Loading...
HomeMy WebLinkAbout20070332 Ver 2_More Info Received_20080123 ARCADIS Infrastructure, environment, facilities Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Subject: DWGl Project # 07-0332 Neuse River Basin Riparian Buffer Approval, GS Plantation Point, LP; Raleigh, Wake County, North Carolina Dear Sir/Madam: Please find attached five copies of the additional information that was requested relative to the above referenced project. The attachments include the City of Raleigh's approval of the stormwater management plan, site plans at a scale of 1" _ 50', and level spreader details at a scale of 1" - 20'. If you have any questions or require additional information, please contact me at (919) 854-1282. Sincerely, ARC~DIS G&M of N9rth~a[olina, Inc. ~ }~ ~~ ~ ~~ rnda Diebo "~, Senior Scientist copies: Jon Callahan -John A. Edwards & Company Todd Wigfield - Greystar Development Group, LP ARCADIS G&M of North Carolina, Inc. 801 Corporate Center Drive Suite 300 Raleigh North Carolina 27607 Tel 919.854.1282 Fax 919.854.5448 www.arcadis-us.com WATER RESOURCES Date: 22 January 2008 Contact: Linda Diebolt Phone: 220 Email: Idiebolt C~ arcadis-us.com Our ref: NC707012.0000 JAN 2 3 2008 DENk - NVA~'EFi QUAUTI' VdETLANDS AND STtaRbM1AT'ER BRANCH ~~ of Mew City of Raleigh Public Works Stormwater Engineers Date: January 11, 2008 To: North Cazolina Division of Water Quality/401 Section 512 N. Salisbury St. Raleigh NC, 27604 (919)733-5083 1617 Mail Service Center Raleigh, NC 27699 Re: Stormwater Management Plan approval by City of Raleigh To Whom It May Concern: JAN 2 3 2008 t3ENR - ~JA1~k QUAtJT1` VNET11WaS AND STQF2MWATER BRAtd(~ The stormwater management plan (SMP) for Plantation Point Apartments 5-70-2007 (dated Ol/03/08~ has been reviewed and approved by the City of Raleigh for compliance with our stormwater requirements. This approval is for the purpose and design that you show in the above referenced plans. If the SMP changes this approval is voided and the applicant will be required to request a new approval letter. No disturbance of the Neuse River Buffer will be permitted on the above referenced projects until the City of Raleigh receives verification of approval and issuance of buffer permit(s) by NCDWQ. Should you have\an~y questions, please contact me at (919) 516-2155. Gary Lee Morton, PE Senior Stormwater Engineer City of Raleigh Public Works/Stormwater Management POB 590 Raleigh, NC 27602-0590 email: gary.morton(c~ci.ralei hg nc.us phone: (919)-516-2155 FAX: (919)-516-2681 219 Fayetteville St. PO Box 590, Raleigh, NC 27602 Voice (919) 516-2155 fax (919) 516-2681