670 69,043 433,268 Culvert /Orifice Structures Weir Structures IAI [Bl [C] ID] IAl IBl [C] IDl Rise (in) = 30.00 5.00 8.00 0.00 Crest Len (ft) = 12.56 75.00 0.00 0.00 Span (in) = 30.00 5.00 8.00 0.00 Crest EI. (ft) = 247.80 248.80 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert EI. (ft) = 242.00 245.00 246.00 0.00 Weir Type =Riser Ciplti --- --- Length (ft) = 96.00 0.00 0.00 0.00 Multi-Stage =Yes No No No Slope (%) = 5.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes Yes No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions i 1 stage (ft) Stage /Discharge stage (ft) s oo 8.0o . 6 00 6.00 . I 4 00 4.00 . ~ 2 00 2.00 . 0.00 0.00 0.00 30.00 60.00 90.00 120.00 150.00 180.00 210.00 240.00 270.00 300.00 330.00 Discharge (cfs) Total Q 15 u ydrograph Summary Report 16 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 38.72 1 733 177,229 ---- ------ ------ Pre Development Area 1 2 SCS Runoff 178.85 1 721 460,604 ---- ------ ------ Post Development Area 1 3 Reservoir 20.42 1 750 387,859 2 248.34 309,686 Pond 1 270205 Pre and Post Dev Pond 1 W ~ Period: 10 Year Tuesday, Jan 15 2008, 11:17 AM Hydraflow Hydrographs by Intelisolve ' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 ' Pre Development Area 1 Hydrograph type Storm frequency = SCS Runoff = 10 yrs Drainage area = 33.000 ac Basin Slope Tc method = 0.0 = TR55 Total precip. = 5.80 in Storm duration = 24 hrs 1 Tuesday, Jan 15 2008, 11:17 AM Peak discharge = 38.72 cfs Time interval = 1 min Curve number = 56 Hydraulic length = 0 ft Time of conc. (Tc) = 29.70 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 177,229 cult Q (cfs) 40.00 ,~ 30.00 20.00 10.00 0.00 Pre Development Area 1 Hyd. No. 1 -- 10 Yr 3 Hyd No. 1 5 8 10 13 15 18 20 23 Q (cfs) 40.00 30.00 20.00 10.00 ~-= 0.00 25 Time (hrs) 17 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 1 Description A B C Totals Sheet Flow Manning's n-value = 0.300 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 27.62 + 0.00 + 0.00 = 27.62 Shallow Concentrated Flow Flow length (ft) = 100.00 180.00 0.00 Watercourse slope (%) = 3.70 3.30 0.00 Surface description =Unpaved Unpaved Paved Average velocity (ft/s) = 3.10 2.93 0.00 Travel Time (min) = 0.54 + 1.02 + 0.00 = 1.56 Channel Flow X sectional flow area (sgft) = 4.00 0.00 0.00 Wetted perimeter (ft) = 6.00 0.00 0.00 Channel slope (%) = 13.50 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) = 16.05 0.00 0.00 Flow length (ft) = 520.0 0.0 0.0 Travel Time (min) = 0.54 + 0.00 + 0.00 = 0.54 Total Travel Time, Tc .............. ........................ ..................... ................... 29.70 min 1E Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:17 AM Hyd. No. 2 Post Development Area 1 Hydrograph type Storm frequency = SCS Runoff = 10 yrs Peak discharge Time interval = 178.85 cfs = 1 min Drainage area = 33.000 ac Curve number = 83 Basin Slope Tc method = 0.0 % = TR55 Hydraulic length Time of conc. (Tc) = 0 ft = 12.40 min Total precip. = 5.80 in Distribution =Type II Storm duration = 24 hrs Shape factor = 484 Hydrogra ph V°lume = 460,604 cult Post Development Area 1 Q (cfs) Hyd. No. 2 -- 10 Yr Q (cfs) 180.00 150.00 120.00 90.00 60.00 30.00 0 00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 2 Time (hrs) 19 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 5.20 0.00 0.00 Travel Time (min) = 8.60 + 0.00 + 0.00 = 8.60 Shallow Concentrated Flow Ftow length (ft) = 150.00 430.00 0.00 Watercourse slope (%) = 5.20 8.00 0.00 Surface description =Unpaved Paved Paved Average velocity (ft/s) = 3.68 5.75 0.00 Travel Time (min) = 0.68 + 1.25 + 0.00 = 1.93 Channel Flow X sectional flow area (sgft) = 9.62 0.00 0.00 Wetted perimeter (ft) = 10.99 0.00 0.00 Channel slope (%) = 0.50 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) = 7.41 0.00 0.00 Flow length (ft) = 850.0 0.0 0.0 Travel Time (min) = 1.91 + 0.00 + 0.00 = 1.91 Total Travel Time, Tc .............. ....................... ...................... ................... 12.40 min 20 21 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:17 AM Hyd. No. 3 ' Pond 1 Hydrograph type = Reservoir Peak discharge = 20.42 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 248.34 ft Reservoir name = Pond 1 Max. Storage = 309,686 cuft Storage Indication method used. Wet pond routing start elevation = 245.00 ft. Hydrograph Volume = 387,859 cuft i 1 ' Pond 1 Q (cfs) Hyd. No. 3 -- 10 Yr Q (cfs) 180 00 . 180.00 150 00 . 150.00 120 00 ' ~ . 120.00 I 90 00 . 90.00 00 60 . 60.00 I 30 00 . ;; 30.00 I I i i 0.00 -'- i 0.00 0 5 10 15 19 24 29 34 39 44 48 - --~ Hyd No. 3 Hyd No. 2 Time (hrs) 1 t 1 1 1 1 1 1 1 1 1 1 1 Pond Report Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:17 AM Pond No. 1 -Pond 1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 242.00 5,965 0 0 1.00 243.00 8,126 7,046 7,046 2.00 244.00 10,640 9,383 16,429 2.50 244.50 27,914 9,639 26,067 3.00 245.00 71,817 24,933 51,000 4.00 246.00 75,012 73,415 124,414 5.00 247.00 78,264 76,638 201,052 6.00 248.00 81,572 79,918 280,970 7.00 249.00 84,937 83,255 364,225 7.80 249.80 87,670 69,043 433,268 Culvert /Orifice Structures Weir Structures [Al [Bl [C] [Dl IAl IBl [C] [D] Rise (in) = 30.00 5.00 8.00 0.00 Crest Len (ft) = 12.56 75.00 0.00 0.00 Span (in) = 30.00 5.00 8.00 0.00 Crest EI. (ft) = 247.80 248.80 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert EI. (ft) = 242.00 245.00 246.00 0.00 Weir Type =Riser Ciplti --- --- Length (ft) = 96.00 0.00 0.00 0.00 Multi-Stage =Yes No No No Slope (%) = 5.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes Yes No Exfiltration = 0 .000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage (ft) Stage /Discharge stage (ft) s oo s.oo . 6 00 6.00 . 4 00 4.00 . 1 i ' ~ 2 00 2.00 i . 1 ~ i o oo . 0.00 0.00 30.00 60.00 90.00 120.00 150.00 180.00 210.00 240.00 270.00 300.00 330.00 Discharge (cfs) Total Q 22 ~Hydrograph Summary Report 23 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 55.86 1 732 242,632 ---- ------ ------ Pre Development Area 1 2 SCS Runoff 215.38 1 721 559,553 ---- ------ ------ Post Development Area 1 3 Reservoir 45.52 1 735 485,468 2 248.80 347,856 Pond 1 270205 Pre and Post Dev Pond 1 W ~~plwi Period: 25 Year Tuesday, Jan 15 2008, 11:17 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Drainage area = 33.000 ac Basin Slope = 0.0 Tc method = TR55 Total precip. = 6.70 in Storm duration = 24 hrs 1 1 Q cfs ( ) 60.00 Tuesday, Jan 15 2008, 11:17 AM Peak discharge = 55.86 cfs Time interval = 1 min Curve number = 56 Hydraulic length = 0 ft Time of conc. (Tc) = 29.70 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 242,632 cult Pre Development Area 1 Hyd. No. 1 -- 25 Yr 50.00 40.00 30.00 20.00 10.00 ~ o~ 1 1 3 Hyd No. 1 5 8 10 13 15 18 20 23 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 25 Time (hrs) 24 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 1 Description A B C Totals Sheet Flow Manning's n-value = 0.300 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 27.62 + 0.00 + 0.00 = 27.62 Shallow Concentrated Flow Flow length (ft) = 100.00 180.00 0.00 Watercourse slope (%) = 3.70 3.30 0.00 Surface description =Unpaved Unpaved Paved Average velocity (ft/s) = 3.10 2.93 0.00 Travel Time (min) = 0.54 + 1.02 + 0.00 = 1.56 Channel Flow X sectional flow area (sgft) = 4.00 0.00 0.00 Wetted perimeter (ft) = 6.00 0.00 0.00 Channel slope (%) = 13.50 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) = 16.05 0.00 0.00 Flow length (ft) = 520.0 0.0 0.0 Travel Time (min) = 0.54 + 0.00 + 0.00 = 0.54 Total Travel Time, Tc .............. ........................ ..................... ................... 29.70 min 25 ' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 1 Hydrograph type = SCS Runoff ' Storm frequency = 25 yrs Drainage area = 33.000 ac Basin Slope = 0.0 ' Tc method = TR55 Total precip. = 6.70 in Storm duration = 24 hrs f Q (c s) ' 240.00 ' 210.00 ' 180.00 150.00 ' 120.00 ' 90.00 60.00 ' 30.00 0 00 Tuesday, Jan 15 2008, 11:17 AM Peak discharge = 215..38 cfs Time interval = 1 min Curve number = 83 Hydraulic length = 0 ft Time of conc. (Tc) = 12.40 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 559,553 cuft Post Development Area 1 Hyd. No. 2 -- 25 Yr 0 2 5 7 Hyd No. 2 9 12 14 16 19 21 23 Q (cfs) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 =- 0.00 26 Time (hrs) 26 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 5.20 0.00 0.00 Travel Time (min) = 8.60 + 0.00 + 0.00 = 8.60 Shallow Concentrated Flow Flow length (ft) = 150.00 430.00 0.00 Watercourse slope (%) = 5.20 8.00 0.00 Surface description =Unpaved Paved Paved Average velocity (ft/s) = 3.68 5.75 0.00 Travel Time (min) = 0.68 + 1.25 + 0.00 = 1.93 Channel Flow X sectional flow area (sgft) = 9.62 0.00 0.00 Wetted perimeter (ft) = 10.99 0.00 0.00 Channel slope (%) = 0.50 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) = 7.41 0.00 0.00 Flow length (ft) = 850.0 0.0 0.0 Travel Time (min) = 1.91 + 0.00 + 0.00 = 1.91 Total Travel Time, Tc .............................................................................. 12.40 min 27 ' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Pond 1 Hydrograph type =Reservoir ' Storm frequency = 25 yrs Inflow hyd. No. = 2 Reservoir name =Pond 1 Pond 1 Hyd. No. 3 -- 25 Yr ~ Storage Indication method used. Wet pond routing start elevation = 245.00 ft. 1 f Q (c s) ' 240.00 ' 210.00 180.00 ' 150.00 ' 120.00 90.00 ' 60.00 30.00 0 00 Q (cfs) 240.00 Tuesday, Jan 15 2008, 11:17 AM Peak discharge = 45.52 cfs Time interval = 1 min Max. Elevation = 248.80 ft Max. Storage = 347,856 cuft Hydrograph Volume = 485,468 cuft 0 5 10 15 19 ---,-- - Hyd No. 3 Hyd No. 2 210.00 180.00 150.00 120.00 90.00 60.00 30.00 24 29 34 39 44 ---~ 0.00 48 Time (hrs) 28 Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 1 -Pond 1 Pond Data ' Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table ' Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (tuft) 0.00 242.00 5,965 0 0 1.00 243.00 8,126 7,046 7,046 2.00 244.00 10,640 9,383 16,429 ' 2.50 244.50 27,914 9,639 26,067 3.00 245.00 71,817 24,933 51,000 4.00 246.00 75,012 73,415 124,414 5.00 247.00 78,264 76,638 201,052 ' 6.00 248.00 81,572 79,918 280,970 7.00 249.00 84,937 83,255 364,225 7.80 249.80 87,670 69,043 433,268 Culvert /Orifice Structures Weir Structures Tuesday, Jan 15 2008, 11:17 AM IA] IB] [C] IDl IA] IBl [C] IDl Rise (in) = 30.00 5.00 8.00 0.00 Crest Len (ft) = 12.56 75.00 0.00 0.00 ' Span (in) = 30.00 5.00 8.00 0.00 Crest EI. (ft) = 247.80 248.80 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert EI. (ft) = 242.00 245.00 246.00 0.00 Weir Type =Riser Ciplti --- --- Length (ft) = 96.00 0.00 0.00 0.00 Multi-Stage =Yes No No No Slope (%) = 5.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 ' Multi-Stage = n/a Yes Yes No Exfiltration = 0 .000 in/hr (Contour) Tailwater Elev. = 0.00 ft ' Stage (ft 8.00 6.00 ' 4.00 2.00 Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage /Discharge Stage (ft) 8.00 6.00 4.00 2.00 0.00 y 0.00 30.00 60.00 90.00 120.00 150.00 Total Q __ 0.00 180.00 210.00 240.00 270.00 300.00 330.00 Discharge (cfs) 29 ~ ydrograph Summary Report 3C Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 91.83 1 732 380,352 ---- ------ ------ Pre Development Area 1 2 SCS Runoff 284.31 1 721 749,968 ---- ------ ------ Post Development Area 1 3 Reservoir 161.87 1 728 674,423 2 249.36 395,458 Pond 1 270205 Pre and Post Dev Pond 1 W Q~Iwn Period: 100 Year Tuesday, Jan 15 2008, 11:17 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:18 AM Hyd. No. 1 ' P D l t A 1 re eve opmen rea ' Hydrograph type Storm frequency = SCS Runoff = 100 yrs Peak discharge Time interval = 91.83 cfs = 1 min Drainage area = 33.000 ac Curve number = 56 i Basin Slope Tc method = 0.0 % = TR55 Hydraulic length Time of conc. (Tc) = 0 ft = 29.70 min Total precip. = 8.40 in Distribution =Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 380,352 cult Pre Development Area 1 Q (cfs) Hyd. No. 1 -- 100 Yr Q (cfs) ' 100.00 ' 90.00 80.00 70.00 ' 60.00 ' 50.00 ' 40.00 30.00 ' 20.00 10.00 0 00 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 3 5 8 10 13 15 18 20 23 25 Time (hrs) Hyd No. 1 31 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 1 Description A B C Totals Sheet Flow Manning's n-value = 0.300 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 27.62 + 0.00 + 0.00 = 27.62 Shallow Concentrated Flow Flow length (ft) = 100.00 180.00 0.00 Watercourse slope (%) = 3.70 3.30 0.00 Surface description =Unpaved Unpaved Paved Average velocity (ft/s) = 3.10 2.93 0.00 Travel Time (min) = 0.54 + 1.02 + 0.00 = 1.56 Channel Flow X sectional flow area (sgft) = 4.00 0.00 0.00 Wetted perimeter (ft) = 6.00 0.00 0.00 Channel slope (%) = 13.50 0.00 0.00 Manning's n-value = 0.026 0.015 0.015 Velocity (ft/s) = 16.05 0.00 0.00 Flow length (ft) = 520.0 0.0 0.0 Travel Time (min) = 0.54 + 0.00 + 0.00 = 0.54 Total Travel Time, Tc .............................................................................. 29.70 min 32 ' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 P t D l t A 1 eve os opmen rea Hydrograph type Storm frequency = SCS Runoff = 100 yrs Drainage area = 33.000 ac Basin Slope Tc method = 0.0 = TR55 Total precip. = 8.40 in Storm duration = 24 hrs Q (cfs) ~' ~~., ~~ Tuesday, Jan 15 2008, 11:18 AM Peak discharge = 284.31 cfs Time interval = 1 min Curve number = 83 Hydraulic length = 0 ft Time of conc. (Tc) = 12.40 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 749,968 cuft Post Development Area 1 Hyd. No. 2 -- 100 Yr ~ --- 0 2 5 7 Hyd No. 2 9 12 14 16 19 21 23 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 -1- 0.00 26 Time (hrs) 3' 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 1 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 5.20 0.00 0.00 Travel Time (min) = 8.60 + 0.00 + 0.00 = 8.60 Shallow Concentrated Flow Flow length (ft) = 150.00 430.00 0.00 Watercourse slope (%) = 5.20 8.00 0.00 Surface description =Unpaved Paved Paved Average velocity (ft/s) = 3.68 5.75 0.00 Travel Time (min) = 0.68 + 1.25 + 0.00 = 1.93 Channel Flow X sectional flow area (sgft) = 9.62 0.00 0.00 Wetted perimeter (ft) = 10.99 0.00 0.00 Channel slope (%) = 0.50 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) = 7.41 0.00 0.00 Flow length (ft) = 850.0 0.0 0.0 Travel Time (min) = 1.91 + 0.00 + 0.00 = 1.91 Total Travel Time, Tc .............................................................................. 12.40 min 34 3~ Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:18 AM Hyd. No. 3 Pond 1 ' Hydrograph type = Storm frequency = Reservoir 100 yrs Peak discharge Time interval = 161.87 cfs = 1 min Inflow hyd. No. = 2 Max. Elevation = 249.36 ft 1 Reservoir name = Pond 1 Max. Storage = 395,458 cuft Storage Indication method used. Wet pond routing start elevation = 245.00 ft. Hydrograph Volume = 674,423 cuft ' Pond 1 Q (cfs) Hyd. No. 3 -- 100 Yr Q (cfs) 320 00 . 320.00 i 280 00 ' . I 280.00 240 00 ( . ( 240.00 200 00 I ~ ~, ~ . i 200.00 160 00 ~ . I i 160.00 120 00 ---- 12 1 . I i 0.00 80 00 . i I 80.00 40 00 I i I . ~ 40.00 1 0.00 -' I ~ -- ~ 0.00 0 4 7 11 14 18 21 25 28 32 35 39 -°- Hyd No. 3 Hyd No. 2 Time (hrs) Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 1 -Pond 1 Pond Data 1 Pond storage is based on known contour areas. Average end area me thod used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (tuft) 0.00 242.00 5,965 0 0 1.00 243.00 8,126 7,046 7,046 2.00 244.00 10,640 9,383 16,429 ' 2.50 244.50 27,914 9,639 26,067 3.00 245.00 71,817 24,933 51,000 4.00 246.00 75,012 73,415 124,414 5.00 247.00 6.00 248.00 78,264 81,572 76,638 79,918 201,052 280,970 7.00 249.00 84,937 83,255 364,225 7.80 249.80 87,670 69,043 433,268 ' ' Culvert /Orifice Structures [Al LBl [Cl [Dl Rise (in) = 30.00 5.00 8.00 0.00 ' ' S an in P ( ) = 30.00 5.00 8.00 0.00 No. Barrels = 1 1 1 0 Invert EI. (ft) = 242.00 245.00 246.00 0.00 Length (ft) = 96.00 0.00 0.00 0.00 Slope (%) = 5.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes Yes No Tuesday, Jan 15 2008, 11:18 AM Weir Structures [A] [B] [Cj [D] Crest Len (ft) = 12.56 75.00 0.00 0.00 Crest EI. (ft) = 247.80 248.80 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type =Riser Ciplti --- --- Multi-Stage =Yes No No No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. stage (ft) Stage /Discharge stage (ft) 8 00 . i i s.oo ~ I 6 00 i j i ~ . 6.00 4 00 ~ i I ' 11 I ~ . ' ' 4.00 i 2 00 ~ ~ i . { , i j 2.00 ~ 0 00 ~~~ I ~ i I i I . 0.00 0.00 30.00 60.00 90.00 120.00 150.00 180.00 210.00 240.00 270.00 300.00 330.00 Discharge (cfs) Total Q 36 C O 1 U I ` I ~ C I O I U ~ O Q Z - N 1 ~~ to ~ ~- >, . ' '-' 4 r I ~ ~ v =• O I U ~ ' ca O ~ O II U Lf~ ~ r I ~ I ~ 1 t ~ _ • (~ 1 ~ 1 r 1 ~ ~ Ifs I ~ ~ 1 ~ C ~. 1 1 ~ i Q \w} 1 ° 1 U ~ J 1 ~ ~ ' ~ ' {1} 1 r- - 1 f ~ ~ I (y E ^^ LL I > 1 ~ a _ _ ~ ~ ~~ ~ ~ O.. ~. 1 1 .~ ~ ~ ~' ~} 1 e 1 ^ ~ O 0~ ~ 1 ~'` 1 . N G ~'~ 1 e O I.L ~ 1 1 ~ r. _ ~ N f- W ~j ~ _ O d ~ .~ ~ v ~ - 4 1 J a~J ~ .~ t~ ~ ~~ U - ti c ••Lti C I~ C y e °. Ir '. U C6 0o- L-. ~.1 a ~ t ~ U O a E 4 ~ V ¢I Q 1! ~ + j L +~J O E ~ , .41 `' ~ 2 3 o ~ •~ •~ !~ ~ p O r. ~ ,~ 4 , i~ r 4- ~ y r, cG ,o wf tli o its -p vs ~ I ~ I ~ 1 i I >+ 2 C O U i N C O O Q __ O z ~ _' ~ N ~ ~ U ~ ca O a~ N U In ~ r C (0 (B ~ O ~ ~ tri ~1 ~ .= '~ ~ ~ C'} ~ Q 4 _ ~ ~ '~ J ~ U 4 4 .p .~ •~, r ~ iU ~ ~ ~ _ 1 U k 'S O d } E n •r ~ ~ l5 C y--~ Cy ~ 1 ^ ~ ^ ~ t ~~ ~~~ ~4 W ~ LL 1 fl ~ C '!` 1 ~ 1 1 ~ ~ .C 1 1 ~, i ^ I ~ ~ r ~~ ~~ J ~~ ^' LL N O ti N U ~ O ti t. d 1 Y_ ;s 0 Q L L 2 ~ O Q Q O ~ n dG uti ~d {V ~ '~ rf} ~ '~ Table of Contents 270205 Pre and Post Dev Pond 2 WMC.gpw Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Hydrograph Return Period Recap ... 1 ................................................................... 1 -Year Summary Report ................................................................................................................. 2 Hydrograph Reports ........................................................................................................... 3 Hydrograph No. 1, SCS Runoff, Pre Development Area 2 ............................................... 3 ' TR-55 Tc Worksheet .................................................................................................... 4 Hydrograph No. 2, SCS Runoff, Post Development Area 2 ............................................. 5 TR-55 Tc Worksheet .................................................................................................... 6 Hydrograph No. 3, Reservoir, Pond 1 ............................................................................... 7 Pond Report ................................................................................................................. 8 ' 2 -Year Summary Report ................................................................................................................. 9 Hydrograph Reports ......................................................................................................... 10 Hydrograph No. 1, SCS Runoff, Pre Development Area 2 ............................................. 10 TR-55 Tc Worksheet .................................................................................................. 11 Hydrograph No. 2, SCS Runoff, Post Development Area 2 ........................................... 12 TR-55 Tc Worksheet .................................................................................................. 13 Hydrograph No. 3, Reservoir, Pond 1 ............................................................................. 14 Pond Report ............................................................................................................... 15 ' 10 -Year Summary Report ............................................................................................................... ' Hydrograph Reports ......................................................................................................... Hydrograph No. 1, SCS Runoff, Pre Development Area 2 ............................................. TR-55 Tc Worksheet .................................................................................................. Hydrograph No. 2, SCS Runoff, Post Development Area 2 ........................................... TR-55 Tc Worksheet .................................................................................................. Hydrograph No. 3, Reservoir, Pond 1 ............................................................................. Pond Report ............................................................................................................... 25 -Year Summary Report ............................................................................................................... Hydrograph Reports ......................................................................................................... Hydrograph No. 1, SCS Runoff, Pre Development Area 2 ............................................. TR-55 Tc Worksheet .................................................................................................. Hydrograph No. 2, SCS Runoff, Post Development Area 2 ........................................... TR-55 Tc Worksheet .................................................................................................. Hydrograph No. 3, Reservoir, Pond 1 ............................................................................, Pond Report ............................................................................................................... 16 17 17 18 19 20 21 22 23 24 24 25 26 27 28 29 100 -Year 1 Summary Report ............................................................................................................... 30 Hydrograph Reports ......................................................................................................... 31 Hydrograph No. 1, SCS Runoff, Pre Development Area 2 ............................................. 31 TR-55 Tc Worksheet .................................................................................................. 32 Hydrograph No. 2, SCS Runoff, Post Development Area 2 ........................................... 33 Contents 270205 Pre and Post Dev Pond 2 WMC.gpw TR-55 Tc Worksheet .................................................................................................. 34 Hydrograph No. 3, Reservoir, Pond 1 ............................................................................. 35 Pond Report ............................................................................................................... 36 i~ 1 ~I-lydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- 0.894 1.997 ------- ------- 9.823 14.16 ------- 23.22 Pre Development Area 2 2 SCS Runoff ------- 22.54 27.93 ------- ------- 50.96 60.85 ------- 79.44 Post Development Area 2 3 Reservoir 2 0.658 0.915 ------- ------- 1.625 3.896 ------- 25.07 Pond 1 i Proj. file: 270205 Pre and Post Dev Pond 2 WMC.gpw Tuesday, Jan 15 2008, 11:20 AM Hydraflow Hydrographs by Intelisolve ydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 0.894 1 735 7,876 ---- ------ ------ Pre Development Area 2 2 SCS Runoff 22.54 1 718 47,899 ---- ------ ------ Post Development Area 2 3 Reservoir 0.658 1 877 36,368 2 206.49 42,488 Pond 1 270205 Pre and Post Dev Pond 2 W ~s~a~m Period: 1 Year Tuesday, Jan 15 2008, 11:20 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot ' Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Hyd. No. 1 Pre Development Area 2 Hydrograph type Storm frequency = SCS Runoff = 1 yrs Peak discharge Time interval = 0.894 cfs = 1 min Drainage area = 7.700 ac Curve number = 56 Basin Slope Tc method = 0.0 % = TR55 Hydraulic length Time of conc. (Tc) = 0 ft = 26.30 min Total precip. = 3.20 in Distribution =Type II Storm duration = 24 hrs Shape factor = 484 Hydrog raph Volume = 7,876 tuft Pre Development Area 2 Q (cfs) Hyd. No. 1 -- 1 Yr Q (cfs) ' 1.00 ' 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 ' 0.10 0 00 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 150 300 450 600 750 900 1050 1200 1350 1500 Hyd No. 1 Time (min) 3 i TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 2 Description A B C Totals Sheet Flow Manning's n-value = 0.300 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 5.00 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 23.76 + 0.00 + 0.00 = 23.76 Shallow Concentrated Flow Flow length (ft) = 600.00 0.00 0.00 Watercourse slope (%) = 6.00 0.00 0.00 Surface description =Unpaved Unpaved Paved Average velocity (ft/s) = 3.95 0.00 0.00 Travel Time (min) = 2.53 + 0.00 + 0.00 = 2.53 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.000 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 26.30 min 4 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 2 Hydrograph type Storm frequency = SCS Runoff = 1 yrs Drainage area = 7.700 ac Basin Slope Tc method = 0.0 = TR55 Total precip. = 3.20 in Storm duration = 24 hrs Q (cfs) ' 24.00 20.00 16.00 12.00 ' 8.00 4.00 0 00 Tuesday, Jan 15 2008, 11:20 AM Peak discharge = 22.54 cfs Time interval = 1 min Curve number = 85 Hydraulic length = 0 ft Time of conc. (Tc) = 7.40 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 47,899 cuft Post Development Area 2 Hyd. No. 2 -- 1 Yr 0 2 5 7 Hyd No. 2 9 12 14 16 19 21 23 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 -!- 0.00 26 Time (hrs) V 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 75.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 6.00 0.00 0.00 Travel Time (min) = 4.66 + 0.00 + 0.00 = 4.66 Shallow Concentrated Flow Flow length (ft) = 100.00 0.00 0.00 Watercourse slope (%) = 2.00 0.00 0.00 Surface description =Paved Paved Paved Average velocity (ft/s) = 2.87 0.00 0.00 Travel Time (min) = 0.58 + 0.00 + 0.00 = 0.58 Channel Flow X sectional flow area (sgft) = 1.76 0.00 0.00 Wetted perimeter (ft) = 4.71 0.00 0.00 Channel slope (%) = 1.00 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) = 5.93 0.00 0.00 Flow length (ft) = 780.0 0.0 0.0 Travel Time (min) = 2.19 + 0.00 + 0.00 = 2.19 Total Travel Time, Tc .............. ....................... ...................... ................... 7.40 min L Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Hyd. No. 3 Pond 1 Hydrograph type = Reservoir Peak discharge = 0.658 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 206.49 ft Reservoir name = Pond 2 Max. Storage = 42,488 cuft Storage Indication method used. Wet pond routing start elevation = 205.00 ft. Hydrograph Volume = 36,368 cuft ' Pond 1 Q (cfs) Hyd. No. 3 -- 1 Yr Q (cfs) 24 00 24 ' . i i .00 ' 00 ' 20. 20.00 16 00 . 16.00 i I 12 00 ~ 1 ' . i I 2.00 00 ' ! 8. 8.00 i 4 00 4 . i .00 ' I 0.00 -'-~- ~ ~ C I 0.00 0 5 10 15 19 24 29 34 39 44 48 Time (hrs) ---aT~ Hyd No. 3 Hyd No. 2 1 1 1 1 1 1 1 1 1 1 1 1 Pond Report Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Pond No. 1 - Pond 2 Pond Data Pond storage i s based on known contour areas. Av erage end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour are a (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 202.00 725 0 0 1.00 203.00 1,428 1,077 1,077 2.00 204.00 2,267 1,848 2,924 2.50 204.50 7,559 2,457 5,381 3.00 205.00 18,546 6,526 11,907 4.00 206.00 20,940 19,743 31,650 5.00 207.00 23,048 21,994 53,644 6.00 208.00 25,300 24,174 77,818 7.00 209.00 27,660 26,480 104,298 8.00 210.00 30,170 28,915 133,213 Culvert /Orifice Structures Weir Structures IAl IBI [C] ID] IA] [Bl [Cl LD] Rise (in) = 24.00 2.50 6.00 0.00 Crest Len (ft) = 12.56 30.00 0.00 0.00 Span (in) = 24.00 2.50 6.00 0.00 Crest Et. (ft) = 208.50 209.00 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert EI. (ft) = 202.00 205.00 206.00 0.00 Weir Type =Riser Ciplti --- --- Length (ft) = 58.00 0.00 0.00 0.00 Multi-Stage =Yes No No No Slope (%) = 16.40 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes Yes No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions ' Stage (ft) 8.00 ' 6.00 4.00 Stage /Discharge 2.00 Stage (ft) 8.00 6.00 4.00 2.00 0.00 ~ I I f f ~ I 1 f i i ~ ~ ~ x.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00 130.00 140.00 Discharge (cfs) Total Q 8 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 1.997 1 733 12,779 ---- ------ ------ Pre Development Area 2 2 SCS Runoff 27.93 1 718 59,725 ---- ------ ------ Post Development Area 2 3 Reservoir 0.915 1 840 47,606 2 206.80 49,249 Pond 1 270205 Pre and Post Dev Pond 2 W ~~rrn Period: 2 Year Tuesday, Jan 15 2008, 11:20 AM Hydraflow Hydrographs by Intelisolve 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 7.700 ac Basin Slope = 0.0 Tc method = TR55 Total precip. = 3.70 in Storm duration = 24 hrs Tuesday, Jan 15 2008, 11:20 AM Peak discharge = 1.997 cfs Time interval = 1 min Curve number = 56 Hydraulic length = 0 ft Time of conc. (Tc) = 26.30 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 12,779 cult Q (cfs) 2.00 1.00 0.00 ' 0 3 Hyd No. 1 Pre Development Area 2 Hyd. No. 1 -- 2 Yr 5 8 10 13 15 18 20 23 Q (cfs) 2.00 1.00 ~-' 0.00 25 Time (hrs) 10 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 2 Description A B C Totals Sheet Flow Manning's n-value = 0.300 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 5.00 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 23.76 + 0.00 + 0.00 = 23.76 Shallow Concentrated Flow Flow length (ft) = 600.00 0.00 0.00 Watercourse slope (%) = 6.00 0.00 0.00 Surface description =Unpaved Unpaved Paved Average velocity (ft/s) = 3.95 0.00 0.00 Travel Time (min) = 2.53 + 0.00 + 0.00 = 2.53 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.000 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............. ............................................. ................... 26.30 min 11 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Hyd. No. 2 Post Development Area 2 Hydrograph type = SCS Runoff Peak discharge = 27.93 cfs ' Storm frequency = 2 yrs Time interval = 1 min Drainage area = 7.700 ac Curve number = 85 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 7.40 min Total precip. = 3.70 in Distribution =Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 59,725 cuft Post Development Area 2 Q (cfs) Hyd. No. 2 -- 2 Yr Q (cfs) ' ,?8.00 :?4.00 ' 20.00 16.00 12.00 8.00 4.00 0 00 28.00 24.00 20.00 16.00 12.00 8.00 4.00 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) ' Hyd No. 2 12 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 75.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 6.00 0.00 0.00 Travel Time (min) = 4.66 + 0.00 + 0.00 = 4.66 Shallow Concentrated Flow Flow length (ft) = 100.00 0.00 0.00 Watercourse slope (%) = 2.00 0.00 0.00 Surface description =Paved Paved Paved Average velocity (ft/s) = 2.87 0.00 0.00 Travel Time (min) = 0.58 + 0.00 + 0.00 = 0.58 Channel Flow X sectional flow area (sgft) = 1.76 0.00 0.00 Wetted perimeter (ft) = 4.71 0.00 0.00 Channel slope (%) = 1.00 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) = 5.93 0.00 0.00 Flow length (ft) = 780.0 0.0 0.0 13 Travel Time (min) = 2.19 + 0.00 + 0.00 = 2.19 Total Travel Time, Tc .............................................................................. 7.40 min ' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 d 1 P on Hydrograph type Storm frequency =Reservoir = 2 yrs Inflow hyd. No. = 2 Reservoir name =Pond 2 Tuesday, Jan 15 2008, 11:20 AM Peak discharge Time interval Max. Elevation Max. Storage = 0.915 cfs = 1 min = 206.80 ft = 49,249 tuft Storage Indication method used. Wet pond routing start elevation = 205.00 ft. '' Pond 1 Q (cfs) Hyd. No. 3 -- 2 Yr a Hydrograph Volume = 47,606 tuft 28.00 24.00 I i 20.00 i 16.00 ~ 12.00 - 'i 8.00 I ~ i i ~ I j 4.00 ~ ~ ~ I Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 t n nn -i ~ 0.00 0 5 10 15 19 24 -- Hyd No. 3 Hyd No. 2 29 34 39 44 48 Time (hrs) 14 1 1 1 1 1 1 1 1 1 1 1 1 Pond Report Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Pond No. 1 -Pond 2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 202.00 725 0 0 1.00 203.00 1,428 1,077 1,077 2.00 204.00 2,267 1,848 2,924 2.50 204.50 7,559 2,457 5,381 3.00 205.00 18,546 6,526 11,907 4.00 206.00 20,940 19,743 31,650 5.00 207.00 23,048 21,994 53,644 6.00 208.00 25,300 24,174 77,818 7.00 209.00 27,660 26,480 104,298 8.00 210.00 30,170 28,915 133,213 Culvert /Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 24.00 2.50 6.00 0.00 Crest Len (ft) = 12.56 30.00 0.00 0.00 Span (in) = 24.00 2.50 6.00 0.00 Crest EI. (ft) = 208.50 209.00 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert EI. (ft) = 202.00 205.00 206.00 0.00 Weir Type =Riser Ciplti --- --- Length (ft) = 58.00 0.00 0.00 0.00 Multi-Stage =Yes No No No Slope (%) = 16.40 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes Yes No Exfiltration = 0 .000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions Stage (ft) Stage /Discharge i 8.00 6.00 4.00 I i i 2.00 j i iI f 1 Stage (ft) 8.00 6.00 4.00 2.00 0.00 0.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00 130.00 140.00 Discharge (cfs) Total Q 15 ~-lydrograph Summary Report 16 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 9.823 1 731 41,677 ---- ------ ------ Pre Development Area 2 2 SCS Runoff 50.96 1 718 112,120 ---- ------ ------ Post Development Area 2 3 Reservoir 1.625 1 835 96,987 2 208.24 84,273 Pond 1 270205 Pre and Post Dev Pond 2 W ~~,~aw~ Period: 10 Year Tuesday, Jan 15 2008, 11:20 AM Hydraflow Hydrographs by Intelisolve ' Hydrograph Plot '' Hydraflow Hydrographs by Intelisolve Hyd. No. 1 l t P D A 2 eve opmen re rea Hydrograph type Storm frequency = SCS Runoff = 10 yrs Drainage area = 7.700 ac Basin Slope = 0.0 Tc method = TR55 Total precip. = 5.80 in Storm duration = 24 hrs Q (cfs) 10.00 8.00 6 00 . 4.00 2.00 0 00 Tuesday, Jan 15 2008, 11:20 AM Peak discharge = 9.823 cfs Time interval = 1 min Curve number = 56 Hydraulic length = 0 ft Time of conc. (Tc) = 26.30 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 41,677 cuft Pre Development Area 2 Hyd. No. 1 -- 10 Yr 0 3 Hyd No. 1 Q (cfs) 10.00 8.00 6.00 4.00 2.00 5 8 10 13 15 18 20 23 ~--~ 0.00 25 Time (hrs) 17 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 2 Description A B C Totals Sheet Flow Manning's n-value = 0.300 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 5.00 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 23.76 + 0.00 + 0.00 = 23.76 Shallow Concentrated Flow Flow length (ft) = 600.00 0.00 0.00 Watercourse slope (%) = 6.00 0.00 0.00 Surface description =Unpaved Unpaved Paved Average velocity (ft/s) = 3.95 0.00 0.00 Travel Time (min) = 2.53 + 0.00 + 0.00 = 2.53 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.000 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............. ............................................. ................... 26.30 min 1E Hydrograph Plot ' Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Hyd. No. 2 Post Development Area 2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Peak discharge Time interval = 50.96 cfs = 1 min Drainage area = 7.700 ac Curve number = 85 Basin Slope = 0.0 % Tc method = TR55 Hydraulic length Time of conc. (Tc) = 0 ft = 7.40 min Total precip. = 5.80 in Distribution =Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 1 50.00 40.00 30.00 - 20.00 10.00 - 0 00 - Post Development Area 2 Hyd. No. 2 -- 10 Yr Hydrograph Volume = 112,120 cult 0.0 2.2 4.3 6.5 8.7 10.8 13.0 15.2 17.3 19.5 Hyd No. 2 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 ~ 0.00 21.7 Time (hrs) 19 1 1 1 1 1 t 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 75.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 6.00 0.00 0.00 Travel Time (min) = 4.66 + 0.00 + 0.00 = 4.66 Shallow Concentrated Flow Flow length (ft) = 100.00 0.00 0.00 Watercourse slope (%) = 2.00 0.00 0.00 Surface description =Paved Paved Paved Average velocity (ft/s) = 2.87 0.00 0.00 Travel Time (min) = 0.58 + 0.00 + 0.00 = 0.58 Channel Flow X sectional flow area (sgft) = 1.76 0.00 0.00 Wetted perimeter (ft) = 4.71 0.00 0.00 Channel slope (%) = 1.00 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) = 5.93 0.00 0.00 Flow length (ft) = 780.0 0.0 0.0 Travel Time (min) = 2.19 + 0.00 + 0.00 = 2.19 Total Travel Time, Tc .............................................................................. 7.40 min 20 ' 21 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesda Jan 15 2008 11:20 AM y, , Hyd. No. 3 ' P d 1 on Hydrograph type =Reservoir Peak discharge = 1.625 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 208.24 ft Reservoir name =Pond 2 Max. Storage = 84,273 cuft Storage Indication method used. Wet pond routing start elevation = 205.00 ft. Hydrograph Volume = 96,987 cuft i Pond 1 0 (cfs) Hyd. No. 3 -- 10 Yr Q (cfs) 60.00 ~- 60.00 50.00 50.00 i 40.00 I 40.00 1 30.00 i 30.00 i 20.00 20.00 10.00 i 10.00 I 0.00 -~ 0.00 0 5 10 15 19 24 29 34 39 44 48 ' Time (hrs) -~- Hyd No. 3 Hyd No. 2 Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 1 -Pond 2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (tuft) 0.00 202.00 725 0 0 1.00 203.00 1,428 1,077 1,077 2.00 204.00 2,267 1,848 2,924 2.50 204.50 7,559 2,457 5,381 3.00 205.00 18,546 6,526 11,907 4.00 206.00 20,940 19,743 31,650 5.00 207.00 6.00 208.00 23,048 25,300 21,994 24,174 53,644 77,818 7.00 209.00 27,660 26,480 104,298 8.00 210.00 30,170 28,915 133,213 Tuesday, Jan 15 2008, 11:20 AM Culvert /Orifice Structures Weir Structures IA] IB] [Cl IDl IAl IBl [C] ID] Rise (in) = 24.00 2.50 6.00 0.00 Crest Len (ft) = 12.56 30.00 0.00 0.00 Span (in) = 24.00 2.50 6.00 0.00 Crest EI. (ft) = 208.50 209.00 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert EI. (ft) = 202.00 205.00 206.00 0.00 Weir Type =Riser Ciplti --- --- Length (ft) = 58.00 0.00 0.00 0.00 Multi-Stage =Yes No No No Slope (%) = 16.40 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes Yes No Exfiltration = 0 .000 in/hr (Contour) Tailwater Elev. = 0.00 ft i Stage (ft) 8.00 6.00 4.00 2.00 Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifce conditions Stage /Discharge Stage (ft) 8.00 6.00 4.00 2.00 0.00 f 1 i i 1 1 I 1 I I I 1 0.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00 130.00 140.00 Discharge (cfs) Total Q 22 ydrograph Summary Report 23 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 14.16 1 730 57,056 ---- ------ ------ Pre Development Area 2 2 SCS Runoff 60.85 1 718 135,342 ---- ------ ------ Post Development Area 2 3 Reservoir 3.896 1 760 119,434 2 208.63 94,587 Pond 1 270205 Pre and Post Dev Pond 2 W ~,~rrn Period: 25 Year Tuesday, Jan 15 2008, 11:20 AM Hydraflow Hydrographs by Intelisolve ' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 2 Hydrograph type Storm frequency = SCS Runoff = 25 yrs Drainage area = 7.700 ac Basin Slope Tc method = 0.0 = TR55 Total precip. = 6.70 in Storm duration = 24 hrs 1 Tuesday, Jan 15 2008, 11:20 AM Peak discharge = 14.16 cfs Time interval = 1 min Curve number = 56 Hydraulic length = 0 ft Time of conc. (Tc) = 26.30 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 57,056 cuft Q (cfs) 15.00 12.00 l ,~ 9.00 6.00 I ' 3.00 0 00 Pre Development Area 2 Hyd. No. 1 -- 25 Yr 0 3 Hyd No. 1 5 8 10 13 15 18 20 23 Q (cfs) 15.00 12.00 9.00 6.00 3.00 ~-1- 0.00 25 Time (hrs) 24 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 2 Description A B C Totals Sheet Flow Manning's n-value = 0.300 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 5.00 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 23.76 + 0.00 + 0.00 = 23.76 Shallow Concentrated Flow Flow length (ft) = 600.00 0.00 0.00 Watercourse slope (%) = 6.00 0.00 0.00 Surface description =Unpaved Unpaved Paved Average velocity (ft/s) = 3.95 0.00 0.00 Travel Time (min) = 2.53 + 0.00 + 0.00 = 2.53 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.000 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 26.30 min 25 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Hyd. No. 2 i Post Development Area 2 Hydrograph type Storm frequency = SCS Runoff = 25 yrs Peak discharge Time interval = 60.85 cfs = 1 min Drainage area = 7.700 ac Curve number = 85 Basin Slope Tc method = 0.0 % = TR55 Hydraulic length Time of conc. (Tc) = 0 ft = 7.40 min Total precip. = 6.70 in Distribution =Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 135,342 tuft Post Development Area 2 Q (cfs) Hyd. No. 2 -- 25 Yr Q (cfs) 70.00 1 60.00 50.00 40.00 30.00 20.00 ' 10.00 0 00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) Hyd No. 2 26 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 75.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 6.00 0.00 0.00 Travel Time (min) = 4.66 + 0.00 + 0.00 = 4.66 Shallow Concentrated Flow Flow length (ft) = 100.00 0.00 0.00 Watercourse slope (%) = 2.00 0.00 0.00 Surface description =Paved Paved Paved Average velocity (ft/s) = 2.87 0.00 0.00 Travel Time (min) = 0.58 + 0.00 + 0.00 = 0.58 Channel Flow X sectional flow area (sgft) = 1.76 0.00 0.00 Wetted perimeter (ft) = 4.71 0.00 0.00 Channel slope (%) = 1.00 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) = 5.93 0.00 0.00 Flow length (ft) = 780.0 0.0 0.0 Travel Time (min) = 2.19 + 0.00 + 0.00 = 2.19 Total Travel Time, Tc .............................................................................. 7.40 min 27 28 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Hyd. No. 3 Pond 1 Hydrograph type = Storm frequency = Reservoir 25 yrs Peak discharge Time interval = 3.896 cfs = 1 min Inflow hyd. No. = 2 Max. Elevation = 208.63 ft ' Reservoir name = Pond 2 Max. Storage = 94,587 cuft Storage Indication method used. Wet pond routing start elevation = 205.00 ft. Hydrograph Volume = 119,434 cuft Pond 1 Q (cfs) Hyd. No. 3 -- 25 Yr Q (cfs) 70 00 - - . 70.00 ' 60 00 . i , 60.00 00 50 . I 50.00 ( 40 00 . ~ ~ 40.00 I 30 00 - ~ . 30.00 ~ ~ 20 00 ' . 20.00 10 00 i ' . 10.00 00 -~ ~ 0 I ~ . 0.00 0 5 10 15 19 24 29 34 39 44 48 ' _ -~ Hyd No. 3 Hyd No. 2 Time (hrs) Pond Report ' Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Pond No. 1 -Pond 2 Pond Data ' Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table ' Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 202.00 725 0 0 1.00 203.00 1,428 1,077 1,077 2.00 204.00 2,267 1,848 2,924 ' 2.50 204.50 7,559 2,457 5,381 3.00 205.00 18,546 6,526 11,907 4.00 206.00 20,940 19,743 31,650 5.00 207.00 23,048 21,994 53,644 6.00 208.00 25,300 24,174 77,818 ' 7.00 209.00 27,660 26,480 104,298 8.00 210.00 30,170 28,915 133,213 ' Culvert /Orifice Structures Weir Structures IAl IBl ICl [Dl IAI IBl [Cl IDl Rise (in) = 24.00 2.50 6.00 0.00 Crest Len (ft) = 12.56 30.00 0.00 0.00 1 Span (in) = 24.00 2.50 6.00 0.00 Crest EI. (ft) = 208.50 209.00 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert EI. (ft) = 202.00 205.00 206.00 0.00 Weir Type =Riser Ciplti --- --- Length (ft) = 58.00 0.00 0.00 0.00 Multi-Stage =Yes No No No Slope (%) = 16.40 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes Yes No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft ' Stage (ft) 8.00 ' 6 00 . 4 00 . 2.00 o 00 Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions Stage /Discharge Stage (ft) 8.00 6.00 4.00 2.00 0 00 2~ 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00 130.00 140.00 Total Q Discharge (cfs) ~ ydrograph Summary Report 30 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Runoff 23.22 1 730 89,442 ---- ------ ------ Pre Development Area 2 2 SCS Runoff 79.44 1 718 179,858 ---- ------ ------ Post Development Area 2 3 Reservoir 25.07 1 726 163,403 2 209.11 107,336 Pond 1 270205 Pre and Post Dev Pond 2 W ~l~lwt Period: 100 Year Tuesday, Jan 15 2008, 11:20 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot ' Hydraflow Hydrographs by Intelisolve Tuesday, Jan 15 2008, 11:20 AM Hyd. No. 1 ' Pre Development Area 2 Hydrograph type = SCS Runoff Peak discharge = 23.22 cfs ' Storm frequency = 100 yrs Time interval = 1 min Drainage area = 7.700 ac Curve number = 56 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 26.30 min Total precip. = 8.40 in Distribution =Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 89,442 cuft ' cfs Q( ) ' 24.00 ' 20.00 16.00 ' 12.00 ' 8.00 4.00 0 00 Pre Development Area 2 Hyd. No. 1 -- 100 Yr Q (cfs) 24.00 ' 0 3 ' Hyd No. 1 20.00 16.00 12.00 8.00 4.00 0.00 5 8 10 13 15 18 20 23 25 Time (hrs) 31 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre Development Area 2 Description A B C Totals Sheet Flow Manning's n-value = 0.300 0.011 0.011 Flow length (ft) = 200.0 0.0 0.0 Two-year 24-hr precip. (in) = 5.00 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 23.76 + 0.00 + 0.00 = 23.76 Shallow Concentrated Flow Flow length (ft) = 600.00 0.00 0.00 Watercourse slope (%) = 6.00 0.00 0.00 Surface description =Unpaved Unpaved Paved Average velocity (ft/s) = 3.95 0.00 0.00 Travel Time (min) = 2.53 + 0.00 + 0.00 = 2.53 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.000 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 32 Total Travel Time, Tc .............................................................................. 26.30 min Hydrograph Plot ' Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 2 Hydrograph type = SCS Runoff ' Storm frequency = 100 yrs Drainage area = 7.700 ac Basin Slope = 0.0 ' Tc method = TR55 Total precip. = 8.40 in Storm duration = 24 hrs Q (cfs) ' 80.00 ' 70.00 ' 60.00 50.00 40.00 ' 30.00 ' 20.00 ' 10.00 0 00 Tuesday, Jan 15 2008, 11:20 AM Peak discharge = 79.44 cfs Time interval = 1 min Curve number = 85 Hydraulic length = 0 ft Time of conc. (Tc) = 7.40 min Distribution =Type II Shape factor = 484 Hydrograph Volume = 179,858 cult Post Development Area 2 Hyd. No. 2 -- 100 Yr 0.0 2.0 4.0 6.0 ' Hyd No. 2 8.0 10.0 12.0 14.0 16.0 18.0 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 -"--` 0.00 20.0 22.0 Time (hrs) 33 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post Development Area 2 Description A B C Totals Sheet Flow Manning's n-value = 0.150 0.011 0.011 Flow length (ft) = 75.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.70 0.00 0.00 Land slope (%) = 6.00 0.00 0.00 Travel Time (min) = 4.66 + 0.00 + 0.00 = 4.66 Shallow Concentrated Fiow Flow length (ft) = 100.00 0.00 0.00 Watercourse slope (%) = 2.00 0.00 0.00 Surface description =Paved Paved Paved Average velocity (ft/s) = 2.87 0.00 0.00 Travel Time (min) = 0.58 + 0.00 + 0.00 = 0.58 Channel Flow X sectional flow area (sgft) = 1.76 0.00 0.00 Wetted perimeter (ft) = 4.71 0.00 0.00 Channel slope (%) = 1.00 0.00 0.00 Manning's n-value = 0.013 0.015 0.015 Velocity (ft/s) = 5.93 0.00 0.00 Flow length (ft) = 780.0 0.0 0.0 Travel Time (min) = 2.19 + 0.00 + 0.00 = 2.19 Total Travel Time, Tc .............................................................................. 7.40 min 34 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 ' Pond 1 Hydrograph type =Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 2 Reservoir name =Pond 2 Storage Indication method used. Wet pond routing start elevation = 205.00 ft. Q (cfs) ' 80.00 70.00 60.00 i I ' 50.00 40.00 i ' 30.00 - ~- ~- ~ ~ 20.00 ~ I ~ i ' 10.00 I I I i Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 -~' ~ 0 00 0 4 7 Hyd No. 3 Pond 1 Hyd. No. 3 -- 100 Yr = 25.07 cfs = 1 min = 209.11 ft = 107,336 cuft Hydrograph Volume = 163,403 cult 11 15 Hyd No. 2 18 22 Tuesday, Jan 15 2008, 11:20 AM Peak discharge Time interval Max. Elevation Max. Storage 26 29 33 37 Time (hrs) 3~ ' Pond Re ort p Hydraflow Hydrographs by Intelisolve Pond No. 1 -Pond 2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage /Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 202.00 725 0 0 1.00 203.00 1,428 1,077 1,077 2.00 204.00 2,267 1,848 2,924 2.50 204.50 7,559 2,457 5,381 3.00 205.00 18,546 6,526 11,907 4.00 206.00 20,940 19,743 31,650 5.00 207.00 6.00 208.00 23,048 25,300 21,994 24,174 53,644 77,818 7.00 209.00 27,660 26,480 104,298 8.00 210.00 30,170 28,915 133,213 Culvert /Orifice Structures [A] [B] [C] [D] Rise (in) = 24.00 2.50 6.00 0.00 Span (in) = 24.00 2.50 6.00 0.00 No. Barrels = 1 1 1 0 Invert EI. (ft) = 202.00 205.00 206.00 0.00 ' Length (ft) = 58.00 0.00 0.00 0.00 Slope (%) = 16.40 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes Yes No ' Stage (ft) 8.00 6.00 ' 4.00 2.00 i~ Tuesday, Jan 15 2008, 11:20 AM Weir Structures LAl IB] [C] [Dl Crest Len (ft) = 12.56 30.00 0.00 0.00 Crest EI. (ft) = 208.50 209.00 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type =Riser Ciplti --- --- Multi-Stage =Yes No No No Exfiltration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage /Discharge Stage (ft) 8.00 6.00 4.00 2.00 0.00 0.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 110.00 120.00 130.00 140.00 Discharge (cfs) Total Q 36 C _ O • U N C O U O cc G Q O Z ~ N U ~ m O a> N U ~ In ~ C (Q (6 N ~""' 1 G c G Q {.j ~ . G {•~ U G G q _ {G-' s N ~ c~ ' r~ c _ ` d a y ~ ~ ` ~ > ~•? ~ N r~ ~ `• ~ O 1 ~ `; a ~' 1 tl5 C I y 1 ^i 1 I M J I ~Ir ^1 ~' {.p L L N O ti N U N O ti d w c C '~ a r G ~ .: 4} . ~ G Q ¢ a > ~ ~W ~ O ~ L G ~ S•7 ,G O G •~ G G (~ 1 ~• G G •~ G a >_ d0 •G +!~ C•J G ~ ~•} ~ 1 ~ 1 ~ I ~ 1 ~ 1 ~ ~' 2 1 1 1 1 1 1 1 1 1 1 1 1 1 JOB NAME JOB NUMBER PAGE NO. WAL-MART SUPERCENTER #~ 5743-00 270205 JOB DESCRIPTION BY DATE PRE-DEVELOPMENT AREAS ,1.18 01/02/08 ._ SCIL4TYPE: 'HYDROLOGIC CaROUP B~ "' i ,_.. ~ , : ~A_ _ ~ ~. PRE=DES'. "DLRAIN~AGE~'ARE~"NO: 1~~_ .. .? _ _. ~_ , _ ~ . ~~. '. rTYPEyOF COVER` _,... .: .: _. _ _ . ~.. ~ .~~. .. __ _._- ..._ .._ ACREAGE ' ,_ `"'CN VALUE ., ,_ w.._ ~ _ '-. _..._ .. . ,: _ a ~- ~ WOODED ~~ __._ - -;a _ ~_ -~1470"A~ ~ -~ ~55 -~_ ~ - BRUSH'~ 50°ro-75%~GROUN~-COVER: ° 1830~AC ~ 56 4 ~ ~00-~4C-- ±---5~-- - _... ~ _ _~ ~ I. 1 [ f _~ f E f I PRE-Dev:_D~RAINAGE-AREA NO: 2- ~ ~. ~~ _.. _, t _.. ~ ~ ~ j ,~ -- ~ I- -RE-Of-G~~l'E~-- ----i- C-REy4~G ~/-A~ --~~-- _ L~- _ _ ; . -Wao~E~ - ~ ~ 1.00-AC- 55 BRUSH-(50°1°-75% GROUN covER-) 6 70 AC ± _ 56 _ __ i AVERAGE ~ - ~ I E _ ~; 7:~O...AC t ~ 56 i ' i i ` I I i ~ ..... .. .... I x ,L. j ~ t_ _ _ : i .. ~ t tt . i ~. ( ~ k ~ : k ' - --'-- I -. I ~ ~ ~ ! i i - ~ i. F ~ ~ ~ ~ ~~ w i i.. .. ... - +. i I ~. ~ .. ~. E f _-_ ____J_~-_ ~ .r -----t-- - .I. • ._ i... E ,. __ ! . E f }. f} ..-. i r I I i j .j.. `1 ~ ! t ~ f I ~ ,_ 1 t f .-. a. x.. ~ I GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / 864.297.3027 1 1 1 1 1 1 1 1 1 1 1 c E C N I IN JOB NAME JOB NUMBER PAGE NO. WAL-MART SUPERCENTER # 5743-00 270205 JOB DESCRIPTION BY DATE POST-DEVELOPMENT AREAS JJB 01/02/08 TYPE OF COVER` ACREAGE- CN VALUE: IMP~ERVIOUS~~- 2000 AC~ ~ 98~ OPEN SPACE"(GOOD"CONDITION;" ` H:6O AC k `6~ AVERAGE- 33:00: AC q g3 -DRAINAGE-AREA NO'. 2 TYPE OF-CODER- - ACREAGE- ~ CN VALUE IMPERVIOUS; 5:00 AG t 98 OPEN SPACE (GOOD CONDITION 2-.70 AC 61 GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / 864.297.3027 1 1 1 t 1 1 1 1 1 1 1 1 1 1 POND VOLUME CALCULATIONS 270205 WAL-MART SUPERCENTER #5743-00 Tntal I~rainainP ArPx 33~n Ac_ STORMWATER WETLAND POND 1 ELEVATION (FT.) SURFACE AREA S.F. DEPTM (FT.) VOLUME (C.F.) CUM. VOL. (C.F.) AREA: (AC.) 242 5,965 0.137 1 7,046 7,046 243 8,126 0.187 1 9,383 16,429 244 10,640 0.244 0.5 9,639 26,067 244.5 27,914 0.641 0.5 24 933 51 000 245 71,817 1.649 1 73,415 73,415 246 75,012 1.722 1 76,638 150,053 247 78,264 1.797 1 79,918 229,971 248 81,572 1.873 1 83,255 313,225 249 84,937 1.950 0.8 69,043 382,268 249.8 87,670 2.013 Total Pond Wet Storage 51,000 CF Total Pond Dry Storage 382,268 CF Total Pond Storage 433,268 CF JJB 270205 WMC POND VOLUMES WMC.XLS 1 /15/2008 1 1 1 1 1 f 1 1 1 1 1 i 1 i 1 1 1 1 POND VOLUME CALCULATIONS 270205 WAL-MART SUPERCENTER #5743-00 Total Drainaioe Area: 7.70 Ac. STORMWATER WETLAND POND 2 ELEVATION (FT.) SURFACE AREA S.F. DEPTH (FT.) VOLUME (GF.) CUM; VOL. (C.F.) AREA (AC.) 202 725 0.017 1 1,077 1,077 203 1,428 0.033 1 1,848 2,924 204 2,267 0.052 0.5 2,457 5,381 204.5 7,559 0.174 0.5 6 526 11,907 205 18, 546 0.426 1 19,743 19,743 206 20,940 0.481 1 21,994 41,737 207 23,048 0.529 1 24,174 65,911 208 25,300 0.581 1 26,480 92,391 209 27,660 0.635 1 28,915 121,306 210 30,170 0.693 Total Pond Wet Storage 11,907 CF Total Pond Dry Storage 121,306 CF Total Pond Storage 133,213 CF JJB 270205 WMC POND VOLUMES WMC.XLS 1 /15/2008 r The following rainfall amounts (P) are specific to Johnston County (courtesy of the NRCS Smithfield Office): Storm Event --~2 yr, 24 hr 5 yr, 24 hr -~l 10 yr, 24 hr --1125 yr, 24 hr 50 yr, 24 hr X100 yr, 24 hr Rainfall (inc hes) 3.2g 3.7 4.9 5.8 6.7 7.5 8.4 ~_ 3.1.03 Additional Peak Runoff Calculation Notes Additional methods for computing peak runoff may be acceptable for very large drainage areas (400+ acres). Please consult the Stormwater Administrator prior to submitting a Stormwater Management Plan for more information on available methods. Please note the same method must be used to calculate both predevelopment and postdevelopment peak runoff rates for offsite and attenuation comparisons. However, it is acceptable to utilize different peak runoff calculation methods throughout a site when not compared directly. For example, the rational method may be used to determine culvert and channel sizes, while the SCS method is used for the Offsite Stormwater Impact Analysis. 3.2 Attenuation To reduce stream degradation and to minimize increases in flooding, runoff from all new development must provide attenuation of stormwater runoff in accordance with the Stormwater Management Ordinance. Attenuation must be provided to limit the post-development peak runoff rate to that of the predevelopment peak runoff rata, for the 1-year; 24-hour storm event. Exemption from the stormwater attenuation requirements is provided to new developments that meet one of the following criteria: a) The increase in peak flow between the pre-and post-development conditions does not exceed 10%, or b) The new development meets all of the following criteria: 1. The total impervious area on site is less than 15°% outside of the ESA and less than 12% inside the ESA; and 2. The remaining pervious portions of the site are utilized to the maximum extent practical to convey and control the stormwater runoff in a manner that minimizes concentrated flow and does not create adverse impacts offsite. When attenuation is required, the following guidelines should be followed: Stormwater runoff from impervious surfaces should be directed into stormwater attenuation devices to the greatest extent possible. In particular, runoff from roadways, parking lots and driveways has the highest priority to receive detention; runoff from roofs/buildings and other "detached" impervious surfaces are of a lower priority. However, if significant portions of impervious area are not detained, including detached areas, a more detailed attenuation analysis may be required. See the Offsite Stormwater Impacts Analyses section for more details. 20 Draft Revised V07 APPENDIX C CONSTRUCTED STORMWA TER WETLANDS CALCULATIONS NCDENR DWQ SW401 WETLAND FORM ENERGY DISSIPATER RIP RAP DESIGN STORM DRAIN DESIGN STORM DRAINAREA MAP PRECIPITATION CALCULATIONS BUOYANCY CALCULATIONS ANTI SEEP COLLAR DESIGN ii i 1 1 t JOB NAME JOB NUMBER PAGE NO. ~'.,~ ~ _. JOB DESCRIPTION BY DATE ~ ,,, ~ ~, .~ ~,.. ,. _ ~ ~ 4 -~. ' - - i , . ' ~ _ h ~_. _ _ - I ~r .. .. i ~ ~ ~ ..~ ' G 1. n "~ tir tl ~.: r ~l ~` ~. e ,~ m, ._ ., «,, . ..~ - 2 ~ ~~ ~ ~ ~ ~a ~ ~ ~^ R c~ 1 ~ ~.~, _ , ._ .... . _ ~- _.._ .._ _ .. //'-gg ~~(( ~- i ~ V !lam ~~fi~" ~~ `t' ~' ,^ .• ,.. ~.~ ,~ //~ Z!''~/,~~1 ~~{{, ~ / ~(. SAS .. ~ .. ,- _ _ ____ ~ r ~ ~~ n ~ s ~'~ _ ~~~ r ` ~ s. _ ~~ f i << ._ _ j .E `. ./ ~ ~ ~ L^ % .. ... ... . _ , ~ t ~. __ __ .~ __ ~ _ _ .: r rl k r g .-- f.-. ,t ~ ~ f C ` m , 3 } t »:, r. fI" ~,~ 'J'am (! '(7~.. ^~k9 ~ f '~ f C~ V ~~ ~.~ . ~ 7 ~ ~,c-_.Tv~~r ~ ,.-f- s, ~_~ ~ ._a.,~.. , ,. _,.Y . ~ __ _ _ ~ _ a ~ ., ~ ~. ~J . . „„,_ _ _. .; _,...,.,..,a b.,.,. n. -o, .,. .. -e., w ,. ,~.rw &°. ,.x,.~.s.. .. .~..„...v ,., .. „~ ., _u~ ~, j d ~ ...~.~..d,.,:_. ~,,,.G j.~. ~. GwK_.~, _ .. . i - t GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 i~ JOB NAME MBER J O B NU PAGE NO. ((( / / 7 L C ~ ~.. ~j~ .r JOB DESCRIPTION BY DATE ~.. r E'~~~ pl (, GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 JOB NAME JOB NUMBER PAGE NO. Z7~Z~ JOB DESCRIPTION BY ,per DATTE GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 JOB NAME JOB NUMBER PAGE NO. ~~~~ JO/B~D~ESCRIPTION BY DATE GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 1 ~~ .rw~~ NC©ENR ii Permit Number (to be provided by DWQJ O~O~ W ,O.T ~9QG ~ ~ o -~c STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part lll) must be printed, filled out and submitted along with all the required information. PROJECT INFORMATION ' Project name East Park Plaza Contact name Eric Cornett Phone number 304-255-2240 Date January 15, 2008 Drainage area number Wetland Pond No. 1 II. DESIGN INFORMATION Site Characteristics Drainage area 1,437,480 ftz Impervious area 871,200 ft2 ' Percent impervious 60.6% Delsign rainfall depth 1.0 inch Peak Flow Calculations ' Does this project require pre/post control of the 1-yr 24-hr peak Y (Y or N) flow? 1-yr, 24-hr runoff depth 3.2 in 1-yr, 24-hr intensity 4 in/hr Pre-development 1-yr, 24-hr runoff 3.56 ft3/sec Post-development 1-yr, 24-hr runoff PrelPost 1-yr, 24-hr peak control 1.86 -1.7 ft3/sec ft3/sec Storage Volume: Non-SR Waters ' Design volume (temporary pool volume) 71,275 ft3 Depth of temporary poollponding depth (DP,a°,S) 12 in Drawdown time 2.00 days Diameter of orifice 5.00 in ' Coefficient of discharge (C ) used in orifice diameter o calculation 0.60 (unitless) ' Driving head (H°) used in the orifice diameter calculation 0.330 ft Storage Volume: SR Waters Parameters 1-err, 24-hr depth in Pn;-development 1-yr, 24-hr runoff ft3 ' Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 1 Volume provided ft3 1 Form SW401-Wetland-Rev.1 OK OK OK OK Provide calculations to support this driving head. Parts I and II. Project Design Summary, Page 1 of 3 ' Permit Number (to be provided by DWQ) Surface Areas of Wetland Zones Surface Area of Entire Wetland 71,817 ftz OK Shallow Land 28,726 ftz OK The shallow land percentage is: 40% ' Shallow Water 28,726 ftz OK The shallow water percentage is: 40% D~;ep Pool Forebay portion of deep pool (pretreatment) 7,183 ftZ OK The forebay surface area percentage is: 10% Non-forebay portion of deep pool 7,182 ftz OK The non-forebay deep pool surface area percentage is: 10% ' Total of wetland zone areas 71,817 ftz OK Add or subtract the following area from the zones 0.00 ftz ' Topographic Zone Elevations Temporary Pool Shallow Land (top) 245.00 fmsl ' PE:rmanent Pool Shallow Water (top) 245.00 fmsl Deep Pool (top) 244.50 fmsl ' Most shallow point of deep pool's bottom 242.00 fmsl Deepest point of deep pool's bottom 242.00 fmsl DE;sign must meet one of the following two options: This design meets Option #1, Deep pool is 6'inches below SLWT, If yes: N (Y or N) SLWT (Seasonally Low Water Table) fmsl This design meets Option #2, Has a clay liner Y If yes: Depth of topsoil above clay liner 4 in Topographic Zone Depths Temporary Pool Shallow Land 12 in OK Permanent Pool Shallow Water 6 in OK Deep Pool (shallowest) 30 in OK Deep Pool (deepest) 30 in OK Planting Plan ' Are cattails included in the planting plan? N (Y or N) OK Number of Plants in planting plan recommended: Herbacious (flinch diameter) 2,160 ' Shrubs/small trees (1 gallon or larger) 1,440 Trees (1.5"dbh) 360 Number of Plants in planting plan provided (several species of each plant type are recommended): Herbacious (4'inch diameter) 53 $7 ~~ Shrubs/small trees (1 gallon or larger) ~ 5'7 g aK- Trees (1.5"dbh) 3 b6 °'~- Form SW401-Wetland-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3 Additional Information Can the design volume be contained? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? ' What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Are calculations for supporting the design volume provided in the application? Is BMP sized to handle all runoff from ultimate build-out? Is'the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? The length to width ratio is: ,Approximate wetland length Approximate wetland width ,Approximate surface area using length and width provided Will the wetland be stabilized within 14 days of construction? 1 1 Form SW401-Wetland-Rev.1 Permit Number (to be provided by DWQ) Y (Y or N) OK N (Y or N) Excess volume must pass through filter. NIA ft N (Y or N) Show how flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 1.9:1 OK 375.0 ft 200.0 ft 75,000 ft2 This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Y (Y or N) OK Parts I and II. Project Design Summary, Page 3 of 3 ~~'_^~,, ~~ NCDENR 1 [1 Permit Number (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all the required information. ~I PROJECT INFORMATION Project name Contact name Phone number ' Date Drs~inage area number East Park Plaza Eric Cornett O~~F~W~A TF9~OG > -1 =' ~~--+v~+v~ o ~ c 304-255-2240 January 15, 2008 Wetland Pond No. 2 ' II. DESIGN INFORMATION Site Characteristics Dr<~inage area 335,412 ftz ImI>ervious area 217,800 ftz Percent impervious 64.9% Design rainfall depth 1.0 inch ' Peak Flow Calculations Does this project require prelpost control of the 1-yr 24-hr peak Y (Y or N) flo~+/? 1-yr, 24-hr runoff depth 3.2 in ,1-yr, 24-hr intensity 4 inihr Prey-development 1-yr, 24-hr runoff 0.89 ft3/sec Post-development 1-yr, 24-hr runoff ' Prey/Post 1-yr, 24-hr peak control 0.66 -0.2 ft3/sec ft3/sec Storage Volume: Non-SR Waters Design volume (temporary pool volume) 17,720 ft3 Depth of temporary pool/ponding depth (DP,a~~s) 12 in ' Drawdown time 2.00 days Diameter of orifice 2.50 in ' Coefficient of dischar e (C ) used in orifice diameter g p 0.60 (unitless) calculation ' Driving head (H°) used in the orifice diameter calculation 0.330 ft Storage Volume: SR Waters Parameters 1-yr, 24-hr depth in Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 ' Volume provided ft3 Il ' Form SW401-Wetland-Rev.1 OK OK OK OK Provide calculations to support this driving head. Parts I and II. Project Design Summary, Page 1 of 3 ' Permit Number (to be provided by IJWQJ ' Surface Areas of Wetland Zones Suirface Area of Entire Wetland 18,900 ftz OK Shallow Land 7,560 ft2 OK "the shallow land percentage is: 40% ' Shallow Water 7,560 ftZ OK The shallow water percentage is: 40% Deep Pool ' 1=orebay portion of deep pool (pretreatment) 1,890 ftz OK "the forebay surface area percentage is: 10% IJon-forebay portion of deep pool 1,890 ft2 OK ' 'the non-forebay deep pool surface area percentage is: 10% 'total of wetland zone areas 18,900 ft2 OK iadd or subtract the following area from the zones 0.00 ft2 ' Toppographic Zone Elevations Temporary Pool ;ihallow Land (top) 205.00 fmsl ' Permanent Pool Shallow Water (top) 205.00 fmsl Deep Pool (top) 204.50 fmsl l~lost shallow point of deep pool's bottom 202.00 fmsl Deepest point of deep pool's bottom 202.00 fmsl Design must meet one of the following two options: "this design meets Option #1, ' Deep pool is 6inches below SLWT, If yes: N (Y or N) SLWT (Seasonally Low Water Table) fmsl "this design meets Option #2, ' lias a clay liner Y If yes: Depth of topsoil above clay liner 4 in Topographic Zone Depths Temporary Pool ' >hallow Land 12 in OK Permanent Pool >hallow Water 6 in OK ' Deep Pool (shallowest) 30 in OK Deep Pool (deepest) 30 in OK ' Planting Plan Are cattails included in the planting plan? N (Y or N) OK Number of Plants in planting plan recommended: lierbacious (4`inch diameter) 570 ' ;>hrubs/small trees (1 gallon or larger) 380 Trees (1.5"dbh) 95 Number of Plants in planting plan provided (several species of each plant type are recommended): ' iierbacious (4'inch diameter) /350 0~ :ihrubslsmall trees (1 gallon or larger) yZ6 ° +~ ' Trees (1.5"dbh) ~.~- o k 1 Form SW401-Wetland-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3 Adld itional Information ' Cain the design volume be contained? Dces volume in excess of the design volume flow evenly distributed through a vegetated filter? ' 'What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? An: calculations for supporting the design volume provided in the application? ' Is '~BMP sized to handle all runoff from ultimate build-out? Is ilhe BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? ' The length to width ratio is: ,Approximate wetland length .Approximate wetland width ' .Approximate surface area using length and width provided Will the wetland be stabilized within 14 days of construction? 1 1 1 1 Form SW401-Wetland-Rev.1 Permit Number (to be provided by DWQ) Y (Y or N) OK N (Y or N) Excess volume must pass through filter. N/A ft N (Y or N) Show how flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 1.9:1 OK 190.0 ft 100.0 ft 19,000 ft2 This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Y (Y or N) OK Parts I and II. Project Design Summary, Page 3 of 3 JOB NAME JOB NUMBER PACE NO. JOB DESCRIPTION BY DATE j j 1 i 1 ~ i i ~ € ! i ' ! I 1 i ~ ~ 4 _. .~„..._..~._._ t .r..L1~ .. ...q._._....~^ _..z'.... .,_ ...}. _....K 1 ... ~._.. q.----,-. :- ._.--t .f6-.,_. ~. ...~__....r t. .. r i _f ~ ' n. i' 3 (~ 1 t~. ~ _t _~ ~~_ ~ i_ I i ~ ~.~. x .j" t t t ~ ¢ _. _ i s ~ ~ y .~__ i 3 .. r .,. ..~E. r t-, t _ Y r ...~`r .~_.. ~ t _ y. t~ t 1 € ? a J k ~_ I i I E ' J ._ .. ..... :_ .. G. - t -_ .. a a _ { pp 3 MI A ~ ~ 7d ~ ~ ~ ___'_ _~._, ._,... (i P~~ .. ~ ~f 1 ~ ~ ~ its } S d ~ I ~ ~ ~ Ff i1 _._,_ ~sm~ m_} ....~~ k' ~ ;..~ +~ 1.-`-i' ~ . r~ ~ . ~ } ~_ 1 : ._u y .~... ._i ~ i, tC f ~ `~., ~ i __ k ~ ... ~ _.~... ... .. .. t ,~ 1 ~X .~ ~r~ ~~ ~ >r s t i ~ ; __~:. _- _ p t s ~ i k t ~ ~ t t s t t , 3 ' w,.._ ,,_ _. _.,,, ,.. i . a-.._.. F ._. ...... {.. . .~_..t .. ~ Z. i 3 ~ S ~ ~ -i. , r. ~ ~ E i f k ..._ f I L 3 ~ I y i } ~ o k ~ ~ 1 Y t i ~ i ~ d- ~ ~ ~ I ~~ ~ C i ~ _I_ ._ ~ . .~ r . , HH :.~.~.. _ .~... .~,. k ....., ._. ..,.._ - ~ ° P ~t*i ~' ~ ~ d f t ~ i r d ~ E ~ .. ..,._ r, __ _ i : k t d ~ ~; ~ ~ 5 I t ,~. ,~._ . _. .._ _ a W...__ ! I~t :l i' "~~ pf' ~ t `f ~ t~~} ~~~ f ~ r i I ~ 1 ~ - Y f ~ it i i E i€ ! I l e i- ~ k k t ~ ~ ~. } i y ._ I _-d_.. _.. ~ ,._...,~i t~~ ,-_. ..n...~,~....~;~~.r..~_ ~'~ ~.. ~ ~ ~ ~ ~ ._ ~~..t. 6{..._~ d ~ ~ j .~ ~H f _~ ~. (~ 4 ,{ _~~1 E ~ ~. ll~_/,f ~. _.. f - i.,,, ~ ~ 4, /t~~t e t 3 t 1 I t ~ F ..f f # 1 7 I I ~ ? '. i ~ t t 5«~. ..t...--b..> ......-.K, _..._.~a.«. s._ f ._...~...... ,~..: ~.....eq... .~5+-....._ .u...~a.....«,. - ...,.,~.....,-.s.- -o- ....,,e.,..„,..~,.„..:.. .,t....,...~..,.. p.,. .•-w-,.-. -~ ;~...,.:..... ~ ,.. .._ ,_ _ _ _ ~ _ , ._ . . 1 . i 4 ~ s _ .., i. !. ... ~. .., _ ~ .. ,) ~ "l r ^,~ "r~' ~} d ,'`}~;. ~ if ~' ~I.(;~ ` ;~ j~r1 ~ . f. _ 7th' /~ ~ s . _ < _ :. . __~~u .~ ... t.a. _ _.W.. J ~ .w.. ~.... m .. _ .. ._. _ .~ "" . GRAY ENGINEERING CONSULTANTS_ INC. / 132 Pilgrim Road / Greenville. SC 29607 / (8641 297-3027 JOB NAME JOB NUMBER PAGE NO. ~ ~~ ~ Q,~ JOB DESCRI,PFTIjO~N g~' ~g q~ ~? p*~ n { BV DATE g ~.1\ 80 ~~ - QQ~~ 70 o`~ ~.~~ I~-, _ ~_~, • 60.--, ~' 2 '~' n~ N a c~ _a 1 ~ 0 ds,,=a~ ~ 50 100 Discharge (ft3/sec) 300 ~ 120 Outlet a = Oo + 0.4La 110 Pipe ~ ;-~ ';,~ diameter (Co) ~_ L _~ ; ~' ;i ~ !ii ' a 100 '; : r!' '` •; v 7ailwater z 0.5DD II I!I''~{ li. ---- -_- _ - I, riG~i~l~l~l!!i 40 ~'' , ,(I!!i,~ ~p A V CAI/'_IAICCC]IAI r_ (`(~~ICI II TnNTC ICI (` / 147 Pilnrim Rnari ! t^roorniillc~ cry ~oFn~ / /s~n~~ ~o~_~n~~ JOB NAME JOB NUMBER PAGE NO. JOB DESCRIPTION ~ , - f ~- BY ~ ,, ~ ,,, f-~- DATE , , ~ ~. GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 JOB NAME JOB NUMBER PAGE NO. ~. ~~ ~~~ JOB DESCRIPTION 8Y DATE GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / {864) 297-3027 1 1 1 JOB NAME JOB NUMBER PAGE NO. .~7~' ~/. JOB pDESCRIP710N 8Y DATE GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / (864) 297-3027 1 1 1 1 1 Developed Flow to Structures Structure No. Area SF Area AC Coefficient Rainfall 10-YR inlhr Flow 10-YR cfs Type OUT FACE Al Al - -- -- - -- HW A2 23,550 0.54 0.95 7.60 3.90 D A3 0 0.00 0.95 7.60 0.00 C A4 123,200 2.83 0.95 7.60 20.42 D A5 86,150 1.98 0.90 7.60 13.53 D A6 87,550 2.01 0.60 7.60 9.17 D A7 64,300 1.48 0.40 7.60 4.49 D A8 24,650 0.57 0.50 7.60 2.15 D A9 45,500 1.04 0.70 7.60 5.56 D A10 55,250 1.27 0.75 7.60 7.23 D A3.1 208,750 4.79 0.30 7.60 10.93 HW OUT FACE 61 61 - -- -- - -- HW B2 11,650 0.27 0.95 7.60 1.93 D 63 11,350 0.26 0.95 7.60 1.88 D 64 0 0.00 0.95 7.60 0.00 C B5 30,550 0.70 0.95 7.60 5.06 B 66 16,000 0.37 0.95 7.60 2.65 B 67 34,250 0.79 0.85 7.60 5.08 B 68 46,550 1.07 0.75 7.60 6.09 B 69 20,450 0.47 0.75 7.60 2.68 D 610 12,850 0.29 0.95 7.60 2.13 D 64.1 20,750 0.48 0.95 7.60 3.44 D 64.2 5,250 0.12 0.95 7.60 0.87 D 84.3 19,000 0.44 0.95 7.60 3.15 D B4.4 19,250 0.44 0.95 7.60 3.19 D 64.5 5,000 0.11 0.95 7.60 0.83 D 65.1 30,850 0.71 0.95 7.60 5.11 B 65.2 34,900 0.80 0.95 7.60 5.78 B 65.3 43,850 1.01 0.95 7.60 7.27 D 65.4 14,300 0.33 0.95 7.60 2.37 D 85.1.1 23,700 0.54 0.95 7.60 3.93 B 65.1.2 107,500 2.47 0.95 7.60 17.82 B 66.1 24,350 0.56 0.95 7.60 4.04 B 66.2 60,450 1.39 0.80 7.60 8.44 B OUT FACE C1 C1 - - -- -- -- HW C2 2,650 0.06 0.95 7.60 0.44 D C3 4,500 0.10 0.95 7.60 0.75 D C4 6,400 0.15 0.95 7.60 1.06 D C5 3,650 0.08 0.95 7.60 0.60 D C6 0 0.00 0.95 7.60 0.00 C C7 19,800 0.45 0.95 7.60 3.28 A C8 19,200 0.44 0.95 7.60 3.18 A C2.1 2,650 0.06 0.95 7.60 0.44 D C2.2 2,000 0.05 0.95 7.60 0.33 D C2.3 2,000 0.05 0.95 7.60 0.33 D C2.4 67,150 1.54 0.95 7.60 11.13 A C2.1.1 2,750 0.06 0.95 7.60 0.46 D C2.1.2 79,600 1.83 0.95 7.60 13.19 A C3.1 6,250 0.14 0.95 7.60 1.04 D C3.2 10,850 0.25 0.95 7.60 1.80 D C3.3 32,200 0.74 0.95 7.60 5.34 D C3.4 6,850 0.16 0.95 7.60 1.14 D OUT FACE D1 D1 -- -- -- -- -- HW D2 -- -- 0.95 7.80 0.00 C D3 -- -- 0.95 7.80 0.00 C D4 - - 0.95 7.80 25.00 OS OUT FACE E1 E1 -- -- -- - - HW E2 - -- 0.95 7.80 25.00 OS JJB 270205 WMC-SC CALCS.XLS 1 /6/2008 1 1 1 1 1 1 Recommended Pipe Size/Slope From To Cumulative Flow (Q~o) cfs Pipe Size in. Velocity (Vp) f s Actual Slope % Actual Capacity (Glc) cfs > ~ 10 OUTFAC E Al Al - - -- -- -- -- •- A2 Al 77.37 42 14.07 2.50 159.0 YES A3 A2 73.46 42 13.36 1.00 100.6 YES A4 A3 62.54 36 13.27 6.00 163.3 YES A5 A4 42.12 36 8.94 0.50 47.1 YES A6 AS 28.59 30 7.28 0.70 34.3 YES A7 A6 19.42 30 4.95 0.50 29.0 YES A8 A7 14.94 24 4.75 0.50 16.0 YES A9 A8 12.79 24 4.07 0.50 16.0 YES A10 A9 7.23 18 3.07 0.50 7.4 YES A3.1 A3 10.93 24 3.48 1.56 28.2 YES OUTFAC E B1 B2 61 93.74 48 14.92 1.00 143.6 YES 63 62 91.81 48 14.61 0.50 101.5 YES B4 83 89.93 48 14.31 0.50 101.5 YES 65 B4 78.45 48 12.49 0.50 101.5 YES B6 65 31.10 36 6.60 0.50 47.1 YES 67 66 15.98 18 6.78 5.00 23.5 YES B8 67 10.90 18 4.62 3.00 18.2 YES B9 68 4.81 18 2.04 1.50 12.9 YES 610 69 2.13 18 0.90 0.50 7.4 YES B4.1 64 11.48 24 3.65 5.50 53.0 YES 64.2 64.1 8.04 24 2.56 0.50 16.0 YES B4.3 B4.2 7.17 18 3.04 0.50 7.4 YES 64.4 64.3 4.02 18 1.71 0.50 7.4 YES 64.5 64.4 0.83 18 0.35 0.50 7.4 YES 65.1 BS 42.28 36 8.97 0.50 47.1 YES B5.2 65.1 15.42 24 4.91 0.50 16.0 YES 65.3 65.2 9.64 24 3.07 0.50 16.0 YES 65.4 65.3 2.37 18 1.01 0.50 7.4 YES 65.1.1 B5.1 21.75 18 9.23 6.00 25.7 YES B5.1.2 65.1.1 17.82 18 7.56 3.00 18.2 YES B6.1 66 12.47 18 5.29 6.00 25.7 YES 66.2 66.1 8.44 18 3.58 2.00 14.8 YES OUTFAC E C1 C1 -- -- -- -- -- -- -- C2 C1 44.50 30 14.17 10.00 129.6 YES C3 C2 18.18 18 5.79 10.00 33.2 YES C4 C3 8.13 18 2.59 10.00 33.2 YES C5 C4 7.07 18 2.25 10.00 33.2 YES C6 C5 6.46 18 2.06 4.00 21.0 YES C7 C6 6.46 18 2.06 0.50 7.4 YES C8 C7 3.18 18 1.01 0.50 7.4 YES C2.1 C2 25.88 24 8.24 1.50 27.7 YES C2.2 C2.1 11.79 24 3.75 0.50 16.0 YES C2.3 C2.2 11.46 24 3.65 0.50 16.0 YES C2.4 C2.3 11.13 24 3.54 0.50 16.0 YES C2.1.1 C2.1 13.65 18 4.34 10.00 33.2 YES C2.1.2 C2.1.1 13.19 18 4.20 10.00 33.2 YES C3.1 C3 9.31 18 2.96 1.00 10.5 YES C3.2 C3.1 8.27 18 2.63 1.00 10.5 YES C3.3 C3.2 6.47 18 2.06 10.00 33.2 YES C3.4 C3.3 1.14 18 0.36 1.50 12.9 YES OUTFAC E D1 D1 -- -- -- -- __ - .. D2 D1 25.00 30 7.96 5.00 91.7 YES D3 D2 25.00 30 7.96 13.50 150.6 YES D4 D3 25.00 30 7.96 13.23 149.1 YES OUTFAC E E1 E1 - - __ __ _ _ .. E2 E1 25.00 24 7.96 15.63 89.4 YES JJB 270205 W MC-SC CALCS.XLS 1 /6/2008 t 1 1 1 r 1 1 S TORM DRAIN SCHEDULE PIPE INVERT ELEVATION FROM TO LENGTH FT. DIA. IN SLOPE % INFL.END FT. EFFL.END FT. OUTFACE Al Al -- -- -- -- 240.00 -- A2 Al 90 42 2.50 242.25 240.00 A3 A2 119 42 1.00 243.44 242.25 A4 A3 107 36 6.00 249.86 243.44 A5 A4 185 36 0.50 250.79 249.86 A6 A5 145 30 0.70 251.80 250.79 A7 A6 194 30 0.50 252.77 251.80 A8 A7 47 24 0.50 253.01 252.77 A9 A8 150 24 0.50 253.76 253.01 A10 A9 196 18 0.50 254.74 253.76 A3.1 A3 36 24 1.56 244.00 243.44 OUTFACE 61 61 -- -- -- -- 240.00 -- 62 61 104 48 1.00 241.04 240.00 63 62 130 48 0.50 241.69 241.04 64 63 73 48 0.50 242.06 241.69 65 64 234 48 0.50 243.23 242.06 66 65 410 36 0.50 245.28 243.23 67 66 104 18 5.00 250.48 245.28 B8 67 105 18 3.00 253.63 250.48 69 68 182 18 1.50 256.36 253.63 610 69 45 18 0.50 256.58 256.36 64.1 B4 118 24 5.50 248.55 242.06 64.2 64.1 84 24 0.50 248.97 248.55 64.3 64.2 113 18 0.50 249.53 248.97 64.4 64.3 111 18 0.50 250.09 249.53 64.5 64.4 145 18 0.50 250.81 250.09 B5.1 65 173 36 0.50 244.09 243.23 65.2 65.1 123 24 0.50 244.71 244.09 65.3 B5.2 130 24 0.50 245.36 244.71 65.4 B5.3 58 18 0.50 245.65 245.36 65.1.1 B5.1 57 18 6.00 247.51 244.09 65.1.2 65.1.1 57 18 3.00 249.22 247.51 66.1 66 114 18 6.00 252.12 245.28 B6.2 66.1 124 18 2.00 254.60 252.12 OUTFACE C1 C1 -- -- -- -- 205.00 -- C2 C1 78 30 10.00 212.80 205.00 C3 C2 78 18 10.00 220.60 212.80 C4 C3 58 18 10.00 226.40 220.60 C5 C4 50 18 10.00 231.40 226.40 C6 C5 48 18 4.00 233.32 231.40 C7 C6 98 18 0.50 233.81 233.32 C8 C7 98 18 0.50 234.30 233.81 C2.1 C2 163 24 1.50 215.25 212.80 C2.2 C2.1 156 24 0.50 216.03 215.25 C2.3 C2.2 22 24 0.50 216.14 216.03 C2.4 C2.3 36 24 0.50 216.32 216.14 C2.1.1 C2.1 22 18 10.00 217.45 215.25 C2.1.2 C2.1.1 26 18 10.00 220.05 217.45 C3.1 C3 250 18 1.00 223.10 220.60 C3.2 C3.1 63 18 1.00 223.73 223.10 C3.3 C3.2 44 18 10.00 228.13 223.73 C3.4 C3.3 270 18 1.50 232.18 228.13 OUTFACE D1 D1 -- -- -- -- 193.00 -- D2 D1 92 30 5.00 197.60 193.00 D3 D2 178 30 13.50 221.63 197.60 D4 D3 154 30 13.23 242.00 221.63 OUTFACE E1 E1 -- -- -- -- 192.00 -- E2 E1 64 24 15.63 202.00 192.00 JJB 270205 W MC-SC CALCS.XLS 1 /6/2008 1 1 1 i 1 1 1 STRUCTURE INLET NO. TYPE TOP WEIR BTM. DEPTH ELEV. ELEV. ELEV. FT. OUTFACE Al Al HW -- -- 240.00 -- A2 D 257.80 257.30 242.25 15.55 A3 C 259.40 -- 243.44 15.96 A4 D 260.00 259.50 249.86 10.14 A5 D 259.30 258.80 250.79 8.52 A6 D 259.20 258.70 251.80 7.40 A7 D 263.50 263.00 252.77 10.23 A8 D 263.50 263.00 253.01 10.50 A9 D 259.20 258.70 253.76 5.44 A10 D 259.00 258.50 254.74 4.27 A3.1 HW - -- 244.00 -- OUTFALL 81 B1 HW -- -- 240.00 -- 62 D 259.00 258.50 241.04 17.96 63 D 258.90 258.40 241.69 17.21 64 C 259.00 - 242.06 16.95 65 B -- 255.40 243.23 12.18 86 B -- 258.00 245.28 12.73 67 B -- 258.00 250.48 7.53 BS B -- 258.00 253.63 4.38 B9 D 260.80 260.30 256.36 4.44 B10 D 260.80 260.30 256.58 4.22 B4.1 D 256.50 256.00 248.55 7.95 64.2 D 256.50 256.00 248.97 7.54 64.3 D 256.00 255.50 249.53 6.47 B4.4 D 256.00 255.50 250.09 5.91 B4.5 D 255.50 255.00 250.81 4.69 B5.1 B -- 253.50 244.09 9.41 65.2 B -- 252.40 244.71 7.69 B5.3 D 249.40 248.90 245.36 4.04 65.4 D 249.40 248.90 245.65 3.76 65.1.1 B - 253.50 247.51 5.99 65.1.2 B -- 253.50 249.22 4.28 B6.1 B -- 259.00 252.12 6.88 66.2 B 259.00 254.60 4.41 OUTFACE C1 C1 HW -- -- 205.00 C2 D 237.30 236.80 212.80 24.50 C3 D 239.40 238.90 220.60 18.80 C4 D 241.20 240.70 226.40 14.80 C5 D 239.50 239.00 231.40 8.10 C6 C 239.00 -- 233.32 5.68 C7 A 239.83 239.00 233.81 6.02 CS A 239.83 239.00 234.30 5.53 C2.1 D 229.40 228.90 215.25 14.16 C2.2 D 221.60 221.10 216.03 5.57 C2.3 D 221.60 221.10 216.14 5.46 C2.4 A 221.83 221.00 216.32 5.51 C2.1.1 D 229.40 228.90 217.45 11.96 C2.1.2 A 231.83 231.00 220.05 11.79 C3.1 D 228.50 228.00 223.10 5.40 C3.2 D 229.30 228.80 223.73 5.57 C3.3 D 236.50 236.00 228.13 8.37 C3.4 D 239.00 238.50 232.18 6.82 OUTFACE D1 D1 ED 196.33 -- 193.00 -- D2 C 203.00 -- 197.60 5.40 D3 C 228.00 -- 221.63 6.37 D4 OS 247.80 -- 242.00 -- OUTFAIL E1 E1 ED 195.33 -- 192.00 -- E2 OS 508.50 -- 202.00 -- ' JJB 270205 WMC-SC CALCS.XLS 1 /6/2008 I . f- ' _~ :- ~ ~~~-: .~"' ~. a F ..j. \ i ; /~/t ~\ ~.. .~ % / / ..~ ^! 1 -~~ ~~~ / /, i.,-.. ~/ i .~~. ~. ~.~ ~_ f . ~~ `~ ,= ,_ .- ~ ;, .~.~ ~~ ~--` j ~ _. i i iy I~\ , ~ _ ~ S,nao ~ ~ ~ Y_ ~ ' _ ~ C r ! O' ~~ ~ z ~ _~ ~ ~ ~ ~ ~ w~ 1 ~ j uw~i I ~ *- --- i s.ono xx ~~~ ~ I ~ p~.....~.a I' QI ~ j' --~ w I ' :.uco sv ~ ~~j - W j ~ ( ~ ~. --- "~-- ~ -- ~ ~r" ~ , ;, '~ ~ ~ ~ ~~ C~ ~ ~ ~ ~ ~ ~ I j j ~ _ m ~~- j ~~~~ -=----, ~- / ~ ~ ,11111%l!~ ~ ~' . ~ {l. t - -~'` .. y,-. ~. ` ~ ` /. j ~ ` `+/ r I I j 1 ~ ~ j I STORM DRAIN AREA MAP i N.T.S. .. -_ .. - -s -~ -- s- - - ~ -- - ._ _ _ Lls . _ ,~ . - _ _ - ~ _ .2~ _. ,L .,r ~ _ -~o _ .. . ~.. PQ~ 2.~ _ __ __ N - ,.._ N - ~~ - 3 , ~S ~ -- - - - - _ ~`- - - --'- J i ~NE-HOU ~R•AE.I~FA~.L, IN~ INCHES, _ FIG: 8". - _ _ -- . _ --- -- ~=-~ "T'O:" BE--EJECT-ED~NCE='IN_ 10 :YEARS. 1 ~ ~ ,~ 1 - • _ •_O'H - - ~ _ ._ _. - .NAp • i_ _ -, _.. _ __ _ .. ~~ 3.25 •": - IN 1[~tCHES, ONE- HOUR - RAINFALL FIG E - _ , . . . TO BE EXP-ECT..ED.__..ONCE_ IN ~~YEARS. .~ ._ .. - - - Y - . ._ _ s X A .. .. ~' . s-. .. - -- --- -.... ~- ' ~~ ~..'t~ f 0 ._ _ _. - ..._.. .- _ ~.--- - -- - --. ~ ~ - --.- a -°~.- .. ~ ~ --- - ~. ~ _- ......_- .---~-_~- --- _ .. __ ,~ . - _ ~' ~ .... _ 3.0 J Z _ _ ~_ ~ •- d `. ~: ~-o . - to - ' ~~`o. _ :3yb. -~..-~a_- =sue -~~a~:= - ~~~~= _~ ©~. - ~ ~.-~ ~a .:rl o.;=_tZo .~l~~~Sf~Y. DURATION-.- - _ -_ 1 ~ _.. ~ - - .. :- .. .. ~ - ~ :- .._..- _ ~ . " 4... ~ .w ~ - . r~ . - fit" _ - ._ -- . . .. .'~r"d • 1 ... .... "'•'. Yr~-.=mar: 1 .... ,, .,~.t ':•., 1 1 1 1 1 1 1 1 1 i 1 1 1 1 i 1 1 E C N IN IN JOB NAME JOB NUMBER PAGE NO. WAL-MART SUPERCENTER # 5743-00 270205 JOB DESCRIPTION BY DATE OUTLET STRUCTURE -BUOYANCY CALCS ,1,18 01/03/08 I "POND NO.1 =)OUTLET STRUCTURE ': CHECK_BUOYANCY ~, ;_ __ 4 4 ~ _ - ft _ . CHECK STRUCTURE WEIGHT *ASSUME BLOCKED ORIFICE ND"fCCC~4$-SE WRISER - 5,729'LB + 2,382 LB = $,11.1 Le _ _ ,4 ,z - 4t~ lb ~on~~ - ~ ~ ft. FACTOR OF SAFETY € _ E W _;8;111 + 2;884 lb EFB 9,5941b ; ,. I --BASE 1 G48---~66 5,729-I~.B .RISER ___ _ 1 G48_-_82R _ 2,382_~B _. I f .. ~ i ; r . i i t, f ~ ~ ~~~.__ ~ GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / 864.297.3027 I t 1 f series ALL CONCRETE PRODUCTS. INC. • P.O. BOX 1778 • SPARTANBURG, S. C. 29304 - TELEPHONE (803) 575-3230 ~ 1979 1~ I _ f ~~ LAYING LGTH. SECTION POUNDS 32" G48-32C 2436. ~ 48 " G 48-48C 3654 ' ~ ~ 64" G48-64C 4872 1 ECCENTRIC CONE ~ '' _ r C--- -- - ~- - --, 10" LAYING LGTH. F. AT SLAB TOP 4 ,G48 - FST 1345 LBS. 1 1 1 i~ t A\/I A/n I !'~TII nr/\Tri-1~i 7 20" LAYING LGTH. ~. CONCENTRIC CONE M48-20C 1522 LBS. POUNDS 16" G48-16R 1191 ~~~ ~32" G48-32R 2382 48" G48-48R ~ 3573 -~ LAYING LGTH. SECTION POUNDS 16" G48-168 2751 24 "- G48-248 3347 32" G48-328 3942 40" ~ G48-408 4538 48" ~~ G 48-488 ~ 513 ~~~ ~ 56" G48-56B 5729 64 " ~ G :.~ . .. r .-~ ~-~„ MONOLITHIC BASE ~ ~J 48-648 6324 PIPE OPENINGS OR FLEXIBLE CONNECTORS ARE AVAILABLE ON SPECIAL ORDER. ' POND I 4 RISER 1 1 1 1 i 1 1 1 i i 1 i 1 1 1 1 1 1 G E C N IN IN JOB NAME JOB NUMBER PAGE NO. WAL-MART SUPERCENTER # 5743-00 270205 JOB DESCRIPTION BY DATE OUTLET STRUCTURE -BUOYANCY CALCS ,1.16 01 /03/08 GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / 864.297.3027 ~ ~ ~~, I series ALL CONCRETE PRODUCTS, INC. • P-0. BOX 7778 SPARTANBURG, S.C. 29304 ~ TELEPHONE (803} 575-3230 19'9 1~ I __ _ _ r _- LAY/NG LGTH. SECTION POUNDS 32 " G 48-32C 2436 ~ 48" G48-48C 3654 r 64" G48-64C 4872 1 ECCENTRIC CONE I ,' _ i r '~~ - - - -~ - - --, 10" LAYING LGTI-f. FLAT SLAB TOP 'G48 - FST 1345 LBS. 1 LAYING LGTH. SECTION 16" C~4~-7bN C~)-~- 32„ G48-32R 48 " tAY/NG LGTH. G48-48R C C/-`TIr-1 ~l 16" G48-168 24 " G 48-24 8 32" G 48-32 B (~ 20" LAYING LG r~r I. CONCENTRIC CONE M48-20C 1522 LBS. POUNDS 1191 2382 35 73 POUNDS 2 751 334 7 3942 40" G48-408 4538 48" ~~ G 48-488 ~ 513 56" G48-568 5729 ,<<~ "'~ 64" ~ G48-648 6324 J-! " ~ j-~ n MONOLITHIC BASE ~ ,.. PIPE OPENINGS OR FLEXIBLE CONNECTORS ARE AVAILABLE ON SPECIAL ORDER. ~ pOND Z 4 RISER 1 1 1 1 1 1 c E C N i IN JOB NAME JOB NUMBER PAGE NO. WAL-MART SUPERCENTER # 5743-00 2470205 JOB DESCRIPTION BY DATE ANTI-SEEP COLLAR DESIGN POND 1 JJB 01/03/08 GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / 864.297.3027 1 1 i 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 c E C NGIN N ___ JOB NAME JOB NUMBER PAGE NO. WAL-MART SUPERCENTER # 5743-00 2470205 JOB DESCRIPTION BY DATE ANTI-SEEP COLLAR DESIGN POND 2 .1,16 01/03/08 3 ! r r ~POND~NO: 2~=~~4`NTFSEEP COCL%CR _ _. __ ,__~ ..;"~._ ._ . w _ ,~_ . ,emu _.. __ _. _ .... ... _. _ i . ~_ _ ~ _._._ _., _ I ~...., _ .a..." ,~. ~-.e.-_ ,.s .. ., _m .«~... _ ._, ..,._.. _ ... :-.,.,:._e_ ~. ~_,... ,._._ ..e ate. .....,.~ .._. ~ ...n _ .__ ~_~ ..,_ .. _ IHE EOLLOVYLI~fG DE,SICN~S..BASE,~p_ON.TtiE.METk~~~2,.AP.PRfJVED.BYT1~-1.E_~.SDAS.CS ; ..... ._.. _~ ___. w_ _, _'_._. . . , DETERMINE SATURATION:ZONE ~. ! - --- -,- i ~"~ i Y=~R'ISERCRE~T TO~ EMBANKMENT-INVERT-INTERSECTION- -- - °- ~ _ - -° ~ -~ ~-~ 1 ;' _.~ ~ _ ., .~ ._ a a. . ~ _. • . _..~m Y. =_2p8'.5-202~.~. = C.5 FT __ _: + - _ _~. ._~. ~y I i Z -SLOPE OF IyPSTREAM EMBANKMENT,(HORIZON~ AL COMPONENT ~ER 1 FT VERTICA~.~COMPONENT) , Z._.~...F1. _. w. -i_.__ ~ ~_._ _ _ .~ . ~. .b, _. i f - ~- - So = % = 0.16~T/FT ~ i 1 ~L5 =L"ENGT~i OF"SATUR"ATION ZONE"FOR`EMBAf~1~IGtENT'~'~ i ~~-~ r __~.. _ _ L Y~~~ 4)' G:5(1 + 4)~. 54.2 t .. - - -_.LL. .. ~ ~ .. I _ ti a _. _ ;; _~ _ _~ _~ ~ _. ~ ._ . DETERMINE NUMBER"AND~SPACtNG'OF`COLL"ARS "~ - - ~ ~- +. s~ ~_ ~ R. _ ` I . _ _ .. __ ~ , _ ~... _~ _ __ w P~__ VERTICAL,~?ROJECTION OF T~1E ANTI-SEEP CO LAR.REQUIRED, ~, _, , (( _._.. _ P = 0:075 L = 0.075'54.2 i= 4.0' t~ I _ t I .~ y P =VERTICAL ~ROJECT OF SINGLE STANDARD COL~AR ~_ _ . _ .;._ _e _ __ _ .._. _ i P = 30 IN =;2.~ FT i - ~N~-~NUMBEFtO~-COL-CARS-NEED D ~ - ~ , .. I ~ , ~Y ___ _ ~ ~_'-=~--16 ~ ; P ~~:~. __ ._ _..., _. N=2COL"LaR1~VITR~2:5~FT~(30~11~)~~T7E~RTIC~ACPRODICTION: ~~ ~_ ~. ~~ _ SPMIN ° MINiMU .SPACING,.. . ! C~ . _ .~ .__ .. SPMIN - a(P) 5(4.0) - 20.0 FT; ! SPA = MAXIM ~ M~SPACTNG" ~~ ~ ~~ ~ ~~ SP, _ ~ 4(R~- _ 1`4(4:0) =-56-F~ ~_ ' __ .~ PLACE FIRST LLAR 20-FT FR OUTLET STRUC~URE PLACE SECOND COLLAR 40-FT FOM OUTLET STR CTURE i _ _ I - ~ ~. f , I ~ ~ I { j I j t t t I ~ j i I I € E I i ~.~. I -~- t ,. I ~ C ~' i I } GRAY ENGINEERING CONSULTANTS, INC. / 132 Pilgrim Road / Greenville, SC 29607 / 864.297.3027