Loading...
HomeMy WebLinkAbout20070487 Ver 1_More Info Letter_20070327T .~ ~i, n;ce:~~+ar°~s*w~ ~, ~ ,. ,,. - ,, . ~'P' ' x. ok, ±~' x ear ~ d~"'s a:s.''; - ,jtj ~ z ~'-^ ~, _,.~ Michael F. Easley, Governor M1\ {~ .,;.. ~ ~, ~~e- ~.%' William G. Ross Jr_, Secretary =~ ~ ~ ~j ~ ~.-, ~ NorthGarolina Department oFEnvironment and Nah~raPResuurces ~ ~,~'' ~,~ '~ -.I ';. ,Y; ~ Coleen H: Sullins, Director Division-oY Water Quality December 18, 2007 Mr. J. B. Setzer, P.E. Division Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Subject: Inspection NCSR 1521 B & C, Onion Mountain Road DWQ Project No. 070487 Macon County Dear Mr. Setzer: On December 6, 2007, I visually inspected the construction work on NCSR 1521B & C, Onion Mountain Road. The inspection was only on the northern section of the road due to inaccessibility of the other section of road. Construction is well underway and some culverts have been replaced. Please continue to maintain the sediment and erosion control structures so that State surface waters can be protected. Please refer to the attached inspection report. If you have questions, please call me at 828.296.4500. Sincerely, ~~ Michael R. Parker Environmental Senior Specialist Attachment cc: Nlark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parker, Asheville Regional Office NorthCaroiina Division ot~ WaterQuzlity Internet: www.ncwaterquality.org 2090 U.S. Hi~;rway 70 Swannanoa, NC 28778 Phone (82.8).296-4500 Pr1X (828) 299-7043 An Eq~.tal Oppotturity!Atfirmative Action Employer One NorthCarolina ~i'~ttirra!!y Customer Service 1-877-623-6748 .., ~ DWQ Site Visits for DOT'Proiects Field Sheet DWQ representative: Michael R. Parker County: Macon DOT Division: Division l4 If no, estimated date of completion: Activity: X 401 Compliance Evaluation ^ Complaint ^DWQ Follow Up Evaluation ^ Other DWQ 401 #: 07-0487 NW Permit #: IP #: Project Name: Onion Mountain Road Location of Project: From U S Highway 64 Northeast of Franklin turn onto NCSR 1513 and trave12.75 miles to NCSR 1521, Onion Mm. Road. Project Complete: ^Yes ~ X No Activities (DOT): ^ Bridge X^ Culvert ^ Bottomless Culvert ^ Bottomless Arch X^ Riprap Inlet/Outlet Stabilization ^ Spoil Pile ^ Borrow Pit ^ Wetland Mitigation ^ Stream Restoration ^ On-site Stream Relocation ^ Buffer Restoration ^ Bank Stabilization ^ Other Water~0uality Concerns (DW ^ Steam Standards Violation ^ Turbidity ^ Evidence of spills '" ^ Oil/Petroleum _ ^ Solid Waste . ^ Failed E & S control measures ^ Sedimentation Impacts ^ Stormwater Permit Violation ^ Fill ^ Buffer Impacts (see below) ^ Other Date: December 6, 2007 Region: Asheville Additional Wetland Impacts: ^ yes X^ no ^ Zone 1 .Est Acres Additional Stream Impacts: ^ yes X^ no Estimated linear feet of impact: Buffer Impacts Zone 1 Zone Z ^Neuse ^Yes ^No ^Yes ^No Buffer Designation: ^Exempt Estimated Acres ^ Zone 2 Est Acres Est Linear feet ^Tar-Pam ^Randleman ^Catawba Est linear ft/ acreage of buffer impact ~/ ac Est linear ft/ acreage of buffer impact ft/ ac ^Allowable ^Allowable w/mitigation ^Prohibited ~~'-'..i.~'; Name of Waterway(s) DWQ Site Visits for DOT Projects Background Info Unnamed tributaries to Laurel Creek and Laurel Creek Basin/ Subbasin: LTN 040401 Wetland Type: ^Isolated []Non-Isolated (Waters of US) Stream Class: ^Class B ^303d Listed ^WS-II ^WS-V ^SB X^Class C ^ORW ^Trout ^WS-III ^NSW ^HQW ^WS-I ^WS-IV ^SA ^CA Type of Authorized Impact: X^Culvert ^Bottomless Culvert ^Bridge ^Bottomless Arch X^Riprap Inlet/Outlet Stabilization ^Fill Authorized Wetland Impacts: ^0 - 1/10`'' acre ^ 1/11"' to 1/3rd acre X^1/37dto 1.0 acre ^> 1.0 acre Authorized Stream Impacts: X^< 150 linear feet ^> 150 linear feet Additional comments: Project is well under construction and only the northern section was reviewed. Some pipes have been extended. Continue work with appropriate sediment and erosion control devices and seeding. h