Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout[External] USACE Determinations: No Permit Required & Approved JD / SAW-2024-01783 Mebane Mixed-Use Development / Alamance County NCBaker, Caroline D
From:
Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil>
Sent:
Thursday, January 16, 2025 1:47 PM
To:
Brian E. Hecke; Michelle Savage-Measday, PWS
Cc:
Pam Tutten; Chandler, Rebecca D; Wooten, Samantha
Subject:
[External] USACE Determinations: No Permit Required & Approved JD /
SAW-2024-01783 Mebane Mixed -Use Development / Alamance County NC
Attachments:
USACE-NPR-AJD-MFR_SAW-2024-01783jt_01.16.25.pdf
Importance: High
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Brian,
Please see the attached letters regarding USACE ACTION ID SAW-2024-01783 the Mebane Mixed -Use Development
Project in Alamance County North Carolina.
In summary:
The work as proposed does not involve regulated activities within
jurisdictional wetlands and/or other jurisdictional waters of the United
States (per the attached Approved Jurisdictional Determination for the site); therefore, a DA permit is not required.
The Corps now considers this project file SAW-2024-01783 processed and closed.
Please let me know if you have questions/concerns.
Thank you,
Julia Tillery
Regulatory Specialist, Raleigh Regulatory Field Office
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Mobile: 919.440.1951
Email: Julia.A.Tillerv@usace.army.mil
1