Loading...
HomeMy WebLinkAbout20080174 Ver 1_CAMA Application_20080118,~,~ ~~~~ 08-0174 ~~~_ NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management. Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary January 16, 2008 MEMORANDUM: TO: Ms. Cyndi Karoly Environmental Biological Supervisor Division of Water Quality FROM SUBJECT: Applicant: Project Location: Doug Huggett Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Segrave Properties, LLC c/o Kathy Vinson Q~~~od~~ JAN 1 S 2008 DENR - waTER QUALITY WETLANDS AND STORNNYATER [3RAtiCH within Brooks Creek on the Northwest end of Harkers Island at 117 Maxwell Drive Proposed Project: The applicant is proposing to install a new boat lift west of the existing dock, excavation of an access channel to connect to recently dredged channel located west of Segrave property and additional dredging for access to existing dock and lift and proposed new lift area. Please indicate below your agency's position or viewpoint on the proposed project and return this form by 2/5/2008. If you have any questions regarding the proposed project, please contact Brad Connell at (252) 808-2808. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. 400 Commerce Avenue, Morehead City, North Carolina 28557 SIGNED Phnne:~5?-808-280A \ FAX• 5 - 47-3~T~iternet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper MAJOR PERMIT FEE MATRIX ~, ~.3~~}'.'....C~.b.,.~inuL. ~: ~.:~SJ`:.Si:T~.uw'7~~T:~ _ '.:.*+YUUr-~"'._ _ -~Y~ ~'n6:i~~i~17~'I~LE_. Selection Deveiaprr;er:t Ty~,a f"ee DCM °S DV'JG? `/~ ('1430G 1601 435140093 1625 6253) (24300 1602 43510d09:i 2341) I. Private, non-commercial development that does not $~~0 100% ($250) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: II. Public or commercial development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or o en water areas: IIL For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below a lies: III(A). For Private non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 3301 (see attached can be a lied: III(B). For public or commercial development, if $400 100% ($400) 0% ($0) General Water Quality Certification No. 3301 (see attached can be a lied: III(C). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 3301 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or a vatic life: III(D). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 3301 (see attached) cannot be a lied: IV. For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or o en water areas: 1j DIVISION OF COASTAL i~I~~iAGENIENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Segrave Properties, LLC C/o Kathy Vinson 2. LOCATION OF PROJECT SITE: Within Brooks Creek on the Northwest end of Harkers Island, Carteret County. Property address is 117 Maxwell Drive. Photo Index - 2000: 50-609 grid (J-20)(J-21) 2006: 50-6349 grid (O-5) State Plane Coordinates - X: 2726307.423 Y: 358834.827 Rover # R121015A LAT 34°42'41.96242 LON 76°34'58.68602 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE:Dates of Site Visit - 12/10/07 Was Applicant Present -Yes 5. PROCESSING PROCEDURE: Application Received - 11/28/07 Office -Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan -Carteret County Land Classification From LUP -Limited Transition (B) AEC(s) Involved: Public Trust Area, Estuarine Water (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing -Community Planned - N/A (F) Type of Structures: Existing - 200' pier, 10'x20' platform, boatlift, Home Planned -excavation of an access channel to connect to newly dredged channel by neighbors, excavation around dock area, existing boatlift and proposed new boatlift area, install new boatlift west of existing platform. (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: nRF,n(TF,n FTT,T,F.T) (ITHF.R (A) Shallow Bottom 4350 sf Incorp. N/A N/A (B) Public Trust Area N/A N/A 169 sf Incorp. (C) High Ground N/A 3000 sf N/A (D) Total Area Disturbed: 7519 ft2 (E) Primary Nursery Area: No (F) Water Classification: SA Open: No 8. PROJECT SUMMARY: The applicant is proposing to install a new boat lift west of the existing dock, excavation of an access channel to connect to recently dredged channel located west of Seagrave property and additional dredging for access to existing dock and lift and proposed new lift area. Seagrave Properties, LLC Page 02 9. Narrative Description: The Seagrave Properties, LLC project is located at 117 Maxwell Dr. in Harkers Island, Carteret County. Maxwell Dr. is found by turning south off of Hwy 70 east onto Harkers Island road. Follow this road over the existing Harkers Island Draw Bridge, which turns into Island Road, and then turn onto the second right which is Maxwell Drive. The site lies on the north side of Brooks Creek in this area. The subject property is 17,685 square feet in its entirety and averages 3'-4' in elevation above NHW. Currently on the high ground portion of the site is asingle-family home. Extending off the high ground over the coastal marsh is an existing 6'x200' pier, 10'x20' existing platform and a 15'x 15' existing boatlift. Along the shoreline of this property is a 50' fringe of Coastal Marsh that contains Smooth Cordgrass (Spartina alterniflora) and Sea lavender (Limonium). The high ground portion of the track is vegetated with Wax Myrtle (Myrica cerifera , Yaupon Holly (Ilex vomitoria), Oleandar (Nerium oleandar) and Red Cedar (Juniperus virginiana). Brooks Creek has an evident shellfish resource within the intertidal area. There are significant SAV resources at the mouth, but limited within the creek itself. During the site visit there was no indication of either resource within the proposed excavation area as shown on plats dated 11/20/2007. The shoreline has a total length along the NHW line of 100 ft, There are single-family homes with private docks on both sides of the proposed project. . The Division of Water Quality classifies this area as SA, HQW waters. This area is not a Primary Nursery Area. This portion of Brooks Creek (also known as Knuckles Landing Harbor per DMF) is closed to the taking of shellfish., Morehead City's Land Use Plan dated 1999 classifies this area as Limited Transition within the AEC's. There are no shellfish leases in this area. 10. Proiect Description: In order to obtain deeper water the applicant is proposing to excavate around the existing dock, boatlift and new boatlift area. An access channel will also be excavated to connect to recently dredged channel, which was dredged under Major Permit # 35-07. In order to accomplish what is proposed the applicants are proposing using a bucket to barge dredge and excavate a 47' x 20' channel increasing to 49', which will connect to the recently dredged channel by existing neighbors. Additional dredging around the existing dock, boatlift and new boatlift will be in a 54' x 51' area increasing to 57'. The cubic yards to be excavated for the total project will be 369. The maximum excavation for the recently dredged channel was -~ ft below NLW with the connecting waters at -6ft below NLW. The properties involved with major permit # 35-07 were 119,123 and 125 Maxwell drive. A 13'x13' Boatlift is also being proposed at the west end of the existing platform. Water depths around the existing dock and platform average -1.8'NLW. The final depth for the new connecting channel and excavation area around existing boatlift, platform, pier and new boatlift will not exceed -4 feet below NLW. Substrate composition is mostly silty/sand. Riparian lines were set through f {~ Seagrave Properties, LLC ' Page 03 major permit 35-07 and this application coincides with this. 11. Anticipated Impacts: This proposed installation of the new boatlift and pilings would result in temporary turbidity and would incorporate 169 square feet of Public Trust Area. An increase in turbidity will also occur during excavation. The area proposed for excavation is a silty sand shallow bottom habitat. There should be no hazard to navigation resulting from this project, as there are other docks of equivalent length along the same shoreline. No coastal marsh would be filled or excavated during this project. There is not a potential to impact SAV's or shellfish with docking ingress and egress. HEATHER STYRON Morehead City January 10, 2008 ~~~ ..._.~- NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary MEMORANDUM: TO: DOUG HUGGETT FROM: HEATHER STYRON THROUGH: TERE BARRETT SUBJECT: COMMENTS & RECOMMENDATIONS - CAMA MAJOR PERMIT- THOMAS SEGRAVE, 117 MAXWELL DRIVE HARKERS ISLAND DATE: 1 /14/08 The following are my comments and recommendations regarding the aforementioned proposal. The proposal is to install a 13'x13' boatlift, excavation of an 20' x47' channel increasing to 49', which will connect to a recently dredged channel under major permit # 35-07. They are also proposing excavation around the existing dock, boatlift and new boatlift area. This will be in a 51'x54' area increasing to 57'. The total cubic yards for the project will be 369. The final depth will not exceed - 4 ft below NLW, which is the final depth of the recently dredged channel. Numerous field visits and location of the _ proposed new channel, boatlift and dredging area around existing dock indicate that SAWS and shellfish would not be disturbed. Therefore, I recommend the project be authorized as proposed, contingent upon the following conditions: 1. This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures may be conducted on; in or over public trust waters without permit modification. 2. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 3. The authorized structure and associated activity must not cause an unacceptable interference with navigation. 4. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 5. This permit authorizes a maximum of 2 boat slips. At no time shall more than 2 vessels be moored or docked at the facility. The restriction of the number of vessels shall apply to all marine vessel .types, including but not limited to 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper motorboats, sailing vessels and personal watercraft. 6. This permit does not authorize the excavation or filling of any vegetated wetlands. 7. The final depth of the new channel shall dredged channel under major permit 35-07, not exceed the depth of the recently which is -4 ft below NLW. Cc: Tere Barrett, DCM Ted Tyndall, DCM Dave Timpy, COE ~C~ Mr-1 APPLICATION for Ma~Or D®~elopment Permit o 8` 0 1 7 a (last revised 12127/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner /nformation Business Name Project Name (if applicable) Segrave Properties, Llc n/a Applicant 1: First Name MI Last Name Thomas Segrave Applicant 2: First Name MI Last Name n/a If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 3511 Warwick Drive n/a Greenville NC ZIP Country Phone No. FAX No. 27858 USA 252 - 717 - 3332 ext. 252 - 413 - 0780 Street Address (~f different from above) City State ZIP n/a - Email tseg rave@segrave.com 2. Agent/Contractorlnformation Business Name Coastal Planning Services, Inc. Agent/ Contractor 1: First Name MI Last Name Kathy B. Vinson Agent/ Contractor 2: First Name MI Last Name n/a Mailing Address PO Box City State 827 Morehead City NC ZIP Phone No. 1 Phone No. 2 28584 252 - 240 - 9297 ext. 252 - 354 - 4916 ext. FAX No. Contractor # 252 247 5875 n/a Street Address (d different from above) City State ZIP n/a - Email kbvinson@ec.rr.com <Form continues on back> Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 117 Maxwell Drive n/a Subdivision Name City State Zip Harkers Point Harkers Island NC 28531 - Phone No. Lot No.(s) (~f many, attach additional page with list) n/a - - ext. 21, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Brooks Creek c. Is the water body identfied in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ^Manmade ^Unknown Back Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ^Yes ®No work falls within. Carteret County 4. Site Description a. Total length of shoreline on the trail (ft.) b. Size of entire tract (sq.ft.) 100' 17,685 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (nom-al high water) or 17,685 square feet, NWL (nonnal waterleveQ (If many lot sizes, please attach additional page with a list) +3.0 to +4.0 ®NHW or ^NWL e. Vegetation on tract grass and landscape vegetation f. Man-made features and uses now on tract Single-family residence. g. Identify and describe the existing land uses adfacent to the proposed project site. Single-family residences with docks are located on either side of project site. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Unzoned. (Attach zoning compliance certificate, if applicable) ^Yes ^No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ^Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ^Yes ®No NA If yes, by whom? n/a I. Is the proposed project located in a National Registered Historic District or does it involve a ^Yes ®No ^NA National Register listed or eligible property? <Form continues on next page> m. (i) Are there wetlands on the site? ®Yes ^No (ii) Are there coastal wetlands on the site? ~~~~ ®Yes ^No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ~ ®No (Attach documentation, if available) , ,~ Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit n. Off-site/community septic system. o. Describe existing drinking water supply source. Hackers Island Water Sanitary District provides drinking water. p. Describe existing storm water management or treatment systems. Stormwater sheet-flow into Brooks Creek. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ^Commercial ^PubliGGovernment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Project will serve asingle-family residence located on the site. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. One excator on a barge will perform the dredging and will be stored in Brooks Cree k at night. One barge with pile-driving equipment and working platform will install the boat lift pilings. d. List all development activities you propose. Installation of boat lift and dredging of an access channel to connect to previously dredged channel. e. Are the proposed activities maintenance of an existing project, new work, or both? new f. What is the approximate total disturbed land area resulting from the proposed project? n/a ^Sq.Ft or ^Acres g. Will the proposed project encroach on any public easement, public accessway or other area ^Yes ®No ^NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Stormwater sheet-flow into Brooks Creek. i. Will wastewater or stonnwater be discharged into a wetland? ^Yes ®No ^NA If yes, will this discharged water be of the same salinity as the receiving water? ^Yes ^No ®NA j. Is there any mitigation proposed? ^Yes ^No ®NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additionallnformation In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the pres t f the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawin uish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Daniel H. and Shelia McKay Phone No. Address Box 1191 E NC 24, Kenansville, NC 28349 Name Nancy Ann Baker Phone No. Address 115 Maxwell Drive, Hackers Island, NC 28531 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A search of records at Carteret County and the Division of Coastal Management produced no record of LAMA permits for the site. Off-site Septic Permit 95-17 issued to Mr. Roger Melville on 8/13/1996. h. Signed consuRant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date ___1~~[~-~7 Od rf Print Name _Kathy B. Vinson Signature / ~ ~/~12t~•v~- -u:.: >~ Please indicate application attachments pertaining to your proposed project. '~ ~+~ :a ®DCM MP-2 Excavation and Fill Information ^DCM MP-5 Bridges and Culverts ~~~,,~' pDCM MP-3 Upland Development "' ®DCM MP-4 Structures Information O Form DCM MP-1 (Page 5 of 5) APPLICATION for Major Development Permit ~~~ ~~ .~~~~ ~s~ PROJECT DESCRIPTION Segrave Properties, LLC 117 Maxwell Drive Harkers Island, NC Carteret County The proposed project will serve an existing single-family residence located at 117 Maxwell Drive, Harkers Island, North Carolina. The project site is located adjacent Brooks Creek in the Harkers Point subdivision. An existing 200' pier with platform and one boatlift were previously installed at the site. The project consists of installation of a second boatlift and excavation of an access channel and additional dredging to accommodate the existing dock, lift, and proposed lift facilities. The proposed access channel will connect to a recently dredged channel located west of the Segrave property. The existing channel provides access to the Harbor of Refuge Channel for three properties west of the Segrave site as shown on the site plans. The proposed access channel will measure 47' by 20' increasing to 49'. The project includes additional dredging for better access to the existing dock, lift, and proposed lift facilities associated with the Segrave property. The area of additional dredging will measure 54' x 51' increasing to 57'. A boatlift measuring 12.5' x 12.5' is also proposed. The new boatlift will be installed on the west side of the existing dock and platform as shown on plan drawings. ~~;'- " ~ ~,` ~= ~~' O Thomas J. Segrave 3511 Warwick Drive Greenville, NC 27858 August 10, 2007 To Whom It May Concern: I hereby authorize Kathy Vinson, AICP and John Freshwater, PE to represent me and apply for CAMA perniits to develop my property located at 117 Maxwell Drive, Hankers Island, North Carolina. This authorization extends to all permits and authorizations required by Local, slate, and federal agencies that may be required as part of the permitting process. I also authorize release of information related to the project site to Ms. Vinson and Mr. Freshwater, including boundary surveys, topographic maps, and results of wetland delineation and soil permeability tests. If you have questions or need additional information, please contact me at 252-717-3332. Sincerely, Thomas .Segrave ~~~'.~ ~~,~~. ~~ Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel (NLW or Canal Boat Basin Boat Ramp Rock Groin Rock Breakwater (excluding shoreline NWL stabilization Length 47' n/a n/a n/a n/a n/a 54' Width 20' increasing n/a n/a n/a n/a n/a 51' increasing ' to 49' to 57 Avg. Existing _1 8 NLW n/a n/a n/a NA NA -1.8 NLW Depth . Final Project -4 0 NLW n/a nla n/a NA NA -4.0 NLW Depth . 1. EXCAVATION a. Amount of material to be excavated from below NHW or NWL in cubic yards. 326 cy c. (i) Does the area to be excavated include coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ®None (ii) Describe the purpose of the excavation in these areas: n/a ^This section not applicable b. Type of material to be exca mud and sandy material d. High-ground excavation in cubic yards. n/a 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area. Spoils to be placed in pre-approved spoil disposal site. c. (i) Do you claim title to disposal area? ^Yes ^No ®NA (ii) If no, attach a letter granting permission from the owner. e. (i) Does the disposal area include any coastalwetlands/marsh (CW) submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (VUL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ®None (ii) Describe the purpose of disposal in these areas: n/a ^This section not applicable b. Dimensions of disposal area. approximately 60' x 50' x 3' avg height d. (i) Will a disposal area be available for future maintenance? ^Yes ®No ^NA (ii) If yes, where? n/a f. (i) Does the disposal include any area i ater? ^Yes ®No ^NA ~~' (ii) If yes, how much water area is affected? ~~ n/a O ,~'' W '~, 3. SHORELINE STAB/LIZATION ®This section not applicable (If development is a wood groin, use MP-4 -Structures) a. Type of shoreline stabilization: ^Bulkhead ^Riprap ^Breakwater/Sill ^Other: c. Average distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level Bulkhead backfill Riprap Breakwater/S it I Other i. Source of fill material. b. Length: Width: d. Maximum distance waterward of NHW or NWL: f. (i) Has there been shoreline erosion during preceding 12 months? ^Yes ^No ^NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ^Yes ^No ^NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ^None (ii) Describe the purpose of the fill in these areas: I5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment wilt be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Excavated material will be trucked off-site. bucket to barge c. (i) Will navigational aids be required as a result of the project? d. ^Yes ®No ^NA (ii) If yes, explain what type and how they will be implemented. n/a (i) Will wetlands be crossed in transporting equipment to project site? ^Yes ®No ^NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. n/a Date/(/~~~a~ Project Name plicantture v ~~ Thomas Segrave ,4p plicant Name Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS ^This section not applicable a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public? ^Commercial ^PubliGGovernment ®Private/Community ^Yes ®No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ^Yes ®No (ii) Number 1 (existing If yes: (iii) Length 200' (ii) Number n/a (iv) Width 6' (iii) Length n/a (v) Floating ^Yes ®No (iv) Width n/a (v) Floating ^Yes ^No e. (i) Are Platforms included? ^Yes ^No f. (i) Are Boatlifts included? ®Yes ^No If yes: If yes: (ii) Number 1 existin (ii) Number 1 existing plus 1 proposed (total of 2) (iii) Length 10' on west, 15' on east (iii) Length 12.5' (proposed) (iv) Width 20' (iv) Width 12.5' (proposed) (v) Floating ^Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 2 ^ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 1 ^ Dockage, fuel, and marine supplies ®Dockage ("wet slips") only, number of slips: ^ Dry storage; number of boats: ^ Boat ramp(s); number of boat ramps: ^ Other, please describe: i. Check the proposed type of siting: ^ Land cut and access channel ®Open water; dredging for basin and/or channel ^Open water; no dredging required ^Other; please describe: k• Typical boat length: 20' - 26' m. (i) Will the facility have tie pilings? ^Yes ®No (ii) If yes number of tie pilings? n/a j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). open runabout I. (i) Will the facility be open to the general pu .® ^Yes ®No ~ . ~,.. 2. DOCKING FA- fCILITY/MARINA OPERATIONS ^This section not applicable W e 4 r r 7of ~opoS• %~ ~ C' dhs7f'ut f Q- ~t4/' ~'n a . U ~ r..,3 4 ., ~ ~a.l { '.. .._. _ , . -i .. _ -~~'3 a. Check each of the following sanitary facilities that will be included in the proposed project. ^ Office Toilets ^ Toilets for patrons; Number: ;Location: r/ /°" ^ Showers ^ Boathokiing tank pumpout; Give type and location: /! /O~ b. Describe treatment type and disposal location for all sanitary wastewater. n/a c. Describe the disposal of solid waste, fish offal and trash. n/a d. How will overboard discharge of sewage from boats be controlled? n/a e. (i) Give the location and number of "No Sewage Discharge" signs proposed. n/a (ii) Give the location and number of "Pumpout Available" signs proposed. n/a f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. n/a g. Where will residue from vessel maintenance be disposed of? n/a h• Give the number of channel markers and "No Wake" signs proposed. 0 i. Give the location offuel-handling facilities, and describe the safety measures planned to protect area water quality. n/a j. What will be the marina policy on overnight and live-aboard dockage? n/a k. Describe design measures that promote boat basin flushing? n/a I. If this project is an expansion of an existing marina, what types of services are currently provided? n/a m. Is the marina/docking facility proposed within a primary or secondary nursery area? ^Yes ®No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? O ^Yes ®No ~K'. ~. o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell `` ttoo~m (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ®CW 285 ^SAV ^SB ^WL ^None p. Is the proposed marina/docking facility located within or within close proximity to any she-Ifish leases? ^Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. n/a 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ^Commercial ^PubliGGovernment ^Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GRO/N (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6..MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): b. Number ^Commercial ^Public/Government ^Private/Community c. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines 37.5' to west, existing lift to east is located on riparian property line. Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body Brooks Creek is 1200' wide measured from applicant's shoreline to intersection of Brooks Creek channel and North River channel. e. (i) Will navigational aids be required as a result of the project? ^Yes ®No ^NA (ii) If yes, explain what type and how they will be implemented. n/a b. Proximity of structure(s) to adjacent docking facilities. 46' to west, 48' to eas,~ ~' >•*. °~, ~,:..r~~~ d. Water depth at waterward end of sfru ` NLW or NWL -1.8' NLW existin -4.0' NLW r 8. OTHER ®This section not applicable ,, ,., .i. ..~t~ ~ie.. .. -. ,,. y a. Give complete description: ~~/ /~ z Date Project Name Thomas Segrave plicant Name ~ f~ plic nt Signatur 4'=~ ~ wti '~" ';~,Q'''d ~! ,