January 16, 2008
08-0173
MEMORANDUM:
TO: Ms. Cyndi Karoly
Environmental Biological Supervisor
Division of Water Quality
FROM
SUBJECT:
Applicant:
Project Location:
Doug Huggett
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Camp Albemarle
156 Albemarle Drive adjacent to Bogue Sound, Morehead City, Carteret
County
Proposed Project: The applicant is proposing to remove 12 existing slips and pier, then relocate
west of existing pier, keep existing mooring buoys in original location,
construct new 6'x500' pier, 24'x24' platform, 8'x48' fmger pier, two mooring
buoys, one jet ski lift and 9 sunfish lift which would total the original 25 slips.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
2/6/2008. If you have any questions regarding the proposed project, please contact
Heather Styron at (252) 808-2808. When appropriate, in-depth comments with supporting data are
requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
400 Commerce Avenue, Morehead City, North Carolina 28557
SIGNED Phone: 252-808-2808 \ FAX: 252-247-3~~'~ternet: www.nccoastalmanagement.net
Q~c~~oe~~
JAN 1 8 p008
D~IR - WA7tk uUHUi'r
~DSANO STORMWATER E3RANf.H
An Equal Opportunity \ Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper
M~4.J~~ PI±J~IIT FEF IVIATRI~
"~i.~'~'.~ :-'.r:~i~r.~.L~'.`rI.R! ~'s"0~'.dt+'. FIT.°Ti~i~~'x"iY?~' 'yi~.::~~=dl4 c = _ 3'iw~S::1T.L3
~eloction Deveiopn'~en`. Type ` Fee DCM % i:)bNG~ °i~
(14300 16(!1 435100093 1625 6253) (24300 1602 43510009 2341)
I. Private, non-commercial
development that does not $250 100% ($250) 0% ($0)
involve the filling or
excavation of any wetlands
or o en water areas:
If. Public or commercial
development that does not $400 100% ($400) 0% ($0)
involve the filling or
excavation of any wetlands
or o en water areas:
III. For development that
involves the filling and/or
excavation of up to 1 acre
of wetlands and/or open
water areas, determine if A, .
B, C, or D below a lies:
III(A). For Private non-
commercial development, if $250 100% ($250) 0% ($0)
General Water Quality
Certification No. 3301 (see
attached can be a lied:
ILI(B).-For public or
commercial development, if $400 100% ($400) 0% ($0)
General Water Quality
Certification No. 3301 (see
attached can be a lied:
III(C}. If General Water
~' Quality Certification No. $400 60% ($240) 40% ($160)
3301 (see attached) could
be applied, but DCM staff
determined that additional
review and written DWQ
concurrence is needed
because of concerns
related to water quality or
aquatic life:
III(D). If General Water
Quality Certification No. $400 60% ($240) 40% ($160)
3301 (see attached) cannot
be a lied:
IV. For development that
involves the filling and/or $475 60% ($285) 40% ($190)
excavation of more than ,
one acre of wetlands and/or
o en water areas:
DIVISION OF COASTAL MA.~AGEMENT ~'
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Camp Albemarle, C/o Boyd Sprouse Marine Construction
2. LOCATION OF PROJECT SITE: 156 Albemarle Drive adjacent to Bogue Sound,
Morehead City, Carteret County
Photo Index - 2000: 41-516 grid (R-10)(S-10)
2006: 39-8048 grid (M-9)(L-9)
State Plane Coordinates - X: 2632534.586 Y: 361726.840 Rover # J121809A
LAT 34°43'31.68927 LON 76°53'41.01480
3. INVESTIGATION TYPE: LAMA
4. INVESTIG:~ TIVE PROCEDURE: Dates of Site Visit - 12/18/07
Was Applicant Present -Yes
5. PROCESSI~ G PROCEDURE: Application Received - 12/28/07
Office -Morehead City
6. SITE DESC;~IPTION:
(A) Local ; :end Use Plan -Carteret County
Land ( assification From LUP -Limited Transition/Conservation
(B) AEC( Involved: Public Trust Area, Estuarine Water
(C) Water ~ependent: Yes
(D) Intend 'Use: Private
(E) Waster .;ter Treatment: Existing - On-site Septic Systems
Planned - N/A
(F) Type o Structures: Existing - 13 mooring buoys, twelve existing lifts to be
removed, existing pier to be removed
Planned - 24'x24' platform, 6' x 500' pier, 8'x48' finger
pier, two new mooring buoys and 10 boatlifts to replace 12
existing slips that are to be removed
(G) Estima ~d Annual Rate of Erosion: N/A
Source N/A
7. HABITAT D~:SCRIPTION:
T1RF.T)[rF.T) FTT.T.F.TI (1TNF.R
(A) Open Water N/A N/A 4470 ft2 Incorp.
3960 ftz Shaded
(D) Total Area Disturbed: 8430 ft2
(E) Primary Nursery Area: No
(F) Water Classification: SA, ORW Open: Yes
Camp Albemarle
Page 02
8. PROJECT SUMMARY: As it stands there are 25 existing slips on this property and an
existing dock. The applicant is proposing to remove 12 of the existing slips and the existing pier,
which would then be relocated west of the existing pier area. They are proposing to keep the
existing mooring buoys in their original location, construct a new 6'x500' pier, 24'x24' platform,
8'x48' finger pier, two mooring buoys, one jet ski lift and 9 sunfish lifts which would total the
origina125 slips.
9. IV'arrative Description:
The Camp Albemarle project is located at 156 Albemarle Drive in Morehead City, Carteret
County. The site is found by turning south off of Highway 24 East onto Albemarle Drive. The
site lies on the northern side of Bogue Sound in this area.
The subject property is 29.85 acres in its entirety and averages 6.06' in elevation above
NHW. Currently on the high ground portion of the site are seven cabins, bathhouse, dining
hall, lodge, pool, 2single-family homes, basketball court and office. This is used as a camp
retreat for kids. Extending off the high ground there is an existing bulkhead, which defines
the NHW contour, an existing pier and platform. The existing pier, platform and lifts are
being proposed for removal. The high ground portion of the track is vegetated mostly with
Live Oak (Quercus vir ing iana).
There are significant SAV resources throughout this area of Bogue Sound. During the site
visit there were SAV's located in the proposed new pier area. However, the plat dated
11/2/2007 gives an accurate location of observed SAV beds and the proposed location of the
lifts would be located outside of the SAV bed areas. The shoreline has a total length along the
NHW line of 1120 ft. There are single-family homes located to the east of the proposed
project with private docks.
The Division of Water Quality classifies this area as SA, ORW waters. This area is not a
Primary Nursery Area. This portion of Bogue Sound is not closed to the taking of shellfish.
Morehead City's Land Use Plan dated 1999 classifies this area as Limited
Transition/Conservation within the AEC's. Substrate composition is mostly sand. There are
no shellfish leases within 2 nautical miles of this area.
10. Proiect Description:
In order to obtain deeper water and to keep out of existing SAV beds the applicant is
proposing a 6'x500' pier with a 24'x24' platform, 8'x48' finger pier, two mooring buoys.
There is one boatlift for a jet ski located at 512' from the existing bulkhead and nine boatlifts
for sunfish starting at 405' from existing bulkhead are also being proposed. Water depths
around the proposed lift areas range from -1.5'-2.0' at NLW, however in order to maintain
and protect the SAV beds which end at 390' from the existing bulkhead the applicant is
proposing the lifts to start at 405' from the existing bulkhead. Bogue Sound is approximately
1 mile wide in this area and the dock would extend a total of 572' into the water body from the
existing bulkhead. The two replaced mooring buoys will be located at 550' from the existing
bulkhead with the first located 60' west of the proposed pier and the second at 110'. They are
proposing afifty-foot radius for two 19' flying scots at an average depth of -2.3 ft at NLW.
Camp Albemarle
Page 03
Substrate composition is mostly sand. Riparian lines are drawn 90° from the channel and
appear to coincide with aerial photography showing the channel configuration.
The dock would be located several hundred feet from the 80' AIWW channel setback.
11. Anticipated Impacts:
The proposed installation of the new boatlift, mooring buoys and pilings would result in
temporary turbidity. The docking facility would incorporate 4470 ft2 of open water and shade
4470 ft2 of open water. There should be no hazard to navigation resulting from this project, as
the proposed dock would be located several hundred feet from the existing channel. No
coastal marsh would be filled or excavated during this project. There is not a potential to
impact SAV's with docking ingress and egress with the new mooring buoys and lifts as long
as they are located as shown on plan view dated 11/2/07.
HEATHER STYRON Morehead City January 8, 2008
~~~
.-V..r
~~
NCDENR
North Carolina Department of Environment and Natural
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director
MEMORANDUM:
TO: DOUG HUGGETT
FROM: HEATHER STYRON
THROUGH: TERE BARRETT
Resources
William G. Ross Jr., Secretary
SUBJECT: COMMENTS & RECOMMENDATIONS - CAMA MAJOR PERMIT-
CAMP ALBEMARLE, 156 ALBEMARLE DRIVE NEWPORT
DATE: 1 /14/08
The following are my comments and recommendations regarding the aforementioned
proposal. The proposal is to construct a 6'X500'pier, a 24'x24' platform, an 8'x48' finger
pier extending into bogue sound, 2 mooring buoys and 10 boatlifts. The original docking
facility had 25 existing slips; 13 existing mooring buoys and 12 Lifts. The applicants have
proposed to remove the existing dock and 12 of the exiting slips to be relocated west of
this original area. The 13 existing mooring buoys would remain in the same location.
There would be a total of 960ft2 of platform space for the entire docking facility on a
shoreline of 1120 feet. In accordance with 15A NCAC OOH 0208(b)(6)(D), this square
footage is allowable on the 1120' shoreline. The dock would extend a total of 572' into
the 1-mile plus water body. Numerous field visits and location of the proposed dock
indicate that SAWS would not be disturbed if all lifts are located as shown on plan view
dated 11/02/07. There should be no hazard to navigation as the proposed dock would
be located several hundred feet from the established channel. Only six inches of water
depth is gained from 400' to 500', however in order to protect the existing SAV beds a
pier would need to extend past 400'. In accordance with 15A NCAC 07H 0208(b)(6)(K)
piers longer than 400 feet shall be permitted only if the proposed length gives access to
deeper water at a rate of one foot per 100 foot increment of pier length longer than 400
feet, or if additional length is necessary to span some obstruction to navigation.
Therefore, I recommend the project be authorized as proposed, contingent upon the
following conditions:
1. This permit authorizes only the docks, piers, and other structures and uses
located in or over the water that are expressly and specifically set forth in the
permit application. No other structure, whether floating or stationary, may
become a permanent part of this docking facility without permit modification. No
non-water dependent uses of structures may be conducted on; in or over public
trust waters without permit modification.
2. Any portion of the permitted access pier and docking facilities built over coastal
wetlands must not exceed six feet in width and must be elevated a minimum of
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808 \ FAX: 252-247-3330 \ Internet: www.nccoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper
three feet over the wetland substrate as measured from the bottom of the
decking.
3. No attempt will be made by the permitted to prevent the full and free use by the
public of all navigable waters at or adjacent to the authorized work.
4. The authorized structure and associated activity must not cause an unacceptable
interference with navigation.
5. The permittee will maintain the authorized work in good condition and in
conformance with the terms and conditions of this permit. The permittee is not
relieved of this requirement if he abandons the permitted activity without having it
transferred to a third party.
6. This permit authorizes a maximum of 12 new boat slips. The restriction of the
number of vessels shall apply to all marine vessel types, including but not limited
to motorboats, sailing vessels and personal watercraft.
7. This permit does not authorize the excavation or filling of any vegetated wetlands
or open water areas.
8. Any piles driven through SAV's shall be started with posthole diggers through the
root mat.
9. This permit authorizes a maximum of 25 total boat slips. The restriction of the
number of vessels shall apply to all marine vessel types, including but not limited
to motorboats, sailing vessels and personal watercraft.
Cc: Tere Barrett, DCM
Ted Tyndall, DCM
Dave Timpy, COE
~ ACM M!-1
APPLICATION for ~-
Ma~or Development Permit ~~~~ ~~~~ ~~~
(last revised 12127/06)
~ 8- 0 1 7 3 North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name Project Name (if applicable)
Camp Albemarle Camp Albemarle Pier
Applicant 1: First Name MI Last Name
Robert W. Vodra
Applicant 2: First Name MI Last Name
William Farrior
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address PO Box City State
156 Albemarle Drive Newport NC
ZIP Country Phone No. FAX No.
28570 USA 252 - 726 - 4848 ext. 252 - 726 - 0621
Street Address (if different from above) City State ZIP
Email
robert@ca m pal bemarle.org
2. AgenbContractorlnformation
Business Name
Boyd R. Sprouse Marine Construction
AgenU Contractor 1: First Name
Boyd MI
R. Last Name
Sprouse
AgenU Contractor 2: First Name MI Last Name
Mailing Address
Boyd Richard Sprouse PO Box
93 City
Bath State
NC
ZIP
27808 Phone No. 1
252 - 293 - 0045 ext. Phone No. 2
252 - 945 - 1978 ext.
FAX No.
252 923 0045 Contractor #
Street Address (~f different from above) City State ZIP
Email
<Form continues on back>
1 . ~.
~(°n' ~ i"m"^
t i1 4'
]
y
,
'~lill'~~ '
j3
l`~ + ~ ~ ~ 5 ~ '$
A
,,
n
~
~ .,
>.~
.,:yiy
y :~
~.~ ., '? 3 by _ _ , ., -. LL . . ,~ ,„ ,
corm DCM MP-1 (Page 2 of 4)
Y ~ ~ aea~
y~~~
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple) Street Address ~~ ~ ~~t°~ ~t ~~~`~~ _~~1;,-r.
~
~ State Rd. #
Carteret 156 Albemarle Drive
~
~ 1143
Subdivision Name City State Zip
N/A Newport NC 28570 -
Phone No. Lot No.(s) (~f many, attach additional page with list)
252 - 726 - 4848 ext. N/A, ,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
White Oak Bogue Sound
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
®Natural ^Manmade ^Unknown Atlantic Ocean
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
^Yes ®No work falls within.
Carteret County Planning and Zoning
4. Site Description
a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.)
1120 1,300,266 (29.85 acres)
c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or
N/A, NWL (normal water level)
(If many lot sizes, please attach additional page with a list) 6.06 (at 75 feet from shore) ®NHW or ^NWL
e. Vegetation on tract
grass, oak and pine trees
f. Man-made features and uses now on tract
7 cabins, bathhouse, dining hall, lodge, shelter, pool, 2 houses, office, basketball court, existing pier, used as a camp and
retreat locataion.
g. Identify and describe the existing land uses adjacent to the proposed project site.
Residental houses
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
CC (Attach zoning compliance certificate, if applicable)
®Yes ^No ^NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ^Yes ®No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ^Yes ®No ^NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ^Yes ®No ^NA
National Register listed or eligible property?
<Form continues on next page>
APPRl1+"'^
M~ .
corm DCM MP-1 (Page 3 of 4)
APPLICATION for
F ~~~ j ~'~ Major Development Permit
' ~`;
-~
m. (i) Are there wetlands on the site? ~ f T , "Yes ^No
:~~L. ~ ~ fro;
(ii) Are there coastal wetlands on the site? ®Yes ^No
(iii) If yes to either (i) or (ii) above, has a delineation been con~~!'`t j ~~ ~~ ~~es ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Septic systems
o. Describe existing drinking water supply source.
West Carteret Water Corp
p. Describe existing storm water management or treatment systems.
none
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ^Commercial ^PubliGGovernment
®Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The pier will be used by campers during summer programs and retreat groups in the non-summer months. The boat lifts will
be used to store boats duing our 10 week summer camp. The pier will allow campers to get to boating area without walking
through SAV's (to protect them), and during the non-summer will be used mainly for sitting or small worship services by
retreat groups.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Machine Driving on Barge and working from shore, equipment will be stored on shore or on barge (which will be brought to
deeper water when not in use).
d. List all development activities you propose.
Pier 6' x 500', 24' x 24' platform, Step down (finger) 8' x 48', Sunfish storage racks (9) off side of pier, jet ski lift, two new
moorings/ bout's for Flying Scots (19 foot sailboat), new steps from shore into water
e. Are the proposed activities maintenance of an existing project, new work, or both? Existing mooring bout's will remain,
current pier and boat lifts (12) will be
removed. Pier, 2 moorings, 10 boat
lifts and steps are all new construction
f. What is the approximate total disturbed land area resulting from the proposed project? 0 ®Sq.Ft or ^Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ^Yes ®No ^NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
No discharge of water to occur, most of property is permeable grass covered. No change planned.
i. Will wastewater or stormwater be discharged into a wetland? ^Yes ®No ^NA
If yes, will this discharged water be of the same salinity as the receiving water? ^Yes ^No ®NA
j. Is there any mitigation proposed? ^Yes ®No ^NA
If yes, attach a mitigation proposal.
~ R~~l
... l x. t~~„dd-Y,`~''~'m fit: .p e~i ~;.~~;-i , r, ~~.i s, `: ~::: C' .3 .u}»? ., c~'.1 ;_ 3 ~„3 .. is ..,,.,. .y
Form DCM MP-1 (Page 4 of 4) j ; ~ ' ' , t ~, '~ ~ ~,.~ i + ' , PPLICATION for
r ~, ~~. Y ~
~~'-~ ~ ~r evelopment Permit
~~" ~" ,"~: i ~ ~'
<Form continues on back>
6. Additional Information '.~~ ; ~~ ~~, ~ ~ ~,~ a ~ ' ` ~~
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) - (t) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Don Waddell Phone No. 703-493-1022
Address 9708 Spanish Oak Court, Fairfax, VA 22039
Name note: all adjacent property owned by Don Waddell Phone No.
Address
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
Bulk head Permit SAWC078-N-025-0080 (4-1-88)
Former Pier CESAW-C080-N-000-0291 (2-24-95) CAMA 21-95
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
~ 7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge
Date~.Z o ecember 18, 2007 Print Name _Boyd R. Sprouse
Signature
Please indicate application attachments pertaining to your proposed project.
^DCM MP-2 Excavation and Fill Information ^DCM MP-5 Bridges and Culverts
^DCM MP-3 Upland Development
®DCM MP-4 Structures Information
APPROla'~
Forrri DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
~~ '~'~ ~
~~~~~~ ~~
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facility/marina:
^Commercial ^PubliGGovernment ®Private/Community
c. (i) Dock(s) and/or pier(s)
(ii) Number 1
(iii) Length 500'
(iv) Width 6'
(v) Floating ^Yes ®No
e. (i) Are Platforms included? ®Yes ^No
If yes:
(ii) Number 1
(iii) Length 24'
(iv) Width 24'
(v) Floating ^Yes ®No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
25 at end of oroject
(ii) Number of slips existing
25 (12 exisiting will be removed and relocated in our
construction)
i. Check the proposed type of siting:
^ Land cut and access channel
^Open water; dredging for basin andlor channel
®Open water; no dredging required
^Other; please describe:
k• Typical boat length: 14' - 19'
m. (i) Will the facility have tie pilings?
^Yes ®No
(iii-lf yes number of tie pilings?
^ This section not applicable
b. (i) Will the facility be open to the general public?
^Yes ®No
d. (i) Are Finger
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating
Piers included? ®Yes ^No
1
48'
8'
^Yes ®No
f. (i) Are Boatlifts included? ®Yes ^No
If yes:
(ii) Number 10
(iii) Length 6' - 9'
(iv) Width 4' - 5.5'
(1) 6'x4' Jet ski lift. (9) 9' x 5.5' Sunfish lifts
h. Check all the types of services to be provided.
^ Full service, including travel lift and/or rail, repair or
maintenance service
^ Dockage, fuel, and marine supplies
® Dockage ("wet slips") only, number of slips: 25
^ Dry storage; number of boats:
^ Boat ramp(s); number of boat ramps:
^ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
Sunfish sailboats. 1 jet ski, 19' Flving Scot Sailboats
I. (i) Will the facility be open to the general public?
^Yes ®No
APPROr"^
r.
< C y~~.a 7fu`~,.. ica '~ ~'a...
r ~ _- L.. 1_! .. _
2. DOCKING FACILITY/MARINA OPERATIONS yam: ~ ection not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
^ Office Toilets
^ Toilets for patrons; Number: ;Location: Toilets and showers exisiting on site, not part of proposed project
^ Showers
^ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
existing speptic systems on site
c. Describe the disposal of solid waste, fish offal and trash.
Trash cans and dumpster on site
d. How will overboard discharge of sewage from boats be controlled?
no boats will have heads only sunfish and flying scot sailboats, N/A
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
N/A
(ii) Give the location and number of "Pumpout Available" signs proposed.
N/A
f. Describe the special design, if applicable, for containing industrial type po-lutants, such as paint, sandblasting waste and petroleum products.
N/A, no boat maintenance done
g. Where will residue from vessel maintenance be disposed of?
N/A, no boat maintenance done
h• Give the number of channel markers and "No Wake" signs proposed. 0
i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality.
N/A no fuel handling facilities
j. What will be the marina policy on overnight and live-aboard dockage?
No overnight sleeping on boats allowed
k. Describe design measures that promote boat basin flushing?
Open water flushing
I. If this project is an expansion of an existing marina, what types of services are currently provided?
Currently have 12 lifts for sunfish and 13 existing mooring buoys for holding boats when setting up, or during breaks.
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
^Yes ®No ~ ~~~ ®~
-. .: .. .-;'y {.'9~ h«+~,',;`L3 i~C'7 ~+' .. v .t,.,:. .r2: _ ~,. ~W £7+d.af •., ,l „_ _. _ ,-
..:
s~ ,~t~ ( ~,t;
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
®Yes ^No ea ~ ~'~' ,~/
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (V1IL)? If any boxes are checked, provide the number of square feet affected.
^CW ®SAV ADJ ^SB
^WL ^None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ^Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
checked with Division of Marine Fisheries on Dec. 18, 2007. Closest lease is located over 2 Nautical Miles from proposed
project (between Broad Creek and Sander's creek, on Bogue Banks side of sound)
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
^Commercial ^PublidGovernment ^Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable
a• (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable
a• Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS
a. Is the structure(s):
^Commercial ^Public/Government ®Private/Community
^This section not applicable
b• Number 13 currently, 15 at end of proiect
c. Distance to be placed beyond shoreline 550' for our 2 new d
erooosed moorings. exisiting 420' - 570' from shore in a
grid oattem
Note: This should be measured from marsh edge, if present.
Description of buoy (color, inscription, size, anchor, etc.)
13 existing white and blue buoys held by stainless steel
anchor bolts. These are existing and only used for
temporary mooring in preparing boats for sailing
mornings, and between groups
We want to add two additional buoys to anchor our two
Flying Scots for our 10 week summer season
e. Arc of the swing 50' for new buovs
APP~p,
., ~ ~ .. -~_,.~~~-~~s~~ ~ _ - ~_ .~z,.~,~,~_ .
~.._ .x ,
_~ _ ,.tan. ~_'~° _.~. ~" ..a .. _ - _
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
563'
r~.• ~ ~ 1
,~ ` ri
N
P ~ ,
fy~'V ~~ J ~1 ~~iY~
b. Proximity of sttucfiire(s) to adjacent'doc~kmg faciii~ie§.
632'
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body
2.37 N.M. (625 yards from land to channel)
/?~'~
d. Water depth at waterward end of structure ~NLV1(or NWL
2.5' NLW
e. (i) Will navigational aids be required as a result of the project?
^Yes ®No ^NA
(ii) If yes, explain what type and how they will be implemented.
8. OTHER ^ This section not applicable
a. Give complete description:
December 18, 2007
Date
Pier at Camp Albemarle
Project Name
Boyd R. Sprouse
Applicant Name
Applicant Si atu~e
~~ O " ~~ /$ ,2~e7
4PPp0yE~c
. ~~~-8~~ 'al~~~"3..~~;~' ..:r P:vy.a:a~C.C=.~s'_ ~saK;c~ *a,.-- _,
i ~ i
~~ ~ i
~~
~ ~ ~ ~~ ~
\ /\ 1\
~ i ~ i ~
\ ~
/ ~
\
( ~
~ '
4 ~ ~
~
_
/
~ ~,
a
~
/_ ~ ~
/ ~ ~ \
~ ~~ ~( 8z ~ ~ ~ ~
/~ /~ ~ ~
~
/ / \ / ~
/
/ , ~
/ ~
~/ ~
~/ ~
~
~" am:
,
..~ .. ~1 . ...
~ ~.~. jj~ g
~r5,3
S
~.:
s
f ~A~
J
C ~'.
7~
V
3
W
0
o r
m ~ o
N
O
m
~ m
W
Z Z
(n Q ~
W ~ Q
~ ~ ~
/ ~ ~/ ~
1
~` r
~~ ~
ti
.~ ~-
sYf ~
,._ o
~~ o
~
.,~` o
~ ~ °~ ~
s
3
i i
t
1 ~."1
.,:~.J g Y
~
/
~
[
~
z C
'.J
Q
(~ n _7 ~~
~ ~
V+
~~
cfl
O ~ ~-
r~
N °Z
c
°~ r
q
~ ,s c
~~ t
mo c?:
Y
~~
~ N
m
`W
n~
{~.
4 ___I
~ ~
W
0
QQ
Q
~ - V
g-
h
W
Z
_ ~
N
z
0
o w 3
o g
8 ~ z ~~
M1 ~ ~ ~ ~ ~
~~~ ~~~
.L J~
`~'~ yl3 ~Y a
": NC'~ a a
0
w z ~/
Q Uzi
~°~ ~ o
Q~~ ~ ~~
W~~ g ~~ ~~
m~z ~
z~
Q~
~~ o ~~
^o ~ z~
~ ~~ o~
U
o
ti
O
o .+..~
N
^~
~ W
Z =
m
L
0
.o
m
Y
N
~
ci I:.i
o ~ ~
j..j~
',
L
:V
._-~
.y~ ~~
~, 0
L
~
^ _
~ -~
~
0
Z i i i
i ?
a Ivl 1
Ivi ~
a
m _ ~
_~
`' s
~
n ~
\ ~
I~i i~i ~~
NJ ~
~~~
^, •~1 Z
~~ I Iv
t
0
C
~~~
UI_
k
1 N I
B
z
wy
3
~~
0
00
~~
n
153M
V
Z
7
a
1
Y~
C~
G
'!
`i ..
L
s
°m°
~~a
i
~a
~w
amp
z°N ~
y W
a
W~v }}
F
~~ Z
~
a ~$~
3
0
U~
V
e e I I
I F
C~
y
W
a=
<o
00
5
°o
('r,,
r
r
~_
{
4'X
~.
~ti~
~~
W
(n
[n
m
m
0
w
z
w ~ Q
0 0 0